An overview of the SAP R/3 Production Planning
(PP) module
Automotives Building Materials Chemicals Engineering Construction and Operations Fabricated materials Power plant Construction Healthcare Utilities Services Apparel and Footwear Discrete manufacturing Food and Beverages
Industry Sectors for Production
Manuf. Type Strategy Example
Discrete MTSMTOETO
Standard AssembliesCustom Req. MaterialConstruction
Repetitive MTS Spare Parts
Process Industry MTSMTO
Foods, Beverages & Pharmaceuticals
Production Planning Overview
Agenda Review of Materials Management PP Organization Bills of Material Work Centers Routings Material Requirements Planning
Agenda (Cont’d)
Processing Planning Results Production Order Management Capacity Planning and Leveling Product Cost The Production Cycle Sales and Operations Planning Master Planning and Demand Management Master Production Scheduling
Review of MM Organization
Material Typee.g. Raw material, semi-finished good, service, trading good, finished productControls access securityDetermines how material is procuredControls how material movements affect financial accountsLinked to material number rangesControls what fields appear on what screens
Industry SectorControls what fields appear on what screens
Unit of Measuree.g. Piece, box, crate, pallet, Each, KG, LitreDifferent parts of the business can measure quantities in different units
Multi-Lingual Texts
Material Master Data
Material Master Data
General Data St. Loc. Specific Data Plant Specific DataSales Specific Data
Material Master
Data applicable throughout the client
e.g.
Material number
Description
Units of measure
Weight
Volume
Product hierarchy
Data dependent on sales organization and distribution channel
e.g.
Delivering plant
Sales text
Sales units
Shipping data
Division
Data relevantfor planning andproduction
e.g.
MRP profile
Production costs
Planning data
Valuation
Data referring to storage and inventory management
e.g.
Quantities
Special stock
Warehouse attributes
Material Types in the Standard SAP
Material Type
DIENERSAFERTHALBHAWAHIBELEERNLAGROHVERPWETTPROD
ServiceSpare PartFinished ProductSemi-finished ProductTrading GoodOperating SupplyEmpty ContainersNon stock ItemRaw MaterialPackagingCompetitor ProductProduction Resources/ Tools
Description
ProductData
EngineeringDesign
Sales
ProductionStock
Finance
Purchasing
Master data is a key pieceof information in the system
Master data can be seen froma number of views
Each view can correspondto an SAP module
Each view has a numberof information screens
Each view belongs to an org unit within the business
One product may have multiple plant and sales views, one for each plant or sales area
Master Data Views
EngineeringDesign
Sales
Production Stock
Finance
Purchasing
Examples of How Data is Used
Texts copiedto purchase orders
Maintains stock levels by plant, storage location, and batch
Data used tocalculate MRP
lead times
Controls customer ordering rules
for material
Controls whichGeneral Ledger
Account is updated
Material descriptionused in reporting
ProductData
Production Planning
Production Planning Basic Data
Routings
Work CentersMaterials
CapacitiesInspectionPlans
Production Facilities
Bills of Material
PP Basic Data Production Resources/Tools
F06010
Production Planning Functionality
Provides overviews from rough-cut throughto detailed shop floor planning
PP-CRP Capacity Requirements Planning
Controls production costingPP-PC Product Costing
Generation of order proposals based on requirements defined by PP-SOP
PP-MRP Material Requirements Planning
Generates data used for processing orders, e.g., dates, costs and resources
PP-SFC Production Order Control
Coordination and planning of production activitiesPP-SOP Sales and Operations Planning
Monitoring / analyzing on-going production activities / data
PP-IS Shop Floor Information System
Products, Production Processes and Resource Requirements
PP-BD Basic Data for Production
Bills of Material
Bills of Material
Simple BOM Variant BOM Multiple BOM
Simple BOM representing single material
Similar materials representedby variants on one BOM
BOM representing a material which can be made up of multiple compositions e.g. different components
and quantities
Bill of Material Validity Area of Validity – The same Bill of
Material can be allocated to several plants. Before you can allocate the BOM to a different plant, the material must exist at the new plant, the unit of issue on the BOM item must be the same.
Validity Period (Valid from/to dates)• Becomes effective with the valid from date• The validity date is determined by the system
automatically to be either the next effective from date, or 12/31/1999.
A A
B C B DX----------------------------------------------------------->>>>from 1/1/95 from 12/31/95to 12/30/95 to 12/31/99
BOM Scrap Data
Assembly Scrap – yield or process scrap resulting from the assembly of components into a finished or sub-assembly. It is used for calculating material used in an assembly. MRP increases the material requirements for all components contained in the assembly.Example: Quantity to produce 1000 units with a 1% assembly scrap = 10 units
Component Scrap – considers component loss before the component is used in an assembly. For example, shrinkage during storage. The scrap refers only to the component in the assembly. When the BOM is exploded, MRP increases the quantity of the component. Example: Component Qty of 1000 units with a 5% component scrap would need 1050 units required.
