SAP PS Functionality

Embed Size (px)

Citation preview

  • 8/12/2019 SAP PS Functionality

    1/177

    Project Functionality of - SAP-PS (Project System)

    The Project System module of SAP (PS) is specifically designed to provide comprehensive andfully integrated project management functionality for SAP customers. When it was originally designedand developed its core functionality was borrowed from and shared with the PP and CO modules.

    So most of the PS objects (WBS elements, networks, activities, activity elements) are cost objectssimilar to cost centers in CO, while networks have scheduling and resource managementcapabilitiesthat are very similar to PP. Whenever you need flexibility and frequent user interaction for resourceloaded scheduling activities, you still feel the remnants of an architecture and user interface that wasoriginally designed for the more static context of PP.

    Shortcomings include user-friendliness since SAP did not manage to satisfactorily put the end userin control to easily manipulate the data. In that respect, SAP's unsurpassed enterprise functionalityoften is perceived as an issue by end-users. Also, and somewhat ironically, PS and PP are notseamlessly integrated. This means that costs or dates do not roll up or cannot be pushed downbetween PS &PP.

    What is SAP PS?

    Projects are generally part of the internal processes of a company. To be able to control

    all tasks in project execution, you need an organizational form that is specific to the

    project and which is shared by all departments involved. Before you can carry out a

    project in its entirety, the project goals must be precisely described and the project

    activities to be carried out must be structured. A clear, unambiguous project structure is

    the basis for successful project planning, monitoring, and control.

    The high degree of integration between the Project System (PS) and other R/3

    application

    components means that you can plan, execute, and account for projects as part of your

    normal commercial procedures. This means the Project System has constant access to

    data in all the departments involved in the project.

    The R/3 PS guarantees close and constant monitoring of all aspects of your project

    including both technical and commercial aspects of the project.

    Versions in Project Systems

  • 8/12/2019 SAP PS Functionality

    2/177

    Explain the type of version in SAP Project Systems.

    Basically, there are different kinds of versions in PS. They are:

    1. Project versions- these are basically snapshots of a project at different stages of a project.

    Based on how the system is set up, a version could be created everytime the system status of a

    project object is changed, for example. Or, you could manually create a project version in

    transaction CNS41 or the like. You could create a version with a key and then you could

    compare the different snapshots of a project against each other or against version 0 (operative

    project).

    2. Simulation versions- these are essentially "play around with" versions. Meaning that you

    could use them to try "what if" kind of scenario by changing dates, structure, milestones, etc...

    and compare results with the operative version. For example, you may want to determine whatthe impact is going to be of a certain change to the project before making the actual change to the

    operative project. Then, you could create a simulation version, play around with it to make sure

    it does what you want it to do, then make the actual change to the operative change or you could

    convert the simulation version to the operative version also. I am not sure if they are hidden

    issues in doing this, but to make the point here, the simulation version is a "play ground" for

    "what if" scenarii for the project. The main difference, I believe, between the project and

    simulation versions is that project versions cannot be changed/modified once they are copied,

    while simulation versions can be. Also, you cannot copy a project version to an operativeversion, but you can copy a simulation version to an operative version.

    3. Planning/Controlling versions- these are the versions used for storing different kinds of

    planning details for the project. Essentially, these versions are also "operational" and can be

    changed as needed. For example, you may want to keep the operative version (version 0) always

    for actual costs, while you will use planning version P1 to store planned values from ECP, then

    version P2 for Unit Costing values, etc... Unlike simulation versions however, you cannot copy a

    planned version to the operationalproject (I don't think). You can however, copy one plan version to the other.

    4. Progress Versions- These versions are used for carrying outEarned Value Analysis and other

    measurements against project progress based on POC, etc. Progress version is controlling area

    specific and defines the control data for POC and earned values. It is mandatory to maintain

  • 8/12/2019 SAP PS Functionality

    3/177

    progress version along with method of calculation. The system records progress analysis data in

    the progress version. That is why you can get the result only if you maintain it in the progress tab

    of WBS.

    SPRO -> Project System -> Progress-> Progress Analysis ->Define Measurement Method as

    Default.

    Here you define the Version, Object Type, Plan/Actual, Default Measurement Method.

    After that Version would be defaulted for the object in the hierarchy.

    SAP PSBasics of Project System- http://www.sap-basis-abap.com/sapps.htm

    This course covers basic SAP Project System in 10 lessons, including master data, project

    planning, acquisitions, network activities and settlements using the new Project Builder. This is

    an interactive simulation course and includes simulated SAP screens. This allows you to interact

    with the screens just like a real SAP system, including entering data in fields and clicking on

    buttons or links.

