CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 1 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
SALUSMARITIMEOH&SMANAGEMENTPLAN
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 2 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
TABLEOFCONTENTS Page
1.0 PROJECTPARTICULARS 5
1.1 Purpose 5
1.2 DescriptionofWorks 5
1.3 InterestedParties 5
1.4 IdentifiedHazards 5
2.0 MANAGEMENTRESPONSIBILITY 7
2.1 OHSpolicy/Objectives 7
2.2 SALLUSOrganisationalStructureandResponsibilities 8
2.21 ContractorsPrincipals(Directors)Responsibilities 8
2.22 ProjectManager 8
2.23 OHSManager 8
2.24 SiteManager 10
2.25 SiteOperatives 11
2.26 Subcontractors 11
3.0 COMMUNICATIONANDCONSULTATION 12
3.1 ConsultationProcess 12
3.2 ToolBoxTalks 13
3.3 MonthlyOHSManagementMeetings 13
3.4 WorkSiteCommunication 13
4.0 SERVICEPROVIDERS 14
4.1 SALLUSasPrincipalContractors 14
4.2 Assessmentandselectionofserviceproviders 14
4.3 ServiceProviderCompliance 15
4.4 Monitoringserviceproviders 15
4.5 Poorperformancemanagement 16
5.0 PURCHASING 17
5.1 PurchasingandHiring 17
5.2 ObtainingOHSInformation 17
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 3 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
6.0 DESIGN 18
6.1 Managementofdesignprocess 18
6.2 Designprocedures 18
7.0 RISKMANAGEMENT 20
7.1 RiskIdentification 20
7.2 RiskAssessment 21
7.3 HazardReporting 21
7.4 OngoingHazardIdentificationandreporting 22
7.5 Riskcontrol 22
7.6 PersonalProtectiveEquipment 23
7.7 FireProtection 23
7.8 SafeWorkMethodStatements 23
7.9 EmergencyProcedures 25
7.10 HazardControlintheEventofanIncident 25
7.11 SiteSafetyRules 25
7.12 OHSLegalRequirements 26
8.0 TRAINING 26
8.1 ConsultationTraining 26
8.2 OHSInductionTraining 26
8.3 RefresherTrainingNeeds 27
8.4 TrainingtoOperatePlantandEquipment 27
8.5 EmergencyProcedureTraining 27
8.6 TrainingProcedure 28
8.7 SALLUSTrainingPolicy 28
9.0 INSPECTION,TESTING&SERVICING 29
9.1 InspectionandTestPlans 29
9.2 WorkProcesses 29
9.3 IncomingProducts 30 9.4 PlantandEquipment 30
9.5 Electrical 30
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 4 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
9.6 Plant 30
9.7 LiftingGear 31
9.8 RecordKeeping 31
10.0 INCIDENTMANAGEMENT&CORRECTIVEACTION 32
10.1 IncidentManagement 32
10.2 CorrectiveAction 32
10.3 AccidentInvestigation 33
10.4 WorkersCompensation 33
10.5 ReturntoWork 33
10.6 FirstAid 34
10.7 IncidentReporting 35
11.0 HANDLING,STORAGE,PACKAGING&DELIVERY 36
11.1 HazardousProcesses 36
11.2 MaterialsHandling 36
11.3 ManualHandling 37
11.4 HazardousSubstances 37
11.5 CertificationofPlantandOperators 38
12.0 INTERNALREVIEWS 39
12.1 ConstructionWorkSiteCheckLists 39
12.2 InternalReviews 39
12.3 InternalAudits 39
12.4 CorrectiveActions 39
13.0 DOCUMENTATIONANDRECORDS 40
APPENDICIES
A OHSInspectionandTestPlan 41
B Document/RecordcontrolRegister 42
C Site-SpecificSafetyManagementPlan 44
D SafeWorkMethodStatements 45
E FormsToBeMaintainedOn-Site 46
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 5 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
1.0 PROJECTPARTICULARS 1.1 Purpose
ThisplanwillbeissuedtoallpeoplethatrequireitandusedasaguidebySALLUSstaffforcompletionofalloperationsundertakenduringcompletionoftheabovecontractandtooutlinetherequirementsfortheworkareainordertominimiseanyriskofinjuriestoemployeesandthepublic
1.2 DescriptionofWorks
1.4 IdentifiedHazards
Assessmentoftheworksiteandprojectduringtheplanningstageidentifiedthefollowingsite-specifichazards:
• Inclementweather;• AccessandEgress;• Traffic&vehicles;• Public;• HazardousMaterials(Hazardoussubstances/chemicals)• ExistingServices(Overheadhazards);• Formwork;• Hotwork;• Materialshandling;• Movingmachineryandplant;• Workingnear,overandonwater;
2.0 MANAGEMENTRESPONSIBILITY
2.1 OHSpolicy/ObjectivesAtSALLUSourOccupationalHealth,SafetyandRehabilitationPolicyisbasedonabeliefthatthewell-beingofpeopleemployedatwork,orpeopleaffectedbyourwork,isamajorpriorityandmustbeconsideredduringallworkperformedonourbehalf.Peopleareourmostimportantassetandtheirhealthandsafetyisourgreatestresponsibility.TheobjectivesofourSafetyPolicyare:
! Toachieveanaccidentfreeworkplace.! Tomakehealthandsafetyanintegralpartofeverymanagerialandsupervisory
position.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 6 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
! Toensurehealthandsafetyisconsideredinallplanningandworkactivities.! Toinvolveouremployeesinthedecisionmakingprocessesthroughregular
Communication,consultationandtraining.! Toprovideacontinuousprogramofeducationandlearningtoensurethatour
employeesWorkinthesafestpossiblemanner.! Toidentifyandcontrolallpotentialhazardsintheworkplacethroughhazard
identificationandriskanalysis.! Toensureallpotentialaccident/incidentsarecontrolledandprevented.! Toprovideeffectiveinjurymanagementandrehabilitationforallemployees.! Thesuccessofourhealthandsafetymanagementisdependenton:
o Pro-activeplanningofallworkactivitieswithdueconsiderationgiventoimplementing
o Occupationalhealthandsafety(OHS)controlsthataresuitabletoeachgivensituation.
o UnderstandingthetotalworkprocessandassociatedOHSrisks.o Ensuringtheworkteamistotallycommittedtoachievingourobjectives.o Ensuringthatopenandhonestcommunicationexistsbetweenmanagementandallemployees.
………../…../……......DirectorsName Signature Date
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 7 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
2.2SALLUSOHSOrganisationalStructureandResponsibilities
2.2.1 Contractor’sPrincipals(Directors)Responsibilities
a) InsertMDResponsibilities
2.2.2 ProjectManager
Forthisparticularproject,theprojectmanagerhasthefollowingresponsibilities:a) Responsibleforcompletionofthecontractinaccordancewithcompanypoliciesand
proceduresincludingthisOHSmanagementsystem.b) ManagingcompliancewithOHS,workplaceinjurymanagementandworkers
compensation,legislation,standardsandcodesc) ActasContractor’sRepresentativeinaccordancewithAS2124.d) EnsureallemployeesarefamiliarwithandunderstandtherequirementsofthisProject
OHSmanagementplan.e) LiaisewiththeSuperintendentandexternalStakeholdersconcerningalldaytodaywork
practicesandanyrelevantOHSissues.f) ManagementofdesignissuesthateffectOHSmatters.