Bill of Material Glossary BOM Category – categorizes BOM’s to represent
different objects; for example:• Material BOM -- structure of products manufactured• Equipment BOM -- structure of equipment for plant
maintenance• Document BOM -- structure of documents such as
drawings (3.0) BOM Group – is a collective number for all BOM’s in a
group which allows for one or several similar products to be decribed under one number.• All Alternatives of a multiple Bill of Material• All variants of a variant Bill of Material
BOM Usage – special view of the BOM which represents a specific area of the company in which the BOM is used; for example, Engineering, Production, Costing, Sales, Plant Maintenance. The BOM Usage allows different views to exist without separate BOM’s for each usage.
Technical Type – the system distinguishes BOM’s according to whether they represent product variants or production alternatives. If you create a variant for the BOM, the system marks it as a Variant Bill . If there is more than one alternative for a material, the system marks the BOM as a Multiple Bill.
Bill of Material Glossary BOM Validity – Bills of Material are valid over an area and effectivity period.
Area of Validity -- identifies which plants the BOM has been allocated to Validity Period -- identifies the from and to effectivity dates. The default to date is
12/31/9999 Item Category – When you enter a new Bill of Material item, an item category must be
assigned.It has important control functions such as: Screen selection Specific processing, such as material number required, negative values supported. The Item Category cannot be changed once set. It must be deleted and re-added. Sizes are maintained for variable-size items Item categories include:
• Stock Items -- material in stock as a component• Non-stock Items -- material not stocked - with or without a material number• Variable-size -- system calculates the quantity required using formulas• PM Structure Item -- used with plant maintenance equipment• Document Item -- used with Document BOM’s
Sub-Items – are typically used to represent different installation points for partial quantities of an item.
In assembling resistors on a printed circuit board, the installation points are described.
There is no logic related to sub-items
BOM Structure
BOM Header
Item 10
Item 20
Item 30
Sub Item 10
Sub Item 20
Plant AssignmentValidity PeriodRelease Indicator
Stock ItemsNon-stock ItemsVariable Size ItemsDocument ItemsText Items
Additional component details
e.g. installation pointsfor components
BOM StructureProduct
Component 2
Component31
Component32
Component33
Component 3(assembly)Component 1
By-product Document Part Class
Components:
Stock material Non-stock material Variable-sized item Text item Scrap/waste
Variant Bills of Material
Several similar products are represented in one bill of material
Bike withBlack Frame
HandlebarAssembly
Gear Assembly
Bike withRed Frame
Bike withBlue Frame
Red Frame/Fork Assembly
Blue Frame/Fork Assembly
Chrome Forks Black Frame
Red Frame
Blue Frame
Qty. for variant 1Qty. for variant 2
Black Frame/Fork Assembly
Multiple BOM
A finished product can be manufactured using different methods of production with different components or component quantities
Qty. for alternative 1Qty. for alternative 1Qty. for alternative 2
Alt 1 - Lot Size 1 to 100Alt 2 - Lot Size 101 to 500Alt 3 - Lot Size 501 to 1000
Qty. for alternative 2
Pigment 2
Production Variants
Blue Paint
Solvent Water Pigment 1
One material but with different combinations ofcomponent material based on production method
BOM explosion Single-level Bill of Material Multi-level Bill of Material Summarized Bill of Material
BOM Reporting
Component Where used Single-level Where used Multi-level Where used Summarized Where used
C
A B
BOM Recursiveness
E1
K1 B3 K2
E1 K3
Work Centers
AssemblyLine
Machines
People
ProductionLine
Capacity Requirements Planning
Scheduling, Execution Times
Costing
Work Centers
Work Centers
Cost Center
Work Center HierarchyPlant 1
Production
Assembly
Assm Line 1
Assm Line 2
WorkCenter 1
WorkCenter 2
Fabrication
Plant 2
Production
Fabrication
Mach = 10 hrsLabor = 8 hrs
Mach = 6 hrsLabor = 10 hrs
Mach=16 hrsLabor=18 hrs
Work Centers and Routings
Routing
Operation 10
Operation 20
Operation 30
Work Center W1
Cost Center 100Assembly
Cost Centre 200
Work Center W2 Finishing
Cost Center 200
Work Center W1
Cost Center 100Assembly
Work Center Category Work centers are allocated to different work center categories
The work center category is used to control the field and screen selectionfor work centers during work center maintenance.
