lahad datu kimanis OIL, GAS & ENERGY SECTOR EPP 1 : LAHAD DATU REGASIFICATION TERMINAL (LD RGT) EPP 2 : SABAH O&G TERMINAL (SOGT) AND SABAH - SARAWAK PIPELINE (SSGP) UPSTREAM/MIDSTREAM UPSTREAM/MIDSTREAM Key outcomes of the EPP / KPIs What needs to be done? Availability of natural gas supply at east coast of Sabah including Sandakan, Lahad Datu and Tawau (also along the route) Transfer of technology and knowledge to local manpower and contractors who are involved with this project Spurring the economy along the pipeline Construction period of LNG Storage Tank which is the critical path of the project (normally will take up to 24 months) Front End phase of a project, where activities are mainly focused towards project planning and contracting/bidding activities for the appointment of Frond End Engineering Design Consultant expected in mid-October 2011 Evaluate and finalize the land lease of the reclaimed land of the proposed site with POIC. Site Reclamation works is expected to start by Q1 2012 Key Challenges Mitigation Plan Transporting major equipment and bulk materials from Sandakan to Lahad Datu (~200km) Shortage of capable manpower due to simultaneous construction of LD power plant Available manpower are lack of re-gas terminal construction skills (special) Potential security threat with historical events of pirates attack towards workers and equipment Coordination for safety and evacuation during emergency with local authorities Improvement of the road condition from Sandakan to Lahad Datu or consider for permanent/temporary jetty at Lahad Datu Proper education planning to prepare and develop the skilled and semi skilled manpower Collaboration with state authorities to tighten the security along the coast lines Project Status SOGT: On-going construction SSGP: Land acquisition and pipe construction Key outcomes of the EPP / KPIs What needs to be done? Availability of natural gas supply at SOGIP and spur the huge potential of petro-chemical industry Transfer of technology and knowledge to local manpower and contractors who are involved with this project Spurring the economy along the pipeline Continue with the construction Continue with land acquisition and networking with Land and Survey Department of Sabah, UPEN Sabah and District Offices Key Challenges Mitigation Plan Acquisition of land for right of ways (ROW) Shortage of capable manpower and local contractors Potential security threat manpower and equipment towards workers and equipment from unhappy squatters Collaboration with Land and Survey Department to speedup the large number of documentations due to large number of private land owners Proper education planning to prepare and develop the skilled and semi skilled manpower Collaboration with state authorities to tighten the security along the coast lines Vaporization Station Berth Jetty LNG Storage Tank (0.76 MTPA) DESCRIPTION To develop a facilities to receive, store and vaporize imported LNG with a maximum capacity of 0.76 MTPA (up to 100 mmscfd) and supply the natural gas to the Power Plant DESCRIPTION 512 km Sabah Sarawak Gas Pipeline connects Kimanis to Bintulu (Pipeline in Sabah: 91.24km). A branch line will be constructed to cater for SOGIP in Sipitang Terminal to receive and process oil and gas from off shore (Kinabalu, Gamusut, etc) in Kimanis Oil Terminal: 2.5 mboe Gas Terminal: 1,250 mmscfd

Sabah Entry Point Projects

  • Upload
    ashq85

  • View
    118

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Sabah Entry Point Projects

lahad datu

kimanis

OIL, GAS & ENERGY SECTOR

EPP 1 : LAHAD DATU REGASIFICATION TERMINAL (LD RGT)

EPP 2 : SABAH O&G TERMINAL (SOGT) AND SABAH - SARAWAK PIPELINE (SSGP)

UPSTREAM/MIDSTREAM

UPSTREAM/MIDSTREAM

Key outcomes of the EPP / KPIs What needs to be done?• AvailabilityofnaturalgassupplyateastcoastofSabahincludingSandakan,LahadDatu

andTawau(alsoalongtheroute)• Transferoftechnologyandknowledgetolocalmanpowerandcontractorswhoareinvolved

withthisproject• Spurringtheeconomyalongthepipeline

• ConstructionperiodofLNGStorageTankwhichisthecriticalpathoftheproject(normallywilltakeupto24months)

• FrontEndphaseofaproject,whereactivitiesaremainlyfocusedtowardsprojectplanningandcontracting/biddingactivitiesfortheappointmentofFrondEndEngineeringDesignConsultantexpectedinmid-October2011

• EvaluateandfinalizethelandleaseofthereclaimedlandoftheproposedsitewithPOIC.• SiteReclamationworksisexpectedtostartbyQ12012