2.2.3 OHSManager
TheOHSManagerhasalargeamountoftimetodedicatetowardsOHShisresponsibilitiesaremanyasdetailedbelow.a) ManagingcompliancewithOHS,workplaceinjurymanagementandworkers
compensationlegislation,regulations,standardsandcodes.b) Verifyingthatemployeesandserviceprovidersimplementsafeworkmethods.c) ManagingcompliancewiththisProjectOHSManagementPlan.d) EnsurethatadequateOHSplanningisdevelopedandcarriedoutbeforecommencing
workonsiteandatappropriatetimesthroughouttheproject.e) VisitthesiteregularlyandrandomlytocheckonOHSproceduresf) Reviewallconstructionmethods,designandprocedurestodetectanyinherenthazards
orhazardsthatariseduringimplementation.g) Ensurefirstaidisavailableonsite.h) Immediatelystopping,rejectingandquarantininguseofun-safeworkareas,workmethods,
materials,plantandequipment.i) EnsurethatallworkersonthesitehaveattendedabytheOHSManager
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 8 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
j) Conducthazardappraisalsofthesitecoveringallrelevantaspectsofaccidentpreventionincludinghousekeeping,‘manoverboard’,fireprotection,useofladders,personalprotectiveequipment,accessandegressandothermattersthatdevelopthroughouttheproject.ProvidewrittennoticetotheProjectManageroffindingsandactiontakenforcorrectionofthoseaspects.
k) EnsurethatHazardsareidentifiedwithallworkprocesses,includingreviewofhazardsidentifiedbyserviceprovidersandclients.TheOHSManagermustthenmakesurethatallidentifiedhazardsareriskassessedwithappropriateriskcontrolmeasureimplemented.
l) Carryoutinvestigationsintoallaccidentsandinstigatecorrectiveaction.m) EnsurethatthisProjectOHSplanisonsitecommunicatedeffectivelytoallpersonnel
throughacquisitionanddisseminationofrelatedinformation.n) Assessingtheorganisation’sserviceprovider’sabilitytocomplyandcompliancewithOHS
requirements.o) PreparationandimplementationofSafeWorkMethodStatementsp) PlanningandconductingOHStraining,includinginduction,taskandrefreshertraining.q) EnsurethatallemployeesreceiveadequateexplanationofSiteSafetyRules.r) Ensurethatemployeeshaveandwearprotectivepersonalequipment;sub-contractorsare
requiredtoabidebythesamerequirements.s) Developmentandimplementationofemergencyprocedures.t) Maintainanuptodatelistofpersonalparticularsforallworkersonthesiteincludingsub-
contractors.Detailstoberecorded,whereappropriateare:Nextofkinandemergencycontactnumbers.
u) MaintainacurrentlistofemergencytelephonenumbersofEmergencyServices,OH&SManager,andanyotherrelevantpersonsorbodiesconnectedwithemergencies.
v) ResponsibleforensuringthatthelistofSiteSafetyRuleswillbedisplayedatthesite.w) Verifying(byinspectionandtests)thatworkareas,workmethods,materialsplantand
equipmentcomplywithOHSlegislation,regulations,standardsandcodes.x) Stopping,rejectingorquarantiningunsafeworkmethods,materials,plantandequipmenty) Reportingofaccidents,injuriesandWorkCoverclaimsarefullycompletedandpromptly
forwardedtoHeadOffice.Reviewallotherreportsofdamage,accidents,injuriesandnearmisseswithin48hoursandensurethatallcorrectiveactionistaken,reportsaresubmittedasperOHSManualwiththerelevantinformationcollatedtoprovidestatisticaldata
z) Investigatingincidentsandinitiatingcorrectiveandpreventativeactions.aa) Developingandimplementinginjurymanagementprogramsandcoordinatingthe
rehabilitationofinjuredpersonnelbb) ManagingOHSrecordsanddocumentationasdetailedinsection13.cc) Acquiring,communicatingandconsultingonOHSinformation,suchasOHSpolicies,
managementsystems,plansandprocedures.dd) UndertakinginternalreviewsoftheOHSManagementSystemanditsuseonaregularbasis
andreportingtoseniormanagementatmonthlyOHSmeetings
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 9 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
ee) EstablishmentandimplementationofconsultationarrangementswithemployeesandotherrepresentativesonOHSmatters.ff) PubliciseOHSconsultativearrangementsthroughverbalnotification,memos,andnoticeboards,withallmeetingsscheduledonthemonthlyplannerandremindersdocumentedine-mailsgg) ControlofHazardoussubstanceinformationincludingMSDSandtheproposed
methodsofcontrollingtheassociatedriskshh) Consultwithallemployeespriortodecisionsaffectingtheirhealthandsafetyin
ToolboxmeetingsandMonthlyManagersMeetings.ii) makesurealloperationmanuals,maintenancemanualsandotherrelevantOHS
informationisprovidedforplantandequipment
2.2.4SiteManagerThesitemanagerhasalargeOHSresponsibility.Thesitemanagerhasthemostonsitetimeandisthereforresponsibleforenforcingday-to-dayOHScompliance.
a) TheSiteManagerisresponsibleforkeepingtheworksiteenvironmentsafe.b) ManagingsubcontractorsOHSissues.Issuingsiteinstructionsandwarnings.c) EnsuringSWMSareuptodate,relevantandareACTUALLYBEINGFOLLOWEDd) Managesitespecificinductiontrainingandsitespecificworkactivitytraininge) Reportincidentsandaccidentsasrequiredf) LiaisewiththeOHSManageroversitespecificissuesg) Keepallsite-specificOHSdocumentationuptodateasdetailedinsection12.1.h) Maintainsitehousekeepingofahighstandardatalltimes.i) Intheeventofanincident,allinjuriesaredocumentedintheInjuryregisterand
anaccidentinvestigationreportiscompletedthatdefinestheincidentandproposesamethodofrectification.Thisreportisthenfiledonsiteandfolloweduponintervalsdependingonitsseverity.
2.2.5 SiteOperatives
Employeeshavearesponsibilitytopresentthemselvesforworkinanablecondition
andtoworkinasafemanner.Theywill:a) Bealertatalltimestopossiblehazardsanddangers,warnworkmatesofpossible
dangers,makesuggestionstoeliminatehazardsandnotengageinhorseplay.b) Learnandcarryoutthesafetyrulesofthesite.c) Reportanyinjury,damageoraccidentornearmissaccidenttotheOHSManager.d) Performworksafelybyusingcorrecttools,correctsystemsandmethodsofwork.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 10 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
Keepworkareascleanandtidyandwearprotectiveequipmentwhereapplicable.e) Assistintheeventofanaccident,providedtheyarefamiliarwithFirstAid.f) Assistasrequiredintheinvestigationofaccidents.g) Notperformworkinwhichtheyareinexperiencedorhavenotbeeninstructedor
areunqualified.
2.2.7 Sub-contractorsSubcontractorsshall,inaccordancewithProvisionsoftheOccupationalHealthandSafetyAct2000andOHSRegulation2001carryouttheircontractworksinasafeandsatisfactorymannerandwithoutlimitingthegeneralityoftheforegoingshallwhereappropriate: a) Supplysafeworkmethodstatementsforareasofoperationunderthe
contractors’controlbeforecommencingonsite.MaintainatsiteMaterialSafetyDataasappropriateforallmaterialsusedatsite.
b) StrictlyconformtotherequirementsofanyActofParliament,regulations,CodesofPractice,By-LawsorOrdersmadethereunderrelatingtothesafetyorpersonsonoraboutthesite.
c) ImmediatelydiscontinueanypracticeorremoveanyequipmentconsideredbySALLUStobedangerousnotwithstandingthatSALLUSmayhavepreviouslyapprovedsuchpracticeorequipment.
d) ComplyinallrespectswithSALLUSstandardofaccidentcontrol.e) Supplypersonalprotectiveequipmentfortheiremployeesf) Adequatelyinstructtheirworkforceincorrectworkingmethodsandsafeworking
practicesandensurethattheycomplywiththeinstruction. 3.0 COMMUNICATION&CONSULTATION
Communicationandconsultationareimportanttomakesureemployeesandserviceprovidersshareinformation,areprovidedwithinformationabout,andhaveinputintodecisionsrelatingtoOHSissuesItistheresponsibilityofallemployeestoencourageaworkenvironmentwheresafetyissuesarediscussedfreely.Ifthereisasafetyissueitmustberaisedregardlessofprogrampressuresandtimeconstraints,SALLUShasthefollowingconsultationarrangementsinplacetoshareOHSinformationofthisproject.