Work Center Category Screen View
Statistical Work center Basic Data
Production Work Center Basic DataDefault ValuesCapacity ValuesSchedulingCost Center Assignment
Cost Center Assignment to Work Center for Operation Costing
Cost Center
Oper 0010 Oper 0020 Oper 0030 Oper 0040
Routing with standard values
Set Up (SET)
Machine (MACH)
Labor (LAB)
Work Centerwith Activitiesduring production
Activity Rates
Set Up $70.00
Mach $60.00
Labor $80.00
Overhead $70.00
Work Center Capacity
Oper 0010 Oper 0020 Oper 0030 Oper 0040
Routing with standard values
Set up Formula
Machine Time Formula
Teardown Formula
Work CenterFormulas
Set up 1.0 hrs
Machine 5.5 hrs
Teardown .5 hrs
Operation Std Values
Work Center Schedule
Use of Formulas in Work Centers
Available Capacity at a Work Center
8 hrs
1 hr
7 hrs
1 hr
6 hrs
WorkingHours
BreakTime
WorkingHours less
Breaks
PlannedDowntime
ProductiveWorkingHours
Routings
BOMGroups
Production Master Data
Materialsand PRTs
Bills of Material Routings Work
Centers
RoutingGroups
CostCenters
ComponentsAllocated toOperations
Item Category
Material Type
W/C Category
Routing Structure Views
Routing
Operation 30Operation 20Operation 10
Work Centre: PP-ASSEM
Control Key:- Time Tkts- Costing
Operation Text:Pre-assemble
frame
Std Values:Lab:10 mins
Mach:10 mins
MaterialsComponents
BOM
Process Resource Tool
(PRT)
Operation
Operation types
(Main) operation
Sub-operationSub-operation HierarchyCosting
Completion confirmations Scheduling always takes place on the
(main) operation level
The control key defines whether completion confirmations and costing are carried out on the (main) operation level, or on the sub-operation level.Indicator: group operation sub-operation level
combined operation (main) operation
Operation / Sub-operation
Operation0010
Operation0020
Sub Operation0010 / 10
at Work Center A1
Sub Operation0010 / 20
at Work Center A2
Sub Operation0010 / 30
at Work Center A3
Schedule at Operation Level
Useful when processing for operation 0010occurs over multiple work centers
Capacity Planning & Costingpossible at Sub Operation Level Level
03 02
Sequence CategoriesMaterial
RoutingGroup 01
Oper 10
Oper 20
Oper 30
Oper 40
Oper 50
Oper 60
Oper 10
Oper 15
Oper 20
Oper 40
Oper 50
Alternate Seq 0001
Parallel Seq 0002
Standard Seq 0000
Branch operations
Return Operations
Routing Types
Standard Routing
Reference Routing
10 20 N
10 20 N
Material
R 1
Reference Operation
Set Z
Reference Operation
Set Y
Reference Operation SetsOper 0010
Oper 0020
Oper 0030
Oper 0040
Oper 0050
Oper 0022
Oper 0024
Oper 0026
Oper 0045
Reference Operation Set X
Material Allocation
Op. 10
Op. 20
Op. 30
Op. 10
Op. 30
Routing BOM
Product
Material
1
1
2
2
01
02
01
02
1
1
1
2
3
1
2
3
1
1
Routing Group
Routing GroupCounter
Material-Routing Allocations
A routing alterative can be allocated to several materials. A material in a plant can be allocated to several alternatives.
Routing Default Values
RoutingMaterialMaster
WorkCenter
Base Unit of MeasurePlanner GroupShort Text
Control KeyStandard ValuesActivitiesStandards Text KeyHR data
External ProcessingOper 0010
Oper 0020
Oper 0040
Oper 0050
Purch Reqn
Purch Ord
Vendor Proc
Goods Rec
Routing data copied to orderincluding quantities and dates
Purchasing creates P.O.
At goods receipt, the operationis confirmed
Operation Lead Time
Float Before Float AfterOper 0010 Oper 0020 Oper 0030
Queue | Setup | Process | Teardown | Wait | Move
Execution TimeInteroperation Time
Interoperation Time
Operation Lead Time
Routing Operation Sequences
StandardRouting represents a standard sequence defining production procedure
ParallelRouting includes processes which can be performed simultaneously to achieve time efficiencies
SplitRouting includes processes which can/must be split across a numberof work centers
OverlappedRouting defines process where one operation is to overlap with the following operation
Parallel Operation Sequences
Special form of overlapping Positioning the parallel sequence at the beginning or end of an operation Usage: for example in the chemical industry for analytical processes
which run parallel to the production process
Op. 10
Op. 20 Op. 20
Op. 30 Op. 90
Op. 40
Material Requirements Planning
MRP Features
MRP
Lot sizing
Order schedulingand generation
Internal productionand external purchasing
Net requirementscalculation
Bill of MaterialExplosion
Forecasting
MRP Overview
Overview Purchased ItemsMRP
Purchasing
Accounting
Warehousemanagement
system
Goods receipt
Inventory managementValuation
Goods Transfer issue posting
Invoice receipt
Invoice verification
Master data
MaterialBatchesVendors
Customers :
MRP: Reorder Point Planning
Reorder Point
Safety Stock
Order Date Delivery DateTime
Stock
PurchasingProcess Time
Vendor Planned Delivery Time
Desired Delivery DateRelease
Order Date
Forward Scheduling for External Procurement
Today
Goods ReceiptProcess Time
Forward scheduling used for reorder point material
Daily Accumulation:
Sales Orders
Planned Individual Requirements
