Integrity Commitment Passion Seamlessness Speed
ULTRATECH CEMENT LIMITEDAndhra Pradesh Cement Works, Tadipatri
Safety Excellence
Integrity Commitment Passion Seamlessness Speed
Unit Vision & Mission
Vision 2020
To be a Model Cement Plant by 2020 with a clear focus on Safety, Environment,
Quality, Cost, Productivity, Delivery, Employee & Societal Satisfaction.
Mission 2020To deliver superior value to our customers, shareholders, employees and society at largewith Systems & Team based, Safe & Environment friendly work culture throughInnovation, Skill up-gradation, Conservation and Technological up-gradation adheringto Aditya Birla Group Values.
Integrity Commitment Passion Seamlessness Speed
HSE Policy
Andhra Pradesh Cement Works has a separate written safety and health policy duly signed / approved by Occupier
Andhra Pradesh Cement Works (APCW) 4
EHS Policy Deployment Methodology
EHS POLICY
UTCL safety Apex Board
UTCL Safety sub committee
APCW Site Safety Sub committee
s
Statutory Safety
Committee
Environ-ment cell
Health (Hospital)
Safety Departme
nt
WCM EHS Sub
committee
APCW Safety Apex
Board
Sustainability cell
HSE Policy objectives
Implementation
Compliance
SystemStandards
SMPSWP
Standardoperating
procedures
RulesandProcedures
Method of deploying H&S objective
Integrity Commitment Passion Seamlessness Speed
Mode of HSE Policy communications
The policy is made to know to all levels of employeesCategory Mode of Communication
Visitor Safety & Health Policy boards are displayed at all the office buildings in plant area and also displayed at guest houses / visitor safety orientation.
Company Employees
Safety & Health Policy is briefed to all employees as part of induction training. Each policy point is explained for clear understanding & compliance.
Safety & Health boards displayed in plant at all office areas and at shop floor. Posters are displayed at prominent locations of the plant
Safety & Health policy is also printed in safety standards pocket book and distributed to all employeesPocket size Safety & Health policy cards are distributed to all of employees for ready reference & reminder.Safety & Health policy is uploaded in our intranet portal for accessing by our employees
Contractors & their employees
Safety & Health policy is printed in the contractor safety manual / plan and issued to them. Safety Policy by major contractors is also prepared, displayed & followed.
Vendors & Suppliers
Safety & Health Policy is uploaded in UltraTech Business website for reference / access suppliers and vendors. Policy is also printed in the contractor safety plan / manual. They are also communicated in the periodic vendors meet.
Andhra Pradesh Cement Works (APCW) 6
Safety Standards & ProceduresSafety Standards
1. HIRA/JSA2. Confined Space Entry 3. Excavation4. Working at height5. Scaffolding6. Electrical safety 7. LOTOTO8. Incident Investigation9. Road safety 10. Rail safety 11. HEMM12. Handling of load by Mobile Crane &Lifting Tackles 13. Hot Work14. PPE – Selection, use and maintenance15. Storage, Transportation & Handling of Explosives16. Dump Management17. Drilling Standard18. Ripping & Dozing19. Loading & Rock Breaking20. Transportation in Mines21. Fire Risk Management
Safety Procedures 1. On-site Contractor Safety Management(CSM)2. Training & Capability Building3. Permit to Work4. Machine Guarding5. Heavy Earth Moving Machinery / Equipment Operation 6. First Party Safety Audit7. Corporate Safety Audit8. Multiple Agency Working9. Floor Hole Cover10. Job Cycle Checks11. Silo Cleaning12. Management of Change13. Progressive consequence management
Integrity Commitment Passion Seamlessness Speed
HSE Organization structure
• The HSE organization is well structured in such a waythat almost all line managers are responsible /accountable for safety in respective departments / sectionacross plant.
• HSE policy is implemented by setting periodical objectives& targets, which are reviewed in the monthly Safety apexmeetings.
• Line managers right from top management i.e. from UnitHead to the FLE’s/FLO’s (front line engineers / front lineofficers) are accountable/responsible to ensure & achievethe HSE objectives & targets.
Organizational set up and responsibilities at various levels and arrangements for implementation of H&S policy
HSE Organization chart
Integrity Commitment Passion Seamlessness Speed
HSE Organization
H&S OrganogramV. Ganesan
Unit HeadAPCW, Tadipatri
P.Ganapati Raju
DH-QC & Envt.
