BLANK Pre-Commissioning Form
FORM # J-011 (5/09)SHT 1 of 2SAUDI ARAMCO PRE-COMMISSIONING FORMTURBINE, POSITIVE DISPLACEMENT, AND MAGNETIC FLOW METERS
EQUIPMENT TYPE:USER REFERENCE:
EQUIPMENT TAG NO.:DESCRIPTION:
BI/JO NO.:PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.:SERIAL NO.:
COMMISSIONING DATE:
METER FACTOR:REPEATABILITY:
LINEARITY:
CHECKS TO BE PERFORMEDRESULT
PASSFAIL
SPIN METER TO CHECK FREEDOM OF MOVEMENT
VERIFY THAT MAGNETIC FLOW METER WILL ALWAYS BE LIQUID FULL DURING PROCESS OPERATION
CHECK METER RANGE AND SPAN
CHECK UPSTREAM AND DOWN STREAM PIPING FOR STRAIGHT RUN REQUIREMENTS
CHECK FLANGE TYPE AND RATING
CHECK DIRECTION OF FLOW
CHECK THAT INSTALLATION IS PER MANUFACTURER'S RECOMMENDATION
TABLE IS CONTINUED IN NEXT PAGE
OBTAIN 5 POINT MANUFACTURER CALIBRATION, LINEARITY AND REPEATABILITY CHECKS
CHECK METER MATERIAL
CHECK MANIFOLD CONFIGURATION
REMARKS:
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.APPROVALSSAPMTINSPECTIONOTHER DEPT.OPERATIONS
Signature & Date