3.1 ConsultingProcess
a) TheSiteManagerwillbepresentonsitetoprovideameansofrelatingOHSissuesthatarisetofromdaytodayworks,touppermanagement
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 11 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
b) Informationwillprovidedtoallemployeesandserviceprovidersonrelevantrisks,riskcontrolmeasuresandreportingproceduresthrough:o Monthlymanagementmeetingso Tool-BoxTalkso Monthlyplannerinheadofficeo Sitesafetyrulesclearlydisplayedonallsiteso Noticeboardso SafeWorkMethodStatementso MSDSandaHazardoussubstanceregisterthatismaintainedonsiteo General,activityandsitespecificinductions
c) InformationregardingallOHSconsultationarrangementswillberecordedandrelatedbacktoallworkerstoinformandupdatethemofanydevelopments,Tool-BoxTalksandinductions.Monthlymanagementmeetingsscheduledonmonthlyplannerinheadofficeandcommunicatedelectronically
d) Specificconsultationarrangementwillbemadepriortomakinganydecisionsthatmayaffectthehealthandsafetyorwelfareofemployees,whiletheyareatworkandeffectedserviceproviders.
3.2 ToolBoxTalks
ToolboxTalkswillbeheldsosafetyissuescanbediscussed.TheyshallbeconductedweeklyonsiteoranytimeasignificantOHSissuearises.Theyaretobeattendedbysitemanagers,siteworkersandtheOHSmanager.Issuesaretobediscussedinformally,correctivemeasuresdecideduponandallinformationfiledontheRecordoftoolboxtalks.ThefollowingtoolboxmeetingwillvisitissuesfromthepreviousmeetingtomakesurethatOHSissueshavebeenrectified.
3.3MonthlyOHSManagementMeetingsOHSmanagementmeetingsaretobeheldmonthlyonsite.Theyareformalandaredesignedtogettuffonsafety.AttendanceistoincludeOHSManager,ProjectManagers,SiteSupervisorsandDirectorsifavailable.DetailedaretobekeptontheOHSManagementMeetingMinutes(Form21)andtimeframesforrectificationsdecidedupon.Adequatetimemustbeallocatedto
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 12 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
reviewallsystemsasoutlinedinthiscorporateOHSmanagementplanaretobereviewedtomakesurethesystemiseffective.
3.4 WorkSiteCommunication
SALLUSwillprepare,implementandenforceSiteSafetyRulesandemergencyProceduresforthatworksite.TheOHSManagerassessesthesiteatcommencement,andthroughouttheprogressofworks,thendefinesthemostappropriaterulesandproceduresforthatspecificsite.Foreffectivecommunicationoftheserulesandprocedures,includingallemergencycontacts,SALLUSwilldisplaythemonnoticeboardsandothersuitablelocationsontheworksite.Bymakingclearreferencetotheselocationsandtheircontents,duringallsiteinductions,allworkersandvisitorswillbeadequatelyinformedoftheirrequirementsandresponsibilities.
4.0 SERVICEPROVIDERS
AsarequirementoftheOHSRegulation2001SALLUShasbeenappointedprincipalcontractor,astheprojectinvolvingdemolitionoftheCoalloadingstructure
4.1 AssessmentandSelectionofServiceProviders
ToassurecompliancewithOHSrequirementsSALLUShasastrictselectionprocesswhendeterminingserviceproviders.AnumberofservicesprovidersareconsideredaspreferredserviceprovidersduetoprovencommitmenttowardsOHSmanagement.FornewserviceprovidersaServiceProviderAssessment(form17)iscompleted.ThisformwillgiveanOHSratingtoeachofthefollowingselectioncriteria:
a) Pastperformanceanddemonstratedcapabilityb) SafeworkpracticesincludingpastuseofOHSmanagementplansandsafe
workmethodstatementsc) AbilitytocomplywithOHS,workplaceinjurymanagementandworkers
compensationlegalrequirementsd) Allsub-contactorstoprovideevidenceofcomplyingwithworkers
compensationlegislationandhaveanaverageallowanceofwagesofatleast$40,000
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 13 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
e) Allsub-contactorstoprovideevidenceofappropriatepublicliabilityinsurancecover.CopiesofWorker’scompensationandPublicLiabilitycertificatesofcurrencytobeheldatheadoffice.
Aserviceproviderwithscoreof12orlesscannotbeused.Theserviceprovidercanre-applyiftheyimprovetheirOHSsystems.
4.2 ServiceProvidercompliance
WhereSafeWorkMethodStatementsarerequiredtobedevelopedbysubcontractors,SALLUSwillissueguidelinesfortheirpreparation.Theseguidelinesdetailtherequirementssetoutinsection7.8.ToensurecompliancewiththeseguidelinestheOHSmanagerortheSiteManagerwillrevieweachSafeWorkMethodstatement,comparingitwiththeSWMSreviewform(Form022)andthensignoffonitscompliance.
4.4 MonitoringServiceProvidersSALLUSmonitorsandreviewstheperformanceoftheserviceprovidersoncetheyarecarryingouttheproposedworkthroughcontinuallyanalysingcomplianceof/withthefollowing:
a) Safeworkmethodstatementsb) Workerscompensationandotherinsurancerequirementsc) OHSworkplaceinjurymanagementandworkerscompensationrequirementsd) Inductionandworkactivitytrainingrequirements.
TheOHSManagerandSitemanagerhavethecombineddutiesofunderstandingtheOHSrequirementsoftheserviceproviders,constantlymonitoringandreviewingtheircomplianceandimplementingcorrectiveactions.ThiscomplianceismorespecificallymonitoredbytheSiteManagerphysicallyobservingthesiteworksandcomparingtheprocessestowhatisdescribedintheSWMS.ThiscompliancecheckwilloccureverytwoweeksorwhenspecificallyrequiredfornewprocessesandwillbesignedoffbytheSiteManagerontheactualSWMSdocument.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 14 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
4.5 PoorPerformanceManagement
ThefollowingchartisaguidetothemanagementofOHSissuesthatarisefrompoorperformance;itistobeusedforrelativelylowriskOHSincidents/issues.AtthediscretionofSALLUSmanagementaninstructiontoleavesitecanbeissuedimmediatelyinthecaseofaseriousissue/incident.AtthediscretionofSALLUSmanagementawarningmayinvolveastopworktillrectifiednotice,ortimelimittorectifyissuewillworkcontinues.
5.0 PURCHASING
5.1 PurchasingandHiring
Assubstandardmaterialsorpoorlymaintainedleasedplantorequipmentmaycauseseriousillness/injurySALLUSdefinesandimplementssystemstosafelymanagepurchasingandhiringfortheworksite.Forexample:
a) Allplant,equipment,goodsorsubstancestobeboughtorhiredarepreassessedthroughMSDSandoperationmanuals.Therequirementtoprovidethisinformationisstipulatedanddocumentedinpurchaseordersandinsubcontractagreements.Ifthisinformationisnotprovidedtheplant,equipment,goodorsubstancewillnotbeused.