    SAP PS Training Goals- This course will help you become familiar with SAP's PS (Project

    System) module using the Project Builder. You will learn how to:

    Create a Project with Work Breakdown Structures (WBS) & Network Activities

    Create Project Plans with Easy Cost Planning and Project Planning Board

    Create Requisitions and Purchase Orders for WBS

    Run Settlements

    Run Project Reports

    This SAP PS training uses ECC 6.0 (newest SAP release) and includes 420+ training slides,

    study guide for each lesson, 60+ pages of additional SAP documentation and email support.

  • 8/12/2019 SAP PS Functionality

    4/177

    "The training is very clear and easy to understand. The fact that it can be done anytime is a

    "great" feature as I could do it at homewith no interruptions. Also having the capability to back

    up and repeat a process is extremely helpful. With no set time limits, when I was ready to book

    an asset, I could review just that section and get pointers right on the spot."

    Pat Z., Whirlpool Corporation

    Training Content

    Lesson 1Create Project Structure & Work Breakdown Structures

    Lesson 2Create Network Activity

    Lesson 3Create Project Plan (Cost Planning & Project Planning Board)

    Lesson 4 Create Requisitions & Purchase Orders for WBS

    Lesson 5 Complete Network ActivityLesson 6Settle Network Activity to WBS

    Lesson 7 Settlement to Asset under Construction

    Lesson 8Run Project Reports

    Lesson 9Create Final Settlement Rules

    Lesson 10Project Closeout and Final Settlement

    Transaction Codes

    CJ** are mainly Project Definition and WBS related,

    CN** are mainly Network and activity related and the

    OP** are mainly PS Configuration / Customization related.

    There are other codes which is not on the list, but this is a good platform to start and build up

    your own list of PS transactions as per your requirements:

    CJ01 Create Work Breakdown Structure

    CJ02 Change Work Breakdown Structure

    CJ03 Display Work Breakdown Structure

    CJ06 Create Project Definition

    CJ07 Change Project Definition

    CJ08 Display Project Definition

    CJ11 Create WBS Element

    http://www.sapprojectsystem.com/sap-ps-transaction-codes/http://www.sapprojectsystem.com/sap-ps-transaction-codes/http://www.sapprojectsystem.com/sap-ps-transaction-codes/
  • 8/12/2019 SAP PS Functionality

    5/177

    CJ12 Change WBS Element

    CJ13 Display WBS Element

    CJ14 Display WBS Element (From DMS)

    CJ20 Structure planning

    CJ20N Project Builder

    CJ21 Change Basic Dates

    CJ22 Display Basic Dates

    CJ23 Change Forecast Dates

    CJ24 Display Forecast Dates

    CJ25 Change Actual Dates

    CJ26 Display Actual Dates

    CJ27 Project planning board

    CJ29 Update WBS (Forecast)

    CJ2A Display structure planning

    CJ2B Change project planning board

    CJ2C Display project planning board

    CJ2D Structure planning

    CJ30 Change Project Original Budget

    CJ31 Display Project Original Budget

    CJ32 Change Project Release

    CJ33 Display Project Release

    CJ34 Project Budget Transfer

    CJ35 Budget Return from Project

    CJ36 Budget Supplement to Project

    CJ37 Budget Supplement in Project

    CJ38 Budget Return in Project

    CJ3A Change Budget Document

    CJ3B Display Budget Document

    CJ40 Change Project Plan

    CJ41 Display Project Plan

    CJ42 Change Project Revenues

    CJ43 Display Project Revenues

    CJ44 Act. overhd: Projects, ind. process.

  • 8/12/2019 SAP PS Functionality

    6/177

    CJ45 Act. ovhd: Projects, coll. process.

    CJ46 Plnd ovrhd: Projects, ind. process.

    CJ47 Pld Overhead: Projects, Coll.Procssg

    CJ48 Change Payment Planning: Init.Screen

    CJ49 Display Payment Planning: Init.Scrn

    CJ70 Maintain Project Settlement LIs

    CJ72 Project: Act. amt. line item settlmt

    CJ74 Project Actual Cost Line Items

    CJ76 Project Commitment Line Items

    CJ7E Plan Data Transfer: Projects

    CJ7G Plan Data Transfer: Projects

    CJ7M Project Plan Cost Line Items

    CJ7N Maint. DRG inv.projects for retmt.

    CJ80 Availability Control - Overview

    CJ81 Update Report List

    CJ88 Settle Projects and Networks

    CJ8A Act.-setlmt: Proj. retirmt. from IM

    CJ8G Actual Settlement: Projects/Networks

    CJ8V Period Close for Project Selection

    CJ91 Create Standard WBS

    CJ92 Change Standard WBS

    CJ93 Display Standard WBS

    CJ9B Copy WBS Plan to Plan (Collective)

    CJ9B_OLD Copy Project Cost Planning (old)

    CJ9BS Copy WBS Plan to Plan (Indiv.)