Reservations
Entriesfrom
Planning File
Warehouse Stock
+
Open Order Proposals
Shortages
Order Proposal
Net Change Planning
Coverage calculation per requirement date
MRP Types
VB
VM
VV
PD
M0
Manual Reorder Point Planning:MRP produces order proposals when stock falls below a “reorder point”. The reorder point and safety stock levels are entered manually
Automatic Reorder Point Planning:The reorder point and safety stock level are calculated based on the forecast results
Forecast PlanningThe latest forecast is copied as requirements which are used to create order proposals
Deterministic PlanningMRP produces order proposal(s) to match the exact quantity of the requirements based on independent and dependent demands
Master Production SchedulingSimilar to PD but used for master schedule items
Carrying Out the Planning Run
Total Planning – All materials in a given plant
All materials are reviewed by MRP regardless of activity
Only the materials in a plant that have undergone a change relevant to planning since the last planning run (net change planning)
Planning Interval – Limiting the MRP Planning Interval
Time
Planned requirements andsupply order receipts
example:100 days
MRP Planning Horizon
MRP List
MRP ControllerGroup of Materials for which controller
is responsible
Controller’s MRP Listing
Goods ReceiptGoods Issues
MRP Order Proposals and Planner Messages
from MRP Planning run.
Planner can drill down to review material movement activity
Stock OverviewThe Stock Overview shows the stock position for all locations within a Company/Plant/Storage Location/Batch for all dispositions of material
Total Company 100 20 15
Plant US01 Total 100 20 15
SLoc 0001Total 75 Batch 01 Total 45 Batch 02 Total 30
SLoc 0001Total 25
Unrestricted Quality Ins Reserved On Order ...
Stock Requirements List
Date MRP Element Supply/Demand Ref EM Quantity Available
01/01 STOCK 10001/08 ORDER Sales Order 25 7501/15 PL ORD 1000 120 05 100 17502/01 -----------------------------------------------------> Planning Time Fence
Stock Requirements List brings together all the supply orders, independent and dependent demands and stock balances for the material. MRP makesorder proposals to balance the supply/demand position for the material
Processing Planning Results
Order Proposals: Planned Orders
Procurement Type isIn-house Production
MRP MRPController
Planned OrderOrder QtyOrder DateCapacity Reqts.Resource Reqts.
Production Order
Planning for In-house Production
PlannedOrder
ProductionOrder
Auto Change/ Delete if situation changes
AutoCreation
Collective Conversioninto Production Order
Manual changes/deletion
ManualCreation
Planning Run MRP Controller
Individual Conversioninto Production Order
ProductionOrder Release
Planning for External Procurement
Planned OrderAuto Creation
Convert Planned Orders to Requisitions
Manual Change/Deletion
Manual Creation
Planning Run MRP Controller
PurchaseRequisition
Purchase Order
DeliverySchedule
Auto Change/Deletion
Auto Creation
Auto Change/Deletion
Auto Creation
Manual Change/Deletion
Manual Creation
Manual Change/Deletion
Create PO via Requisition
Manual Creation
Purchasing Group
Auto Change or Delete
Link to Scheduling Agreements
Quota Arrangement
External Supplier
MRP Planning Run
Source List
Schedule AgreementLines Created
MRP Supplierfrom Source List
Scheduling Agreement
50 Units50 Units50 Units
Distribution Function
50 Units 50 Units
Several planned orders are created for partial quantities of the dependent requirement quantity
The planned orders are scheduled for various dates within the run time of the production order
A daily provisioning of partial quantities distributed over the run time of the order is possible
Models a continuous flow process
Total Requirement of 250 units for the week
Master Planning and Demand Management
Master Planning Demand Management
• Planning and Consumption Strategies• Specification of Requirement Quantities and Delivery Dates
Master Production Scheduling• Planning for Master Schedule Items• Planning Time Fence• Interactive MPS
Copy from Sales Plan
Copy from Prodn Plan
Copy from Forecast
Copy from Orig Plan
Demand Management“Demand Program”
Manual Planned Independent
Requirements
Sales Demand fromSales Orders
MRP/MPS
Sales and Operations Planning
Demand Management
Planning Strategy – Make-to Stock Make product for stock in expectation of
customer sales Plan using planned independent requirements for
“anonymous” make-to-stock production. Use Net or Gross Requirements Planning
• Net Requirements -- includes warehouse stock, planned issues and receipts
• Gross Requirements -- excludes warehouse stock. Just includes planned and open orders
Example is a shelf stock item such as a bike accessory light
Planning Requirement Type is LSF - make to stock which is used in the planned independent requirements transaction
Sales Order Requirement is KSL - which is sale from stock
Sale from stock Planning
Production Push
Warehouse Stock Finished Product