Key Challenges Mitigation Plan• TransportingmajorequipmentandbulkmaterialsfromSandakantoLahadDatu(~200km)• ShortageofcapablemanpowerduetosimultaneousconstructionofLDpowerplant• Availablemanpowerarelackofre-gasterminalconstructionskills(special)• Potentialsecuritythreatwithhistoricaleventsofpiratesattacktowardsworkersand

equipment• Coordinationforsafetyandevacuationduringemergencywithlocalauthorities

• ImprovementoftheroadconditionfromSandakantoLahadDatuorconsiderforpermanent/temporaryjettyatLahadDatu

• Propereducationplanningtoprepareanddeveloptheskilledandsemiskilledmanpower• Collaborationwithstateauthoritiestotightenthesecurityalongthecoastlines

Project Status

SOGT:On-goingconstruction

SSGP:Landacquisitionandpipeconstruction

Key outcomes of the EPP / KPIs What needs to be done?• AvailabilityofnaturalgassupplyatSOGIPandspurthehugepotentialofpetro-chemical

industry• Transferoftechnologyandknowledgetolocalmanpowerandcontractorswhoareinvolved

withthisproject• Spurringtheeconomyalongthepipeline

• Continuewiththeconstruction• ContinuewithlandacquisitionandnetworkingwithLandandSurveyDepartmentofSabah,

UPENSabahandDistrictOffices

Key Challenges Mitigation Plan• Acquisitionoflandforrightofways(ROW)• Shortageofcapablemanpowerandlocalcontractors• Potentialsecuritythreatmanpowerandequipmenttowardsworkersandequipmentfrom

unhappysquatters

• CollaborationwithLandandSurveyDepartmenttospeedupthelargenumberofdocumentationsduetolargenumberofprivatelandowners

• Propereducationplanningtoprepareanddeveloptheskilledandsemiskilledmanpower• Collaborationwithstateauthoritiestotightenthesecurityalongthecoastlines

Vaporization Station

Berth

JettyLNG Storage Tank (0.76 MTPA)

DESCRIPTION

Todevelopafacilitiestoreceive,storeandvaporizeimportedLNGwithamaximumcapacityof0.76MTPA(upto100mmscfd)andsupplythenaturalgastothePowerPlant

DESCRIPTION

512kmSabahSarawakGasPipelineconnectsKimanistoBintulu(PipelineinSabah:91.24km).AbranchlinewillbeconstructedtocaterforSOGIPinSipitang

Terminaltoreceiveandprocessoilandgasfromoffshore(Kinabalu,Gamusut,etc)inKimanis

OilTerminal:2.5mboeGasTerminal:1,250mmscfd

Page 2: Sabah Entry Point Projects

kimanis

kimanis

EPP 3 : GAS SEPARATION PLANT AT KIMANIS (GSP)

UPSTREAM/MIDSTREAM

EPP 4 : KIMANIS POWER PLANT (300MW)

DOWNSTREAM

DESCRIPTION

KimanisPowerPlantwilladdresstheimmediateneedsofelectricitydemandinSabah(especiallyinWestCoast)

Key outcomes of the EPP / KPIs What needs to be done?• Creationof415jobsforSabahanfromtopmanagementtosupportingstaffduring

operationsand2100jobsduringconstruction.Hence,transferoftechnologyandknowledgewilltakeplacetolocalmanpowerandcontractors

• Additional300MWofcleanerandstableenergysupplyintoSESBtopreserveSabahecotreasure

• ReducetheyearlylostfromindustriallossesRM4.59billion/peryearduetopowerinterruption

• CompleteconstructionofsiteofficebyQ12012• Proceedswithconstructiononcethelandworkcompleted• EnsurethecompletionofSOGTproject• EnsurethecompletionofSESBtransmissionfacilityupgrade

Key Challenges Mitigation Plan• LengthynegotiationperiodonPowerPurchaseAgreement(PPA)• Shortageofcapablemanpowerandlocalcontractors

• PendingMPRCdiscussionoutcome• Propereducationplanningtoprepareanddeveloptheskilledandsemiskilledmanpower

Key outcomes of the EPP / KPIs• AdditionalGDPofRM29,560milliontoSabahfrom

thatsalesofC3andC4ontopofC1andC2.• Thisextensionwillhelptoexpeditethegrowthof

KKIP• Industriesalongthepipelinecanalsobenefitfrom

thespinofffromextensionofthepipeline.

