19
Safe project conditions for renewable energy – a challenge for a clean future Peter Klessascheck, Head of Project Management Vilnius, 24 November 2010

Safe project conditions for renewable energy – a challenge for a clean future

  • Upload
    gracie

  • View
    47

  • Download
    0

Embed Size (px)

DESCRIPTION

Safe project conditions for renewable energy – a challenge for a clean future. Peter Klessascheck, Head of Project Management Vilnius, 24 November 2010. Index. PowerWind GmbH Risks in project financing Impact on Lithuanian Renewable Energy Law. PowerWind GmbH at a glance. Founded in 2007 - PowerPoint PPT Presentation

Citation preview

Page 1: Safe project conditions for renewable energy – a challenge for a clean future

Safe project conditions for renewable energy – a challenge for a clean future

Peter Klessascheck, Head of Project Management

Vilnius, 24 November 2010

Page 2: Safe project conditions for renewable energy – a challenge for a clean future

2German engineered wind turbines

Index

o PowerWind GmbH

o Risks in project financing

o Impact on Lithuanian Renewable Energy Law

Page 3: Safe project conditions for renewable energy – a challenge for a clean future

3German engineered wind turbines

PowerWind GmbH at a glance

o Founded in 2007

o Headquarters: Hamburg (Germany)

o Production facility: Bremerhaven (Germany)

o Products:

o PowerWind 56 (900 kW)

o PowerWind 90/100 (2500 kW)

o 141 employees

o Fully owned by Warburg Pincus, an international growth investor

Source: BFB

Page 4: Safe project conditions for renewable energy – a challenge for a clean future

4German engineered wind turbines

33 WECs installed, 8 under construction, 32 more sold as of 22nd November

USA

Poland AzerbaijanGermany

Italy RomaniaBulgaria

Page 5: Safe project conditions for renewable energy – a challenge for a clean future

5German engineered wind turbines

Risks in project financing

Page 6: Safe project conditions for renewable energy – a challenge for a clean future

6German engineered wind turbines

Wind energy converters are usually owned by a Special Purpose Vehicle. This SPV has to pay all investment costs.

Investment costs

Author
Page 7: Safe project conditions for renewable energy – a challenge for a clean future

7German engineered wind turbines

Typical investment costs for a wind energy project

WECo Blade markings/aviation lights

(according to building permit)

o Shadow flicker modules(according to building permit)

o Transport(costs depending on distance and accessibility of site)

o Crane(costs depending on distance to site and local availability)

o Transformer/switchgear(depending on project characteristics)

Infrastructureo Roads and crane areas

o Soil investigations

o Foundations

o Grid connection! extreme high costs in Lithuania due to tender system, presently there is no other regulation

o Compensation payments for impacts on environment

Page 8: Safe project conditions for renewable energy – a challenge for a clean future

8German engineered wind turbines

Dividend distribution and loan paid back to share holders

Investment costs

Investors

Equity moneyIncome from energy sold

One part of the SPV’s capital is invested by share holders. This loan is paid back later by the SPV’s profits.The SPV’s only financial income is generated by the WEC.

Author
Page 9: Safe project conditions for renewable energy – a challenge for a clean future

9German engineered wind turbines

The main part of the SPV’s capital is financed by a bank. The credit is paid back later by the SPV’s income.

Debts and amortization

Dividend distribution and loan paid back to share holders

Financing Bank

Investment costs

Financing of investment costs, financed capital

Investors

Equity moneyIncome from energy sold

Author
Page 10: Safe project conditions for renewable energy – a challenge for a clean future

10German engineered wind turbines

In a rating procedure, the financing bank evaluates the probability that the financed capital can‘t be paid back by the SPV as agreed in the credit contract.

In general, the bank analyses the main risks caused by commercial, technical and legal impacts.

Page 11: Safe project conditions for renewable energy – a challenge for a clean future

11German engineered wind turbines

Typical topics analyzed in the rating procedure

o Reports, studies (e.g. wind at site) and expertise

o The technology used WECs with type certificates are preferred

o Permits for installation and operation of the WEC according to the planned conditions

o Legal aspects in contract and permits

o Reliability of the equity investors

o Estimation of future energy consumption and related prices

o Business plan Due to the unstable Lithuanian Law on Renewable Energy, the price per kWh and the law’s period of validity is uncertain

Page 12: Safe project conditions for renewable energy – a challenge for a clean future

12German engineered wind turbines

Debts and amortization

Financing Bank

Investment costs

Financing of investment costs, financed capital

Investors

Equity moneyIncome from energy sold

Beside the debts and amortization the SPV has to pay the monthly operation costs.

Operating costs Dividend distribution and loan paid back to share holders

Author
Page 13: Safe project conditions for renewable energy – a challenge for a clean future

13German engineered wind turbines

Typical operating costs for a WEC

Land lease payments

4-8% of annual revenues

Land lease payments

4-8% of annual revenues

Technical & commercial

management

1,5-2,5% of annual revenues

Technical & commercial

management

1,5-2,5% of annual revenues

Service

13% of annual revenues

(Full service contract = 1.1 Cent/kWh)

Service

13% of annual revenues

(Full service contract = 1.1 Cent/kWh)

ReservesReserves RepairsRepairs InsurancesInsurances

Page 14: Safe project conditions for renewable energy – a challenge for a clean future

14German engineered wind turbines

The only income a SPV can generate comes from sales of the energy produced.

This source is essential for paying off the financed capital, the operation costs and finally a dividend to the investors!

Wirtschaftlichkeitsanalyse

Energy producedFinancial capital

+Operating costs

+Dividend

Without a reliable Lithuanian Law on Renewable Energy, neither banks nor investors will invest in the clean technology to the benefit for all of us.

Page 15: Safe project conditions for renewable energy – a challenge for a clean future

15German engineered wind turbines

Impact on Lithuanian Renewable Energy Law

 Germany Lithuania Consequence

for Lithuanian projects

Present rate of equity

15-20% 40% Fewer potential investors

Small projects

Access to grid Guaranteed by Renewable Energy Law Tender system

High risk and high demand on working capital already

in planning phase Avoid tender system

Period of guaranteed feed-

in tariff

Guaranteed up to20 years

(depending on potential   of production site)

No regulation any more (but 5 years are in-sufficient in order to receive bank financing)

High risk for bank no financing or very high

interest rates Price should be fixed

for at least 13 years

Page 16: Safe project conditions for renewable energy – a challenge for a clean future

16German engineered wind turbines

Thank you for your attention

PowerWind GmbH

Kehrwieder 820457 Hamburg - Germany

www.powerwind.de

T + 49 (0)40 741067 - 0F + 49 (0)40 741067 - 599

[email protected]

Insert Photo

Page 17: Safe project conditions for renewable energy – a challenge for a clean future

Back up

Page 18: Safe project conditions for renewable energy – a challenge for a clean future

18German engineered wind turbines

Wirtschaftliche Bedeutung: Arbeitsplätze Stand: 9/2005

Page 19: Safe project conditions for renewable energy – a challenge for a clean future

19German engineered wind turbines

With its full range of features, the PowerWind 56 perfectly matches the technical challenges of the site in Azerbaijan

o Highest energy yield in wind class II

o Full-scale converter ensures that the system is suitable even for weaker grids

o Three active cooling systems enable the turbine to be installed and operated also in regions with extreme climatic conditions

o Compact design allows inexpensive transportation and installation even in locations with weak infrastructure