June 5, 2003 ANS D&D TRACKING ID: 79559 1 Safety Management Aspects of the Tokamak Fusion Test Reactor D&D Mike Viola (TFTR Construction Manager) 2003 American Nuclear Society Annual Meeting June 5, 2003

Safety Management Aspects of the Tokamak Fusion Test Reactor D&D

  • Upload
    talmai

  • View
    47

  • Download
    0

Embed Size (px)

DESCRIPTION

Safety Management Aspects of the Tokamak Fusion Test Reactor D&D. Mike Viola (TFTR Construction Manager) 2003 American Nuclear Society Annual Meeting June 5, 2003. Tokamak Fusion Test Reactor D&D Safety. - PowerPoint PPT Presentation

Citation preview

Page 1: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 1

Safety Management Aspects of the Tokamak Fusion Test Reactor D&D

Mike Viola (TFTR Construction Manager)2003 American Nuclear Society Annual Meeting

June 5, 2003

Page 2: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 2

Tokamak Fusion Test Reactor D&DSafety

• Daily meeting at the start of the day – openly solicited hazards or recent events (often mini toolbox safety meeting)

• Weekly safety meeting

• Zero tolerance for even minor cuts and bruises

• 100% supervision – Construction Manager and lead technicians

• Pre/post job briefs

Page 3: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 3

Tokamak Fusion Test Reactor D&DSafety

• Pre-lift meeting

Page 4: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 4

Tokamak Fusion Test Reactor D&DSafety

• Inspect tools prior to use

• Fall protection – emphasized and regularly reviewed

• Construction Grade extension cords and cannot daisy chain

• Chicago air fitting not auto shutoff – air connection whips and flow restrictors (reputable suppliers)

Page 5: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 5

Tokamak Fusion Test Reactor D&D Tooling

• Correct tool always ordered or made!• Bought specialized tools up front

– Broderson

– Brokk

– Champion vs. Holmotro

– Wachs clamshell

– Wachs guillotine

– Nibblers and wide-mouth Portaband Saws

– Water-jet cutter

– Aerial lifts and forklifts

Page 6: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 6

Tokamak Fusion Test Reactor D&D Tooling

• Broderson

Page 7: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 7

Tokamak Fusion Test Reactor D&D Tooling

• Brokk

Page 8: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 8

Tokamak Fusion Test Reactor D&D Tooling

• Champion

Holmotro

Page 9: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 9

Tokamak Fusion Test Reactor D&D Tooling

• Wachs clamshell

Page 10: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 10

Tokamak Fusion Test Reactor D&D Tooling

• Wachs Guillotine

Page 11: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 11

Tokamak Fusion Test Reactor D&D Tooling

• Nibbler

• Wide mouth portaband saw

Page 12: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 12

Tokamak Fusion Test Reactor D&D Tooling

• Water jet cutter

Page 13: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 13

Tokamak Fusion Test Reactor D&D Platform Removals

• Platforms removed piece by piece rather than large awkward chunks.

Platform

Page 14: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 14

Tokamak Fusion Test Reactor D&D Diagnostic Removals

• Diagnostic removals complicated but well coordinated

– Electrical first

– Then line breaks

– Then mechanical removals

Page 15: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 15

Tokamak Fusion Test Reactor D&D Diagnostic Removals

• Electrical trays first

Page 16: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 16

Tokamak Fusion Test Reactor D&D Diagnostic Removals

• Electrical first

Page 17: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 17

Tokamak Fusion Test Reactor D&D Diagnostic Removals

• Bay D XCS

• Bay E XIS

Page 18: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 18

Tokamak Fusion Test Reactor D&D Diagnostic Removals

• Port cover line breaks

Page 19: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 19

Tokamak Fusion Test Reactor D&D Diagnostic Removals

• Diagnostic vent

• Ran throughout the room to service tritiated exhaust.

• Could have been confused with conduit or other piping; so it was marked with yellow paint.

Page 20: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 20

Tokamak Fusion Test Reactor D&D Diagnostic Removals

• XIS Lead removals

• Trained one crew to handle lead and package it for reuse or recycling.

Page 21: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 21

Tokamak Fusion Test Reactor D&D Umbrella Lift

• Lift of Umbrella Structure was the heaviest lift (92 tons) of the project.

• Umbrella lift simplified compared to original installation.

• Considered a “Critical Lift” – extensive forethought and planning resulted in a smooth event.

Page 22: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 22

Tokamak Fusion Test Reactor D&D Umbrella Lift

• 10 point installation lift with hub vs. 5 point disassembly lift

Page 23: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 23

Tokamak Fusion Test Reactor D&D Umbrella Lift

• Installation lift vs. disassembly lift

Page 24: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 24

Tokamak Fusion Test Reactor D&D Vacuum Pump Duct Removals

• Complicated extrication:

– Major line break.

– Unusual shape and center of gravity.

– Supports welded after bolts installed.

– Floor plates not consistent.

