BSF Kettering Science Academy
Geotechnical Report
251076
January 2010
Safeguarding your business
environment
Report No. 251076-01 BSF Kettering Science Academy Page 2 of 20
CONTENTS DOCUMENT CONTROL 3
1. INTRODUCTION ............................................................................................................................. 4 1.1 Instructions........................................................................................................................... 4 1.2 Project Brief .......................................................................................................................... 4 1.3 Limitations ............................................................................................................................ 4
2. SITE DETAILS................................................................................................................................. 5 2.1 Description and Geographic Setting.................................................................................. 5
3. ANTICIPATED GROUND CONDITIONS........................................................................................ 6 3.1 Published Geology............................................................................................................... 6
4. GROUND INVESTIGATION............................................................................................................ 7 4.1 Site Work............................................................................................................................... 7
5. PHYSICAL GROUND CONDITIONS.............................................................................................. 8 5.1 Findings of Ground Investigation ...................................................................................... 8 5.2 Groundwater....................................................................................................................... 12
6. ENGINEERING CONSIDERATIONS............................................................................................ 13 6.1 Details of the Proposed Development ............................................................................. 13 6.2 Geotechnical Hazards........................................................................................................ 13 6.3 Foundations........................................................................................................................ 15 6.4 Ground Floor Slabs............................................................................................................ 18 6.5 Chemical Attack on Buried Concrete............................................................................... 18
7. CONCLUSIONS AND RECOMMENDATIONS............................................................................. 19 7.1 Conclusions........................................................................................................................ 19 7.2 Recommendations for Further Geotechnical Work........................................................ 20
FIGURES
Figure 1 Site Location Plan
Figure 2 Site Layout & Exploratory Point Location Plan
Figure 3 Geological Cross Section A
Figure 4 Geological Cross Section B
Figure 5 SPT Plot versus Depth
APPENDICES
Appendix A Fieldwork Records
Window Sampler Records
Dynamic Probe Records
RSK STATS Geoconsult Ltd The Enterprise Centre
Coventry University Technology Park
Puma Way
Coventry
CV1 2TX
UK
Telephone: +44 (0)2476 236816
Fax: +44 (0)2476 236014
www.rsk.co.uk
RSK STATS Geoconsult Ltd
Registered office
Spring Lodge • 172 Chester Road • Helsby • Cheshire • WA 0AR • UK
Registered in England No. 2611785
www.rsk.co.uk
DOCUMENT CONTROL
Document Title: Geotechnical Report
BSF Kettering Science Academy
The Client: Kier Marriott Marriott House Brindley Close Rushden Northamptonshire NN10 6EN
RSK STATS Geoconsult Ltd (RSK) has prepared this report in accordance with the instructions of BDP Limited, acting on behalf of Kier Marriott (“the Client”) by e-mail, dated 17
th December 2009
and under the terms of appointment for RSK. This report is confidential and non-assignable by the Client and RSK shall not be responsible for any use of the report or its contents for any purpose other than that for which it was prepared and provided. Should the Client require to pass copies of the report to other parties for information, the whole of the report should be so copied, but no professional liability or warranty shall be extended to other parties by RSK in this connection without the explicit written agreement thereto by RSK.
Report Number
251076-01
Status
FINAL
Date of issue
19th January 2010
Prepared by Mariah Gray
Graduate Geoenvironmental Engineer
Reviewed by Mark Steward
Associate Director
Approved by Shon Williams
Director
Page no. 3 of 20
Report No. 251076-01 BSF Kettering Science Academy Page 4 of 20
1. INTRODUCTION
1.1 Instructions
On the instructions of BDP Limited, on behalf of Kier Marriott (the ‘Client’), RSK STATS
Geoconsult Ltd (RSK) has carried out a Supplementary Geotechnical Investigation of the
playing fields at the Kettering Science Academy, to the south of Deeble Road, Kettering.
The project was commissioned in order to confirm ground conditions at the site, and thence to
assess the foundation options for the proposed development: a two-storey educational
building with a footprint of approximately 9000m2.
1.2 Project Brief
The project was carried out to an agreed brief as set out in RSK’s proposal letter of 11th
December 2009.
The work undertaken included the following tasks:
• A site walk-over reconnaissance survey;
• A study of the local geology of the site;
• A review of the information in Geotechnics’ Factual Report PC093889;
• Sinking of eight drive-in window sampler boreholes, to depths of 4.0m.bgl;
• Sinking of five dynamic probe holes, to depths of 5.0m.bgl;
• Associated soil sampling and in-situ testing; and
• Interpretative reporting.
The intrusive aspects of the investigation were generally carried out following guidance given
in BS 5930:1999.
1.3 Limitations
This report should be considered in the light of any changes in legislation, statutory
requirement or industry practices that may have occurred subsequent to the date of issue.
The "vicinity" of the site for the purposes of this report, is defined as locations situated within
an approximate 250m radius of the site.
The opinions and recommendations expressed in this report are based on the ground
conditions encountered during the site work, the results of field testing and interpretation
between exploratory holes. The material encountered and samples obtained represent only a
small proportion of the materials present on-site, therefore other conditions may prevail at the
site which have not been revealed by this investigation.
The accuracy of the information provided by Geotechnics through their exploratory hole logs,
geotechnical laboratory testing results and final report cannot be guaranteed, and RSK cannot
be held liable for any issues resulting from reliance on these data.
Geotechnical laboratory testing and the investigation of issues relating to ground
contamination were outside the agreed scope of works.
Report No. 251076-01 BSF Kettering Science Academy Page 5 of 20
2. SITE DETAILS
2.1 Description and Geographic Setting
The site is located approximately 1.2km to the east of Kettering, at National Grid reference SP
879 784, as shown in Figure 1.
The site covers approximately 3.2 hectares and comprises the two playing fields to the east of
Ise Community College, as shown in Figure 2. The playing fields are on two levels; the
western playing field is several metres higher than the eastern field, and they are separated
by a fairly steep slope approximately 2.5m high.
The area around the site is generally residential, with small areas of undeveloped floodplain
associated with the River Ise, which flows in a southerly direction approximately 80m to the
east of the site boundary.
Report No. 251076-01 BSF Kettering Science Academy Page 6 of 20
3. ANTICIPATED GROUND CONDITIONS
3.1 Published Geology
3.1.1 General Characteristics
The published 1:50,000 scale geological map of the area (Sheet 171, ‘Kettering’) indicates
that the site is underlain by deposits of Whitby Mudstone Formation, with a small area of
Alluvium along the eastern edge of the site, associated with the River Ise. The area covered
by the Kettering Science Academy buildings, adjacent to the west of the site, is underlain by
the Northampton Sand Formation, which is further underlain by the Whitby Mudstone
Formation.
On the basis of the published geological maps of the area, the full succession of natural strata
in the vicinity of the site is likely to comprise:
Table 3.1 Conjectural Geological Succession Beneath the Site
Geological Unit Brief Description Anticipated
Thickness
Superficial Soils/Drift
Alluvium Silty clay, possibly containing layers of silt, peat
and gravel
Several
metres
Solid Geology Deposits
Northampton Sand
Formation
Greenish grey sandy ironstone, weathering to
brown limonitic sandstone, and generally becoming
less iron-rich and more clayey at its base
4 – 8m
(max. 21m)
Whitby Mudstone
Formation
Dark grey fossiliferous mudstone and siltstone,
occasionally with thin siltstone, silty mudstone and
calcareous sandstone beds
Up to 120m
The former topography and subsequent re-grading of the site suggests that, in addition to
these natural strata, made ground is likely to be present beneath the site, especially in the
area of the embankment between the upper and lower playing fields.
Details of a previous ground investigation carried out by Geotechnics Limited (Factual Report
PC093889, June 2009) were provided by Andrew Tatlock of Kier Marriott. Information from
the report is summarised in Section 5.