R. Nithianandan
SH-Envt.
Vinod Kumar
Officer-Envt.
MSRK Prasad
FH-HR,P&A
Dr.Babu Prasanna
CMO (Health)
Dr.Manohar
Medical Officer
Dr.Swarnalatha
Lady Doctor
S.Umar Farooq
DH- Safety .
B.Hari Prasad
SH-Safety
Dada peer saheb
SH-Safety
B.Sanjeeva RajuSafety engineer
Integrity Commitment Passion Seamlessness Speed
HSE Organization
Safety KPI for every employee in order to achieve H&S Objective
• Accountability is fixed for the individual for achieving safetyperformance and 15% weightage is given for advancement.
• Promotions of managers are delayed in case of fatal / seriouspotential incidents in their respective supervision/areas.
• Progressive consequence management is implemented to takedisciplinary actions for violation of life saving rulespertaining to – work at height, hot work, PTW, LOTO,Confined space entry, Non-reporting of incidents, condoningany of these.
• Cash Awards & appreciation letters given to employees /contractors for identifying / preventing fatal /serious potentialincidents.
Safety KPIs
Safety inspection and Audits
Reduction in no.of
incidents
Standard compliance
Monthly Schedule of
Safety Observation
Round
Reduction in unsafe
behaviors
Reporting Near Miss
Cases
Compliance to
recommendations
Integrity Commitment Passion Seamlessness Speed
Review of HSE performance by top management
Review report on H&S performance
HSE performance of all the units of UltraTech Cement Business is reviewed in themonthly UTCL Safety & Sustainability Board meeting.
Ten subcommittees including Off the Job Safety subcommittee Chaired supportingthe UTCL OH&S Board, reviews the core performance of all the UTCL plants in theirmonthly meetings conducted by respective Chairman.
HSE performance of the unit is reviewed in the monthly site apex safety meeting Chaired by Unit Head, as well as the six safety subcommittees.
Monthly safety report & Cement Sustainability Initiative (CSI) report detailing plantsafety performance is sent to our Corporate - Safety Head and CMO/DMD.
A copy of Safety performance indicating brief report on injuries & CSI(CementSustainable Initiatives) ,leading &lagging indicator report submitted monthly to thecorporate safety board
Safety performance indicating brief report on injuries & CSI(Cement Sustainable Initiatives) report
Integrity Commitment Passion Seamlessness Speed
Review of HSE performance by top management
Organization is certified OHSMS under Indian Standards.
Integrity Commitment Passion Seamlessness Speed
HSE TrainingsIdentification of training Needs for employees and contractors• Line managers identify & ensure safety training needs (TNI) of the employees / contractors working under them and training is
arranged / conducted through trained trainers on each safety standard / procedure.Training matrix for Employees & Contractors (Trade Wise)
Trade Wise Contract employees Training Matrix
TradeCSM Working
at Height ScaffoldingLifting and
Supporting of Loads
Hot work
Confined Space Entry
Machine Guarding LOTOTO HEMM HIRA/JSA Electrical
Safety Excavation Road Safety Standard
Hot Work Standard
Mine Safety Rail Safety
Technical
Mines
Technical
Mines
Technical Mines Technic
al MinesTechnical
Mines
Technical Mines Tech
nicalMine
sTechnical
Mines
Technical
Mines
Technical
Mines
Technical
Mines
Technical
Mines
Technical
Mines
Technical
Mines
Technical
Mines
Technical
Mines
Contractor Supervisor √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ × √ √ √ √ √ √ √ √ √ √ √ × √ √ √
Technician × × √ × √ √ √ √ √ √ √ × √ √ √ √ × √ √ √ √ √ √ √ × × × × × √ √ ×Driller/Helper × × × × × × × × √ √ × × √ √ × × × √ √ √ × × × × × × × × × √ × ×Electrician × × √ × × × × × √ × √ × √ √ √ √ × √ √ √ √ √ × × × × × × × √ √ ×Wireman × × √ × × × × × × × √ × √ √ √ √ × × √ √ √ √ × × × × × × × × × ×Fitter × × √ × √ √ √ √ × × √ × √ √ √ √ × √ √ √ √ √ × × × × √ √ × √ √ √
Welder × × √ × √ √ × × √ √ √ × √ √ √ √ × √ √ √ √ √ × × × × √ √ × √ √ √
Rigger × × √ × √ √ √ √ √ √ √ × √ √ × × × √ √ √ √ √ × × × × √ √ × √ √ √