What needs to be done?• FeasibilityStudy:3months• DetailedFeasibilityStudy:9months• BasicEngineeringDesign:12months• EPCC:24months• Totalduration:4yearstocomplete

Key Challenges• ChoosingthecompatiblesystemforGSPtoconnect

withSOGTsystem• Layingthe75kmpipelinefromGSPatKimanisto

IndustrieswhichmostlywillbelocatedatKotaKinabaluandSOGIP

Mitigation Plan• ProperfeasibilitystudyondesigningtheGSP• CollaborationeffortbetweenSEC,PETRONASand

SabahStateAuthorities(i.e.SabahLandandSurveyDepartmentandUPENSabah)

DESCRIPTION

TodesignandbuiltanLPGextractionplantanditsexportfacilitiestoenhancethevalueofSabahgasatSabahO&GTerminal(SOGT)

PipelinefromOffshore

NewTransmission/DistributionPipeline

Saleswillbetransmitted

SSGP

SOGT

Bintulu

Industries

GSP

Capacity

KIMANIS POwer SdN Bhd

300 MW

Natural Gas (60 mmscfd)

SESB

Fuel

Off-taker

OIL, GAS & ENERGY SECTOR

Page 3: Sabah Entry Point Projects

lahad datu

EPP 5 : LAHAD DATU POWER PLANT (300MW)

DOWNSTREAM

EPP 6 : SIPITANG OIL & GAS INDUSTRIAL PARK (SOGIP)

DOWNSTREAM

DESCRIPTION

ThefuelforthepowerplantwillbeLNG

ThepowerplantandLNGre-gasificationplantaretobebuiltinPOICLahadDatuPhase3

Key outcomes of the EPP / KPIs• Creationof390jobsforSabahanfromtopmanagement

tosupportingstaffduringoperationsand2737jobsduringconstruction.Hence,transferoftechnologyandknowledgewilltakeplacetolocalmanpowerandcontractors

• Additional300MWofcleanerandstableenergysupplyintoSESBtopreserveSabahecotreasure

• ReducetheyearlylostfromindustriallossesRM4.59billion/peryearduetopowerinterruption

What needs to be done?• ProjectconsortiumneedstoResolvelandpurchase/

leasemattersbyDec2011• Resolvejettybuildingandownershipmattersbetween

projectconsortiumandPOIC/SabahAuthoritiesbyDec2011

• ProjectconsortiumneedstostartthelandworkslatestbyQ12012

• MLNGneedstosecuretheLNGimportsuppliesfrominternationalmarketby2014

Key Challenges• POICpolicynottosellseafrontlandandprojectowner

plantopurchasethelandforjettyandporttolowertheprojectcostandensurethesecurityoflongterminvestment

• POICpolicyforthemtobuildandoperatethejettyvsprojectownerplantoselfbuildandselfoperatethejettytoreducecost

• LengthynegotiationperiodonPowerPurchaseAgreement(PPA)

• Shortageofcapablemanpowerandlocalcontractors

Mitigation Plan• Workontheagreedpriceforbothpartieswhetheron

selling/purchasingorleasingtheland• Speedupstategovernmentdecisionontheownershipof

thejetty• InterventionfromMPRC,stategovernmentintothe

negotiationofPPAtospeedupthedecision• Propereducationplanningtoprepareanddevelopthe

skilledandsemiskilledmanpower

Capacity

LdPP300 MW

Natural Gas (60 mmscfd)

SESB

Fuel

Off-taker

SOGIP

DESCRIPTION

Phase1-SAMUR(1.25mt/yearureaproduction)–620acresToprovidethenecessaryinfrastructure(basicroad,drainage,watersupply&compoundlighting)requiredforthedevelopmentofSAMUR

Phase2–Mitsui(1.0mt/yearammoniaproduction)–690acresToprovidethenecessaryInfrastructure(basicroad,drainage,watersupply&compoundlighting)requiredforthedevelopmentofammoniaplant

Phase3-Developmentofbasicinfrastructurefor3,000AcresofIndustrialLand

SAMURProjectSite Phase1DevelopmentPlan

Phase2DevelopmentPlan Phase3DevelopmentPlan

Key outcomes of the EPP / KPIs• ToaccelerateindustrialdevelopmentinSabah• TocreatejobopportunityandcontributetoGDP

growth• Tomakeammoniaavailableataverageof

957,000mt/yearasrawfeedstocktobeusedbyvariousindustriestoproduceproductssuchasacrylonitrile,capro-lactum,lsocyanaeandammoniumnitrate.