Strategy: Make-To-Stock Production
Example: Common shelf items such as a bike accessory (light)
Planning Strategy – Planning with Final Assembly Make product in expectation of customer sales
Plan using planned independent requirements at finished goods level to drive demand to long lead time components
Typically there is a longer lead time to produce than the customer is willing to wait for
Sales orders consume the planned independent requirement quantities
Planned quantities that are not consumed by sales orders result in excess stock
Example is a long lead time custom product
Planning Requirement Type is VSF – planning with final assembly
Sales Order Requirement is KSV – which is sales order with consumption
Sales Order Planning
Production Push
Warehouse Stock Finished Product
Example: Custom furniture such as a cherry table
Final Assembly
to Sales OrderPurchase Produce
MRP without reference to sales order
Planned Independent Requirements
Strategy: Planning with Final Assembly
Planning Strategy – Planning Without Final Assembly Final assembly is initiated by the customer sales order Stop production at sub-assembly level Final assembly pull Example is automobile assembled with unique combination of features (sub-assemblies) Planning Requirement Type is VSE -- planning without final assembly Sales Order Requirement is KEV -- independent customer order with consumption
Sales Order
Planning
Production PushFinal Assembly Pull
Warehouse Stock Finished Product
Warehouse StockAssembly 01
Warehouse StockAssembly 02
Example: Option oriented product such as a car
Stop at level
Planned Independent Requirements
Assembly when Sales Order Scheduled
Purchase Produce
Strategy: Planning Without Final Assembly
Planning Strategy – Planning with Planning Material
Planned independent requirements of Planning Material initiate procurement of the planning bill components
Sales orders for the final assembly create planned orders of the finished product and reduce planning quantities for the planning material
Possible to plan a family of products from forecast placed on the planning bill. The planning bill details, through percentages, the quantity required for common parts
Example is a bike with common sub-assemblies used in many finished items
Planning Requirement Type is VSEF -- planning with planning material
Sales Order Requirement is KEVV -- independent customer order with planning material
Sales Order Planning
Production PushFinal Assembly Pull
Customer StockFinished Product
PlanningMaterial
Warehouse StockAssembly 01
Warehouse StockAssembly 02
Example: Bikes with the same features except for the color
Purchase Produce Note: Percentages drive lower level demands for sub assemblies
Strategy: Planning with Planning Material
Planned Independent Requirements
Planning Strategy – Planning at (Sub)Assembly Level Used if forecasts are more reliable at the sub-
assembly level. (hour-glass) Sales orders received initiate an explosion of the
finished product level Resulting dependent requirements consume the
planning quantities of the finished product Must maintain the Mixed MRP Indicator in the
Material Master MRP2 View forsub-assembly planning. Maintain the consumption indicator in the item screen of demand management
Example is a PC where the forecast for individual features is more accurate than forecasts for the completed PC’s
Planning Requirement Type is VSFB -- planning at assembly level
Sales Order
Planning
Production PushFinal Assembly Pull
Warehouse Stock Finished Product
Warehouse StockAssembly 02
Warehouse StockAssembly 03
Example: A PC with a large number of end item configurations
Brake AssemblyCommon Sub Assembly
Strategy: Planning At Assembly Level
Sales Order
Production by Lot Size Pull
Warehouse Stock Finished Product
Example: Combine customer orders for the same item
Strategy: Production by Lot Size
Planning Strategy – Make to Order Production Sales orders are planned according to
sales order number Produced quantities for each sales order
are managed individually Production and procurement costs are
managed in either a settlement order ora project
Example is a custom product with a unique structure such that it only applies to a particular customers order
Sales Requirement Type is KE -- independent customer order without consumption
Sales Order
Production by Lot Size Pull
Warehouse Stock Finished Product
Example: New machinery
Strategy: Make-To-Order Production
Customer requirements consume planning requirements directly before or after it Consumption mode is either determined in the material master record or
in the configuration menu of demand management Consumption mode determines either --
Backward consumption – requirements directly before the sales order
Forward consumption – requirements directly after the sales order
Both types are allowed – the system looks for the next closest planning requirements
If no consumption periods exist, then you can only consume requirements planned
on the same day.
