SAMOHI SRTS PLAN AND DESIGNWorkshop 3
October 23, 2013
SAMOHI SRTS Planning Process
School/Community Workshop 1 –Collect Info
Prepare Concept Plans
School/Community Workshop 2 – Show
Concepts and Prioritize
Narrow Down Concepts,
Preliminary Design, Cost Estimates
School/Community Workshop 3 – Show
Designs, Cost Estimates, Get
Feedback
School/Community Workshop 1January 16
Map Exercise
Map Exercise – Workshop 1
Santa Monica High SchoolImprovement
Concept Plans
Michigan Avenue
Lincoln @ Michigan (Intersection 4)• Continental crosswalks• Bike boxes to cross Lincoln• Audio signals• Advanced stop bars• Automatic walk phase during school hours• Leading pedestrian interval• Bulb-outs to cross Michigan• Bulb-outs to NW and SW corners to cross Lincoln• No Right on Red for southbound movement on Lincoln
Michigan Avenue
Lincoln to 7th (Segment Option 1)• Convert to one-way westbound• 6’ bike lane with 2’ parking buffer
westbound• 6’ colored contra-flow bike lane with 2’
parking buffer eastbound• Double yellow lines to separate
contraflow bike lane• Dashed green intersection treatment
across Lincoln
• Lincoln to 7th (Segment Option 2)
• Convert to one-way westbound• 5’ bike lane with 2’ parking buffer
westbound• 6’ colored contra-flow bike lane with 2’
parking buffer eastbound• Double yellow lines to separate
contraflow bike lane • Dashed green intersection treatment
across Lincoln
Michigan Avenue
Lincoln to 7th (Segment Option 2)
• Convert to one-way westbound• 5’ bike lane with 2’ parking buffer
westbound• 6’ colored contra-flow bike lane with 2’
parking buffer eastbound• Double yellow lines to separate contraflow
bike lane • Dashed green intersection treatment
across Lincoln
7th Street
Michigan @ 7th
• Raised Crosswalk• Continental crosswalks• Advanced stop bars• Yield to Pedestrians
7th Street Options
5
7th Street
Michigan to Picosegment• Convert to one-way southbound for motorists• 6’ colored bike lane southbound• 6’ colored contra-flow bike lane with 6’ parking
buffer eastbound• Double yellow lines to separate contraflow bike
lane• Street lighting• Landscaping and pervious materials to sidewalk
parkways• Shorten parking stalls to 16’
Pico @ 7th
• Signalize with audio and countdown signals• Bicycle-only phase for turning cyclists• Advanced stop bars to cross Pico• Continental crosswalks to cross Pico• Raised crosswalk to cross 7th
• Bulb-outs on NW and NE corners to cross 7th
• Colored dashed bike lanes to connect 7th to cycle track
6th to 7th
• 12’ 2-way median cycle track
• 2’ raised buffer on north side• 4’ landscaped buffer on
south side• Reduce #1 travel lane to 10’
and #2 (curbside) to 11’
PICO BOULEVARD
Pico Blvd.
7th St.
SAMOHI
Pico Boulevard
Pico Boulevard6th to 7th
• 12’ 2-way median cycle track
• 2’ raised buffer with white reflectors on north side
• 4’ landscaped buffer on south side
• Reduce #1 travel lane to 10’ and #2 (curbside) to 11’
Pico @ 6th
• Bicycle-only phase for turning cyclists• Continental crosswalks on all 3 crossings• Bulb-outs on NW and NE corners to cross 7th
• Colored dashed bike lanes to connect 6th to cycle track• 5’ northbound bike lane, 6’ bikes-only lane southbound on 6th
• Double yellow lines to separate southbound bike lane• Shorten curb extension on SW corner• Advanced stop bars
SAMOHI
Hotel
Pico to Olympic• 4’ landscaped buffer to sidewalk
on east side• Bikeway with “super sharrows”
Pico @ 4th
• Continental crosswalks• Protected left turns
Civic Center @ 4th
• New north leg crossing• Continental crosswalks to north and east legs• Advanced stop bars to north and east legs• Bulb-outs @ NE and SE corners to cross Civic Center• Keep clear markings in intersection
SamohiTrack
Gas Station
Parking Structure
Hotel
4th Street
Olympic Drive4th to 7th• Add 7’ to 8’ to sidewalk• Reduce widths of travel lanes
Olympic @ 5th
• Continental crosswalk• Advanced stop bar• Bulb-outs to SE and SW corners to cross 5th
• Crossing island
Olympic @ 4th
• New north leg crossing• Continental crosswalks• Red arrow for northbound vehicles• Leading pedestrian interval • Reduced curb return SW corner• Audio signals
Lincoln BoulevardLincoln @ Pico• Continental crosswalks• Advanced stop bars• Leading pedestrian interval• Audio signals • Automatic walk phase during school hours• Lengthen green walk phase to cross Lincoln• Bulb-outs to cross Lincoln, depending on Lincoln Blvd.
