    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    1

    CODE OF PRACTICE ONSAFETY MANAGEMENT SYSTEM FOR THE

    CHEMICAL INDUSTRY

    Developed jointly by the Oil and Petrochemical Industry Technical & Safety Committeeand the Occupational Safety Department, Ministry of Manpower

    Published in January 2001

  • 8/12/2019 Safety Code of SMS

    2/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    2

    This Code of Practice on Safety Management System for the Oil, Petrochemical and Chemical Industries

    has been developed by a Working Group which comprised representatives from the Oil andPetrochemical Industry Technical and Safety Committee (OPITSC) and the Occupational Safety

    Department, Ministry of Manpower.

    The Working Group involved in the preparation of this Code comprised the following members:

    Name Organisation

    Chairman : Mr Chan Yew Kwong Occupational Safety Department (MOM)

    Members : Mr Ismadi Mohamed Occupational Safety Department (MOM)

    Mr Koh Bok Thong Occupational Safety Department (MOM)

    Mr Kader Mydin Occupational Safety Department (MOM)

    Mr Wang Hui Hua Chairman, OPITSC

    (Petrochemical Corporation of Singapore)

    Mr Richard Tan Chevron Oronite

    Mr Au Foo Yien Du Pont Singapore

    Mr Pachaimuthu Sankaran Du Pont SingaporeMr John Tai ExxonMobil Singapore

    Mr David Ong ExxonMobil Singapore

    Mr Ho Yuen Chuan ExxonMobil Singapore

    Mr Albert Lim Shell Eastern Petroleum

    Mr Leng Ng Tai Shell Eastern Petroleum

    Ms Cissie Yeung Singapore Chemical Industry Council

    (Ciba Specialty Chemicals Singapore)

    Ms Lam Kit Wing Singapore Chemical Industry Council

    (ISK Singapore)

    Mr Eric Tang Tong Hai Singapore Refining CompanyMr Michael Yan Vopak Terminal Singapore

  • 8/12/2019 Safety Code of SMS

    3/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    3

    Contents

    PageForeword

    SPECIFICATION

    A Scope ________________________________________________________________________5

    B Definitions _____________________________________________________________________5

    1 Element 1 Safety Policy ________________________________________________________8

    2 Element 2 Safe Work Practices__________________________________________________9

    3 Element 3 Safety Training______________________________________________________10

    4 Element 4 Group Meetings ____________________________________________________12

    5 Element 5 Incident Investigation and Analysis _____________________________________14

    6 Element 6 In House Safety Rules and Regulations__________________________________15

    7 Element 7 Safety Promotion____________________________________________________16

    8 Element 8 Contractors Evaluation, Selection and Control ____________________________18

    9 Element 9 Safety Inspection____________________________________________________20

    10 Element 10 Maintenance Regime _______________________________________________22

    11 Element 11 Hazard Analysis ___________________________________________________24

    12 Element 12 Control of Movement and Use of Hazardous Chemicals ____________________26

    13 Element 13 Occupational Health Programs________________________________________28

    14 Element 14 Emergency Preparedness ___________________________________________30

    15 Documentation Control and Records_______________________________________________32

    APPENDICES

    A List of Safe Work Practices ______________________________________________________33

    B List of Safety Training Requirements_______________________________________________34

    C List of In-House Safety Rules and Regulations_______________________________________35

    D List of Maintenance Regimes ____________________________________________________36

  • 8/12/2019 Safety Code of SMS

    4/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    4

    Foreword

    This Code of Practice has been developed by a Working Group which comprised representatives fromthe Oil & Petrochemical Industry Technical and Safety Committee and the Occupational Safety

    Department, Ministry of Manpower.

    Under section 71B of the Factories (Amendment) Act 1999, the Minister may require the occupier of a

    certain class or description of factories to implement a Safety Management System for the purpose of

    ensuring the safety, and protecting the health and welfare of persons employed in the factory. The

    occupier shall appoint such number of approved auditors to audit the Safety Management System as

    required and to implement, as far as is practicable, the recommendations of the approved auditor without

    undue delay.

    This Code represents a standard of good practice and has been prepared with the objective of

    formulating the discipline to which these procedures should conform. It stipulates requirements for the

    14 elements of the Safety Management System as specified in the Thirteenth Schedule of the Factories

    (Amendment) Act 1999.

    It is generally intended for personnel in the Oil, Petrochemical and Chemical industry, especially those

    involved in the preparation, supervision and execution of processes in major hazardous installations and

    plants. This Code is also recommended for use by the other manufacturing and general industries as

    appropriate. It forms a basis for audit and review of the Safety Management System.

    This Code recommends compliance with the Factories Act and its subsidiary legislations, as well as with

    other regulatory requirements, internationally accepted codes and standards and best practices.

  • 8/12/2019 Safety Code of SMS

    5/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    5

    A Scope

    This Code of Practice sets down the basic expectations and requirements of the Safety Management System implemented in afactory in the Oil, Petrochemical & Chemical Industries for the purpose of ensuring the safety and protecting the health of all

    personnel and workers working in the factory.

    B Definitions

    For the purpose of this Code, the following definitions shall apply

    B1 Use of Language

    Shall - means a mandatory requirement

    Should - means a preferred method of action

    May - means a possible method of action

    B2 Contractor

    Any company undertaking contract works or providing services of any kind for the factory and shall include all the sub-contractor

    companies engaged by the main contractor.

    B3 Elements

    A grouping of expectations into a key safety management system focus area such as Safety Policy, Safety Training, Emergency

    Preparedness etc.

    B4 Factory

    The expression factory in this Code covers all premises engaged in the processing or manufacturing of petroleum, petroleum

    products, petrochemicals, petrochemical products and other hazardous chemicals where workers are employed for the purpose

    of trade or for gain.