Report No. 251076-01 BSF Kettering Science Academy Page 7 of 20
4. GROUND INVESTIGATION
4.1 Site Work
4.1.1 Rationale
The purpose of the intrusive investigation is to provide geotechnical information in the locality
of the proposed development. The techniques adopted for the investigation have been
chosen considering the anticipated ground conditions and the proposed development.
4.1.2 Scope of Works
The site work was carried out on 21st and 22
nd December 2009, and comprised the sinking of
eight drive-in window sampler boreholes to depths of 4.0m.bgl and five dynamic probe holes
to depths of 5.0m.bgl. The investigation and the soil descriptions were carried out in general
accordance with BS5930:1999 - Code of Practice for Site Investigations.
The exploratory hole logs and other site work records are presented in Appendix A.
The investigation points were marked out by a Kier engineer at the time of investigation. The
ground levels at the borehole locations were interpolated from the levels shown on the site
plan provided by Randall Surveys LLP.
4.1.3 Limitations of Fieldwork
Due to the covering of snow, it was not possible to locate the holes accurately on the site
plan, although they were kept outside the sports pitches. Their approximate positions are
shown on Figure 2.
Report No. 251076-01 BSF Kettering Science Academy Page 8 of 20
5. PHYSICAL GROUND CONDITIONS
5.1 Findings of Ground Investigation
5.1.1 General Succession of Strata
The exploratory holes revealed that the site is underlain by a variable thickness of Made
Ground over the Northampton Sand Formation, with the Whitby Mudstone Formation at
depth. The central section of the site, comprising the embankment between the two playing
fields, contains an area of Fill between the Made Ground and the Northampton Sand
Formation. The eastern edge of the site is underlain by Made Ground over Alluvium, which is
then underlain by the Whitby Mudstone Formation at depth. This appears to generally
confirm the stratigraphical succession described within Section 3.1.
For the purpose of discussion, the ground conditions are summarised in Table 5.1, below,
and are presented as two geological cross-sections (A and B) as Figures 3 and 4. Cross-
Section A contains WS1, WS5, WS6 and WS7, while Cross-Section B contains WS2, WS3,
WS4 and WS8. All the tables in this section also include any relevant data from Geotechnics’
Report PC093889, thereby summarising all the data from the area of the two playing fields.
Throughout the remainder of this report, the Geotechnics’ exploratory holes are prefixed with
“G”, in order to distinguish them from RSK exploratory hole designations.
Table 5.1 General Succession of Strata Encountered
Stratum Exploratory Holes
Encountered
Depth to top
of stratum
m.bgl
Depth to base
of stratum
m.bgl
Thickness
(m)
Made Ground All 0.00 0.20 – 1.40 0.20 – 1.40
Fill WS4, WS5 & GBH24 0.35 – 0.90 1.30 – 3.50 0.90 – 2.60
Alluvium WS7, WS8,
GWS26 & GWS27 0.40 – 1.40 2.45 – >5.00 2.05 – >3.60
Northampton Sand
Formation
All except
WS7, WS8, GWS26,
GWS27& GBH24
0.20 – 3.50 0.70 – >4.00 0.20 – 3.25
Whitby Mudstone
Formation
All except
WS4, WS8 & GWS27 0.70 – >5.00 >10.00 >7.20
5.1.2 Made Ground
The exploratory holes encountered a variable thickness of Made Ground across the site,
generally ranging from 0.20m to 1.00m. The variation in the thickness of the Made Ground
across the site does not appear to correspond to any particular features, with the exception of
the 1.40m of Made Ground encountered within GWS27, the closest exploratory hole to the
River Ise.
In general the Made Ground encountered during RSK’s investigation comprised firm to stiff
slightly silty slightly gravelly occasionally slightly sandy CLAY, with rare rootlets and minor
constituents including sandstone and brick cobbles, and tin, clinker, ash, slag and brick
fragments.
Visual / olfactory evidence of contamination, other than the minor constituents noted above,
was not encountered within the Made Ground.
Report No. 251076-01 BSF Kettering Science Academy Page 9 of 20
The measured and inferred soil parameters for the Made Ground are listed in Table 5.2,
below.
Table 5.2 Summary of Soil Parameters for the Made Ground
Soil Parameters Range Results
Consistency Term Firm – Stiff Appendix A
Soil Suction (kN/m2) 25 – 105 Appendix A
Strength Term Low – High
5.1.3 Fill
The exploratory holes WS4 and WS5, located at the top of the embankment between the two
playing fields, generally encountered between 2.45m and 2.60m of Fill, underlying the Made
Ground. GBH23, located at the far northerly end of the slope between the two playing fields,
and possibly slightly on the embankment up to Deeble Road, only encountered 0.90m of Fill.
In general the Fill encountered during RSK’s investigation comprised three main layers. The
first contained firm to stiff slightly silty slightly gravelly CLAY with rare decayed rootlets. The
gravel was angular to subrounded fine to medium occasionally coarse ferruginous sandstone.
The second layer contained firm to stiff slightly silty slightly sandy slightly gravelly CLAY, with
occasional ferruginous sandstone cobbles and rare fine to medium gravel sized clinker
fragments within WS4. The gravel was subangular to subrounded fine to medium flint. The
base of this layer was mottled black, with a high organic / decayed plant fragment / wood
content.
The third layer contained firm to stiff slightly silty slightly sandy CLAY. The sand was fine to
medium.
With the exception of the clinker fragments within WS4, visual / olfactory evidence of
contamination was not encountered within the Fill.
As shown in Figure 5, the Fill increases in strength with depth.
The measured and inferred soil parameters for the Fill are listed in Table 5.3, below.
Table 5.3 Summary of Soil Parameters for the Fill
Soil Parameters Range Results
Moisture Content (%) 26 – 27 Geotechnics Report
SPT ‘N’ Values 5 – 13 Figure 5 (labelled as Made Ground)
Undrained Shear Strength (kN/m2)
inferred from SPT ‘N’ values 25 – 65
Consistency Term Firm – Stiff Appendix A
Soil Suction (kN/m2) 50 – 135 Appendix A
Strength Term Medium – High
Report No. 251076-01 BSF Kettering Science Academy Page 10 of 20
5.1.4 Alluvium
The Alluvium, encountered at the eastern end of the lower playing field during RSK’s
investigation, within WS7 and WS8, comprised three main layers. The first contained stiff
slightly gravelly CLAY. The gravel was subangular to subrounded fine ferruginous sandstone
and flint.
The second layer contained slightly sandy, gravelly to very gravelly CLAY. The sand was fine
to coarse, and the gravel was angular to rounded fine to medium flint.
The third layer contained medium dense clayey very sandy angular to rounded fine to coarse
flint GRAVEL. The sand was fine to coarse.
Within WS8, a layer of stiff slightly silty slightly gravelly CLAY was encountered between the
second and third layers. Within WS7, a layer of medium dense clayey very gravelly fine to
coarse SAND was encountered beneath the third layer.
Visual / olfactory evidence of contamination was not encountered within the Alluvium.
As shown in Figure 5, the Alluvium generally increases in strength with depth.
The measured and inferred soil parameters for the Alluvium are listed in Table 5.4, below.
Table 5.4 Summary of Soil Parameters for the Alluvium
Soil Parameters Range Results
Moisture Content (%) 19 – 30 Geotechnics Report
SPT ‘N’ Values 5 – 18 Figure 5
Undrained Shear Strength (kN/m2)
inferred from SPT ‘N’ values 25 – 90
Consistency Term (cohesive) Stiff Appendix A
Consistency Term (granular) Medium Dense Appendix A
Soil Suction (kN/m2) 90 Appendix A
Strength Term High
5.1.5 Northampton Sand Formation
The Northampton Sand Formation, encountered during RSK’s investigation below the Made
Ground across the site with the exception of WS7 and WS8, typically comprised firm to stiff
CLAY with varying proportions of silt, sand and gravel, and with rare decayed rootlets and
occasional iron-rich laminations. The granular layers within this formation were generally
loose. This stratum is sometimes termed “Superficial Deposits” within the Geotechnics
Report.