Page 25: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 25

Tokamak Fusion Test Reactor D&D Vacuum Pump Duct Removals

Pump Duct

Pump Duct

Page 26: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 26

Tokamak Fusion Test Reactor D&D Vacuum Pump Duct Removals

Pump Duct

Pump Duct

Page 27: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 27

Tokamak Fusion Test Reactor D&D Vacuum Pump Duct Removals

• Foam filled to control contamination

• Separating duct for packaging after foam filled.

Page 28: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 28

Tokamak Fusion Test Reactor D&D Vacuum Pump Duct Removals

• Separated duct after foam filled

• Water is a byproduct of foam

Catch Basin

Page 29: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 29

Tokamak Fusion Test Reactor D&D Shear Compression Panel

• Special sockets for shear compression panel (SCP) and cover bolts

• Repetitive motion issues– Limited to 2 hours

continuous effort– 4 hours per day

Page 30: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 30

Tokamak Fusion Test Reactor D&D Shear Compression Panel Cover

Page 31: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 31

Tokamak Fusion Test Reactor D&D Shear Compression Panel (SCP)

SCP Cover

removed

Studs connecting SCP to coil cases

Page 32: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 32

Tokamak Fusion Test Reactor D&D Poloidal Coil Removals

• Began to cut PF’s after the umbrella removed.

• Removed stack 9 lower in sections from around the machine.

WACHS guillotine

Page 33: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 33

Tokamak Fusion Test Reactor D&D TF Coil Cutting - Marvel Saw

Page 34: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 34

Tokamak Fusion Test Reactor D&D TF Coil Cutting - Marvel Saw

• One time the coil vibrated off of the saw. The coil had been wrapped with Nomex for shipping and was slippery enough to vibrate off of its supports.

• Strapped coil to wood stand and applied nonskid tape to the floor

Page 35: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 35

Tokamak Fusion Test Reactor D&D Basement Piping

• Heating/ cooling pipes cut with WACHS cutter.

• Complicated rigging set up

• Used personnel scissor lifts for access.

Piping

Page 36: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 36

Tokamak Fusion Test Reactor D&D Basement Piping

• Vacuum piping Under Bay C pump duct

• Line break• Took the extra

time to build scaffolding

Piping

Page 37: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 37

Tokamak Fusion Test Reactor D&D Basement Piping

• Vacuum piping cut with WACHS cutter.

• Line break with HP monitoring with Scintrex.

WACHS

Scintrex

Page 38: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 38

Tokamak Fusion Test Reactor D&D Diamond Wire Cutting Support

• Three enclosure setup.

• Complicated task with many levels of support.

• Went smoothly due to complete mockup of process.

Page 39: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 39

Tokamak Fusion Test Reactor D&D Diamond Wire Cutting Support

• Mask clean, decon, and disinfect.

• Did not expect significant amount of time needed.

Page 40: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 40

Tokamak Fusion Test Reactor D&D Special Problems

• Penetration jelly was extremely slippery– citrus cleaner, floor stripper, etc results in mixed waste issues.

• ZEP products smell and produce phosgene vapors in the same room as an arc.

• Lead – had lots of shielding – trained separate crew to handle and paint.

• Wall access difficult (Broderson, JLGs).• Block wall was hard to disassemble because blocks were

RTV’d together.• Cruder demolition rigging techniques vs. Precision fixtures

for assembly.

Page 41: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 41

Tokamak Fusion Test Reactor D&D Lessons Learned

• Sector lifted toward box.

• Bumped Box Lid

Box Lid

Page 42: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 42

Tokamak Fusion Test Reactor D&D Lessons Learned

• Lid fell – storage area / potential energy• Conduit represents box lid length

Conduit (Box Lid)

Page 43: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 43

Tokamak Fusion Test Reactor D&D Lessons Learned

• Supervision at all times!

• Tooling – Quickly demonstrate that management supports all work to be done properly with the right tool. Developed various fixtures and tooling for specific tasks. Take the time and wait as needed.

• Contamination Control and Decon.

– Pro-active approach – an ounce of prevention...

– Active involvement of hp’s. – Lots of experience, good ideas.

Page 44: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 44

Tokamak Fusion Test Reactor D&D Lessons Learned

• Safety first – really! Stopped work whenever any confusion or apparent trend developed.

• Daily kickoff meeting / Weekly Safety meeting

• Developed excellent teammanship and safe working environment. Used individual experience and talents wherever possible.

• Procedures/techniques – procedures used 100% BUT crews often developed new ideas which were fed back into procedure review and JHA analysis – never stop thinking!!

Page 45: Safety Management Aspects of the  Tokamak Fusion Test Reactor D&D

June 5, 2003 ANS D&D TRACKING ID: 79559 45

• Acknowledgement: This work was supported by U.S. DOE Contract AC02-76CH03073

• More information on the TFTR D&D Project, including all presentations at a Lessons Learned Workshop, can be found at HTTP://dd.pppl.gov