Example -- Forward Consumption
01/07 01/14 01/21 01/28Planned Requirements 0 0 0 100Customer Requirements 25 -------^
Example -- Backward Consumption 01/07 01/14 01/21 01/28
Planned Requirements 0 100 0 100Customer Requirements ^----- 25
Consumption Logic
Production Order Management
Material at 0010------------------------------• Material Number• Quantity• Date
Operation 0020------------------------------• Work Center• Control Info• Operation Times
Elements of a Production Order
Order Header------------------------------ Settlement Rule Planned/Actual Costs Operation Sequence
Operation 0010------------------------------ Work Center Control Information Operation Times
Material at 0010------------------------------ Material Number Quantity Date
Production Order HeaderOrder Header
Main View
Order Type Order Number Production Order Quantity Production Order Date
Order HeaderMaster Data
For Routing For Bill of Material For Costing
Order HeaderAllocation Data
For Plant MRP Controller
Order HeaderAcct Assignment
Settlement Rates
Order HeaderOrder Monitoring
Date Quantity
Production Order Operation
OperationOverview
Operation Sequence
OperationGeneral View
Work Center Control Key Text Status
OperationStandard Values
Base Quantity Standard Times (Setup, Machine, Labor)
Operation Dates
Dates per time element
Splitting Default Values Overlap Default Values Continuous Flow Production
OperationOverlap/Split
Production Order Component
Material Number Requirement Quantity Requirement Date
Reservation Item Category Bulk Material Indicator
Operation Long Text
Text Key
ComponentOverview
ComponentGeneral Data
Production Order
Material: A, Qty: 100 PCSSchd Type: BBasic dates: Start/Finish
Components Operations0010 B 1 0010 PHNASM000020 C 1 0020 0030 0040
User fields:• General text data• Quantity data• Value data• Date fields
Production Order
0010 PHNASM00002000300040
PHNASM00Std Values:Setup: 005Prodn: 075TDown: 005
Routing
Work Center
A
B C
Bill of Material
The Production Cycle
The Production Cycle
Issue Materials to
Order
SelectBOM
SelectRouting
ScheduleTimes & Dates
CalculateCapacity
Purchase Requisitions
GoodsIssue
Production Order
CalculatePlanned Costs
ReleaseOrder
Check Availability
Print Shop Floor Papers
CreateOrder
CreateRequired Purchases
ConfirmCompletion
Receive complete goods into stock
GoodsReceipt
Confirmation Slip
CalculateActual Costs
ActualLabor
Production Order Cycle Status CREATED RELEASED DISPATCHED CONFIRMED DELIVERED COMPLETE . BOM and RTG . Completion Conf- . Capacity Leveling . Actual Production . Goods Receipt . Actual costs selected irmation possible possible for oper usage and time delivered settled to captured cost objects. Lead Time . Shop paper printed Scheduling . Milestone operation (MILE). Reservations . Availability Check created for possible, at or components before release
. Capacity Reqmts . Material issues for Work Centers after oper release . Planned Order costs created (PRC)
. Settlement Rule Determined (SETC)
CRT REL DSPT CNF DLV COMP
Production Order CreationManual
Order CreationOrder Proposal
MRP Conversion
DetermineOrder Type
RoutingSelection
Lead TimeScheduling
Bill of MaterialSelection
Enter start or finish datedepending on scheduling direction
Component Overrides Material Reservations Item Categories
Alternate Sequence Assignments One operation is required
Changes are allowedbefore order release
Production Order ReleaseProduction OrderReady for Release
Material AvailabilityCheck
Order orOperation Release
Shop Paper Printing Possible
MaterialWithdrawals Possible
Order release is carried out manually
Uses checking rules defined in configuration
On-line or in background Pick List, Confirmation Slips,...
Material Availability Check
Stock on Hand
150 Units
Reservationfor
50 Units
NetAvailable 150 100 300 100
Planned Orderfor
200 Units
Dependent Requirement
for 200 Units
Requirement for 50 Units are Available
Material Availability Check
Stock on Hand
150 Units
Reservationfor
50 Units
NetAvailable 150 100 300 100
Planned Orderfor
200 Units
DependentRequirement
for 200 Units
Requirement for 150 Units not Available
06/01/95Today
Goods Movement for a Production Order
Material 1
Material 2
Production
Goods receipt of Material 3
Goods Issue Consumption ofMaterial 1 and 2
Reservation
Planned Goods Issue
Unplanned Goods Issue
Goods issues only apply to stock items
Goods Issue Results
Goods Issue Posting
UpdateReservations
G/L AccountUpdate
Accounting
Material Document
MaterialUsage
Statistics
Cost ObjectAllocation
Completion ConfirmationsProduction Order
Operations
0010 - Assemble Board
0020 - Assemble Case
0030 - Assemble unit
0040 - Final Test
C
ConfirmOperation 0010
Activities
ConfirmOperation 0020
Activities
ConfirmOperation 0030
Activities
ConfirmOperation 0040
Activities
Partial or Final Confirmation Single or Collective Confirmation Milestone Confirmation Reduction of Capacity Requirements Determination of Actual Costs
Milestone
Confirmation DataQuantity
Dates
Labor
Yield Scrap Quantity Scrap Reason
Start date Finish date
Work Center Personnel Number Qualification Wage Group Wage Type
Capacity
Capacity Planning
MRP Requirements
Capacity Requirements
Capacity Evaluation
Work Center Capacity
MasterData
Material
BOM
Routes
WorkCenter
Capacity Levelingto adjust capacityperiods
Standard Values• Formula Key• Formula
Constants
• Std ValuesSet up .5 hrsProc 5.5 hrs
Teardown .5 hrs• No. Splits
FormulasSetup | Process | T/D
Work Center Operation
CapacityRequirements
Formulasfor
Schedulingand
CapacityReqmts
Tables
Capacity Scheduling
Float Before Float AfterOper 0010 Oper 0020 Oper 0030
Queue | Setup | Process | Teardown | Wait | Move
Execution TimeInteroperation Time
Interoperation Time
Operation Lead Time
Material Master Lead Time
Lead Time Reduction Measures
Float Before Float AfterQueue | Setup | Process | Teardown | Wait | Move (2) (1) (6) (1) (2) (2)
Use Minimum Queue Time
Optional Splittingor Overlapping
Use Minimum Move Time
ReduceFloat Time
ReduceFloat Time
Queue(1)
Split ProcessSet up(1) Split Process
Wait(1)
T Down(1)
Move(1) Float AfterFloat Before
Standard FormulasOperation Time is ....