Visual / olfactory evidence of contamination was not encountered within the Northampton
Sand Formation.
As shown in Figure 5, the Northampton Sand Formation increases in strength with depth.
The measured and inferred soil parameters for the Northampton Sand Formation are listed in
Table 5.5, below.
Report No. 251076-01 BSF Kettering Science Academy Page 11 of 20
Table 5.5 Summary of Soil Parameters for the Northampton Sand Formation
Soil Parameters Range Results
Liquid Limit (%) 51 Geotechnics Report
Plastic Limit (%) 26 Geotechnics Report
Plastic Index (%) 25 Geotechnics Report
Modified Plasticity Index (%) 25
Plasticity Term High (CH)
Volume Change Potential (NHBC) Medium
Moisture Content (%) 16 – 26 Geotechnics Report
SPT ‘N’ Values 6 – 12 Figure 5
Undrained Shear Strength (kN/m2)
inferred from SPT ‘N’ values 30 – 60
Consistency Term (cohesive) Firm – Stiff Appendix A
Consistency Term (granular) Loose Appendix A
Soil Suction (kN/m2) 50 – 130 Appendix A
Strength Term Medium – High
5.1.6 Whitby Mudstone Formation
The Whitby Mudstone Formation encountered during RSK’s investigation, and underlying the
Northampton Sand Formation or Alluvium in the former’s absence, typically comprised stiff to
very stiff occasionally firm silty CLAY, with selenite present. This stratum was formerly named
the Upper Lias Clay, the term used in the Geotechnics Report.
Visual / olfactory evidence of contamination was not encountered within the Whitby Mudstone
Formation.
As shown in Figure 5, the Whitby Mudstone Formation generally increases in strength with
depth.
The measured and inferred soil parameters for the stratum are listed in Table 5.6, below.
Table 5.6 Summary of Soil Parameters for the Whitby Mudstone Formation
Soil Parameters Range Results
Liquid Limit (%) 50 – 56 Geotechnics Report
Plastic Limit (%) 24 – 27 Geotechnics Report
Plastic Index (%) 26 – 29 Geotechnics Report
Modified Plasticity Index (%) 26 – 29
Plasticity Term High (CH)
Volume Change Potential (NHBC) Medium
Moisture Content (%) 19 – 32 Geotechnics Report
SPT ‘N’ Values 8 – 24 Figure 5
Undrained Shear Strength (kN/m2)
measured by Triaxial Testing 61 – 64 Geotechnics Report
Undrained Shear Strength (kN/m2)
inferred from SPT ‘N’ values 40 – 120
Report No. 251076-01 BSF Kettering Science Academy Page 12 of 20
Soil Parameters Range Results
Consistency Term Soft/Firm – Stiff
Very Stiff (Geotechnics data) Appendix A
Soil Suction (kN/m2) 80 – 165 Appendix A
Strength Term High – Very High
5.2 Groundwater
Groundwater was encountered within the majority of RSK’s exploratory holes at the depths
summarised in Table 5.7; from anecdotal evidence, the playing fields are known to be
frequently waterlogged.
Table 5.7 Groundwater Results
WS Stratum Strike
m.bgl
Rise
m.bgl
WS1 Made Ground 0.30 (seepage) Unknown
WS2 Northampton Sand Formation 0.50 (seepage) Unknown
WS5 Made Ground / Fill 0.30 (seepage) 0.90
WS6 Northampton Sand Formation Not visible 1.00
WS7 Alluvium Not visible 0.85
WS8 Made Ground Not visible 0.80
GWS21 Northampton Sand Formation 3.00 (damp) Unknown
GWS27 Made Ground 1.00 (seepage) Unknown
It should be noted that groundwater levels might fluctuate for a number of reasons, including
seasonal variations. On-going monitoring would be required to establish both the full range of
conditions and any trends in groundwater levels.
Report No. 251076-01 BSF Kettering Science Academy Page 13 of 20
6. ENGINEERING CONSIDERATIONS
6.1 Details of the Proposed Development
It is understood that the proposed development will comprise a two-storey reinforced concrete
frame educational building with a footprint of approximately 9000m2. The site will be levelled
by a cut-and-fill exercise to achieve finished floor levels of 67.0m.AOD for the ground floor
and a 65.5m.AOD for the lower ground floor. Information provided by BDP Limited indicates
that the maximal column loads will be in the order of 1500kN on an approximate 7.5m grid
spacing.
6.2 Geotechnical Hazards
A summary of commonly occurring geotechnical hazards is given in Table 6.1 together with
an assessment of whether the site may be affected by each of the stated hazards.
Table 6.1 Summary of Main Potential Geotechnical Hazards that May Affect Site
Hazard category
(excluding contamination
issues)
Hazard status
based on investigation findings
and proposed development
Engineering
considerations
if hazard affects site
Found to
be
present
on site
Could be
present but
not found
Unlikely to
be present
and/or affect
site
Sudden lateral changes in
ground conditions 4
Alluvium, associated with
the River Ise, is present
only along the eastern side
of the lower playing field
Likely to affect ground
engineering and
foundation design and
construction
Shrinkable clay soils
4
The Northampton Sand
and Whitby Mudstone
Formations comprise clay
of medium volume change
potential
Design to NHBC
Standards Chapter 4
or similar
Highly compressible and low
bearing capacity soils,
(including peat and soft clay) 4
Likely to affect ground
engineering and
foundation design and
construction
Silt-rich soils susceptible to
loss of strength in wet
conditions 4
Variable silt content in the
Northampton Sand and
Whitby Mudstone
Formations
Likely to affect ground
engineering and
foundation design and
construction
Karstic dissolution features
(including ‘swallow holes’ in
Chalk terrain) 4
May affect ground
engineering and
foundation design and
construction
Report No. 251076-01 BSF Kettering Science Academy Page 14 of 20
Hazard category
(excluding contamination
issues)
Hazard status
based on investigation findings
and proposed development
Engineering
considerations
if hazard affects site
Found to
be
present
on site
Could be
present but
not found
Unlikely to
be present
and/or affect
site
Evaporite dissolution
features and/or subsidence 4
May affect ground
engineering and
foundation design and
construction
Ground subject to or at risk
from landslides 4
Likely to require
special stabilisation
measures
Ground subject to peri-glacial
valley cambering with gulls
possibly present 4
Likely to affect ground
engineering and
foundation design and
construction
Ground subject to or at risk
from coastal or river erosion 4
Likely to require
special
protection/stabilisation
measures
High groundwater table
(including waterlogged
ground) 4
Groundwater encountered at shallow depths beneath the site. From anecdotal
evidence, the playing fields are known to be frequently waterlogged
May affect temporary
and permanent works
Rising groundwater table due
to diminishing abstraction in
urban area 4
May affect deep
foundations,
basements and
tunnels
Underground mining
4
Likely to require
special stabilisation
measures
Existing sub-structures (e.g.
tunnels, foundations,
basements, and adjacent
sub-structures)
4
Likely to affect ground
engineering and
foundation design and
construction
Filled and made ground
(including embankments,
infilled ponds and quarries)
4
A variably thick layer of
Made Ground covers the
entire site. Greater
thickness of Made Ground
and Fill is present within
the slope separating the
upper and lower playing
fields
Likely to affect ground
engineering and
foundation design and
construction
Report No. 251076-01 BSF Kettering Science Academy Page 15 of 20
Hazard category
(excluding contamination
issues)
Hazard status
based on investigation findings
and proposed development
Engineering
considerations
if hazard affects site
Found to
be
present
on site
Could be
present but
not found
Unlikely to
be present
and/or affect
site
Adverse ground chemistry
(including expansive slags
and weathering of sulphides
to sulfates)
4 See
Section 6.5
May affect ground
engineering and
foundation design and
construction
Note: Seismicity is not included in the above table, as this is not normally a design consideration in the
UK.