    B5 Hazard Analys is

    A thorough, organised and systematic approach used to identify, evaluate and control hazards by the application of one or more

    internationally recognised techniques/methodologies. Checklists, What-if Checklists, Failure Mode and Effect Analysis (FMEA),

    Fault Tree Analysis, and Hazops are examples of accepted hazard analysis techniques.

    B6 Hazardous Chemicals/Substances

    Substances and chemicals used, handled or stored in a factory, which are toxic, corrosive or flammable.

  • 8/12/2019 Safety Code of SMS

    6/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    6

    B7 HAZOP

    Hazard and Operability Study - A formal procedure or technique of systematically investigating each element of a system for all

    potential deviations from design conditions. Deviations are critically analysed for effects of potential problems and the consequencesof failure reviewed, and safeguards assessed for adequacy.

    B8 Lockout/Tagout System

    A system designed to help safeguard employees from unexpected start-up of machinery or equipment or the release of

    hazardous energy during servicing or maintenance work.

    B9 Management of Change

    A procedure that records, schedules, addresses and monitors hazards that may be introduced by any change to the design,

    operation or maintenance of plant machinery and equipment in accordance with internationally recognised standards such as API

    750 or OSHA 1910.

    B10 Management Systems

    The human and technical factors including materials, processes, planning activities, procedures and responsibilities that are

    necessary to achieve and maintain the requirements of this Standard.

    B11 Material Safety Data Sheet (MSDS)

    Information label or leaflet to be provided by the supplier or manufacturer of any toxic, corrosive or flammable substance which

    shall provide accurate and adequate description of the identity, physical and chemical properties of the substance, safety and health

    hazard information, precautions to be taken and safe handling information.

    B12 Occupier

    In relation to a factory, a person who occupies or uses a premises as a factory.

    B13 Personal Protective Equipment (PPE)

    Personal protective clothing and appliance to be provided and maintained for all persons employed in any process involving

    exposure to hazardous conditions and substances. The specific aspects of PPE to be addressed include System Requirements,

    Eye and Face protection, Respiratory protection, Head protection, Foot protection, Electrical protective equipment, Ear protection

    and Hand protection.

    B14 Pre-Startup Safety Review (PSSR)

    A pre-startup safety review is normally carried out before any new process facility or modified facility when the modification is

    significant enough to require a change in the process safety information can be brought on line.

  • 8/12/2019 Safety Code of SMS

    7/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    7

    B15 Procedure

    A written description of how a specific task should be accomplished.

    B16 Risk Assessment

    Risk assessment includes scenario identification and consequence analysis. Scenario identification describes how an accident

    occurs. It frequently includes an analysis of the probabilities. Consequence analysis describes the damage expected and includes

    loss of life, damage to the environment or capital equipment and days outage.

    B17 Safety Audit

    Under section 71B of the Factories (Amendment) Act 1999, the occupier of a certain class or description of factories shall appoint

    such number of approved auditors to audit the safety management system at such time and in such manner as the Chief Inspector

    may require, and to implement the recommendations of the approved auditor without undue delay as far as is practicable.

    B18 Safety Committee

    The occupier of a factory, in which 50 or more persons are for the time being employed, shall establish a safety committee on

    which both employees and management are represented for the purpose of keeping under review circumstances in the factory

    which affect or may affect the safety or health of the persons employed in the factory.

    B19 Safety Management System

    Under section 71B of the Factories (Amendment) Act 1999, the Minister may, by Order, require the occupier such class or

    description of factories to implement a safety management system for the purpose of ensuring the safety and protecting the health

    and welfare of persons employed in the factory.

    B20 Safety Review

    Normally refers to internal audits performed in supplementary to safety audits.

  • 8/12/2019 Safety Code of SMS

    8/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    8

    CODE OF PRACTICE ON SAFETY MANAGEMENT SYSTEMCODE OF PRACTICE ON SAFETY MANAGEMENT SYSTEM

    FOR THE CHEMICAL INDUSTRYFOR THE CHEMICAL INDUSTRY

    ELEMENT 1: SAFETY POLICY

    Objective

    To establish and maintain a written safety policy, which spells out managements commitment towards

    safety and the principles that govern safety and health decisions in the factory. Senior management shall

    ensure that the safety policy is communicated to all employees and relevant contractors and shallestablish a Culture that safety and health are valued as basic and fundamental prerequisites for the

    business of the factory.

    System Requirements

    1.1 An effective Safety Policy shall demonstrate the management commitment towards safety and

    health improvement, its objectives and directions, including goal setting. The Safety Policy shall

    incorporate and address the following:

    1.1.1 Emphasis on the importance to protect the safety and health and the general well beingof every personnel working in the factory.

    1.1.2 Accountability for the safety and health function by top management.

    1.1.3 Allocation and delegation of duty and responsibility for safety and health from the top

    management to the line staff.

    1.1.4 Responsibility at all levels in preventing incidents.

    1.1.5 Commitment of sufficient resources towards the achievement of safety and health goalsand objectives.

    1.2 The Safety Policy shall be signed by the most senior management staff of the factory.

    1.3 The Safety Policy shall be effectively communicated to all employees and contractors in the

    factory.

    1.4 The Safety Policy should be reviewed at defined intervals and updated to ensure relevancy and

    continuous improvement.

  • 8/12/2019 Safety Code of SMS

    9/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    9

    ELEMENT 2: SAFE WORK PRACTICESELEMENT 2: SAFE WORK PRACTICES

    Objective

    To establish a system to ensure that safe work practices are carried out in the factory through procedural

    and administrative control of work, critical operating steps and parameters, pre-startup safety reviews for

    new and modified plant equipment and facilities, and management of change of plant equipment and

    process.

