Form No. P- 070 Issue Date: March 2006 Sheet 1 of 5 SAUDI ARAMCO PRE-COMMISSIONING FORM DIESEL ELECTRIC GENERATORS Equipment Type: User Reference: Equipment Tag No: Equipment Description: BI/JO No: Plant No. / Location: Ref. Drawings & Documents: Manufacturer: Model No: Serial No: Test Completion Date: FIELD INSTALLATION CHECK LIST VISUAL AND MECHANICAL INSPECTION Yes No 1. Inspect for physical damage. 2. Compare nameplate rating and connection with specifications and single line diagram. 3. Inspect for proper anchorage and grounding. engine cooling and fuel system integrity. ELECTRICAL TESTS Yes No 1. A dielectric absorption test shall be made on the generator winding with respect to ground. Record the polarization index. 2. Phase rotation test shall be made to determine compatibility with load requirements. 3. Protective relay devices shall be tested in accordance with the guide lines established in the commissioning procedures. 4. Engine shutdown features shall be function tested, low oil pressure, over temperature, over speed and any other features as applicable. 5. Perform vibration base line test. Amplitude vs. Frequency to be plotted for each main bearing cap or non-drive end bearing, as applicable. 6. Perform over potential test between winding to ground. Witness PDD Inspection Operation/Maintenance Contractor Signature & Date Copyright©Saudi Aramco 2009. All rights reserved.

SA-P-070

  • Upload
    mahdig

  • View
    219

  • Download
    2

Embed Size (px)

DESCRIPTION

precom

Citation preview

Form No. P- 070 Issue Date: March 2006Sheet 1 of 3

SAUDI ARAMCO PRE-COMMISSIONING FORM

DIESEL ELECTRIC GENERATORS

Equipment Type:User Reference:

Equipment Tag No:Equipment Description:

BI/JO No:Plant No. / Location:

Ref. Drawings & Documents:

Manufacturer:

Model No:Serial No:

Test Completion Date:

FIELD INSTALLATION CHECK LIST

VISUAL AND MECHANICAL INSPECTION

YesNo

1. Inspect for physical damage.

2. Compare nameplate rating and connection with specifications and single line diagram.

3. Inspect for proper anchorage and grounding. engine cooling and fuel system integrity.

ELECTRICAL TESTS

YesNo

1. A dielectric absorption test shall be made on the generator winding with respect to ground. Record the polarization index.

2. Phase rotation test shall be made to determine compatibility with load requirements.

3. Protective relay devices shall be tested in accordance with the guide lines established in the commissioning procedures.

4. Engine shutdown features shall be function tested, low oil pressure, over temperature, over speed and any other features as applicable.

5. Perform vibration base line test. Amplitude vs. Frequency to be plotted for each main bearing cap or non-drive end bearing, as applicable.

6. Perform over potential test between winding to ground.

7. Record voltage frequency, load current, oil pressure and coolant temperature during test. Voltage regulation, frequency stability and maximum temperature rise shall be calculated.

8. Perform resistive load bank test at one hundred percent (100%) name plate rating. Loading shall be 25% of rated for 30 minutes, 50% of rated for 30 minutes, 75% of rated for 30 minutes and 100% for 2-1/2 hours.

Test Data

GENERATOR NAMEPLATE DATA

ManufacturerMfg.'s, location

Serial No.Mfg.'s., order number

Purchasers order no.Year of manufacture

VoltageCurrent

FrequencyPhases

Rating: KW/KVAPower factor

Insulation classWeight

SpeedFrame

N.D.E. bearing no.Temperature rise

Field Voltage Field Current

Field Resistance - ohms.

Generator winding resistance

Phase 1 to 2 ohmsPhase 2 to 3 ohmsPhase 3 to 1 ohms

Insulation Resistance @ 500 volts

Ambient Temperature =_______________

1 Min2 Min3 Min4. Min5 Min6 Min7 Min8 Min9 Min10 Min

megohms

______megohms______megohms______megohms______megohms______megohms______megohms______megohms______megohms______megohms______

Winding Temp., o C0.010.020.030.040.050.060.070.080.090.0100.0110.0

Kt0.030.060.120.250.501.02.04.08.016.032.064.0

Correct for 50 o C. Rc= Kt x Rt; Rc = insulation resistance corrected to 50 C, Rt = insulation resistance at temp "t", Kt = insulation resistance temperature coefficient at temperature "t".

Polarization Index = Insulation resistance @ 10 min / 1 min= ______megohms / ______megohms =_____

GENERATOR LOAD TEST DATA

TIME - MINUTES AND

PERCENT LOADSTART0

25%30

50%60

75%90

100%120

100%150

100%180

100%210

100%240

100%

PHASE CURRENTA

B

C

Voltage/FrequencyA-B

B-C

C-A

% VOLTAGE UNBALANCE

N. D. E. BRNG VIBRATION

N. D. E. BRNG TEMP

AMBIENT TEMP

WINDING TEMP

WitnessPDDInspectionOperation/MaintenanceContractor

Signature & Date

CopyrightSaudi Aramco 2009. All rights reserved.