• Contributetothelocaljobmarket.• Technologytransferthroughjointventurewith

OricaLimited(Australia)

What needs to be done?• Toprovidebasicinfrastructureinthearea

(Accessroad,water&electricity).• Vendordevelopmentprogrammetobe

designedfortheproject.Tohaveprogrammeforparticipantsinordertoacquireskills&knowledgebeyondthoserequired.

Key Challenges• Lackofbasicinfrastructureandpublicamenities

suchasroad,drainage,water&electricity.• Identifynewpotentialprivatesectortoutilise

ammonia.• Needofinvestmentpackagetoattractinvestors• ROWforutilities• Betterroadconditionandportfacilitiestoexport

endproducts.Accommodationandcommercialfacilities.

• Guaranteedgassupply

Mitigation Plan• Toconstructbasicinfrastructuressuchassite

formation,road,drainage&waterreticulation.• Toprovidewatersupply-20mld• Toprovideelectricitysupply-18MW• Provide90mmscfdofgas

Key outcomes of the EPP / KPIs• ToaccelerateIndustrialdevelopmentinSabah• TocreatejobopportunityandcontributetoGDP

growth• DesignatedareaforoilandgasIndustry• CooperationandsynergywithBrunei’sPMB

development• SynergywithAseanSupplyBase(ASB)in

Labuan• Contributetothelocaljobmarket

What needs to be done?• Toprovidebasicinfrastructureinthearea

(accessroad&water).• Vendordevelopmentprogrammetobe

designedfortheproject.Tohaveprogrammeforparticipantsinordertoacquireskills&knowledgebeyondthoserequired.

• Lightandmediumfabrication• Integratedlogisticscentre• Fullyequippedlogisticsfacilityforstorage,

transportation,freightforwarding,procurement,customs,immigrationclearance,agencyrelatedservices

• Supplybasefunction:purpose-builtbasewithofficespace,workshops,warehousecomplexandopenyard

• StorageofOCTG,tubularandheavyequipment

Key Challenges• Identifynewpotentialprivatesectortoutilise

gas,ammoniaandurea.• Needofinvestmentpackagetoattractinvestors• ROWforutilities• Betterroadconditionandportfacilitiestoexport

endproducts.Accommodationandcommercialfacilities

Mitigation Plan• Toconstructbasicinfrastructuressuchasroad

&drainage.• Toprovidewatersupply

Phase1DevelopmentPlan Phase2DevelopmentPlan

OIL, GAS & ENERGY SECTOR

Page 4: Sabah Entry Point Projects

kimanis

EPP 7 : PIPELINE TO KKIPUPSTREAM/MIDSTREAM

Key outcomes of the EPP / KPIs What needs to be done?• Withthisextensionofthepipeline,thesecondaryrecoveryofoilwellsinERBWestfieldis

possible• ThisextensionwillhelptoexpeditethegrowthofKKIPaswellasensurethenaturalgas

supplysecuritytotheKKIP’sIPPsandsmallindustrialusers• Industriesalongthepipelinecanalsobenefitfromthespinofffromextensionofthe

pipeline

• EconomicstudiesoftheviabilityoftheprojectbyPGBandSEC• CollaborationdemandprojecteddemandstudiesbetweenSEC,PGBandKKIP• ProvisionofROW• SyndicationwithMalaysiaGasManagement(MGM)andPETRONASCarigaliSdnBhd

(PCSB)ontheextraallocationofnaturalgas

Key Challenges Mitigation Plan• AcquisitionoflandforROW• Landacquisitionforcitygatestations• Noextragasallocation

• WorktogetherwithJKRandSabahLandAuthoritiestomapoutcommonutilitycorridorortunnel

• WorktogetherwithSabahLandAuthoritiestoassistintheacquisitionoflandintherespectiveareas/districtsfortheconstructionofthecitygatestation

• WorkwithPETRONASMalaysianGasManagementUnittosecureadditionalgasallocation

KK  

KKIP  

Kimanis  

SSGP  

Propose  Extension  

85  km  Extension  Pipeline  

Ppr  

LK  

Ppg  

DESCRIPTION

ExtensionofSSGPtappedfromKimanisendtoKKIP•Distance:85km•Diameter:18”•ExpectedCompletion:2015

Theextensionwillpassby•Papar•LokKawi•Penampang•KotaKinabalu

Expectedcompletion:2015

OIL, GAS & ENERGY SECTOR