    System Requirements

    2.1 Every factory shall establish and implement safe work practices for its main operation or process,

    which may include, but not limited to the list as specified in Appendix A. Safe work practices

    must be developed and implemented for the work operations or processes as specified in the

    Twelfth Schedule of the Factories Act.

    2.2 The safe work practices should be established after a risk assessment of the work operation or

    process has been conducted, including hazard identification and risk analysis of the risks

    associated with the operation or process.

    2.3 The safe work practices shall be clearly written and communicated to all relevant employees andcontractors. The safe work practices shall be made readily available to all employees and

    contractors.

    2.4 Safe work practices, where appropriate, should include a Lockout/Tagout system for the effective

    isolation of the energy sources associated with the plant or equipment that is being worked on,

    including, but not limited to, hydraulic, electrical, pneumatic as well as mechanical isolation of

    pipelines and equipment.

    2.5 Depending on the complexity of the factorys operation, a permit to work system should be

    incorporated into the safe work practices to ensure that all precautionary measures are takenbefore the commencement of work.

    2.6 The factory should maintain operating procedures for each process. These operating procedures

    should provide clear understanding of detail operating parameters and limits for safe operation

    for those who are operating the process. The formulation of operating procedures should begin

    from design stage and should be reviewed to update changes made in the process. Operating

    procedures should provide the foundation for operator training and should reflect process safety

    information.

  • 8/12/2019 Safety Code of SMS

    10/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    10

    2.7 The factory should establish and implement a Pre-Start-up Safety Review policy/procedure for

    new equipment, facility or installation to confirm that all process safety elements of this Code are

    addressed and that their areas of concern are all rectified before the initial commissioning of thenew equipment, facility or installation. The Pre-Start-up Safety Review policy/procedure should

    also apply to new factory or process or factory/process, which has major modification.

    2.8 The factory should establish and implement a Management of Change policy/procedure to

    address all hazards/concerns that may be introduced by any Change of hardware, procedures

    or chemicals of the factorys process/facility. The policy/procedure should institute a systematic

    evaluation of the possible hazards or concerns arising from the Change and ensure that the

    appropriate measures are in place before approving the Change.

    2.9 Periodic review of all safe work practices shall be carried out to evaluate their relevance andadequacy. Lessons learned from incidents shall, where applicable, be taken into consideration

    in the review.

  • 8/12/2019 Safety Code of SMS

    11/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    11

    ELEMENT 3: SAFETY TRAININGELEMENT 3: SAFETY TRAINING

    Objective

    To equip employees and contractors at all levels with the knowledge, skills and attitudes relating to the

    operation or maintenance of facilities so as to work in a safe and reliable manner.

    System Requirements

    3.1 An effective training program shall be established to train employees at all levels. A scheme

    shall be devised to identify the safety and health training needs for each level of employees and

    contractors.

    3.2 Safety Instruction Courses, and other mandatory safety-training courses, shall be provided to all

    relevant employees. Such courses shall cover the relevant safe work practices established in

    the factory, hazard identification in work areas and response to emergency situations.

    3.3 All supervisors and workers shall be trained to a competent level expected of their tasks. Where

    appropriate, workers shall be certified in their skills such as for welding, handling of chemicals

    and gas testing.

    3.4 All supervisory staff shall be thoroughly trained in the methods and skills required to perform theirtasks, such as the proper operation of instruments, tools and equipment, reading and

    understanding of the documentation provided and their respective role in accident prevention

    at the workplace.

    3.5 Training shall be provided to all relevant management staff so that they are equipped with the

    proper understanding of the safety management system and their responsibilities and duties in

    safety and health in the factory. The training shall also provide them with the tools and techniques

    needed for managing safety and health effectively at the workplace.

    3.6 Safety orientation or induction shall be conducted for all contractors. Such orientation or induction

    programs shall include an understanding of the factory's safety and health policy as well as all

    its rules and regulations.

    3.7 The training programs may include but not limited to the list as specified inAppendix B.

    3.8 The training programs shall be conducted in languages understood by the trainee.

    3.9 The training programs shall be documented and periodically reviewed. The effectiveness of such

    training shall be measured and reviewed based on feedback from the employees, supervisors,

    managers and the contractors.

    3.10 The factory shall maintain a record of all the training received by each employee.

  • 8/12/2019 Safety Code of SMS

    12/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    12

    ELEMENT 4: GROUP MEETINGSELEMENT 4: GROUP MEETINGS

    Objective

    To promote communication and co-operation between management, employees and contractors so as

    to ensure that issues are addressed and appropriate actions are taken in order to achieve and maintain

    a safe and healthful work environment.

    System Requirements

    4.1 The factory shall establish a Safety Committee for the purpose of improving, promoting and

    reviewing of all matters relating to the safety and health of employees. The Safety Committee

    also acts as a channel for communicating and imparting knowledge and best practices on safety

    and health to all personnel.

    4.2 The Safety Committee shall have a clearly defined charter with prescribed functions and

    responsibilities. The composition, functions and duties of the Safety Committee shall be in

    accordance with the Factories Act and the Factories (Safety Committees) Regulations.

    4.3 The Safety Committee shall be effectively led by the senior management of the factory. TheSafety Committee shall be given the necessary support and resources so as to achieve the

    Committees safety and health objectives.

    4.4 The factory should also establish other group meetings, which may include but not limited to the

    following:

    4.4.1 Tool Box Meetings

    4.4.1.1 Tool Box Meetings involving supervisors and workers should be held regularly

    such as before the commencement of work to provide opportunity for operatorsand workers to discuss safety and health issues in relation to their work.

