Upload
others
View
8
Download
0
Embed Size (px)
Citation preview
The new technology era has a huge
impact on Non-Volatile Memory (NVM),
demanding memories with faster speed
and higher storage capacity.
Manufacturers have therefore channeled
investment into the development of new
NVMs with more memory cells in a single
chip.
Samsung continues to dominate the
semiconductor industry, including the
memory industry, as shown by the
magnificent $22 billion revenue in 2018
generated by its NAND memory business.
Its manufacturing techniques change from
one generation to another to produce
reliable memory chips with higher
capacity.
This report presents a detailed technology
study of the latest Samsung 3D Vertical-
NAND memory made with 92-Layer word
lines. Thanks to high quality optical
images and high-resolution scanning
electron microscope (SEM) images, the
physical analysis shows details of die cross
sections, including material identification.
The report includes a detailed process to
better understand the major fabrication
steps. It also includes a cost estimation of
producing Samsung’s new generation 3D
NAND chips and the packaging cost.
Finally, this report features a comparison
of Samsung’s previous NVM generation
with the latest generation. This identifies
the different and similar features in the
two generations, and compares the
fabrication cost and the impact of the
added layers.
COMPLETE TEARDOWN WITH
• Detailed optical and SEM photos and
cross-sections
• Precise measurements
• Material analysis
• Manufacturing process flow
• Supply chain evaluation
• Manufacturing cost analysis
• Comparison of 92-layer with 64-layer
V-NAND
• Estimated sales price
Fifth generation 3D NAND memory chip reveals Samsung’s latest memorytechnology and fabrication methods.
REVERSE COSTING® – STRUCTURE, PROCESS & COST REPORT
Title: Samsung 3D V-NAND 92-Layer Memory
Pages: 100
Date: September 2019
Format: PDF & Excel file
Price: EUR 3,990
Samsung 3D V-NAND 92-Layer Memory
IC – LED – RF – MEMS – IMAGING – PACKAGING – SYSTEM – POWER - MEMORY - DISPLAY
TABLE OF CONTENTS
Overview/Introduction
• Executive Summary
• Reverse Costing Methodology
Samsung Company Profile
Market Analysis
• NAND Flash Market Revenue
• NAND Market Shipments
• Samsung NAND Flash RoadMap
Physical Analysis
• Synthesis of the Physical Analysis
• Physical Analysis Methodology
• 970 EVO Plus SSD Teardown
• Package View and Dimensions
• Memory Die
View, dimensions & marking
Cross-section
Contacts and metallization
• 3D NAND Patents
Manufacturing Process Flow
• Overview
AUTHORS
• Fab Unit
• Process Flow
Cost Analysis
• Summary of the Cost Analysis
• Yields Explanation & Hypotheses
• Memory 3D 92-Layer
Memory front-end cost
Memory front-end cost per process steps
• Process Steps
• Component
Bonding front-end cost
Memory wafer & die cost
Back-end: Final test cost
Memory 3D 92-layer component cost
Selling Price
Comparison between Samsung 92-Layer and 64-Layer V-NAND
SAMSUNG 3D V-NAND 92-LAYER MEMORY
RELATED REPORTS
Leading-edge 3D NAND Memory Comparison 2018A deep technology analysis and cost comparison report on cutting edge 3D NAND memory chips from Toshiba/SanDisk, Samsung, SK Hynix and Intel/Micron.December 2018 - EUR 4,990*
Toshiba SanDisk 64 Layers 3D NAND MemoryThe latest 3D NAND Flash memory produced by Toshiba and SanDisk for the IPhone X.November 2018 - EUR 3,990*
NAND Service –Memory ResearchNAND market downturn continues into early 2019, with recovery expected in the second half.June 2019 - EUR 30,000*
Belinda Dube is working for SystemPlus Consulting as Analyst inSemiconductor Memories andIntegrated Circuits. She holds aMasters degree in Nano Scienceand Nanotechnologies from EcoleCentral Lyon and INSA Lyon.
Véronique Le Troadec has joinedSystem Plus Consulting as alaboratory engineer. Coming fromAtmel Nantes, she has extensiveknowledge in failure analysis ofcomponents and in deprocessing ofintegrated circuits.