planning process• Bulb-out on SE corner to cross Pico• Reduce curb return on SE and SW corners
Olympic @ Lincoln• Continental crosswalks• Advanced stop bars• Leading pedestrian interval• Audio signals • No RTOR during school hours for eastbound
motorists on Olympic• Reduce curb return on SE and SW corners• Truncate median, add median nose, straighten
crosswalk on south crossing of Lincoln
Gas StationTommy’s
U-Haul
Bike Parking
Workshop 2 -Project
PrioritizationMay 22
Workshop 2 Results – Intersections Improvements
Intersections # Green Dots (x2) #Yellow Dots (x1) Total Points
Michigan Ave. & Lincoln Bl. 5 10
Pico Bl. & 7th St. 4 1 9Pico Bl. & 6th St. 3 6Olympic Dr. & Lincoln Bl. 2 1 5Olympic Dr. & 4th St. 1 2 4Michigan Ave. & 7th St. 2 4Civic Center Dr. & 4th St. 3 3Olympic Dr. & 5th St. 2 2Pico Bl. & Lincoln Bl. 2 2Pico Bl. & 4th St. 1 1 2
Workshop 2 Results – Linear Projects
Segment# Green
Dots Option 1
# Green Dots
Option 2
# Green Dots
Option 3
#Yellow Dots
Option 1
#Yellow Dots
Option 2
#Yellow Dots
Option 3
Total Points
Option 1
Total Points
Option 2
Total Points
Option 3
Olympic Dr. 1- -
2- -
Michigan Ave. 4 8
7th St. 4 8
Pico Blvd. 4 8
4th St. 2 2
7th Street - Michigan to Pico• Convert to one-way southbound for
motorists• 6’ colored bike lane southbound• 6’ colored contra-flow bike lane with 6’
parking buffer eastbound• Double yellow lines to separate
contraflow bike lane• Street lighting• Landscaping and pervious materials to
sidewalk parkways• Move parking stalls forward
Michigan - Lincoln to 7th
• Convert to one-way westbound• 5’ bike lane with 2’ parking buffer
westbound• 6’ colored contra-flow bike lane with 2’
parking buffer eastbound• Double yellow lines to separate
contraflow bike lane • Dashed green intersection treatment
across Lincoln
Pico - 6th to 7th • New Signal at 7th and Pico• 12’ 2-way median cycle track• 2’ raised buffer with white reflectors
on north side• 4’ landscaped buffer on south side• Reduce #1 travel lane to 10’ and #2
(curbside) to 11’
Phase I -Michigan/7th/Pico Design
Phase I - Michigan/7th/Pico Design
Phase II - Olympic Design
4th to 5th Street
Phase II - Olympic Design
Samohi Driveway
7th Court to Lincoln
Phase II - Olympic Design
Next Steps• Complete traffic analysis to ensure no significant
traffic impacts• City Council Winter 2014• Prepare Construction Drawings for Phase I• Seek funding for Phase II• Continue to work with Michigan Avenue Greenway
Project• Incorporate recommendations into Lincoln
Visioning Project