OHS Issue/ Incident Initial Verbal Warning
OHS Issue/Incident Rectified No Further Action
Problem Not Rectified Formal Written Warning
Number 1;
OHS Issue/Incident Rectified No Further Action
OHS Issue Not Rectified Formal Written Warning
Number 2
OHS Issue Rectified Service Provider Catorgorised as
High OHS Risk
OHS issue not rectified Final Written Instruction Service
Provider Removed from Site
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 15 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
b) WhenplantispurchasedorhiredaPlantInspectionReportisfilledoutbyaqualifiedpersonandfiled
c) Beforenewplant,equipment,goodsorsubstancesareintroducedintotheworkplace,OHShazardsareidentifiedandriskscontrolledalongwithconsultationwithallpersonnelinvolved.ThehazardcontrolHierarchy(detailedinsection6)isappliedinthissituationandgenerallystoppingorquarantiningwhereOHSissuesareidentified
d) ItistheOHSmanagersresponsibilitytomakesurealloperationmanuals,maintenancemanualsandotherrelevantOHSinformationisprovidedforplantandequipment
5.2 ObtainingOHSInformation
SALLUSmakessurethattheproductssuppliedtothem,suchasplant,equipment,materials,goodsandsubstances,aresafeandwithoutriskstohealthandsafetywhenproperlyused.AdequateOHSinformation,containedinoperationmanualsandMSDS,areprovidedto SALLUS, through requirements stated on purchase orders which includesinformationabout:
a) Thepurposeoftheproductb) Thetestingandinspectionsrequiredc) Installation,commissioning,operation,d) Maintenance,cleaning,transport,storageanddismantlinginformatione) Systemsofworkneededforthesafeuseoftheproductf) Theknowledge,trainingorskillneededtoundertakeinspectionandtestingg) Emergencyprocedures.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 16 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
6.0DESIGNByinfluencingdesigndecisionsmadeattheearlystagesofaprojectSALLUSinfluencesconstructionprocessesandthehealthandsafetyofpersonnelonsiteduringandafterconstruction.
6.1 ManagementofDesignProcess
DuringthedesignprocessSALLUShasvariouslevelsofinputintoOHSrequirements,hazardidentification,andtheevaluationandcontrolofhealthandsafetyrisks,inrelationto:
a) Useandmaintenance,especiallyrisksarisingoutofthenatureofthedesignofafacility,includingoperationalriskmanagement
b) Theconstructionmethodc) CompliancewithOHSlegislation,regulationsandcodesofpracticed) Ensuringthatsitesetoutisproactiveinmaintainingasafeworkenvironment
6.2 DesignProcedures
SALLUS,theirclientsanddesignersconsultaboutthehazardsidentifiedduringallstagesofthedesign.Thisincludeshazardsidentifiedwithconstruction,use,maintenanceanddisposal,anddetermininganddescribinghowtheywilltobemanaged.ThedesignproceduresinwhichSALLUSareinvolvedinclude:
a) AdoptingahazardidentificationandOHSriskassessmentapproachb) Applyingthehierarchyofhazardcontrols(detailedinsection6)todesignout
orotherwisemanagehazardsc) Whererequired,especiallyonprojectswithalargedesignelement,The
‘ConstructionHazardAssessmentImplicationReview’(CHAIR)approachisadoptedtoassistdesigners,constructors,clientsandotherkeystakeholderstocometogethertoreduceconstruction,maintenance,repairanddisposalOHSrisksrelatingtodesign.TheCHAIRframework(detailedbyWorkCover)involvesa3stageprocesswhere‘Holdpoints’areimplementedtoprovideanopportunitytositdown,pauseandreflectonpossibleOHSdesignproblems
d) Verifyingthatthedesigned‘product’orfacilityisfitandsafeforpurposeandmeetsOHSlegislativerequirementsbyprovidingastatementofcomplianceorrequiringthiscompliancemustbeprovidedbyanydesignconsultants.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 17 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
e) AllpeopleundertakingdesignprocessestorefertorelevantcodesofpracticeandAustralianStandards,heldinheadoffice
f) Designreviewmeetingsaretobescheduledasdeterminedbytheprojectmanager,withaportionoftheagendadedicatedtoOHS.TheOHSManagerdetermines:o Thedetailsofthispartoftheagendao Thepeoplethatmustattend,(generally:designer/designconsultant,
client,relevantstakeholders,Projectmanager,OHSmanager,Sitemanager,OHSRepresentative)
o Whowilltakeactionontheissuesthatareraisedo Howtheseactionsaretobeclosedout(generallysignedoffatthe
followingdesignreviewmeeting)o ThatMinuteshavebeentakenandfiledappropriately
g) AsmodificationandchangestodesignsoccurtheyaretobereviewedandapprovedbytheOHSmanager.Thisprocessisperformedduringdesignreviewmeetingsorifrequiredpriortotheapplicationofthedesignchange.
h) Aimingtoachievereasonableandsafe‘constructability’;safetywithuse;longevityof‘product’;reduced,simplifiedandsafemaintenance;andsafedisposal
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 18 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
7.0 RISKMANAGEMENT
SALLUSiscommittedtocontrollingandmitigatingrisktoalevelaslowasreasonablypracticable.Priortoundertakingspecifictasksallhazardsandrisksidentified,assessed,documented,controlledandfollowedupbyimplementingthefollowingprocedures:
7.1 RiskIdentificationAdetailedhazardreviewofallmajorprojectactivitieswillbeundertakenpriortothecommencementofworkandregularlyreviewedtodeterminewhatrisksareassociatedwiththespecificoperationsandhowthoserisksmaybeeliminated,reducedorcontrolled.Tohelpidentifyallpotentialrisksthejobwillbebrokendownintoactivitiesthatfollowthesequenceofconstruction.TheseactivitieswillbeprovidedinSafeWorkMethodStatements(SWMS),whichisalistofjobprocedures,andotherwork-relatedpracticesprovidedtothePrincipalContractor.TheSWMSdetailshowtheScopeofWorkwillbecarriedout.ForeachoftheworkactivitiesandassociatedjobstepsidentifiedintheSWMS,thepotentialhazardswillbeidentified.Regulartestsandinspectionsareperformedonallplantandequipmentidentifyinganypotentialhazards.Toassistthisprocess,resourcessuchasthefollowingwillbeused:a) WorkCoverandtradebasedCodesofPracticeandotherpublications,e.g.safety
alerts;b) HazardProfilesforspecifictradegroups;c) Workplaceexperience;andd) Consultation(e.g.ToolBoxTalks),withworkersexperiencedinthetask,tobe
undertaken.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 19 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
7.2 RiskAssessment
INSERTSALLUSRISKMATRIXHEREANDREMOVEBELOW
Consequences
Likelihood Insignificant Minor Moderate MajorCatastrophic
A(Almostcertain) 2 1 1 1 1
B(likely) 2 2 1 1 1
C(moderate) 3 2 2 1 1
D(unlikely) 3 3 2 2 1
E(Rare) 3 3 2 2 2
Eachriskclassificationwillbeusedtodeterminethelevelofcontrolsrequiredtoeliminateorminimisethepotentialrisk.Thehighertheclassificationthemoreextensivethecontrolstobeprovided.
Levelsofrisk
1:Extremelydangerous,riskofdeathorinjuryseniormanagementreviewrequired
2:Moderateriskofseriousinjury/losttime
3:Lowrisk;minorinjuryresultinginnolosttime
7.3 HazardReporting
Onceahazardhasbeenidentifiedandassessedintermsoftherisklevel,anincident/hazardreportformisfilledoutandfiledbythesiteManager,copiedandforwardedtotheOHSManager,detailingthenatureofthehazard,thedeterminedriskclassanddetailsofcorrectiveactions,including:
• Thenatureofthecorrectiveactiontobeundertaken• Persontoenforcethisaction• Deadlinefortherectification
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 20 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
7.4 OngoingHazardIdentificationandReporting
AllsitepersonnelareresponsibleforreportinganyrisksidentifiedduringthedaytodayoperationstotheSiteManager,astheSafetyandEnvironmentRepresentative.Inturn,theSiteSupervisor/ForemanwillrecordtheriskandremedialorcontrolmeasuretakentorectifythesituationandforwardacopyofthereporttotheProjectManager.