    4.4.1.2 During the meeting, the supervisor should review the work to be carried out to

    highlight the potential hazards and necessary safety precaution to be taken,

    such as issues pertaining to the use of Personal Protective Equipment.

    4.4.2 Safety Improvement Teams

    The factory should set-up group based Safety Improvement Teams to work through

    safety and health related projects for the purposes of improving the physical work

  • 8/12/2019 Safety Code of SMS

    13/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    13

    environment and to reduce unsafe human behaviours in the factory.

    4.5 The management shall ensure that the personnel participating in the above meetings are:

    4.5.1 competent for their tasks;

    4.5.2 in full understanding of their roles and functions;

    4.5.3 committed to the improvement of safety and health in the workplace. It is important that

    all workers are inculcated with positive attitudes towards safety and health promotional

    activities, and

    4.5.4 given the necessary support so that they can effectively perform their duties.

    4.6 The factory shall establish a mechanism whereby the decisions and actions proposed by the

    various groups are effectively communicated to persons responsible for their implementation.The mechanism shall also ensure that all outstanding actions are effectively followed through and

    implemented.

  • 8/12/2019 Safety Code of SMS

    14/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    14

    ELEMENT 5: INCIDENT INVESTIGATION AND ANALYSISELEMENT 5: INCIDENT INVESTIGATION AND ANALYSIS

    Objective

    To establish procedures for incident reporting and investigation so as to identify root causes of incidents

    and to implement effective corrective measures or systems to prevent recurrence.

    System Requirements

    5.1 The factory shall establish written procedures to ensure that all incidents (accidents and near

    misses) are reported and recorded promptly. A mechanism shall be set up to report incidentsby all personnel including contractors.

    5.2 The factory shall establish written procedures for the investigation into incidents. The procedures

    should include the criteria for the type and degree of seriousness of incidents to be formally

    investigated. All incidents investigated shall determine the root causes, circumstances and other

    indirect contributing factors leading to the incidents.

    5.3 Line managers, supervisors, safety personnel and safety committee members should be

    included in the investigation team. They shall be adequately trained and equipped with the

    necessary knowledge and skills for their tasks.

    5.4 A system shall be established to ensure that the findings and recommendations of the

    investigations are effectively and promptly followed through and implemented.

    5.5 Procedures shall be established to ensure lessons learned from the incidents are proliferated

    to all relevant personnel in the factory for information and awareness.

    5.6 Analysis of all reported incidents and statistics should be carried out periodically to identify the

    type, frequency, severity and root causes of incidents. Such information is useful for drawing up

    safety and health strategic plans, promotional programs and training courses.

  • 8/12/2019 Safety Code of SMS

    15/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    15

    ELEMENT 6: IN-HOUSE SAFETY RULES AND REGULATIONSELEMENT 6: IN-HOUSE SAFETY RULES AND REGULATIONS

    Objective

    To establish written safety rules and regulations for all personnel in the factory so as to inculcate a

    common understanding of their safety and health obligations and responsibilities.

    System Requirements

    6.1 A set of basic safety rules and regulations shall be formulated in the factory to regulate safety and

    health behaviors at the workplace. The rules shall cover the main work operation or process inthe factory, which should include but not limited to the list as specified inAppendix C.

    6.2 The safety rules and regulations shall be documented and effectively communicated to all

    employees and contractors through promotion, training or other means. The rules shall be made

    readily available to all employees and contractors.

    6.3 The safety rules and regulations shall be effectively implemented and vigilantly enforced in the

    factory. All employees and contractors shall comply with the rules and regulations at all times.

    6.4 The safety rules and regulations shall be in conformance with the regulatory requirements. Rulesthat are non-statutory shall conform to international standards or best practices.

    6.5 The factory shall establish and implement disciplinary or corrective procedures for failure to

    observe any of the rules.

    6.6 The factory shall establish procedures to periodically review the safety rules and regulations to

    ensure its relevance and effectiveness. Records of such review shall be maintained.

  • 8/12/2019 Safety Code of SMS

    16/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    16

    ELEMENT 7: SAFETY PROMOTIONELEMENT 7: SAFETY PROMOTION

    Objective

    To raise and maintain safety and health awareness among all employees and contractors and to

    demonstrate the managements commitment towards safety and health excellence in the factory.

    System Requirements

    7.1 The factory shall develop and conduct promotional programs to demonstrate clearly the

    managements commitment and leadership in promoting good safety and health behaviors and

    practices in the factory.

    7.2 Safety and health promotional activities should be organised regularly and should include but

    not limited to the following: -

    7.2.1 Display of the corporate safety policy and commitment at strategic locations in the

    factory's premises;

    7.2.2 Conduct of structured or thematic safety campaigns with active employees and

    contractors participation;

    7.2.3 Display of incident statistics and safety performance charts;

    7.2.4 Conduct of topical safety talks;

    7.2.5 Screening of safety videos;

    7.2.6 Formation of safety improvement teams;

    7.2.7 Display of signs, posters or other visual material to increase safety awareness or to

    highlight a particular safety issue;

    7.2.8 Issuance of safety handbooks or brochures to both employees and contractors to

    increase safety awareness, as part of personal safety training; and

    7.2.9 Conduct of first-aid and emergency response exercises and drills.

    7.3 The factory should encourage all contractors to be actively involved in the safety promotional

    activities.

  • 8/12/2019 Safety Code of SMS

    17/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    17

    7.4 All personnel, including contractors should be encouraged to make positive suggestions to

    improve safety at the workplace. The factory may set up a safety suggestion scheme to

    encourage employees' participation.