6.3 Foundations
6.3.1 General Suitability
The ground conditions at the western end of the upper field appear suitable for the design and
construction of relatively shallow spread foundations for lightly loaded structures. However, in
view of the anticipated high loads from the proposed development (1500kN) and the
increasing thickness of the Made Ground and Fill towards the eastern end of the upper field
and the embankment, foundations will have to be taken to a greater depth. Deep spread
foundations appear technically feasible, although the depth to which such foundations will
need to extend may mean that piles will provide a more economic foundation solution.
Alternatively, the near-surface ground conditions appear suitable for the use of selected
ground improvement techniques that would facilitate the use of shallow spread footings
supported on the improved ground.
6.3.2 Spread Foundations
The recommendations for the design and construction of spread foundations in relation to the
ground conditions are set out in Table 6.2.
Table 6.2 Design and Construction of Spread Foundations
Design/construction
considerations
Design/construction recommendations
Founding stratum Northampton Sand Formation or Whitby Mudstone Formation
Depth Foundations should be taken to a minimum depth of 1.5m below
finished ground level (around 64.0m.AOD) and at least 0.1m into the
founding stratum below any overlying Made Ground, or to any greater
depth required in respect of the special design considerations given
below.
Special design
considerations
Due to the presence of shrinkable soils, foundations should be designed
taking into account all the normal precautions, including minimum
depths, to minimise the risk of future foundation movements in
accordance with NHBC Standards, or similar.
The findings of the ground investigation indicate that foundations should
be designed for shrinkable soils of medium volume change potential.
During all cut-and-fill exercises, especially involving slopes near the
River Ise, the stability of the slopes created should be considered; the
Report No. 251076-01 BSF Kettering Science Academy Page 16 of 20
Design/construction
considerations
Design/construction recommendations
maximum gradient recommended is 1:3.
It is noted that the areas of the site underlain by the Northampton Sand
Formation are within an area for which full radon protection measures
are required. Further advice may be obtained from the Documents of
the National Radiological Protection Board (Radon Atlas of England and
Wales, NRPB-W26-2002), and further assessment will be required, in
line with the guidance provided in BRE publication 211 “Radon:
guidance on protective measures for new dwellings (2007)
Bearing capacity Strip foundations with a width of up to 2.00m, or pad foundations with a
width of up to 4.00m, both constructed on the Northampton Sand
Formation or Whitby Mudstone Formation at a minimum depth of 1.5m
may be designed using a net allowable bearing pressure of 100kN/m2.
The allowable bearing capacity includes an overall factor of safety of 3
against bearing capacity failure and with total settlements associated
with the bearing pressure estimated to be less than 25mm.
Dewatering Groundwater was encountered in the majority of the exploratory holes.
Dewatering may therefore be required to facilitate foundation
excavation.
The cohesive nature of the soils encountered suggests that pumping
from open sumps should be sufficient to keep the excavations
reasonably dry
Stability of
excavations
Due to the potential for the high groundwater level to affect the stability
of excavations, it is recommended that excavation support systems are
made available during the groundwork stage of the development
Construction
considerations
All foundation excavations should be inspected and any made ground,
soft, organic or otherwise unsuitable materials removed and replaced
with mass concrete
6.3.3 Piled Foundations
The recommendations for the design and construction of piled foundations in relation to the
ground conditions are set out in Table 6.3. It should be noted that the soil parameters used
for the design are adopted from deeper boreholes undertaken by Geotechnics, although the
final depths to which those boreholes are taken may not be sufficient to provide the necessary
information for the design.
Table 6.3 Design and Construction of Piled Foundations
Design/construction
considerations
Design/construction recommendations
Pile type The construction of both bored and driven piles is considered technically
feasible at this site
Possible constraints
on choice of pile type
Given the close proximity of the site to other properties the use of driven
piles may not be acceptable due to ground vibration and noise related
problems
Temporary casing
where groundwater is
present
Bored piles may require temporary casing throughout their depth due to
the possible presence of groundwater within the Whitby Mudstone
Formation. Alternatively, the use of continuous-flight-auger (CFA)
injected bored piles usually overcomes this issue
Report No. 251076-01 BSF Kettering Science Academy Page 17 of 20
Design/construction
considerations
Design/construction recommendations
Man-made
obstructions
The presence of buried sub-structures or other obstructions within Made
Ground may lead to some difficulty during piling. It is recommended
that once the proposed pile layout has been determined, pre-pile
probing be carried out at each of the pile positions. Where buried
obstructions are encountered, it will be necessary to either relocate the
pile(s) or make allowance for removing the obstruction
Hard strata An allowance should be made for chiselling thin ‘rock’ bands (claystone)
within the Whitby Mudstone Formation
Adhesion Factor (α) 0.5
Bearing Capacity Factor (Nc) 9
Undrained Shear Strength (cu) 80 + 7z kN/m2 where z = depth into
clay
Global Safety Factor 3.0
Limiting Shaft Friction 140kN/m2
Soil and pile design
parameters for Whitby
Mudstone Formation
Limiting Concrete Stress 7.5N/mm2
Bored pile shafts and
bases
Bored pile concrete should be cast as soon after the completion of
boring as possible and in any event the same day as boring.
Prior to casting, the base of the pile bore should be clean, otherwise a
reduced safe working load will be required. Similarly, if the pile bore is
left open, the shaft walls may relax/soften, leading to a reduced safe
working load.
The design procedure for piles varies considerably, depending on the proposed type of pile.
However, for illustrative purposes Table 6.4 gives likely working pile loads for traditional
bored, cast-in-situ concrete piles of various diameters and lengths, based on the design
parameters given in Table 6.3.
Table 6.4 Illustration of Typical Pile Working Loads for Bored Cast-in-situ Piles
Typical Pile Working Loads (kN)
Pile Diameter Depth of pile below
existing ground
level (m) 300mm 450mm 600mm 750mm
10 165 268 387 520
151)
293 466 658 867
201)
448 705 983 1284
251)
530 985 1364 1769
1) assumed Whitby Mudstone Formation extents at depth
6.3.4 Vibro-replacement
As discussed in Section 6.3.1, should it not be possible to remove sufficient soil to penetrate
the base of the Made Ground or Fill, consideration can be given to improving the soil using
some form of ground improvement such as vibro replacement. Advice regarding the specific
design of the columns should be sought from a specialist contractor.
Report No. 251076-01 BSF Kettering Science Academy Page 18 of 20
The impact of the vibro-stone columns on any slopes remaining on site should be assessed,
in order that they do not affect the slopes’ stability.
6.3.5 Eastern Playing Field
The ground conditions on the eastern (lower) playing field generally comprise materials with
average undrained shear strengths of 50kN/m2, equating to bearing capacities of approximately
100kN/m2. It is considered that the ground will be able to support a build up of the proposed fill
in relation to the building up of the field to accommodate the proposed surface water drainage
attenuation tanks. It is however recommended that the formation levels are inspected and any
made ground, soft, organic or otherwise unsuitable materials removed and replaced with
mass concrete.
6.4 Ground Floor Slabs
The sub-grade soil conditions beneath the footprint of the proposed buildings comprise a
variable thickness of Made Ground and Fill over Northampton Sand Formation over Whitby
Mudstone Formation. Ground bearing floor slabs could be adopted with a suitable sub-base
layer for the proposed development. The proposed ‘levelling’ of the site by cut-and-fill
technique means that at some point the ground bearing slabs will pass from natural ground on
to structural fill, resulting in differential settlements from the floor slab loading due to the
difference in the stiffness of the two materials. To achieve a comparable stiffness between
natural ground and compacted fill, some form of treatment of the latter may be required. In
addition, where a slab crosses over the junction from natural ground to compacted fill it is
recommended that the slab is suitably reinforced to accommodate possible movements and a
transition zone consisting of a stabilised layer of the natural sub-grade material should also be
introduced.