Queue Time + Execution Time + Wait Time
Queue Time specified in the operation
Execution Time = Setup + Proc Time * Lot Size/Base Qty
Wait Time specified in the operation
Product Costing
Costing IntegrationPP
PP-PCProduct Costing
PP-MRPMat. Requirements
Planning
PP-MPSDemand Management
PP-BDBasic Data
PP-ISShop Floor Info
System
PP-CRPCapacity Planning
PP-SFCProduction Activity
Cntrl.
CO
CO-PCProduct Cost Acctg.
CO-PAProfitability Analysis
CO-PAProfit Centers
CO-OPAOrders
CO-CCACost CenterAccounting
R/3Client / Server
SD
MM
PP
QA
PM
HR IS
OC
PS
AM
CO
FISales &
Distribution
MaterialsMgmt.
ProductionPlanning
QualityAssurance
Plant Main-tenance
HumanResources
IndustrySolutions
Office &Communi-
cation
ProjectSystem
Fixed AssetsMgmt.
Controlling
FinancialAccounting
Costing and Organizational Structures
Plant PP01 Plant PP02 Plant PP03 Plant 0001
Valuationarea PP01
Valuationarea PP02
Valuationarea PP03
Valuationarea 0001
Companycode 0001
Companycode 0002
Companycode PP01
Controllingarea 0001
Controllingarea PP01
Client
Chart of accounts
GKR
(
)
()
Logistics and Cost Accounting
Logistics
Materials managementProduction planningMaterial requirements planningProduction ordersCapacity planning
Cost elementsCost centersCO orders
Cost Accounting
Pricing
Valuation
Profitability analysis
Controlling
Cost object controlling:• Preliminary and standard costing• Final costing
Master Data for CostingMaterial Master Record
• Costing View — Product Costing Indicator, Costing Lot Size, Overhead Group• Accounting View — Valuation Class, Category, Price Control
Bills of Material — Materials required to make the product
Cost Center — Accounting dataWork Center — Standard Value key and
Efficiency RateRouting — Relevancy to Costing Indicator
Component Cost Layout 02Cost Component 1 Raw MaterialsCost Component 2 ProductionCost Component 3 Overhead-MaterialCost Component 4 Overhead-ProductionCost Component 5 Overhead-AdminCost Component 6 Overhead-SalesCost Component 7 External Processing..Cost Component 15 Miscellaneous
.
Cost Components• Cost components are defined in Product Costing Customizing• Each costing variant (standard cost, current cost, ...) points to a cost component layout• There can be up to 40 cost components in a cost component layout• For each cost component identify which costs are rolled up to the next higher level
Component Cost Layout 01
Cost Component 1 Raw MaterialsCost Component 2 ProductionCost Component 3 Overhead-MaterialCost Component 4 Overhead-ProductionCost Component 5 Overhead-AdminCost Component 6 Overhead-SalesCost Component 7 External Processing..Cost Component 15 Miscellaneous.
The Production Order and Inventory Accounting
A Production Order collects all costs associated with making an inventoriable item. The order “picks up” costs through the manufacturing process from the Bill of Material and the Routing.