    7.5 The factory should establish an incentive program to encourage group safety effort. A

    measurable standard should be developed to assess the group safety performance. Rewards,

    commendations and appropriate recognition for outstanding group safety performance shall be

    presented to the deserving recipients by a top management staff.

  • 8/12/2019 Safety Code of SMS

    18/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    18

    ELEMENT 8: CONTRACTOR EVALUATION, SELECTIONELEMENT 8: CONTRACTOR EVALUATION, SELECTION

    AND CONTROLAND CONTROL

    Objective

    To establish a system to evaluate contractors safety performance as part of the selection and control

    process so that only contractor who can meet the factorys safety performance standards and

    requirements are permitted to work in the factory.

    System Requirements

    8.1 The factory shall establish and document a system for assessment and evaluation of contractors

    to ensure that only competent and qualified contractors are selected and permitted to carry out

    contracted works in the factory.

    8.2 The system for evaluation and selection of contractors shall consider basic safety performance

    indicators such as contractors safety policy and safety management system, safety track

    records, competency and qualification of contractors personnel, safety training records and safe

    work procedures.

    8.3 In pursuant to the system for evaluation and selection of contractors, the factory may incorporatea formal system for pre-approval of contractors for major and specialised work in the factory. In

    such a system, only pre-approved contractors are invited to tender for work in the factory. New

    contractors who are not in the pre-approved list will have to be subjected to the evaluation and

    selection process prior to inclusion in the pre-approved list.

    8.4 Upon selection of the contractor, the factory should maintain a written contract with the said

    contractor in which the safety and health responsibilities and obligations of the contractor should

    be clearly spelt out.

    8.5 Prior to the commencement of work, the factory shall ensure that the contractor personnel

    working in the factory are given the proper safety induction training. The induction training shall

    cover key areas such as procedures for the reporting of incidents and emergency situations and

    basic in house rules and regulations.

    8.6 The factory shall establish procedures to effectively monitor and control the safety performance

    of the contractors working in the factory. The procedures shall ensure that the contractors safety

    performance is in conformance with internal standards and is within the limits as specified in the

    contract.

    8.7 The factory should maintain and record safety performance statistics for contractor companies

  • 8/12/2019 Safety Code of SMS

    19/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    19

    working in the factory.

    8.8 The factory shall document procedures for the inspection and checking of contractors' equipment

    before they can be taken into use in the factory.

    8.9 The factory shall establish procedures to ensure that contractors, whose safety performance is

    found unacceptable, promptly and effectively carry out proper corrective action.

    8.10 The factory should document a written disciplinary policy to demerit or penalise contractors or

    their workers for breaching the internal safety standards and rules and regulations.

  • 8/12/2019 Safety Code of SMS

    20/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    20

    ELEMENT 9: SAFETY INSPECTIONELEMENT 9: SAFETY INSPECTION

    Objective

    To establish a system to verify compliance with the relevant regulatory requirements, in-house safety

    rules and regulations and safe work practices.

    System Requirements

    9.1 The factory shall develop and implement a written program for formal and planned safety

    inspections to be carried out in the factory. The program should include safety committeeinspection, routine safety inspection, plant and equipment inspection and other special or

    surprise inspection.

    9.2 The factory shall develop a list of protocol or checklist for identifying workplace hazards and

    classifying the major findings. The protocol or checklist used for the safety inspections shall be

    designed such that it involves a thorough and systematic check of the factory's workplace,

    equipment, tools, materials and work practices.

    9.3 The factory shall establish performance standards for the safety inspections. The standards shall

    specify the following:

    9.3.1 The competency of the safety inspector appropriate training shall be provided to

    personnel involved in the inspection;

    9.3.2 The frequency of the safety inspection shall commensurate with the factorys business

    operations; and

    9.3.3 The scope and coverage of the safety inspection.

    9.4 The factory shall establish procedures to ensure that prompt corrective actions are taken to

    address or eliminate the unsafe conditions/hazards and substandard behaviors/acts found during

    the safety inspections. The procedures shall define the following:

    9.4.1 The acceptable time frame for implementation of corrective actions,

    9.4.2 The specific responsibilities of personnel involved in the implementation of the corrective

    and follow-up action; and

    9.4.3 The method of verification and monitoring of corrective actions carried out.

  • 8/12/2019 Safety Code of SMS

    21/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    21

    9.5 The factory shall establish a feedback system to ensure that critical findings from safetyinspections are effectively communicated to relevant personnel for implementation of corrective

    action and for general awareness.

    9.6 The factory shall establish an evaluation program to evaluate and check the safety inspection

    system to verify its effectiveness and to ensure that standards are met.

  • 8/12/2019 Safety Code of SMS

    22/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    22

    ELEMENT 10: MAINTENANCE REGIMESELEMENT 10: MAINTENANCE REGIMES

    Objective

    To establish a system to maintain at all times the integrity of all plant, machinery and equipment used in

    the factory so as to prevent any failure of these equipment due to a lack of maintenance or repair, which

    can result in unsafe situations.

    System Requirements

    10.1 The factory shall establish a maintenance program to ensure that the mechanical integrity ofcritical plant equipment is maintained.