6.5 Chemical Attack on Buried Concrete
The results of chemical tests carried out on soil samples from the entire Kettering Science
Academy Site as part of Geotechnics’ investigation indicate 2:1 water soil extract sulfate
contents of up to 0.96g/l with pH values ranging between 5.2 and 7.3.
These results indicate that, in accordance with BRE Special Digest 1: 2005 Concrete in
aggressive ground, the Aggressive Chemical Environment for Concrete (ACEC) Classification
is AC-2 with a Design Sulfate Class for the site of DS-2. This assumes nominally mobile
groundwater conditions, and that no significantly disturbed clay comes into contact with
concrete foundations or structures. However, it is noted that a pH of 5.2 was recorded in
GWS19, which would indicate an ACEC classification of AC-4z. However, as this low pH was
detected in only one of the 13 samples tested, and the average pH of the samples tested from
the site is 6.7, it is considered that this result can be discounted.
If significantly disturbed clay is likely to come into contact with concrete foundations or
structures, it will be necessary to carry out additional tests on the soil to investigate its total
potential sulfate content. This will facilitate a re-evaluation of the ACEC Classification and
Design Sulfate Class for the material, to take into consideration potential oxidation of available
sulphides (e.g. pyrite), as defined in Table C1 (natural ground sites) or C2 (brownfield sites)
BRE Special Digest 1: 2005.
Report No. 251076-01 BSF Kettering Science Academy Page 19 of 20
7. CONCLUSIONS AND RECOMMENDATIONS
7.1 Conclusions
The site covers approximately 3.2 hectares, and currently comprises the two playing fields to
the east of Ise Community College. The currently proposed development is understood to
comprise a two-storey educational building with a footprint of approximately 9000m2.
Information provided by BDP Limited indicates that the maximal column loads will be in the
order of 1500kN on an approximate 7.5m grid spacing.
The published geological map indicates that the site is underlain by the Whitby Mudstone
Formation, whilst the area adjacent to the west of the site is overlain by the Northampton
Sand Formation. A small area of Alluvium, associated with the River Ise, is present along the
eastern edge of the site. The former topography and subsequent re-grading of the site
suggests that, in addition to these natural strata, made ground is likely to be present beneath
the site, especially in the area of the embankment between the upper and lower playing fields.
The site work, carried out on 21st and 22
nd December 2009, included the sinking of eight
drive-in window sampler boreholes to depths of 4.0m.bgl and five dynamic probe holes to
depths of 5.0m.bgl. The exploratory holes advanced during the site investigation indicate that
the geology generally comprises a variable thickness of Made Ground and Fill (up to
maximum thicknesses of 1.40m and 2.60m respectively), overlying the Northampton Sand
Formation, in turn overlying the Whitby Mudstone Formation. Along the eastern edge of the
site, the Northampton Sand Formation had been eroded by the River Ise, and Alluvium had
been deposited in its place. No significant visual / olfactory contamination was identified
within the strata encountered in the exploratory holes on site.
The ground conditions at the western end of the upper field appear suitable for the design and
construction of relatively shallow spread foundations for the proposed development.
However, in view of the nature and thickness of the Made Ground and Fill towards the eastern
end of the upper field and the anticipated high loading, piles may provide the most appropriate
foundation solution. Alternatively, ground improvement by installation of vibro-stone columns
through the Made Ground and Fill can be also be considered.
It is considered that the ground will be able to support a build up of the proposed fill in relation to
the building up of the field to accommodate the proposed surface water drainage attenuation
tanks in the lower eastern part of the site.
Ground bearing floor slabs can be adopted, providing a well compacted, suitable granular fill is
placed at the formation level. Appropriate measures to reduce impact from the differential
settlements at the location where the slab passes from the natural ground to a structural fill
should be introduced.
In accordance with BRE Special Digest 1: 2005 Concrete in aggressive ground, the
Aggressive Chemical Environment for Concrete (ACEC) Classification is AC-2 with a Design
Sulfate Class for the site of DS-2. However, it is noted that a pH of 5.2 was recorded in
GWS19, which would indicate an ACEC classification of AC-4z. However, as this low pH was
detected in only one of the 13 samples tested, and the average pH of the samples tested from
the site is 6.7, it is considered that this result can be discounted.
Report No. 251076-01 BSF Kettering Science Academy Page 20 of 20
7.2 Recommendations for Further Geotechnical Work
From the data already collected from both site investigations, it is not possible to determine
where the large thickness of Made Ground and Fill within the slope between the upper and
lower playing fields ends. Delineating this thick Made Ground and Fill, and knowing its profile
closer to the embankment would be greatly advantageous. The number and placement of
vibro-stone columns will be affected by the size of the area where the depth of the Made
Ground / Fill exceeds the depth to which material will be excavated from.
Report No. 251076-01 BSF Kettering Science Academy
FIGURES
Extract of 1:50,000 Ordnance Survey Explorer Map
Reproduced from Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery Office. Crown Copyright reserved (Licence No: 100002620).
Site: BSF Kettering Science Academy Client: Kier Marriott
National Grid Reference: SP 879 784 Scale: Not to Scale
Job No: 251076
SITE LOCATION PLAN
Fig No: 1
The Site
Site: BSF Kettering Science Academy Client: Kier Marriott
Source: Mott MacDonald’s Northamptonshire
Academies Geo-Environmental Site Fact Sheet (Figure 1 – Site Location)
Scale: Not to Scale
Job No: 251076
SITE LAYOUT PLAN
Fig No: 2
WS6
WS3
WS4
WS1 WS5
WS2
WS7
WS8
DP1
DP2
DP3
DP4
DP5
Sheet 1 of 1
Job Number: 251076
Figure: 5BSF Kettering Science Academy
Client:
Kier Marriott
SPT 'N' VALUES vs DEPTH
Site:
-4.5
-4
-3.5
-3
-2.5
-2
-1.5
-1
-0.5
0
0 5 10 15 20 25 30
SPT 'N' Value (for 300mm penetration)
Dep
th b
elo
w e
xis
tin
g g
rou
nd
level
Alluvium Made Ground Northampton Sand Formation Whitby Mudstone Formation
Report No. 251076-01 BSF Kettering Science Academy
APPENDIX A
Fieldwork Records
BOREHOLE RECORD(Window Sampler)
BoreholeNumber:
Site:
Client: Ground Level: Job No.:
GROUND WATER SAMPLES/TESTS STRATA RECORDStrike Well Depth Type/Depth Depth Level Key Description
(m) (m) (mAOD)
Remarks and Water Observations
Figure:
Logged by:
Scale:
Dates:
S Specialist Engineering, Materialsand Environmental Consultants
Location:
(m)In-situ Tests
HV-Hand Vane (kN/m2)PP-Pocket Penotometer (kN/m2)
MP-Mackintosh Probe (N150)
Key for Insitu tests
BSF Kettering Science Academy
Kier Marriott
Hand-dug pit excavated to 1.00m.bgl. No services wereencountered. Groundwater was encountered as seepage at 0.30m.bgl;field is known to be frequently waterlogged. Hole advanced to4.00m.bgl, with an SPT carried out at its base, and was backfilledand compacted on completion.