Billof
Material
Routing
Production Order
STATUS:Created, Released,
Confirmed, Delivered,Settled
Order: 73 Type: PP01Plant: LR001Sys Status:CRT REL CNF DLV SETCQuantities: Total Produced: 100 Tons Scrap: .001 Confirmed: 100 TonsDates: Schedule 09/15/95 Confirmed 09/16/95
Costing Production OrdersPreliminary
Order CostingFinal
Order CostingSimultaneousOrder Costing
• Planned Order Costs are calculated from target input quantities according to BOM and Routing
• Standard Price for R/M• Planned Activity Prices• Planned Overhead Rates
• Actual material and activities used & confirmed
• Invoices for external activities
• Overhead Calculated Rates
• Order confirmed complete• Quantities delivered have
been posted• Last operation confirmed
complete
Calculating Production Costs
CostCenter Formula
Routing
• Standard values• General standard values
Work center
• Formula constants
Activity type
Actual time/quantityActivity price
Costs
Overhead CostingDirect material costs
Indirect material costs
Direct production costs
Indirect production costs
Costingsheet
+
+ =
=
Material costs
Production costs
+
=Manufacturing costs
Indirect managementcosts
Indirect sales costs
Cost of goods sold
+
+
=
The Costing SheetCalculation basis
• Cost element• Origin
Overhead• Percentage rates• Planned/actual• Dependencies
Order type/categoryPlantCompany codeBusiness areaOverhead key
Credit• Cost element• Origin• Object
Cost centerOrder
Make-to-Order ProductionOrder
Delivery
Goods issue
Invoice
Material requirements planning
Production
Sales orderstock
Target—
Actual—
Individual customer requirements
Production memo
Reduction of
sales order stock
Cost Objects with Make-to-Order Production
Objects of integrated R/3 modules
Material number (MM)• Production order, operation (PP)• Sales order (SD)• Project item (PS)• Network (PS)• CO order (CO)
Basic General Functions for Cost Object Controlling
Master data• Cost object, cost object hierarchy• Internal/external numbering system
Preliminary costing• Costing items• Automatic valuation• Planning aids (revalue, copy, reference)• Cost component structure
Simultaneous costing• Actual quantity used * price• Overheads• Actual yield• Calculation of target costs• Variances according to category• Work in progress
Analysis of actual product costs• Closed periods • Settlement to stock (at standard price)• Settlement to profitability analysis (variances)
Controlling• Summarization using classifiable characteristics• Selection using classifiable characteristics• Cost object analysis
Cost Roll-up• Costs for assemblies in the low-level code with the highest number are calculated first• Upper level is production costs at this production level• Lower level is costs of all material components processed at this production level• Total costs are the sum of the costs for the upper and lower level costs
Cost Component Split - TotalMaterial Internal Activity External Activity Overhead
Cost Component Split - Upper LevelMaterial
Cost Component Split - Lower LevelMaterial Internal Activity External Activity Overhead
Cost Component Split - Upper Level Internal Activity External Activity Overhead
Cost Component Split - TotalMaterial Internal Activity External Activity Overhead
FinishedProduct
Semi-FinishedProduct
RawMaterial
Master Production Scheduling
Separate Planning Run for Master Schedule Items During an MPS run, only master schedule items are planned Dependent requirements are created for the BOM level directly below the planning level Levels below the master schedule items are not planned Changes can be made to the master plan without effecting lower BOM levels Supply orders are reviewed for timing and quantity to match requirements Allows for daily planning without a negative impact on system performance
MPS Item
Assembly 1 Assembly 2
MPS level
MRP level
MPS Functions
Protects the master plan from automatic changes to the master schedule During a planning run, no automatic change proposals are made within the
planning time fence which is determined for each item in the Material Master. The system calculates the planning time fence starting from the planning date
Planning Date Planning Time Fence
Automatic Order ProposalsOrder Proposals are Fixed
Planning Time Fence
Create PlannedIndependent Requirements
Carry outSeparate MPSPlanning Run
Make Changes UsingInteractive MPS
Start MRP Runfor Lower Levels
Using Demand Management
Proposal Changes within Planning Time Fence System Creates Order Proposals Outside PTF
Fine tune MPS Items withinPlanning Time Fence
Carry-out MRP
MPS Procedure
Planning Run Types Regenerative Planning – all master schedule
items are planned for a plant. It is generally used during initial start-up to insure all items are planned or when heavy maintenance causes most items to be re-planned.
Net Change Planning – only master schedule items which have undergone a change to the supply/demand balance, such as warehouse receipts and issues, are re-planned. It is common to run net change MPS daily.
Net Change Planning in the Planning Horizon – shortens the period over which MPS plans to the planning horizon, which is set in Customizing. It is typically set to the length of time of the longest lead time item. This means that only those master schedule items which have undergone a relevant change within the planning horizon are planned.
The system does not plan new order proposals within the planning time fence. Instead, new requirements needed within the planning time fence are scheduled at the end of theplanning time fence, depending on the fixing type.
Planning Date Planning Time Fence
Automatic Order ProposalsOrder Proposals are Fixed
During the next planning run, the system places all order proposals that crossed overthe planning time fence at the PTF. The master scheduler needs to “fix” or firm theseorder proposals to the correct date inside the PTF. Once fixed, the system will not change.
Orders can be firmed collectively (Planned orders->firm) through selection of MRP controller, material, run schedule, production version, or planning id.
Firming Planned Orders
Availability Check
Inward movementof goods
Outward movementof goods
Stock
PurchaseOrder
PurchaseRequisition Planned
Order
DeliverySalesOrder Reservation
Other factors to take into account:
Safety stockStock in transfer
Replenishment lead timeBlocked stock in QA