    10.2 The maintenance program should include but not limited to the following:

    10.2.1 Establishment of an appropriate inspection program to monitor the condition of the

    equipment and machinery on a continuos basis;

    10.2.2 Establishment of a corrosion control program to maintain the integrity of critical equipment

    and machinery and piping systems;

    10.2.3 Development and documentation of work practices and maintenance procedures that

    shall take into consideration the safety and health exposure of personnel to the work

    operations and the associated risks to the environment during the carrying out of

    maintenance work. The work practices and maintenance procedures shall incorporate

    safety precautionary measures such as Lockout/Tagout System and Permit-to-Work

    Systems. Supplemental or special work procedures, which may include job safety or

    risk analysis, shall be included when undertaking high-risk work activities;

    10.2.4 Conduct of relevant training of personnel involved in the work practices and maintenance

    procedures;

    10.2.5 Establishment of procedure or system to ensure that the material used in the

    maintenance of critical equipment continue to meet design specification, and any

    changes in material shall be appropriately reviewed before use (such as consideration

    through a management of change review process); and

    10.2.6 Development of a long-term maintenance plan for periodic maintenance of major and

    critical equipment. The plan shall be reviewed annually to take into consideration the

    inspection findings, incident reports and regulatory requirements.

  • 8/12/2019 Safety Code of SMS

    23/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    23

    10.3 The factory shall establish a control system to ensure that critical safety devices, which control

    or monitor the safety of process equipment operation (such as safety alarms, control and

    shutdown equipment), are tested and maintained periodically.

    10.4 The types of equipment, instruments or systems that may be considered as safety critical

    devices may include but not limited to the list as specified in Appendix D:

    10.5 The control system may include but not limited to the list as specified in Appendix D:

  • 8/12/2019 Safety Code of SMS

    24/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    24

    ELEMENT 11: HAZARD ANALYSISELEMENT 11: HAZARD ANALYSIS

    Objective

    To methodically identify, evaluate and control hazards in the processes of a factory. The process of

    Hazard Analysis shall be documented and shall include measures over a serious scenario that can occur

    in a factory and the necessary corrective or control measures that can be incorporated to mitigate the

    frequency or severity of the risks associated with the scenario event.

    System Requirements

    11.1 The factory shall evaluate potential accidental scenarios of the processes in the factory premises.

    The evaluation plan shall include the following:

    11.1.1 Analysis and consideration of a range of probable cases and selection of a worst case

    scenario that can cause the most harmful safety and health effect to the factory;

    11.1.2 Assessment of the harmful effects that can be caused by the worst case scenario.

    Depending on the scenario, qualitative evaluation of the harmful effects can be

    considered when carried out by qualified on-site persons. Techniques such as gas

    dispersion and fire explosion modelling of vapour releases techniques may be applied

    for the evaluation;

    11.1.3 Development and implementation of the measures to prevent the worst case scenario

    from occurring and/or mitigation of the potential effects and impacts; and

    11.1.4 Documentation of the above, and approval by the most senior person in the factory.

    11.2 The factory shall review each process to address hazards by recommending action to prevent

    or/and mitigate the effect of the hazards. The review plan shall include the following:

    11.2.1 Assignment of a multi-discipline team to perform the review and the application of oneor more internationally recognised methodologies such as Checklist, What if checklist,

    Hazop, Failure Mode & Effect Analysis (FMEA) and Fault Tree Analysis. Established in-

    house methodologies should also be considered;

    11.2.2 Implementation of recommendations to address the significant hazards identified in the

    review;

    11.2.3 Establishment of a system to accomplish the recommendations with proper

    documentation; and

  • 8/12/2019 Safety Code of SMS

    25/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    25

    11.2.4 Conduct of fresh reviews for new process changes, projects of new facilities, lesson from

    incidents and as and when the need arises.

    11.3 The factory shall establish a program to schedule the respective plans as specified in 11.1 and

    11.2.

    11.4 The factory shall communicate the recommendations of the respective plans as specified in 11.1

    and 11.2 to all persons involved in the process.

  • 8/12/2019 Safety Code of SMS

    26/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    26

    ELEMENT 12: CONTROL OF MOVEMENT AND USE OFELEMENT 12: CONTROL OF MOVEMENT AND USE OF

    HAZARDOUS CHEMICALSHAZARDOUS CHEMICALS

    Objective

    To establish a system to identify and manage all hazardous chemicals in the factory through the provision

    of Material Safety Data Sheets and procedures for proper use, storage, handling and movement of the

    hazardous chemicals.

    System Requirements

    12.1 The factory shall establish a control program for the management of hazardous chemicals. Theprogram shall include and incorporate the following:

    12.1.1 The maintenance of a register of hazardous chemicals in use in the factory. Each

    hazardous chemical shall be accompanied with the appropriate Material Safety Data

    Sheet (MSDS) to facilitate the risk assessment process and training of employees on

    proper handling techniques and precautionary measures to observe during its use,

    handling and storage;

    12.1.2 The establishment of procedures for proper receipt, storage, issue, distribution, handling

    and safe use of the hazardous chemicals;

    12.1.3 The appointment of competent persons who has adequate knowledge of the properties

    of the hazardous chemicals to administer the control of the chemicals; and

    12.1.4 The prohibition of purchase or trial use of all hazardous chemicals until its chemical,

    physical and toxicological properties have been reviewed in a risk assessment to

    determine whether the chemical can be used, handled and disposed without undue risk

    to employees safety and health or to the environment.

    12.2 All storage tanks, vessels and containers used to store or contain the hazardous chemicals shall

    be:

    12.2.1 of good construction, sound material, adequate strength and free from patent defect and

    shall be properly maintained;

    12.2.2 provided with proper labels on the external walls with information such as the name and

    properties of the chemical contained therein and the hazards associated with the

    chemicals; and

    12.2.3 subjected to periodic inspection of its structures, fittings and attachment to ensure its

  • 8/12/2019 Safety Code of SMS

    27/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    27

    structural and mechanical integrity.

    12.3 The total inventory of the hazardous chemicals stored in the factory at the process area or at

    other designated storage areas shall not be in excess of the capacity necessary for productionrequirements; and

    12.4 The hazardous chemicals shall be stored in designated areas, which shall be suitable for the

    chemicals and secured against unauthorised access. The chemicals shall be returned to the

    designated areas when not in use.