7.5 RiskControlTheprocessofriskcontrolwillbeappliedtoidentifiedrisksthroughthefollowingriskcontrolhierarchy,eliminationbeingthefirstmeasureofcontrolthroughtotheuseofprotectiveclothingandequipment.Theseare:
Engineering Controls
Change processes, equipment, machinery, plant or tools
Protective clothing and equipment
Isolation
Substitution
Administrative controls
Elimination Remove any hazard that is not necessary to a system of work
Replace the hazard with another product, process or plant and machinery which is less harmful to health and less likely to cause injury
Enclose or isolate the hazard from employees
Change work processes to reduce existing hazards that may cause work related illness or injury
Provide personal protective equipment such as clothing, gloves, helmet, eye protection, hearing protectors and respirators
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 21 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
7.6 PersonalProtectiveEquipmentWhereothermeansofprotectionarenotpracticableSALLUSwillsupplyclothingorequipmentdesignedtoprotectparts,orall,ofthebody.Thisequipmentmayinclude:gloves,hearingprotection,highvisibilitygarments,breathingapparatus,thermalwear,eyeprotection,suncream,safetybeltsandharnesses.SALLUSwillensureallitemsofPPEaremanufactured,usedandmaintainedinaccordancewiththerelevantAustralianStandard.ProofofAustralianStandardcompliancewillbeprovided,e.g.labeling.AllissuesofPPEtoeachindividualwillberecordedonthePersonalProtectiveEquipmentIssuedRegister.
7.7 FireProtectionTheSitemanagershallensurethatanadequatenumberandtypeoffireextinguishersareavailableattheworkplaceandadditionalextinguishersarelocatedintheimmediatevicinityofanyworkthatmaycreateafirerisk.Thisrequirementwillapplywithoutexceptiontoanyhotworksuchaswelding.AllfireextinguisherswillbeservicedandmaintainedbycompetentpersonsandarecordcompletedandmaintainedinaccordancewithAustralianStandardAS-1851(FireProtectionRegister)The“chargelevel”ofallfireextinguisherswillbecheckedeveryfortnight.Toaidinthepreventionoffireallcombustiblematerialswillnotbeallowedtoaccumulateinworkareas.
7.8 SafeWorkMethodStatementsSafeWorkMethodStatementswillbepreparedandimplementedforallworkactivitiesassessedashavingOHSrisks.Particularattentionwillbepaidtoworkactivitieswithahighsafetyrisk.WhenpreparingSafeWorkMethodStatements,thepersonnelwhoaretofollowthemwillbeconsultedandinvolved.Thiswillhelpimprove,andencouragetheirownershipofactionsandproceduresintheStatements.SafeWorkMethodStatementswill:
a) Beontheorganisation’sletterheadandshowthenameandregisteredofficeaddressoftheorganisation
b) BesignedanddatedbyaseniormanagementrepresentativeoftheorganisationandthosewhoparticipatedindevelopingtheSafeWorkMethodStatements
c) SafeWorkMethodStatementsmustatleastinclude:• Adescriptionoftheworktobeundertaken• Thestep-by-stepsequenceofactivitiesandtasksinvolvedindoingthe
work• Thepotentialhazardsandrisksassociatedwitheachstepofthework
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 22 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
• Thesafetycontrolsthatwillbeputinplacetominimisetheserisks• Allprecautionstobetakentoprotecthealthandsafety• Allhealthandsafetyinstructionstobegiventopersonsinvolvedwith
thework• IdentificationoftheapplicablesectionsofOHS,workplaceinjury
managementandworkerscompensationlegislation,regulations,codes,standardsandproceduresapplicabletothework,andwherethesedocumentsarekept
• Thenamesandqualificationsofthosewhowill:o Supervisetheworko Inspectandapproveworkareaconditions,workmethods,
protectivemeasures,plant,equipmentandpowertoolsforuse• Adescriptionofwhattrainingisgiventopeopleinvolvedwiththe
work• Thenamesofthosewhowillbe,orhavebeen,trainedforthework
activitiesdescribedintheSafeWorkMethodStatements,andthenamesandqualificationsofthoseresponsiblefortrainingthem
• Identificationoftheresources,plantandequipmentthatismostlikelytobeusedontheworksite,suchasladders,scaffolds,grinders,electricalleads,weldingmachines,fireextinguishers,toolsandmaterials
• DetailsofanyWorkCoverpermitsrequiredtocompletetheworkandwheretheyarekept
• detailsoftheinspectionandmaintenancechecksthatwillbe,orhavebeen,carriedoutontheplantandequipmentlistedforuse.
d) SafeWorkMethodStatementswillbemaintainedandkeptuptodate.All
relevantpersonnelmustbeconsulted,providedwithaccesstocopiesof,andre-trainedinitsuse,whenaSafeWorkMethodStatementischanged.
e) TheSafeWorkMethodStatementsprovidedbySALLUSwillbecompletedinaccordancewithsection6.8andthensignedbyanappropriatelyqualifiedpersonrepresentingSALLUSwhoiscompetentinworkactivitytobeundertaken.WorkwillnotproceeduntilemployeesreviewtheSWMSandsignthattheyunderstandandarewillingtoimplementthecontrolsrequiredtocarryouttheworksafely.
f) WhereSafeWorkMethodStatementsarerequiredtobedevelopedbysubcontractors,SALLUSwillissueguidelinesfortheirpreparation.Theseguidelinesdetailtherequirementssetoutinsection6.8.ToensurecompliancewiththeseguidelinestheOHSmanagerortheSiteManagerwillrevieweachSafeWorkMethodstatement,comparingitwiththeSWMSreviewform(Form022)andthensignoffonitscompliance.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 23 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
g) AlltheserviceprovidersutilizedbySALLUS,willbedirectedtocomplywiththeSafeWorkMethodStatementsthattheyhavedeveloped.7.9 EmergencyPrecedures
IntheeventofanemergencythereareanumberofproceduresandprocessesthatSALLUShasestablishedinordertominimisetheeffectoftheemergency,theyinclude:
a) Anuptodateandwellmaintainedfirstaidkitwillbepresenton-siteatalltimes
b) Emergencycontactnumbers(includinglocalpoliceandambulance)willbeondisplayateachsite
Ineventofanemergency,ifrequiredanambulancewillbecalledimmediately
7.10 HazardControlintheEventofanIncidentorInjury/Illness
IntheeventofanIncidentorInjury/illness,thecausinghazardisidentifiedandassessedintermsoftherisklevel,anincident/hazardreportformisfilledoutandfiledbytheOHSManager,whichdetailsthenatureofthehazard,thedeterminedriskclassanddetailsofcorrectiveactions,including:
• Thenatureofthecorrectiveactiontobeundertaken• Thepersontoenforcethisaction• Thedeadlinefortherectification
Toensurethatcorrectiveactionsareperformedtothefullextentinwhichtheyarerequired,anInjuryregisteriscompiledwithalloutstandingcorrectiveactionsbeingbroughtupatMonthlymanagementmeetingsuntiltheOHSmanagerissatisfiedandhassignedoffonitscompletion.
7.11 SiteSafetyRulesSALLUSwillprepare,implementandenforceSiteSafetyRules(SeeSite-SpecificSafetyManagementPlan)ontheworksite.TheOHSManagerhasassessedthesitedefiningthemostappropriaterulesforthisparticularproject.ForeffectivecommunicationoftheserulesandproceduresSALLUSwilldisplaythemonnoticeboardsandothersuitablelocationsontheworksite.Bymakingclearreferencetotheselocationsandtheircontents,duringallsiteinductions,allworkersandvisitorswillbeadequatelyinformedoftheirrequirementsandresponsibilities.