COSTING TOOLS
REVERSE COSTING® – STRUCTURE, PROCESS & COST REPORT
Process-BasedCosting Tools
ParametricCosting Tools
WHAT IS A REVERSE COSTING®?
Reverse Costing® is the process of disassembling a device (or asystem) in order to identify its technology and calculate itsmanufacturing cost, using in-house models and tools.
IC Price+
MEMS CoSim+
MEMS Price+
Power CoSim+
Power Price+
LED CoSim+
3D PackageCoSim+
DisplayPrice+
PCBPrice+
SYSCost+
CONTACTS
ABOUT SYSTEM PLUS CONSULTING
System Plus Consulting is specialized
in the cost analysis of electronics
from semiconductor devices to
electronic systems.
A complete range of services and
costing tools to provide in-depth
production cost studies and to
estimate the objective selling price of
a product is available.
Our services:
• STRUCTURE & PROCESS
ANALYSES
• TEARDOWNS
• CUSTOM ANALYSES
• COSTING SERVICES
• COSTING TOOLS
• TRAININGS
www.systemplus.fr
Our analysis is performed with our costing tool IC Price+.
System Plus Consulting offers powerful costing tools to evaluate the production cost and selling price from
single chip to complex structures.
IC Price+The tool performs the necessary cost simulation of any Integrated Circuit: ASICs, microcontrollers, memories,DSP, smartpower…
Headquarters22, bd Benoni GoullinNantes Biotech44200 NantesFrance+33 2 40 18 09 [email protected]
Europe Sales OfficeLizzie LEVENEZFrankfurt am MainGermany+49 151 23 54 41 [email protected]
America Sales OfficeSteven LAFERRIEREWestern USA & Canada+1 [email protected]
Chris YOUMANEastern USA & Canada+1 919-607-9839 [email protected]
Asia Sales OfficeTakashi ONOZAWAJapan & Rest of Asia+81 80 4371 [email protected]
Mavis WANGGreater China+886 979 336 [email protected]
Peter OKKorea+82 10 4089 [email protected]
ORDER FORMPlease process my order for “Samsung 3D V-NAND 92-Layer Memory” Reverse Costing® – Structure, Process & Cost Report Ref: SP19489
Full Structure, Process & Cost Report : EUR 3,990* Annual Subscription offers possible from 3 reports, including this
report as the first of the year. Contact us for more information.
SHIP TO
Name (Mr/Ms/Dr/Pr): .............................................................
Job Title: …….............................................................................
Company: ….............................................................................
Address: …….............................................................................
City: ………………………………… State: ..........................................
Postcode/Zip: ..........................................................................
Country: ……............................................................................
VAT ID Number for EU members: ..........................................
Tel: ……………….........................................................................
Email: .....................................................................................
Date: ......................................................................................
Signature: ..............................................................................
BILLING CONTACT
First Name : ............................................................................
Last Name: …….......................................................................
Email: …..................................................................................
Phone: ……..............................................................................
PAYMENT
By credit card:
Number: |__|__|__|__| |__|__|__|__| |__|__|__|__|
|__|__|__|__|
Expiration date: |__|__|/|__|__|
Card Verification Value: |__|__|__|
By bank transfer:HSBC - CAE- Le Terminal -2 rue du Charron - 44800 St Herblain FranceBIC code: CCFRFRPP• In EUR
Bank code : 30056 - Branch code : 00955 - Account : 09550003234 IBAN: FR76 3005 6009 5509 5500 0323 439
• In USDBank code : 30056 - Branch code : 00955 - Account : 09550003247 IBAN: FR76 3005 6009 5509 5500 0324 797
REVERSE COSTING® – STRUCTURE, PROCESS & COST REPORTSAMSUNG 3D V-NAND 92-LAYER MEMORY
Each year System Plus Consultingreleases a comprehensive collectionof new reverse engineering andcosting analyses in various domains.You can choose to buy over 12months a set of 3, 4, 5, 7, 10 or 15Reverse Costing® reports.
Up to 47% discount!