    12.5 Incompatible hazardous chemicals shall not be stored in the same storage areas. If this is not

    practicable, they shall be stored in areas separated from one another by physical barriers such

    as walls and floors or by other suitable means.

    12.6 Adequate training shall be provided to all personnel and contractors who may be exposed to

    the hazardous chemicals. Training shall also be provided to the related personnel whenever a

    new hazardous chemical is introduced into the process.

    12.7 Warning notices in languages understood by the relevant persons specifying the danger of the

    hazardous chemicals shall be placed at all entrances to any workroom and at appropriate

    locations where hazardous chemicals are used or stored.

    12.8 Periodic exposure assessment on related personnel and contractors shall be carried out.

    Appropriate environmental monitoring shall be followed up based on the exposure assessmentresults. Suitable measures shall be implemented to prevent or minimise exposure based on the

    environmental monitoring results and the permissible exposure limits.

    12.9 Regular medical surveillance for personnel and contractors exposed to the hazardous chemicals

    shall be performed.

    12.10 Establishment and implementation of procedures for disposal of hazardous chemicals shall be

    carried out in accordance with regulatory requirements or manufacturers recommendations.

  • 8/12/2019 Safety Code of SMS

    28/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    28

    ELEMENT 13: OCCUPATIONAL HEALTH PROGRAMSELEMENT 13: OCCUPATIONAL HEALTH PROGRAMS

    Objective

    To identify, evaluate and control occupational health hazards to protect all personnel from developing

    occupational diseases or illnesses arising from their exposure to specific occupational health hazards

    present in the work environment and to establish policies and programs to protect all workers from

    specific occupational health hazards.

    System Requirements

    13.1 The factory shall ensure that for every hazardous chemical used, produced or otherwise

    encountered in the operations, there are available:

    13.1.1 Information to identify and evaluate the related safety and health hazards. The factory

    shall ensure that appropriate Material Safety Data Sheet (MSDS) is provided for each

    chemical used;

    13.1.2 Precautionary advice for the safe transport, storage, use and disposal of the hazardous

    chemicals;

    13.1.3 Safe work procedures in relation to the hazardous chemicals;

    13.1.4 Adequate training for employees and contractors so that they shall understand the nature

    of the hazards, safe handling procedures, personal protection and emergency actions

    for all hazardous chemicals that they are likely to encounter at the workplace; and

    13.1.5 Expertise to conduct the necessary occupational health program.

    13.2 The factory shall establish a Hearing Conservation Program, which shall include the following:

    13.2.1 Regular monitoring of noise levels;

    13.2.2 Reduction of noise levels through engineering and administrative control measures;

    13.2.3 Selection, provision and maintenance of suitable hearing protectors and supervision of

    their usage;

    13.2.4 Pre-employment and annual audiometric examinations of all exposed workers; and

    13.2.5 Training and education of workers.

  • 8/12/2019 Safety Code of SMS

    29/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    29

    13.3 The factory shall establish a Respiratory Protection Program, which shall include the following:

    13.3.1 Regular monitoring of air contaminants;

    13.3.2 Reduction of air contaminant levels through engineering and administrative control

    measures;

    13.3.3 Selection, provision and maintenance of suitable respirators and supervision of their

    usage;

    13.3.4 Training in the proper use of respirators and education on the health hazards; and

    13.3.5 Ensuring that there is proper fit of respirators.

  • 8/12/2019 Safety Code of SMS

    30/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    30

    ELEMENT 14: EMERGENCY PREPAREDNESSELEMENT 14: EMERGENCY PREPAREDNESS

    Objective

    To establish written emergency response plans to mitigate consequences arising from potential

    emergency situations.

    System Requirements

    14.1 The factory shall establish procedures to:

    14.1.1 Identify emergency situations and their impacts;

    14.1.2 Implement emergency response plans for each level of the organisation, with clear

    scope, roles and responsibilities; and

    14.1.3 Maintain an up-to-date emergency response plan

    14.2 The emergency response plan shall be documented and effectively communicated.

    14.3 The emergency response plan shall include the following:

    14.3.1 Establishment of Emergency Team and their duties and responsibilities;

    14.3.2 Appointment of Emergency Superintendent who shall command the emergency

    procedures in accordance with the requirements of the emergency response plan;

    14.3.3 Procedure for notification and raising of alarms;

    14.3.4 Procedure for initial response to emergency situations such as preliminary fire-fighting,

    first-aid and containment responses;

    14.3.5 Procedure for evacuation and rescue;

    14.3.6 Capability of in-house resources such as rescue and medical facilities; and

    14.3.7 Capability of nearest government response agency, their roles and the response time

    to the emergency situations

  • 8/12/2019 Safety Code of SMS

    31/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    31

    14.4 The factory shall establish a program of drills and exercises to assess the preparedness of the

    factory for prompt and effective response to emergency situations.

    14.5 The factory shall establish effective first-aid programs to provide first-aid and emergency

    treatment to victims of an accident. This would include provision of adequate first-aid facilities and

    trained first-aiders.

  • 8/12/2019 Safety Code of SMS

    32/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    32

    1515 DOCUMENTATION CONTROL AND RECORDSDOCUMENTATION CONTROL AND RECORDS

    System Requirements

    15.1 The general documentation requirements are given separately in each element. The factory shall

    establish a central documentation control and record system to integrate these documentation

    requirements and to ensure that they are complied with. As the system progresses, the quantity

    of documents and drawings increases and a foundation numbering and management system is

    essential for traceability of these documentation.