7.12 OHSLegalRequirementsForthepurposesofriskmanagement,copiesofallOHS,workplaceinjurymanagementandworkerscompensationlegislation,standardsandcodes,aretobekeptonsiteandallrequiredemployeeskeptuptodateondevelopmentsand
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 24 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
changes.relevantinformationiscommunicatedtootheremployeesthroughmonthlymanagermeetingandToolboxtalks.
8.0 TRAININGTrainingisimportantforSALLUStokeepemployees,includingmanagement,informedaboutOHSriskmanagement.SALLUShasatrainingprogram,whichconsidersthetrainingneedsforeachstageofaconstructionprocess.ItallowsforregularandongoingOHScommunication,forexamplethrough‘toolbox’meetingsandmonthlymanagerialsafetymeeting,andfacilitatesthedeliveryofappropriatetrainingbyappropriatelyqualifiedpersonnel.Trainingisspecificallyimplementedwhilenewprocesses,conditions,personnelorequipmentareintroducedontotheworksiteorOHShazardsarise.
8.1 ConsultationTrainingSALLUSprovidesOHSrepresentativeconsultationtraining,whichfacilitatesthecommunicationbetweenemployeesandemployer,providingameansofidentificationandaddressingOHSissues.
8.2 OHSInductionTrainingToimproveknowledgeaboutsitesafetyrules,OHSissues,hazards,risksandprocedureshasathree-stageinductiontrainingprograminplacetomeetOHSrequirements,theyinclude:
a) A‘SiteInduction’providessite-specifictrainingandisarequirementforallworkerswhencommencingworkonthesite.Itwillexplainthesitesafetyrules,relevantsafeworkmethodstatements,riskmanagementproceduresandconsultativearrangementsonthatspecificsite.Thesiteinductionwillalsocommunicateemergencyprocedurestoeveryoneonsite.Wherethefullextentofworksonsiteisbeingcarriedoutbyasinglesubcontractor,Thatcontractorisresponsibleforconductingsiteinductionsfortheiremployees
b) Site-specificInductiontrainingwillbeconductedforallvisitorsthatenterthesite,itwillbeconductedinthesamemannerasthe‘SiteInduction’aboveandwillcoverthesamecontent,withcertainirrelevantmaterialomitted.Whileonsite,allvisitorsmustbeaccompaniedbyafullyinductedpersonatalltimes.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 25 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
8.3 RefresherTrainingNeeds
Toensurethattherequiredknowledgeandattitudesaremaintainedbyallpersonnel,refreshertrainingisimplemented,whenrequired,toprovideuptodateinformationonspecificactivitiestoensurethatOHSrequirementsaremet.Refreshertrainingisrequiredonlongerdurationprojectsorforparticularhighriskactivitiessuchasplantoperation,useofhazardoussubstancesandmanualhandling.
8.4 TrainingtoOperatePlantandEquipment
AllemployeesaretoundergoonthejobtrainingwhenoperatingplantandequipmentwheretheydonothaveacurrentLicence(ifalicenceisrequired),orareoperatingplantandequipmentthattheyarenotfamiliarwith.
8.5 EmergencyProcedureTrainingDuringthe‘Siteinduction’,whichisgiventoallpeoplethatenterthesite,trainingisgivenontheproceduresrequiredintheeventofanemergency.Thistrainingwillconvey:
a) Thebestexitstousefromvariousareasofthesiteb) Locationofgatheringareasandthestrictrequirementtoattendc) Locationsoffirstaidkitsanddisplayedemergencycontactnumbersd) AnySpecificemergencyinformationthatisrelevanttothatsite
8.6 TrainingProcedureInordertoascertainthetrainingrequirementsofemployees,individualassessmentsareconductedpriortocommencementofworkandrecordedontheSkills/CompetencyAssessmentRegister.WhereskilldeficienciesaredetectedappropriatetrainingwillbeprovidedandrecordedintheTrainingAttendanceRegisterbeforeworkcommencessothatemployeescanperformtheirdesignateddutiessafely.
8.7 TrainingPolicy
a) Althoughseniorfirstaidersarenotrequiredby(legislation)onmanysites,SALLUSencouragesallemployeestoundergoseniorfirstaidtraining
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 26 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
b) 9.0 INSPECTION,TESTING&SERVICING
SALLUShasestablishedproceduresforOHSinspections,testingandmonitoringinordertoverifyappropriateOHSmanagementisinplaceandconstructionworkprocessesareinaccordancewithOHSmanagementplans.Inspectionandtestingwilloccuratkeystagesoftheproject,withchecklistsandrecordsbeingusedtomeasurecompliancewithprojectOHSmanagementplans.Thesecompliancemeasuresidentify:
a) OHSrisksknowntobepresentontheworksiteb) Verificationthatriskcontrolsareworkingeffectivelyc) Provisionofscopeforidentifyingandmanagingneworpreviouslyunforeseen
OHSrisks
9.1 InspectionandTestingPlansSALLUShasinspectionandtestplansinplacetomaintaincompliancewithforthefollowingworkprocessesandequipment
a) Electricalsafetyb) Workmethodsandadherencetositesafetyrulesc) Worksiteenvironmentincludingaccessandexitsd) Hazardandriskcontrolmeasurese) Incomingmaterialsandequipmentf) Plantandequipment
Theinspectionandtestplan(AppendixA)detailseachitemthatistobeinspectedortestedandthefollowing:
a) Thecriteriaonwhichitistestedb) Theinspectionfrequencyc) Thepersonwhoistoperformtheinspectiond) Thepersonresponsible,ande) Thesiterecordsthataretobekept
Theneedforinspectionandtestplanstobeprovidedbyserviceprovidersistobeassessedonacontractbycontractbasisandwillbeincludedinthequalitymanagementplan.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 27 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
9.2 WorkProcessesInordertoensurethatprocessesbeingcarriedoutonsiteareconsistentwithOHSmanagementplans,thefollowingactivitiesareperformedbythesitemanagerinconjunctionwiththeOHSmanager:
a) Ensuringthattheworksiteisgenerallylaidoutappropriately,includingaccessandexits
b) EnsuringthattheworkmethodsareofasatisfactoryOHSstandardc) EnsuringthattheworkenvironmentiscomplementarytoOHSrequirementsd) ConfirmingthatSafeWorkMethodStatementsarecompliedwithbyall
serviceprovidersandemployees.Noncomplianceisdocumentedandcorrectiveactionperformed
e) Constructionworksitechecklistsarecompletedonafortnightlybasisbythesitemanager.ThesesystematicallyassesseachoftheworkprocessesbeingcarriedoutonsiteandidentifyareaswhereOHSrequirementshavenotbeenmet.Nonconformancesarerectifiedandactionsdocumented
9.3 IncomingProducts
Allincomingmaterials,manufacturedproducts,plantandequipmentwillbeinspectedandtesteduponarrivalunlesswrittenevidencethatinspectionhasbeencarriedoutbythesupplierhasbeenprovidedIncomingmaterialsinspectionwillbeconductedandcheckedforcorrecttypeandquantity,safepackaging,correctlabeling,correctdocumentation,provisionofOHSinformation,andthatnotransitdamagehasoccurred.
9.4 PlantandEquipmentSALLUShasaregularinspectionandmaintenancescheduleforallequipmenttoensureregulatoryrequirementsaremet,includingkeepingequipmentuptostandardsspecifiedbythedesigners,manufacturersorsuppliers.ThroughConstructionWorkSiteCheckListsconditionsandteststatusofplantandequipmentareidentified.Allinspectionsarecarriedoutbyqualifiedpersonnel,thenlabelledortaggedtocertifytheircompliance.
9.5ElectricalAllelectricalequipmentwillbelistedintheElectricalappliancetesttaglogbook.Allelectricalleads,portablepowertools,junctionboxesandearthleakagedeviceswill
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 28 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
betested,inspectedbyasuitablyqualifiedpersonandlabelledwithatagofcurrentdatebeforebeingused.
