    Feeder

    . When a feeder window is installed on

    the top of building to lead the feeder

    cable into the room, it must be sealed

    well.

  • 7/25/2019 Sample Installation Standard of BTS.pdf

    2/10

    support.huawei.com Page 1

    Feeder

    . The antenna jumper and the feeder cable before the feederwindow must have waterproof bends.

  • 7/25/2019 Sample Installation Standard of BTS.pdf

    3/10

    support.huawei.com Page 2

    Feeder

    . When the feeder cable is bent on the top of a building and then

    extended downward along the wall, the protective means should

    be used for the parts of contact with the wall corner. When the

    feeder cable enter to room along the roof, the feeder clips should

    be used to fix the feeder cable.

  • 7/25/2019 Sample Installation Standard of BTS.pdf

    4/10

    support.huawei.com Page 3

    Lightning-proof and Grounding

    . The lightning-proof arrester must be earthed according to

    specification for GSM macro base station. All ground cables are

    connected to the outdoor protection ground bar of equipment room

    after collecting.

  • 7/25/2019 Sample Installation Standard of BTS.pdf

    5/10

    support.huawei.com Page 4

    Lightning-proof and Grounding

    . The outside grounding bar must be wiped off rust and cleaneddirt before they are connected, in order to ensure their reliable

    connection. The outside grounding bar must be anticorrosion

    and antirust processed by using self-spray paint or other

    protection materials after they are connected in order to ensure

    their long-term good contact. Each connecting terminal should

    be installed correctly and firmly together with flat washers and

    spring washers.

  • 7/25/2019 Sample Installation Standard of BTS.pdf

    6/10

    support.huawei.com Page 5

    Lightning-proof and Grounding

    . The feeder grounding clip is directly fixed on the steel sheet of the

    tower perfectly. The installation of this clip must accord with the

    standard requirement. The antirust, anticorrosive and waterproof

    measures are adopted for the grounding clip and reliable connection.

  • 7/25/2019 Sample Installation Standard of BTS.pdf

    7/10

    support.huawei.com Page 6

    Lightning-proof and Grounding

    . When the tower is more

    than 60 meters, add a

    grounding clip to the

    feeder in the middle of

    the tower.

  • 7/25/2019 Sample Installation Standard of BTS.pdf

    8/10

    support.huawei.com Page 7

    Lightning-proof and Grounding

    . The feeder cable should be earthed at three points at least betweenthe top of tower and the equipment room (within one meter away from

    the platform on the top of tower, within one meter between the tower

    body and the outdoor cabling ladder, and within one meter between

    the feeder cable and the feeder window). The feeder cable is tied

    firmly at the grounding points and has perfect waterproof treatments.

  • 7/25/2019 Sample Installation Standard of BTS.pdf

    9/10

    support.huawei.com Page 8

    Lightning-proof and Grounding

    . If the length of feeder cable from the tower to the room on the

    roof (or cabling ladder) is more than 20 meters, a lightning-

    proof protection grounding clip should be added on the roof

    (or cabling rack).