CENTRIFUGAL PUMPS
FORM # G-005 (5/09)SHT 1 of 1SAUDI ARAMCO PRE-COMMISSIONING FORMCENTRIFUGAL PUMPS
EQUIPMENT TYPE:USER REFERENCE:
EQUIPMENT TAG NO.:DESCRIPTION:
BI/JO NO.:PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.:SERIAL NO.:
COMMISSIONING DATE:
1.BASEPLATE LEVELED AND PROPERLY GROUTED.YES ___ NO ___2.JACKSCREWS REMOVED AND FOUNDATION BOLTS TIGHTENED.YES ___ NO ___3.SUCTION SCREEN INSTALLED. YES ___ NO ___4.PIPING STRAIN CHECKED.YES ___ NO ___5.FINAL COLD ALIGNMENT TO MANUFACTURER'S TOLERANCE.YES ___ NO ___6.PUMP AND DRIVER CHECKED FOR FREEDOM OF MOVEMENT.YES ___ NO ___7.DRIVER CHECKED FOR CORRECT ROTATION (UNCOUPLED)YES ___ NO ___8.BEARING HOUSING FLUSHED AND RE LUBRICATED.YES ___ NO ___LUBRICATOR FILLED AND OPERABLE.LUBRICANT ___________9.MOTOR BEARING LUBRICATION CHECKED YES ___ NO ___10.MECHANICAL SEAL OR PACKING INSTALLED. TYPE_______YES ___ NO ___11.COUPLING INSTALLED.YES ___ NO ___12.GUARD IN PLACE AND SECURED.YES ___ NO ___13.PUMP AND DRIVER DOWELED (WHEN SPECIFIED). YES ___ NO ___14.COOLING WATER PIPING INSTALLED (WHEN SPECIFIED).YES ___ NO ___15.SEAL FLUSH PIPING INSTALLED.YES ___ NO ___
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.APPROVALSSAPMTINSPECTIONOTHER DEPT.OPERATIONS
Signature & Date