9.6 PlantMaintenanceschedulesarekeptforallplantdetailingwhenandwhatmaintenanceisrequired.Maintenancereportsarefilledoutandsignedbyqualifiedpersonnelthenfiled.InspectionSchedulesaremaintainedforallplant,itistheOHSmanagersresponsibilitytoensureinspectionsarecarriedoutwhenprogrammedontheschedule.Plantinspectionreportsarecompletedanddetailthefindingsoftheinspections.InspectionandregistrationdetailsanddatesarerecordedinthePlantRegistrationandInspectionRegister.Wherehazardsareidentifiedahazardreportisfilledout,filedandbroughtupinToolBoxMeetingsuntilrectified.
9.7 LiftingGearLiftinggearmustdisplayacurrenttagshowingsafeworkingloadasperOHSregulations.Liftinggearthatdoesnothaveacurrenttestcertificatewilldisposedoforre-tested.
9.8RecordKeepingInaccordancewithregulatoryrequirementsthefollowingrecordsofinspectiontestingandservicingarekept:
a) Electricalequipmentinspectionrecords(Electricalappliancetesttaglogbook)
b) Plantinspectionandtestingrecordsc) Plantmaintenancerecordsd) Maintenanceandcalibrationequipmentrecordsformeasuringequipmente) ConstructionSiteCheckLists
10.0 INCIDENTMANAGEMENTANDCORRECTIVEACTION
10.1 IncidentManagement
WhenOHSissuesarise,suchasnon-compliancewithOHSrequirementsorintheeventofillnessorinjurybeingcausedonsite,SALLUShasspecificproceduresinplacetodealwithsuchissues,suchas:
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 29 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
a) Promptidentificationofanynon-complianceornon-conformancewithOHSrequirements,bykeepingallpersonneladequatelytrainedanduptodateontheOHSmanagementsystem,makingthemanagementsystemavailabletoallworkersandprovidingtheconsultationanddocumentationsystemtofacilitatesuchaprocess.
b) UponoccurrenceofanincidentSALLUShastheManagementsysteminplacetoensurethatthedocumentation,investigation,correctiveactionimplementation,StatisticalanalysisandreviewoftheincidentmanagementsystemareallinplacetominimisetheoccurrencesofIncidentsorInjuries.
c) Whereincidentsresultinillnessorinjurytoworkersandareconsideredserious,SALLUSfacilitatestheworkerscompensationandreturntoworkprocessestoensureworkerswelfare.
Aswellasaidingintheimplementationandmaintenanceoftheabovesystems,thesitemanagerhasthefollowingduties:
a) Eliminateunsafeworkpracticesandunsafeareas,whereevertheyhavebeenidentified
b) Ensuringthatallnon-complyingmaterials,plantandotherproductsareidentified,disposedof,removedorquarantined,thatisplacedinadesignatedsecurearea,tapedofforotherwisedisabledfromimplementationoroperationuntilsignedoffbythequalifiedperson
c) Adviseappropriatepartsoftheorganisation,itsserviceproviders,clientsandrelevantauthorities
d) Rectifyirregularities,non-conformancesandnon-compliancese) Consultwithpersonnelaboutproposedchangesthatmayaffecttheirhealth,
safetyorwelfareatwork,throughsuchthingsastoolboxtalks.
10.2 CorrectiveActionWhereHazardsorissuesofnon-complianceornon-conformancewithOHSrequirementsareidentified,thedetailsarerecordedonaHazard/Non-compliancereport,whichspecificallyidentifiesthe:
• Detailsoftheidentifiedissue• Thepersonresponsibleforimplementingthecorrectiveactions,and·
Thedaterequiredforthecorrectiveaction.Toensureimplementationofcorrectiveactions,aHazard/Non-complianceregisteriscompiled,withallmanagementbeingnotifiedofanyupdatedinformation.Correctiveactionsarebroughtup,theirprogressmonitoredandthenreviewedat
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 30 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
monthlymanagementmeetingsandToolboxtalks,ordependingonseverity,whenTheOHSManagerstipulates.NotuntiltheOHSManagerissatisfiedthattheappropriatecorrectiveactionhasbeenperformedtoasatisfactorylevel,willthatitemintheHazard/Non-complianceregisterbesignedoff.OncesignedoffthecorrectiveactionsthathavebeenundertakenarereviewedforeffectivenessinthefollowingMonthlyManagementMeeting.
10.3 AccidentInvestigation
Toaidintheprocessofimplementationofcorrectiveaction,whereanaccidenthasoccurredanAccidentInvestigationReportiscompletedbytheOHSManager.Thisreportiscompletedwiththeaimofdeterminingthedirectcauseoftheaccident,sothatcorrectiveactionscanbeimplementedinthemosteffectivemanner.
10.4 WorkersCompensation
SALLUSprovidesWorkersCompensationInsuranceforallemployeesandotherpersonsdeemedtobeemployeesundertheWorkersCompensationAct1987.ThetradeandoccupationofeachemployeewithinthecompanywillberecordedintheSkillsCompetencyregister.ArecordoftheinsurancewillbeprovidedonWorkerscompensationandrehabilitationform,togetherwithanattachedcurrentcopyofthepolicydetailsissuedbytheinsurer.
10.5 ReturnToWork
AsarequirementoftheWorkplaceInjuryManagementandWorkersCompensationAct,SALLUSfacilitatesanearlyandsafereturntoworkofallemployeeswhohavebeeninjuredorbecomeill.Thisreturntoworkprogramaddresses:
a) Treatmentofinjuryandillnessb) Rehabilitationandreturntoworkc) Retrainingd) Claimsmanagement
10.6 FirstAidFirstaidfacilitieswillbeprovidedthatareadequatefortheimmediatetreatmentofinjuriesandillnessthatmayariseattheplaceofwork,withregardtothelocation,numberofemployeesataparticularlocationandthetypeofworkbeingundertaken.ForThisconstructionsiteatwhichfewerthan25personsworka“FirstAidKitB’willbeprovided,ToensurethattheseKitsaremaintainedalistofits
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 31 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
contentswillbeprintedandattachedtothecovertoaidintheSitemanagersmonthlychecks.Thecontentsandquantityofeachitem,forthekitaredetailedbelow:
Item Quantity
Adhesiveplasticdressingstrips,sterile,packetof50 1
Adhesivedressingtape,2.5cm5cm 1
Bags,plastic,foramputatedpartsSmallMediumLarge
111
Dressings,non-adherent,sterile,7.5cm7.5cm 2
Eyepads,sterile 2
Gauzebandages:5cm10cm
11
Gloves,Disposable,single 4
Rescueblanket,silver,space 1
Safetypins,packets 1
Scissors,blunt,shortnosed,minimumlength12.5cm 1
Splinterforceps 1
Sterileeyewashsolution,10mlsingleuseampulesorsachets 6
Swabs,prepacked,antiseptic,packof10 1
Triangularbandages,minimum90cm 4
Wounddressing,sterilenon-medicated,large 3
FirstaidpamphletasapprovedbyWorkCover 1
10.7 IncidentReportingAllinjurieswillbereportedtoappropriatemanagementwithallinjuriesrecordedintheInjuryRegister.Recordswillbekeptforaminimumof5years.Wheretheinjuryresultsinanabsencefromtheworkplaceof7daysormoretheinjuryanditscircumstanceswillbereportedtotheWorkCoverAuthorityusingtheappropriateform.WhereIncidentswhichresultinillnessorinjurytoworkersandareconsideredseriouswillresultinimmediatenotificationtoworkcoveron131055andarereportedtoourworkerscompensationinsurerswithin48hours.Clientsandsubcontractorsaretobeinformedonthenatureandseverityofincidents,their
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 32 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
causesandtheprogressofcorrectiveactions.ClientswillbeupdatedmonthlywiththeprovisionoftheInjuryregister,andsubcontractorswillbeinformedimmediately,ifserious,orduringToolboxtalksandinductions.