Operator / Attendant × × √ × √ √ √ √ √ √ √ × √ √ √ √ × √ √ √ √ √ × × × × × × × √ √ ×HEO/Loco/Crane Operator × × × × × × √ √ × × × × √ √ √ √ × √ √ √ √ √ √ √ √ √ × × × √ √ √
Mechinist/Turner × × × × × × × × × × × × √ √ × × × × √ √ × × × × × × × × × × × ×Instrument Tech × × √ × × × × × × × √ × √ √ √ √ × × √ √ √ √ √ √ × × × × × × √ ×Electrical Helper × × √ × × × × × √ √ √ × √ √ √ √ × √ √ √ √ √ √ √ × × × × × √ √ ×Khalasi / Mech helper × × √ × √ √ √ √ √ √ √ × √ √ × × × √ √ √ √ √ × × × × × × × √ √ √
Sampling boy × × √ × × × × × × × √ × √ √ × × × √ √ √ × × × × × × × × × √ √ ×Lab helper × × √ × × × × × × × × × × × × × × × √ √ × × × × × × × × × × × ×Blaster /Helper × × × × × × × × × × × × × × × × × √ √ √ √ √ × × × × × × × × × ×Housekeeping by broom (General Area) × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × √ ×Housekeeping Mines × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
Integrity Commitment Passion Seamlessness Speed
HSE Trainings
Induction method followed for employees, contract workforce, experts, Govt. Officials and others
• safety induction training to new employee (Company &Contractual) who joins the Organization• Safety Orientation to visitors who ever visits the plant at the entrance gate before issuing visitor gate pass
Organization Structure Safety Message by business head Life saving rules Company health and safety
policy
Plant layout and process outline
Hazard and risk inherent in cement manufacturing process
Safety Observation Incident Reporting & Investigation
General overview on Emergency Procedure PPEs and its use Fire Protection & Fighting Vehicular / Traffic Safety
Contents of Safety Induction Training
• pre and posttest for each classroom safety training through which safety training effectiveness of employees is being measured.• Similarly there is also pre and post test is available for on line safety training in which participant must achieve 80% to pass the post
test.
Measurement of Training effectiveness through feedback
Integrity Commitment Passion Seamlessness Speed
HSE Training
Integrity Commitment Passion Seamlessness Speed
HSE TrainingsIndividual training records
• Employee – Trg. details is recorded against each employeewhich is maintained by Training
• Contractors- training passport system in which all trainingsattended with signature of trainer is available and thispassport book will be lying with contractor workman.
CONTRACTOR SAFETY TRAINING PASSPORT
Drivers (Internal& External Vehicles) training• Training and awareness on defensive driving is given to drivers (internal& external).
Training is given in following waysClass room training by internal trainersDistribution of pamphlets and road safety pocket book Playing of audio safety instructions on road safety at the entrance of gateDefensive driving campaign at truck yard and material loading/unloading point Training on defensive driving by external expertsTraining on personal health& hygiene by medical officer
Integrity Commitment Passion Seamlessness Speed
HSE Trainings
Training Particulars
Sr. No. Trainings 2016-17 2017-18
1 Internal Trainings 82 76
2 External Trainings 04 02
3 Training Participants Company 580 558
4 Training Participants Contractors 1700 1785
5 Total Training Hours 27824 26270
6 Training Hr. individual per employee per annum 12.8 8.8
7 Training Hr. Contractor individual per employee per annum 12 10.4
8 % covered Employees 96% 93.9%
9 % Covered Contract workforce 85% 88%
Integrity Commitment Passion Seamlessness Speed
Mock Drills
Mock drill
Sr. NO Description 2016-17 2017-18
1 Fire in cable cellar and technician injured 02 012 Fire in empty bag godown 00 013 Fire in transformer 00 01
4 Fire at coal yard 01 00
Integrity Commitment Passion Seamlessness Speed
Accident/Incidents Reporting
The method of reporting system
• Employees - All incidents reported promptly(within a shift) by concerned employee through mysetu portal .