Deeble Road, Kettering
67.25mAOD 21 Dec 09 251076
WS1
MG
TB1
TB2
TB3
TB4
1.00
2.00
3.00
4.00
C
N=8
HV@ 1.90=117
C
N=14
HV@ 2.90=120
C
N=17
HV@ 3.90=120
C
N=24
150
160
165
0.50
1.50
4.00
66.75
65.75
63.25
0.50
1.00
2.50
Firm to stiff dark orange brown laminated greyslightly silty CLAY with rare rootlets and raresubangular to subrounded fine flint gravel. (MADEGROUND)
Stiff dark grey brown laminated and mottled lightbrown occasionally dark orange silty CLAY with raredecayed rootlets and occasional iron-richlaminations. (NORTHAMPTON SAND FORMATION)
Stiff to very stiff dark grey silty CLAY withselenite present. (WHITBY MUDSTONE FORMATION)
End of Borehole at 4.45 m
1
2
3
4
1:25
Sheet 1 of 1
BOREHOLE RECORD(Window Sampler)
BoreholeNumber:
Site:
Client: Ground Level: Job No.:
GROUND WATER SAMPLES/TESTS STRATA RECORDStrike Well Depth Type/Depth Depth Level Key Description
(m) (m) (mAOD)
Remarks and Water Observations
Figure:
Logged by:
Scale:
Dates:
S Specialist Engineering, Materialsand Environmental Consultants
Location:
(m)In-situ Tests
HV-Hand Vane (kN/m2)PP-Pocket Penotometer (kN/m2)
MP-Mackintosh Probe (N150)
Key for Insitu tests
BSF Kettering Science Academy
Kier Marriott
Hand-dug pit excavated to 1.00m.bgl. No services wereencountered. Groundwater was encountered as seepage at 0.50m.bgl;field is known to be frequently waterlogged. Hole advanced to4.00m.bgl, with an SPT carried out at its base, and was backfilledand compacted on completion.
Deeble Road, Kettering
66.72mAOD 21 Dec 09 251076
WS2
MG
TB1
TB2
TB3
TB4
1.00
2.00
3.00
4.00
C
N=7
HV@ 1.90=100
C
N=8
HV@ 2.90=115
C
N=17
HV@ 3.90=114
C
N=22
100
130
125
130
0.20
2.20
4.00
66.52
64.52
62.72
0.20
2.00
1.80
Turf over firm orange brown slightly silty slightlygravelly CLAY with rare rootlets and tin fragments. Gravel is subangular to subrounded fine to mediumflint. (MADE GROUND)
Firm to stiff dark grey laminated orange silty CLAYwith rare decayed rootlets. (NORTHAMPTON SANDFORMATION)
Stiff to very stiff dark grey silty CLAY withselenite present. (WHITBY MUDSTONE FORMATION)
End of Borehole at 4.45 m
1
2
3
4
1:25
Sheet 1 of 1
BOREHOLE RECORD(Window Sampler)
BoreholeNumber:
Site:
Client: Ground Level: Job No.:
GROUND WATER SAMPLES/TESTS STRATA RECORDStrike Well Depth Type/Depth Depth Level Key Description
(m) (m) (mAOD)
Remarks and Water Observations
Figure:
Logged by:
Scale:
Dates:
S Specialist Engineering, Materialsand Environmental Consultants
Location:
(m)In-situ Tests
HV-Hand Vane (kN/m2)PP-Pocket Penotometer (kN/m2)
MP-Mackintosh Probe (N150)
Key for Insitu tests
BSF Kettering Science Academy
Kier Marriott
Hand-dug pit excavated to 1.00m.bgl. No services wereencountered. Groundwater not visibly encountered. Hole advancedto 4.00m.bgl, with an SPT carried out at its base, and was backfilledand compacted on completion.
Deeble Road, Kettering
64.85mAOD 21 Dec 09 251076
WS3
MG
TB1
TB2
TB3
TB4
TB5
1.00
1.30-1.40
2.00
3.00
4.00
C
N=6
C
N=8
HV@ 2.90=117
C
N=11
HV@ 3.90=113
C
N=19
75
80
120
0.80
3.50
4.00
64.05
61.35
60.85
0.80
2.70
0.50
Turf over firm orange brown slightly silty slightlygravelly CLAY with rare rootlets and medium gravelsized clinker fragments. Gravel is subangular tosubrounded fine to medium flint. (MADE GROUND)
…@ 0.40m half brick
Firm to stiff orange brown laminated orange slightly silty slightly gravelly CLAY with rare sandstonecobbles and with rare decayed rootlets andoccasional iron-rich laminations. Gravel issubangular to subrounded fine to medium sandstone.(NORTHAMPTON SAND FORMATION)
… between 1.30m and 1.40m frequent fine gravel sized black organic fragments… between 1.40m and 1.60m yellow grey brown
… between 1.70m and 2.00m no recovery
… below 2.10m becomes firm to stiff and darkgrey mottled light brown, with selenitepresent… between 2.30m and 2.60m occasional to somelaminations of ferruginous sandstone SAND andfine GRAVEL
… below 2.80m dark orange iron-richlaminations
Stiff to very stiff dark grey silty CLAY withselenite present. (WHITBY MUDSTONE FORMATION)
End of Borehole at 4.45 m
1
2
3
4
1:25
Sheet 1 of 1
BOREHOLE RECORD(Window Sampler)
BoreholeNumber:
Site:
Client: Ground Level: Job No.:
GROUND WATER SAMPLES/TESTS STRATA RECORDStrike Well Depth Type/Depth Depth Level Key Description
(m) (m) (mAOD)
Remarks and Water Observations
Figure:
Logged by:
Scale:
Dates:
S Specialist Engineering, Materialsand Environmental Consultants
Location:
(m)In-situ Tests
HV-Hand Vane (kN/m2)PP-Pocket Penotometer (kN/m2)
MP-Mackintosh Probe (N150)
Key for Insitu tests
BSF Kettering Science Academy
Kier Marriott
Hand-dug pit excavated to 1.00m.bgl. No services wereencountered. Groundwater was not visibly encountered. Holeadvanced to 4.00m.bgl, with an SPT carried out at its base, and wasbackfilled and compacted on completion.
Deeble Road, Kettering
64.30mAOD 21 Dec 09 251076
WS4
MG
TB1
TB2
TB3
TB4
1.00
2.00
2.80
4.00
C
N=7
C
N=8
C
N=10
HV@ 3.90=73
C
N=12
105
55
0.60
1.25
2.00
3.20
3.40
4.00
63.70
63.05
62.30
61.10
60.90
60.30
0.60
0.65
0.75
1.20
0.20
0.60
Turf over firm orange brown slightly silty slightlygravelly CLAY with rare rootlets, fine gravel sizedclinker fragments, and medium gravel sized brickfragments. Gravel is subangular to subrounded fineto medium flint and orange ferruginous sandstone.(MADE GROUND)
Firm to stiff orange brown slightly silty slightlygravelly CLAY with rare decayed rootlets. Gravel is angular to subrounded fine to medium occasionallycoarse orange ferruginous sandstone. (FILL)
Firm brown slightly silty slightly sandy slightlygravelly CLAY with occasional ferruginous sandstonecobbles and with rare fine to medium gravel sizedclinker fragments. (FILL)
…@ 1.80m slag cobble within a large cobblesized pocket of light grey brown fine tomedium sand… between 1.90m and 2.00m mottled black, witha high organic / decayed plant fragmentcontent
Firm to stiff dark yellow grey slightly siltyslightly sandy CLAY. Sand is fine to medium.(FILL)
… between 2.30m and 3.00m no recovery, assampler barrel split
Firm to stiff grey brown sandy to very sandy CLAY.(NORTHAMPTON SAND FORMATION)
Stiff to very stiff brown mottled light greyslightly silty occasionally slightly sandy CLAY with occasional layers of orange ferruginous clay.(NORTHAMPTON SAND FORMATION)
End of Borehole at 4.45 m
1
2
3
4
1:25
Sheet 1 of 1
BOREHOLE RECORD(Window Sampler)
BoreholeNumber:
Site:
Client: Ground Level: Job No.:
GROUND WATER SAMPLES/TESTS STRATA RECORDStrike Well Depth Type/Depth Depth Level Key Description
(m) (m) (mAOD)
Remarks and Water Observations
Figure:
Logged by:
Scale:
Dates:
S Specialist Engineering, Materialsand Environmental Consultants
Location:
(m)In-situ Tests
HV-Hand Vane (kN/m2)PP-Pocket Penotometer (kN/m2)
MP-Mackintosh Probe (N150)
Key for Insitu tests
BSF Kettering Science Academy
Kier Marriott
Hand-dug pit excavated to 1.00m.bgl. No services wereencountered. Groundwater was encountered as seepage at 0.30m.bgl,and was sitting in the previously dug hand pit at approximately0.90m.bgl; field is known to be frequently waterlogged. Holeadvanced to 4.00m.bgl, with an SPT carried out at its base, and wascompacted on completion.