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 33 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
11.0 HANDLING,STORAGE,PACKAGINGANDDELIVERY
11.1 HazardousProcesses
Wherehazardousprocessesarerequiredonsite,certainriskcontrolmeasuresareimplemented,suchas:specialisedfacilities,provenworkmethodsandspecialisedtraining.Wheretheseriskcontrolmeasuredareneeded,SafeWorkMethodStatementsaredevelopedandtheappropriatelicensing,certificationandqualificationofanyoneengagedintheHazardousprocessesischeckedandmonitoredrandomlyandthroughtheConstructionSitesafetyCheckList.Particularattentionwillbegiventobutnotlimitedtothefollowinghazardousprocesses:
a) Spraypaintingb) Abrasiveblastingc) Weldingd) Electroplatinge) Workwithmoltenmetalf) Leadworkg) Electricalworkh) Trafficcontroli) Excavationsj) Deepexcavationk) Workinconfinedspacesl) Scaffoldingm) Formworkn) Workatheightso) Workwithdangerousgoods/explosivesp) Lifting,handling,loadingandunloading
11.2 MaterialsHandling
Materialshandlingislimitedtothetransportation,receipt,unloading,storageandplacementofpermanentandtemporaryconstructionmaterial,equipmentandplant.PriortomaterialsbeingdeliveredtositetheOHSManager,inconjunctionwiththeSiteManagerand/orsubcontractorshallplanthehandlingofmaterials,takingintoconsiderationthefollowing:
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 34 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
a) Accesstoand/orfromtheareafortheremoval,storageandplacementof
thematerials;b) Weight/mass,length,quantity,widthandtypeofmaterialbeinghandled(e.g.
Steel,concrete,PVC);c) Method(s)usedtohandlethematerials(e.g.Manualhandling,crane,forklift,
teleporter,excavator);d) Devicesutilisedforliftingofthematerial;e) Condition,capacityandsuitabilityofthemechanicalliftingequipmente.g.
platelifter,quick-lifts,softslings;f) Skills/competencyofthepersonnelinvolvedinthematerialhandlingactivity;g) Overheadpowerlinesthatmaybeencroachedonduringthematerial
handlingactivity;h) Structuralintegrityofthelocationwherethematerialsaretobeplaced;i) Suitabilityoftheareawherethematerialaretoplaced(e.g.firm,level,clear
ofotheractivities);j) Securityofthematerialonceplacedatthestoragelocationand/ortemporary
storagepriortoinstallationand/oruse;k) Barricadingerectedtomaterialstoragearea;l) Hazardoussubstanceinbunded,cagedorotherapprovedstoragefacilityetc.m) Interfaceswithotheractivitiesoccurringduringthematerialhandlingprocess
addressed:n) Protectionofthepublicandothersfromthematerialhandlingactivity.
11.3 ManualHandling
ToidentifypotentialmanualhandlingriskstheSiteManagerinspectsallproductsasitarrivesonsiteandallocatessuitableequipmentormachineryforitsmovement,andresourcesforitsstorage.Toensuresafetyuntiltheproductisinitsfinalpositionorhasbeenremovedfromthesite,SafeWorkMethodStatementsaredevelopedandimplementedwithappropriateguidanceisgiven,bymanagement,toallsitepersonnel.
11.4 HazardousSubstancesForeveryhazardoussubstancethatisrequiredonsite,thedetailsarerecordedontheHazardoussubstanceregister,whichalsodefinestheriskclassandproposedcontrolmeasures.MaterialDataSafetySheets(MSDS),whichareusedforinitialassessmenttoverifythattheproposedworkmethodsareinaccordancewiththe
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 35 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
manufacturer’sinstructionsarefiledalongwiththeHazardousSubstanceRegisterandmaintainedoneveryworksite.WhereinitialassessmentindicatessignificanthealthriskstheOHSManagerperformsthefollowingtasks:
a) Labelsthesubstancesorgoodsappropriatelyb) Ensuresthepersonnelusingthemhavetheappropriatetraining,experience,
licencesorqualification.c) Arrangesanyspecialrequirementsfortransportandstoraged) Conductsmonitoringtodeterminelevelsofexposureandminimisethemas
muchaspossible.e) MaintainaregisterofhazardoussubstancesalongwiththeassociatedMSDS,
oneveryworksite
11.5 CertificationofPlantandOperatorsTheregistrationdetailsofallPlant,vesselsandequipment,arekeptonfileatheadofficeinthePlantIDRegister.Sitemanagershavethedutyofensuringthatallregistrationrequirementsarekeptuptodateandthatplant,vesselsandequipmentarenotutilisedfortasksnotencompassedbyitsregistration.Duringinductiontraining,relevantplantoperatorsarerequiredtopresenttheirlicencecertificates,whicharecopiedandfiled.AsarequirementofWorkCoverlicencecertificatesaretobekeptonthepersonofeachemployeewhilstoperatingplant.RandomchecksaretobecarriedoutbytheOHSManagertoconfirmthatplantoperatorspossessthisdocumentation.
12.0 INTERNALREVIEWSToconfirmthattheOHSmanagementplansarebeingcompliedwith,SALLUShasaninternalauditandreviewprogram.
12.1 ConstructionWorkSiteCheckListsTheconstructionworksitechecklistisapowerfultoolusedtoensureOHSstandardsaremaintainedonsite.TheChecklististobefilledoutfortnightlybytheSiteManager.
12.2 InternalReviewsSALLUShasquarterlyinternalreviewmeetingschairedbytheOHSmanagertodealwithdeficienciesinOHSmanagementssystemsandplans.Aninternalreviewreport
CompanyOH&SManagementPlan
ContractNo:-RevNo:1-RevDate:30/7/2017
Page 36 of 45
SALUSMARITIMEABN8200842843723PipeClayEsplanade,Cremorne.TasmaniaTELEPHONE+610459467558
iscompiledbytheOHSManager,whichdocumentsthefindings.WhereIssuesofNon-complianceorNon-conformanceareidentifiedtheyarerecordedonaHazard/Non-compliancereport.
12.3 InternalAuditsToconfirmcompliancewithOHSManagementsystemsandplanstheOHSManagerconductsrandomauditsofOHSactivities,hehasaquotaofconducting3peryear.AInternalauditreportiscompiledbytheOHSManagerwithanyNon-complianceornon-conformancebeingrecordedonaHazard/Non-compliancereport.
12.4 CorrectiveactionsWhereissuesareidentifiedthrougheither:internalAuditsorreviews,detailsarerecordedonaHazard/Non-compliancereport,whichalsospecifiesthe:details,personresponsibleforimplementing,anddaterequiredofallcorrectiveaction.Toensureimplementationofcorrectiveactions,aHazard/Non-complianceregisteriscompiled,withallmanagementbeingnotifiedofanyupdatedinformation.Correctiveactionsarebroughtup,progressmonitoredandreviewedatmonthlymanagementmeetings,ordependingonseverity,whenTheOHSManagerstipulates.NotuntiltheOHSManagerissatisfiedthattheappropriatecorrectiveactionhasbeenperformedtoasatisfactorylevel,willthatitemintheHazard/Noncomplianceregisterbesignedoff.
13.0 DOCUMENTATION&RECORDSOutlinedintheDocument/RecordControlRegister(appendixB)arethedetailsforthedocumentationandRecordkeepingprocessesthatarerequiredforthisProjectOHSmanagementplan.Whereresponsibilitiesaredetailedinthistable,itisthatperson’srequirementtomaintaintheaccuracyandupkeepofthedocumentsandensuretheavailabilitytoallpersons,requiredbythisplan.