• Contractor / Visitor - report the incident in Nearmiss card and drop the cards in Near miss boxlocated at various sections of the plant. The boxowner collects the card and reports the incident inmy setu portal.
• Initial reports should be brief and limited to a briefoutline of the known facts (date, time, place, whathappened, and immediate actions taken). Personwho reports the incident is rewarded with cashaward after checking quality
Incident reporting -Mysetu Incident reporting -card
Integrity Commitment Passion Seamlessness Speed
Accident/Incidents ReportingRoot Cause Analysis on incidentsWe are following route cause analysis method to investigate all incidents as per our incident investigation procedure.
Make initial response and report
Form investigation Committee
Determine the facts
Determine the key factors
Determine the system to be strengthen
Recommend corrective actions
Document and communicate the finding
Follow Up
Incidents Team Formation Team Leader
Near miss (High Risk )
Head Of the Department
Head Of the Department
Near miss (Medium Risk )
Section Head Section Head
RWC,MTC,FAC,NMC -Minor injury
Head Of the Department
Head Of theDepartment / Section Head
LWC -Serious injury
Functional Head Functional Head /
HOD
Fatality Unit Head Unit Head
Leading the Root Cause Analysis Process8 steps of Incident investigation process.
Integrity Commitment Passion Seamlessness Speed
HIRAC & SOP
HIRAC for the plant and its critical maintenances.Organization is having standard on HIRA/JSA by which weare carrying out HIRA for all activities (routine/non-routine.Detailed steps of HIRA process in flow chart is as shownbelow:
Standard Operating Procedures exist for all critical and regularactivities.
SOP is made for all critical and regular activities and which is communicated to the employees working in the particular section.
Dept. SMPs SOPs SWPsTPP 25 42 163Mines 25 179 184Production 23 41 30Mechanical 161 104 10Instrumentation 30 57 69Electrical 17 26 112Total 281 449 568
Integrity Commitment Passion Seamlessness Speed
Contractors Safety Management – Contractor Selection
Evaluation of contractor’s methodUltraTech cement Limited established exclusive standard on contractor safety management and the intent of the Standard is to ensure aformal approach for the administration of Contractor Safety. The objective of this program is the development of an incident free workenvironment, by creating a systematic approach to managing contractors and making them aware of the risks associated with workingon site. This standard is a six step process.
Contractor pre-qualification
Contract preparation
Contract award
Contractor orientation and
training
Contractor work coordination and auditing
Contract evaluation
Integrity Commitment Passion Seamlessness Speed
Contractors Safety ManagementFrequency of contractor’s safety performance monitoring• Contractor Field safety Audits are conducted at contractor sites.• If the observations are of severity 4&5 nature, then disciplinary action will be taken against for contractor.• Observations made are communicated to the contractor by concerned engineer for doing necessary compliance, the
status of these points are reviewed in CFSA meetings and apex safety meetings.
Deployment of qualified safety person on board as per 50:1
• Contractors who are working at site deployed qualified safety person on 50:1 ratio which is also an requirementas part of our contractor safety management procedure.
Frequently of involvement of in safety meetings
• For Regular contractor – safety meeting (once in 2 months)
• For project contractor – weekly safety review meeting
Integrity Commitment Passion Seamlessness Speed
Contractors Safety Management
Method adapted to encourage contractors safety performance
We have system for rewarding contractors to motivate contractor for improving safety performance. The methods are as follows.
• Individual motivation – Contractor workmen is awarded with good citizen on every month
• Contractor motivation – Yearly rolling trophy for best safety performance of the year
Apart from the above observations related to contractor field safety audit are being shared with contractors on timely manner to improve
the performance of contractor.