More than 60 reports released eachyear on the following topics(considered for 2018):• MEMS & Sensors: Accelerometer
– Environment - Fingerprint - Gas - Gyroscope - IMU/Combo -Microphone - Optics - Oscillator -Pressure
• Power: GaN - IGBT - MOSFET - Si Diode - SiC
• Imaging: Camera - Spectrometer• LED and Laser: UV LED – VCSEL -
White/blue LED• Packaging: 3D Packaging -
Embedded - SIP - WLP• Integrated Circuits: IPD –
Memories – PMIC - SoC• RF: FEM - Duplexer• Systems: Automotive - Consumer
- Energy - Telecom
ANNUAL SUBSCRIPTIONS
Return order by: FAX: +33 2 53 55 10 59MAIL: SYSTEM PLUS CONSULTING
22, bd Benoni GoullinNantes Biotech44200 Nantes – France
EMAIL: [email protected]
*For price in dollars please use the day’s exchange rate *All reports are delivered electronically in pdf format*For French customer, add 20 % for VAT*Our prices are subject to change. Please check our new releases and price changes on www.systemplus.fr. The present document is valid 6 months after its publishing date: September 2019
1.INTRODUCTIONThe present terms and conditions apply to the offers, sales and deliveries of services managed by System PlusConsulting except in the case of a particular written agreement.Buyer must note that placing an order means an agreement without any restriction with these terms and conditions.
2.PRICESPrices of the purchased services are those which are in force on the date the order is placed. Prices are in Euros andworked out without taxes. Consequently, the taxes and possible added costs agreed when the order is placed will becharged on these initial prices.System Plus Consulting may change its prices whenever the company thinks it necessary. However, the companycommits itself in invoicing at the prices in force on the date the order is placed.
3.REBATES and DISCOUNTSThe quoted prices already include the rebates and discounts that System Plus Consulting could have granted accordingto the number of orders placed by the Buyer, or other specific conditions. No discount is granted in case of earlypayment.
4.TERMS OF PAYMENTSystem Plus Consulting delivered services are to be paid within 30 days end of month by bank transfer except in thecase of a particular written agreement.If the payment does not reach System Plus Consulting on the deadline, the Buyer has to pay System Plus Consulting apenalty for late payment the amount of which is three times the legal interest rate. The legal interest rate is thecurrent one on the delivery date. This penalty is worked out on the unpaid invoice amount, starting from the invoicedeadline. This penalty is sent without previous notice.When payment terms are over 30 days end of month, the Buyer has to pay a deposit which amount is 10% of the
total invoice amount when placing his order.
5. OWNERSHIPSystem Plus Consulting remains sole owner of the delivered services until total payment of the invoice.
6.DELIVERIESThe delivery schedule on the purchase order is given for information only and cannot be strictly guaranteed.Consequently any reasonable delay in the delivery of services will not allow the buyer to claim for damages or tocancel the order.
7.ENTRUSTED GOODS SHIPMENTThe transport costs and risks are fully born by the Buyer. Should the customer wish to ensure the goods against lost ordamage on the base of their real value, he must imperatively point it out to System Plus Consulting when theshipment takes place. Without any specific requirement, insurance terms for the return of goods will be the carriercurrent ones (reimbursement based on good weight instead of the real value).
8.FORCE MAJEURESystem Plus Consulting responsibility will not be involved in non execution or late delivery of one of its dutiesdescribed in the current terms and conditions if these are the result of a force majeure case. Therefore, the forcemajeure includes all external event unpredictable and irresistible as defined by the article 1148 of the French CodeCivil?
9.CONFIDENTIALITYAs a rule, all information handed by customers to system Plus Consulting are considered as strictly confidential.A non-disclosure agreement can be signed on demand.
10.RESPONSABILITY LIMITATIONThe Buyer is responsible for the use and interpretations he makes of the reports delivered by System Plus Consulting.Consequently, System Plus Consulting responsibility can in no case be called into question for any direct or indirectdamage, financial or otherwise, that may result from the use of the results of our analysis or results obtained usingone of our costing tools.
11.APPLICABLE LAWAny dispute that may arise about the interpretation or execution of the current terms and conditions shall be resolvedapplying the French law.It the dispute cannot be settled out-of-court, the competent Court will be the Tribunal de Commerce de Nantes.
TERMS AND CONDITIONS OF SALES