Deeble Road, Kettering
65.75mAOD 21 Dec 09 251076
WS5
MG
TB1
TB2
TB3
TB4
1.00
2.00
3.00
4.00
C
N=5
HV@ 1.90=74
C
N=7
C
N=13
C
N=22
50
135
60
0.90
1.10
1.60
1.80
2.00
2.70
3.50
3.70
4.00
64.85
64.65
64.15
63.95
63.75
63.05
62.25
62.05
61.75
0.90
0.20
0.50
0.20
0.20
0.70
0.80
0.20
0.30
Turf over firm orange brown slightly silty slightlysandy slightly gravelly to gravelly CLAY with raresandstone cobbles and with rare rootlets, finegravel sized clinker fragments, and fine to mediumgravel sized brick fragments. Sand is fine tomedium. Gravel is angular to subrounded fine tomedium ferruginous sandstone. (MADE GROUND)
Firm to stiff dark grey mottled orange and paleyellow slightly silty slightly gravelly CLAY withrare decayed rootlets. Gravel is subangular tosubrounded fine to medium sandstone. (FILL)
Firm to stiff dark orange brown mottled greyslightly silty slightly sandy slightly gravellyCLAY. Gravel is subangular to subrounded fine tomedium flint. (FILL)
… between 1.50m and 1.60m dark grey brownmottled black, with frequent decayed plantfragments and rare black wood
Firm to stiff dark orange brown slightly siltyslightly sandy slightly gravelly to gravelly CLAY.Gravel is subangular to subrounded fine to mediumferruginous sandstone and occasional slag. (FILL)
Firm to stiff dark grey brown mottled black slightly silty slightly sandy CLAY with occasional decayedplant fragments. Sand is fine. (FILL)
Soft very wet slightly sandy slightly gravelly CLAY. (FILL)
Firm dark yellow grey slightly silty slightly sandyCLAY. Sand is fine to medium. (FILL)
… between 3.00m and 3.50m no recovery
Firm to stiff orange brown mottled grey slightlysilty slightly gravelly CLAY. (NORTHAMPTON SANDFORMATION)
Stiff to very stiff dark grey silty CLAY withselenite present. (WHITBY MUDSTONE FORMATION)
… between 3.90m and 4.00m no recovery
End of Borehole at 4.45 m
1
2
3
4
1:25
Sheet 1 of 1
BOREHOLE RECORD(Window Sampler)
BoreholeNumber:
Site:
Client: Ground Level: Job No.:
GROUND WATER SAMPLES/TESTS STRATA RECORDStrike Well Depth Type/Depth Depth Level Key Description
(m) (m) (mAOD)
Remarks and Water Observations
Figure:
Logged by:
Scale:
Dates:
S Specialist Engineering, Materialsand Environmental Consultants
Location:
(m)In-situ Tests
HV-Hand Vane (kN/m2)PP-Pocket Penotometer (kN/m2)
MP-Mackintosh Probe (N150)
Key for Insitu tests
BSF Kettering Science Academy
Kier Marriott
Hand-dug pit excavated to 1.00m.bgl. No services wereencountered. Groundwater was sitting in the previously dug hand pitat approximately 1.00m.bgl; field is known to be frequentlywaterlogged. Hole advanced to 4.00m.bgl, with an SPT carried out atits base, and was backfilled and compacted on completion.
Deeble Road, Kettering
62.40mAOD 21 Dec 09 251076
WS6
MG
TB1
TB2
TB3
TB4
1.00
2.00
2.50
3.50
C
N=9
HV@ 1.90=96
C
N=9
C
N=19
C
N=23
50
65
80
0.80
1.30
1.45
1.601.70
2.35
4.00
61.60
61.10
60.95
60.8060.70
60.05
58.40
0.80
0.50
0.15
0.15
0.10
0.65
1.65
Turf over firm dark orange brown slightly siltyslightly sandy slightly gravelly CLAY with rarerootlets. Sand is fine to coarse. Gravel issubangular to subrounded fine flint. (MADE GROUND)
…@ 0.40m rare medium to coarse gravel sizedbrick fragments
… below 0.60m becomes slightly silty slightlysandy gravelly CLAY. Gravel becomes angularto subrounded fine to medium occasionallycoarse ferruginous sandstone
Loose dark orange brown very clayey very gravellyfine to coarse SAND. Gravel is angular tosubrounded fine to medium ferruginous sandstone.(NORTHAMPTON SAND FORMATION)
Loose dark orange brown very clayey very sandyangular to subrounded fine to medium ferruginoussandstone GRAVEL. (NORTHAMPTON SANDFORMATION)
Firm orange brown mottled light grey slightly siltyCLAY. (NORTHAMPTON SAND FORMATION)
Orange brown slightly clayey fine to coarse SAND.(NORTHAMPTON SAND FORMATION)
Firm to stiff orange brown mottled light greyslightly silty CLAY. (NORTHAMPTON SANDFORMATION)
… between 1.90m and 1.92m slightly clayey fine to coarse SAND… between 2.00m and 3.00m 50% recovery
Stiff to very stiff dark grey silty CLAY withselenite present. (WHITBY MUDSTONE FORMATION)
End of Borehole at 4.45 m
1
2
3
4
1:25
Sheet 1 of 1
BOREHOLE RECORD(Window Sampler)
BoreholeNumber:
Site:
Client: Ground Level: Job No.:
GROUND WATER SAMPLES/TESTS STRATA RECORDStrike Well Depth Type/Depth Depth Level Key Description
(m) (m) (mAOD)
Remarks and Water Observations
Figure:
Logged by:
Scale:
Dates:
S Specialist Engineering, Materialsand Environmental Consultants
Location:
(m)In-situ Tests
HV-Hand Vane (kN/m2)PP-Pocket Penotometer (kN/m2)
MP-Mackintosh Probe (N150)
Key for Insitu tests
BSF Kettering Science Academy
Kier Marriott
No services were encountered. Groundwater was sitting atapproximately 0.85m.bgl at the end of drilling; field is known to befrequently waterlogged. Hole advanced to 4.00m.bgl, with an SPTcarried out at its base, and was backfilled and compacted oncompletion.