Integrity Commitment Passion Seamlessness Speed
Safety Audits
Sl. No. Audits 2016-17 2017-18
1 Internal No of Observation 279 214Compliance % 100% 100%Variance Nil Nil
2 ExternalNo of Observation 72 NilCompliance % 100% NilVariance Nil Nil
Integrity Commitment Passion Seamlessness Speed
Plant Safety Performance
Type 2016-17 2017-18Near-miss 2311 1352High Potential Near miss 10 12First – aid cases 11 9LTI ( Lost Time Incident ) 0 0Fatality 0 0Man hours lost due to LTI 0 0Severity Rate 0 0Frequency Rate 0 0No of Dangerous occurrences as per factory act 0 0
Reportable incident and Frequency Rate
The longest accident free period During the assessment period i.e. 2016-2018
From Period To Period No of Days Accident Free Million Man Hours
01.04.2016 31.03.2018 730 12.794
Integrity Commitment Passion Seamlessness Speed
Occupational Health
Dedicated OHC & Dedicated Staff
Factory is having dedicated Occupational Health Centre with two ambulances to cater in case of emergency. Onechief Medical officer supported with a Medical Officer with required number of Compounders, Nurses, pathologicaltechnician, pharmacist, housekeeping employee, with availability of 10 bed hospital to take care of daily routinemedical care as well as pre-employment / periodical medical examination.
Names of Medical officer are as follows:Dr. Prasanna Kumar- CMODr. K. Manohar- Medical OfficerDr. N. Swarnalatha - Medical Officer (Lady Doctor)
Apart from the above medical doctors, specialist doctors are visiting Occupational Health Centre on regular intervals.
Integrity Commitment Passion Seamlessness Speed
Occupational Health
Pre-medical check procedure for employees
Employees (Company &Contractual) who ever joins the organization, they have to undergo Pre-Medical Examinationat our Occupational Health Centre. Following are the things checked as part of Pre-Medical Examination.
Pre-medical check procedure for employees
Periodical Medical Examination for all employees is carried out once in a year where complete examination including X-Ray, Spirometry is carried out.
General Checking
Blood &Urine Examination ECG Chest X-Ray Spirometry Audiometry
Contractor workforce medical prior to deployment on job
All contractor employee who joins the organization has to undergo mandatory pre-medical examination withoutwhich entry gate pass will not be issued to any contractor workmen. Pre-Medical examination of contractor isconducted at Occupational Health Centre located at plant premises.
Andhra Pradesh Cement Works (APCW) 28
Health Awareness Awareness on is through Posters Mails Tool Box Talks Lectures & Interactive sessions Personal Counselling
Integrity Commitment Passion Seamlessness Speed
Safety Promotional ActivitiesEncouraging employees and workforce to
follow safety practices
S.No. List of promotional activities
1 Employees Suggestion Scheme
2 Near Miss Case – reporting - cash reward scheme
3 Safe Employee of the month award scheme
4 Award Scheme for kaizen
5 Award Scheme for NMC reporting
6 Road safety week celebrations
7 National safety week celebrations
8 Good Citizen award
Andhra Pradesh Cement Works (APCW) 30
Awards & AccoladesSafety
Best Managed Unit (Andhra State) – 2016 awarded by A.P. Govt.
CII EHS Excellence award with 4-star rating in 2016
Best Managed Unit (Andhra State) – 2015 awarded by A.P. Govt.
Indian Bureau of Mines : Hyderabad Region – 2014
1st Prize, Overall performance in MSWC – 2016
1st Prize, Overall performance in MEMC – 2015
Greentech Safety Award – 2012
FIMI Award (Best in Environment) – 2015 NCCBM Environment Excellence Award – 2011
Environment
Integrity Commitment Passion Seamlessness Speed
Awards & Rewards
Sl. No. Awards Achieved / Awarded by 2017-18
1EHS Excellence award with 4 - star rating in southern region in large mfg. sector by CII
Jan’18
Awards & Accolades
Integrity Commitment Passion Seamlessness Speed
Best Practices –Safety
Rearview camera monitor in mines dumper
Proximity Limit Switch in mines dumper Traffic signal lights at junction
Smart ground detector at LDO unloading station to check grounding
Confined space temperature display for safe entry
SMS Facility in DCS for communication about plant emergency
Integrity Commitment Passion Seamlessness Speed
Best Practices –Safety
Biometric entry system for authorized persons in to MCC rooms
Arc flash boundary marking in MCC rooms
Cycle helmets usage by school children
Rail skid to restrict the movement of wagons
Run over protection guard installed in hydra crane
Use of arc flash suit by electrician at MCC room
Integrity Commitment Passion Seamlessness Speed
Best Practices –Safety Gallery
Integrity Commitment Passion Seamlessness Speed
Thank You