    15.2 Documented procedures shall be prepared for operations and maintenance of process systemsand items of plant, machinery and equipment. These documentation procedures shall include

    the various requirements of the work permit controls, pre-startup safety review and management

    of change.

    15.3 Each controlled document shall contain the following:

    a) a unique identifier

    b) the date of issue

    c) the date of any revision

    d) a revision numbere) a descriptive title

    f) an authorising signature by a responsible person from the occupier

    15.4 The occupier shall keep and maintain a master list of each controlled document and the persons

    or parties issued with such documents.

    15.5 The controlled documents may be revised at any time. Revisions shall be authorised by the

    person who certified the original documents.

    15.6 Revised controlled documents shall be issued by the authorising person to those on the masterlist and all copies of the previous issues shall be declared superseded. One copy of the

    superseded document shall be retained by the authorising body.

    15.7 The factory shall document and maintain all regulatory documentation requirements. The

    documents shall conform to the conditions of the said requirement in content, format and

    authorisation.

  • 8/12/2019 Safety Code of SMS

    33/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    33

    APPENDIX AAPPENDIX A

    ELEMENT 2 - SAFE WORK PRACTICESELEMENT 2 - SAFE WORK PRACTICES

    A1 Every factory shall establish and maintain safe work practices for its activities, which may include,

    but not limited to the following:

    a) Hot work;

    b) Work involving the use, handling and transportation of any hazardous, volatile, corrosive or

    flammable chemical, material or solvent in significant quantities;

    c) Dismantling of any pipe or equipment that contains or has contained any flammable or toxic

    substance;

    d) Entry or work in a confined space;

    e) Spray painting;

    f) Grit-blasting work;

    g) High pressure jetting;

    h) Hydrostatic or pneumatic pressure testing of pipelines and equipment;

    i) Functional testing of pipelines and valves (mechanical; electrical; pneumatic or hydraulic);

    j) Work at excessive heights;

    k) Erection and dismantling of scaffolds;

    l) Installation of equipment;

    m) Demolition of equipment;

    n) Radiography work;

    o) Hot tapping;

    p) Chemical cleaning;

    q) Electrical work;

    r) Explosive powered tools;

    s) Crane and lifting operation;

    t) Excavation; and

    u) Diving operation.

  • 8/12/2019 Safety Code of SMS

    34/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    34

    APPENDIX BAPPENDIX B

    ELEMENT 3 - SAFETY TRAININGELEMENT 3 - SAFETY TRAINING

    B1 Every factory shall establish training programs, which may include, but not limited to the following:

    a) Training for Safety Managers;

    b) Training for Safety Auditors;

    c) Training for Safety Officers;

    d) Training for Safety Coordinators;

    e) Training for Safety Committee members;

    f) Training for Safety Inspectors, in particular Hot Work Certification;

    g) Training for Competent Person for Hazardous Chemicals;

    h) Training for First-Aiders;

    i) Training for Noise Monitoring Officer;

    j) Training for Fire Watchmen or Attendant;

    k) Training for Crane Operators;

    l) Training for Lifting Supervisors;

    m) Training for Riggers;

    n) Training for Signalman;

    o) Training for Scaffolders;

    p) Training for Operators of Explosive Powered Tools;

    q) Training for Boiler Attendant;

    r) Training for Steam Engineers;

    s) Training for Contractors;

    t) Safety Orientation/Induction Training for new employees and Contractors;

    u) Refresher training of experienced workers to highlight the specific changes and issues;

    v) Training for Emergency Response Personnel; and

    w) Training on the requirements and the effective use of Personal Protective Equipment.

  • 8/12/2019 Safety Code of SMS

    35/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    35

    APPENDIX CAPPENDIX C

    ELEMENT 6 - IN HOUSE RULES & REGULATIONSELEMENT 6 - IN HOUSE RULES & REGULATIONS

    C1 A set of basic in-house rules and regulations shall be developed to regulate safety at the

    workplace. The rules may include; but not limited to the following:

    a) Compliance with safe work practices and permit-to-work system;

    b) Injury reporting;

    c) Incident and hazard reporting;

    d) The safe use and handling of materials such as hazardous chemicals and substances;

    e) Use and maintenance of machinery, tools and equipment;

    f) Use and maintenance of electrical equipment;

    g) Use of personal protective equipment;

    h) Housekeeping and cleanliness;

    i) Fire prevention; and

    j) Prohibition of horseplay and misuse of equipment.

  • 8/12/2019 Safety Code of SMS

    36/36

    Code of Prac t ice on Safe ty Management System for the Chemical Industry

    APPENDIX DAPPENDIX D

    ELEMENT 10 - MAINTENANCE REGIMEELEMENT 10 - MAINTENANCE REGIME

    D1 The types of equipment, instruments or systems that may be considered as safety critical

    devices may include; but not limited to the following:

    a) Pressure Relieving Devices such as Safety Valves;

    b) Vacuum Relieving Devices;

    c) Shutdown Systems Automatic trips, cut-ins and cut-outs;

    d) High Priority Alarms;

    e) Compressor anti-surge systems;

    f) Pump low-flow recycle loop;

    g) Detectors and Alarms for accidental release of harmful and hazardous substances and fires; and

    h) Critical temperature, pressure and level cut-out devices.

    D2 The control system may include; but not limited to the following:

    a) Identification of the list of safety critical devices;

    b) Designation of responsibility and accountability for the approved list of safety critical devices;

    c) The frequency and scope of testing of the devices;

    d) Procedure for testing, acceptable limits and criteria for passing the test. The procedure may also

    include criteria for special testing exemption by designated management;

    e) Relevant training of personnel involved in the testing and maintenance of the devices; and

    f) Documentation of test records which shall be reported to the responsible person for

    acknowledgement and implementation of corrective action.