Deeble Road, Kettering
60.35mAOD 22 Dec 09 251076
WS7
MG
TB1
TB2
TB3
TB4
0.60-0.75
1.50-1.70
2.00-3.00
3.00-4.00
C
N=8
C
N=11
C
N=13
C
N=8
60
30
90
0.25
0.55
1.00
1.35
2.00
3.00
4.00
60.10
59.80
59.35
59.00
58.35
57.35
56.35
0.25
0.30
0.45
0.35
0.65
1.00
1.00
Turf over firm brown slightly silty CLAY with rarerootlets, fine gravel sized clinker/ash fragments,and fine to medium gravel sized brick fragments.(MADE GROUND)
Stiff dark orange brown slightly silty slightlysandy slightly gravelly CLAY with rare rootlets andmedium gravel sized slag fragments. Sand is fine to medium. Gravel is subangular to rounded fine tomedium flint and occasional ferruginous sandstone.(MADE GROUND)
Stiff orange grey brown occasionally mottled darkred brown slightly gravelly CLAY. Gravel issubangular to subrounded fine ferruginous sandstoneand flint. (ALLUVIUM)
… between 0.75m and 1.00m no recovery
Orange grey brown slightly sandy gravelly to verygravelly CLAY. Sand is fine to coarse. Gravel isangular to rounded fine to medium flint. (ALLUVIUM)
… between 1.20m and 1.35m slightly gravellyvery sandy CLAY
Medium dense grey brown very clayey very sandyangular to rounded fine to coarse flint GRAVEL withrare flint cobbles. Sand is fine to coarse.(ALLUVIUM)
… between 1.70m and 2.00m no recovery
Medium dense grey brown clayey very gravelly fine to coarse SAND. Gravel is angular to rounded fine tomedium flint. (ALLUVIUM)
… between 2.00m and 3.00m very limitedrecovery
Stiff to very stiff dark grey silty CLAY withselenite present. (WHITBY MUDSTONE FORMATION)
… between 3.00m and 4.00m very limitedrecovery
End of Borehole at 4.45 m
1
2
3
4
1:25
Sheet 1 of 1
BOREHOLE RECORD(Window Sampler)
BoreholeNumber:
Site:
Client: Ground Level: Job No.:
GROUND WATER SAMPLES/TESTS STRATA RECORDStrike Well Depth Type/Depth Depth Level Key Description
(m) (m) (mAOD)
Remarks and Water Observations
Figure:
Logged by:
Scale:
Dates:
S Specialist Engineering, Materialsand Environmental Consultants
Location:
(m)In-situ Tests
HV-Hand Vane (kN/m2)PP-Pocket Penotometer (kN/m2)
MP-Mackintosh Probe (N150)
Key for Insitu tests
BSF Kettering Science Academy
Kier Marriott
No services were encountered. Groundwater was sitting atapproximately 0.80m.bgl at the end of drilling; field is known to befrequently waterlogged. Hole advanced to 4.00m.bgl, with an SPTcarried out at its base, and was backfilled and compacted oncompletion.
Deeble Road, Kettering
60.00mAOD 22 Dec 09 251076
WS8
MG
TB1
TB2
TB3
TB4
1.00
1.65-1.80
2.40
3.00-4.00
HV@ 0.90=80
C
N=5
C
N=16
C
N=18
C
N=15
25
30
105
0.30
1.00
1.40
1.70
3.07
4.00
59.70
59.00
58.60
58.30
56.93
56.00
0.30
0.70
0.40
0.30
1.37
0.93
Turf over firm brown slightly silty CLAY with rarerootlets, fine gravel sized clinker/ash fragments,and fine to medium gravel sized brick fragments.(MADE GROUND)
Stiff dark orange brown slightly silty slightlysandy slightly gravelly to gravelly CLAY with rarerootlets and fine gravel sized clinker/ashfragments. Sand is fine to medium. Gravel isangular to subrounded fine to medium slag andoccasional ferruginous sandstone. (MADE GROUND)
Stiff orange grey brown occasionally mottled darkred brown slightly gravelly CLAY. Gravel issubangular to subrounded fine ferruginous sandstoneand flint. (ALLUVIUM)
Orange grey brown slightly sandy gravelly to verygravelly CLAY. Sand is fine to coarse. Gravel isangular to rounded fine to medium flint. (ALLUVIUM)
Stiff dark grey slightly silty slightly gravellyCLAY. Gravel is angular to rounded fine to mediumflint. (ALLUVIUM)
… between 1.80m and 2.00m no recovery
… between 2.50m and 2.60m very gravelly SAND. Gravel is angular to rounded fine to mediumflint… between 2.60m and 3.00m no recovery
Medium dense grey brown slightly clayey very sandyangular to rounded fine to coarse flint GRAVEL.Sand is fine to coarse. (ALLUVIUM)
… between 3.07m and 4.00m very limitedrecovery
End of Borehole at 4.45 m
1
2
3
4
1:25
Sheet 1 of 1
1:25
Sheet 1 of 1
ReadingsBlows / 100mm
Depth(m)
SDP No
(Nm)
Client:
and Environmental Consultants
Figure:
Scale:
Site:
Ground Level : Date :
Job No. :
Specialist Engineering, MaterialsDYNAMIC PROBINGRECORD FORMLocation:
TorqueDiagram (N100 Values)
Remarks:Recorded by:
Kier Marriott
BSF Kettering Science Academy
No services were encountered. Dynamic probe advanced to 5.00m.bgl.
Deeble Road, Kettering
66.430mAOD 22/12/09
MG
DP1251076
00
01
01
12
11
22
22
33
33
54
45
56
56
56
66
77
68
89
87
89
99
910
910
1110
1111
1
2
3
4
5 10 15 20 25
1:25
Sheet 1 of 1
ReadingsBlows / 100mm
Depth(m)
SDP No
(Nm)
Client:
and Environmental Consultants
Figure:
Scale:
Site:
Ground Level : Date :
Job No. :
Specialist Engineering, MaterialsDYNAMIC PROBINGRECORD FORMLocation:
TorqueDiagram (N100 Values)
Remarks:Recorded by:
Kier Marriott
BSF Kettering Science Academy
No services were encountered. Dynamic probe advanced to 5.00m.bgl.
Deeble Road, Kettering
64.820mAOD 22/12/09
MG
DP2251076
00
00
11
11
01
12
34
33
33
43
43
44
44
44
54
55
45
55
65
56
77
88
98
89
910
1
2
3
4
5 10 15 20 25
1:25
Sheet 1 of 1
ReadingsBlows / 100mm
Depth(m)
SDP No
(Nm)
Client:
and Environmental Consultants
Figure:
Scale:
Site:
Ground Level : Date :
Job No. :
Specialist Engineering, MaterialsDYNAMIC PROBINGRECORD FORMLocation:
TorqueDiagram (N100 Values)
Remarks:Recorded by:
Kier Marriott
BSF Kettering Science Academy
No services were encountered. Dynamic probe advanced to 5.00m.bgl.
Deeble Road, Kettering
66.680mAOD 22/12/09
MG
DP3251076
00
01
11
12
11
23
23
33
43
34
44
54
56
67
77
77
89
98
99
98
109
1010
1111
1011
1211
1
2
3
4
5 10 15 20 25
1:25
Sheet 1 of 1
ReadingsBlows / 100mm
Depth(m)
SDP No
(Nm)
Client:
and Environmental Consultants
Figure:
Scale:
Site:
Ground Level : Date :
Job No. :
Specialist Engineering, MaterialsDYNAMIC PROBINGRECORD FORMLocation:
TorqueDiagram (N100 Values)
Remarks:Recorded by:
Kier Marriott
BSF Kettering Science Academy
No services were encountered. Dynamic probe advanced to 5.00m.bgl.
Deeble Road, Kettering
61.500mAOD 22/12/09
MG
DP4251076
00
00
00
10
21
12
22
22
34
33
33
33
44
55
57
66
65
79
88
1011
1011
1111
1210
1112
1111
1
2
3
4
5 10 15 20 25
1:25
Sheet 1 of 1
ReadingsBlows / 100mm
Depth(m)
SDP No
(Nm)
Client:
and Environmental Consultants
Figure:
Scale:
Site:
Ground Level : Date :
Job No. :
Specialist Engineering, MaterialsDYNAMIC PROBINGRECORD FORMLocation:
TorqueDiagram (N100 Values)
Remarks:Recorded by:
Kier Marriott
BSF Kettering Science Academy
No services were encountered. Dynamic probe advanced to 5.00m.bgl.
Deeble Road, Kettering
60.300mAOD 22/12/09
MG
DP5251076
00
01
11
21
22
22
33
24
43
22
35
42
12
22
23
34
45
66
76
66
77
87
88
99
99
1
2
3
4
5 10 15 20 25