    CJ9C Copy WBS Actual to Plan (Collective)

    CJ9C_OLD Copy Project Revenue Planning (old)

    CJ9CS Copy WBS Actual to Plan (Indiv.)

    CJ9D Copy Plan Versions

    CJ9E Plan Settlement: Projects

    CJ9ECP Project System: Easy Cost Planning

    CJ9F Copy Project Costing (Collective)

    CJ9FS Copy Project Costing (Indiv.)

  • 8/12/2019 SAP PS Functionality

    7/177

    CJ9G Plan Settlement: Projects

    CJ9K Network Costing

    CJ9L Forecast Costs: Individual Projects

    CJ9M Forecast Costs: Coll.Project Proc.

    CJ9Q Integrated Planning for Ntwks(Coll.)

    CJ9QS Integrated Planning for Ntwks (Ind.)

    CJA1 Proj.Rel.Order Receipts: Coll.Proc.

    CJA2 Proj.Rel. Order Receipts: Ind.Proc.

    CJAL Send project

    CJB1 Generate Settmt Rule: Coll.Proc.

    CJB2 Generate Settmt Rule: Indiv.Proc.

    CJBBS1 Planning Board Report Assignment

    CJBBS2 Structure Overview Report Asst

    CJBN Reconstruct Availability Control

    CJBV Activate Project Availabilty Control

    CJBW Deactivate Project Availabilty Cntrl

    CJC1 Maintenance Dialog for Stat.by Per.

    CJC2 Maintain Planned Status Changes

    CJCD Change documents: WBS

    CJCF Carry Forward Project Commitments

    CJCO Carry Forward Project Budget

    CJCS Standard WBS

    CJE0 Run Hierarchy Report

    CJE1 Create Hierarchy Report

    CJE2 Change Hierarchy Report

    CJE3 Display Hierarchy Report

    CJE4 Create Project Report Layout

    CJE5 Change Project Report Layout

    CJE6 Display Project Report Layout

    CJEA Call Hierarchy Report

    CJEB Background Processing, Hier.Reports

    CJEC Maintain Project Crcy Trans.Type

    CJEK Copy Interfaces/Reports

  • 8/12/2019 SAP PS Functionality

    8/177

    CJEM Project Reports: Test Monitor

    CJEN Reconstruct: Summarized Proj.Data

    CJEO Transport Reports

    CJEP Transport Forms

    CJEQ Import Reports from Client

    CJET Translation Tool - Drilldown

    CJEV Maintain Global Variable

    CJEX Reorganize Drilldown Reports

    CJEY Reorganize Report Data

    CJEZ Reorganize Forms

    CJF1 Create Transfer Price Agreement

    CJF2 Change Transfer Price Agreement

    CJF3 Display Transfer Price Agreement

    CJF4 Transfer Price Agreement List

    CJFA Analysis of Data Trans. into PS Cash

    CJFN CBM Payment Converter

    CJG1 Enter Transfer Price Allocation

    CJG3 Display Transfer Price Allocation

    CJG4 Enter Trsfr Price Allocation: List

    CJG5 Cancel Transfer Price Allocation

    CJH1 Reconstruct Project Inheritance

    CJH2 Project Inheritance Log

    CJI1 Project Budget Line Items

    CJI2 Budget Line Items: Document Chain

    CJI3 Project Actual Cost Line Items

    CJI4 Project Plan Cost Line Items

    CJI5 Project Commitment Line Items

    CJI8 Project Budget Line Items

    CJI9 Project Struct.Pld Costs Line Items

    CJIA Project Actual and Commt Paymt LIs

    CJIB Project Plan Payment Line Items

    CJIC Maintain Project Settlement LIs

    CJID Display Project Settlement Line Itms

  • 8/12/2019 SAP PS Functionality

    9/177

    CJIE Projects: Retirement LI Settlement

    CJIF Projects: Profitability Analysis LI

    CJIG Display PS Cash Documents

    CJJ2 Change Statistical Key Figures

    CJJ3 Display Statistical Key Figures

    CJK2 Change Statistical Key Figures

    CJK3 Display Statistical Key Figures

    CJL2 Collective Agreement

    CJN1 Reval. ACT: Projects Ind.Pro.

    CJN2 Reval. ACT: Projects Col.Pro.

    CJNO Number range maintenance: FMCJ_BELNR

    CJO8 Overhead COMM: Projects Ind.Pro.

    CJO9 Overhead COMM: Projects Col.Pro.

    CJP1 Create Project Plan Adjustment

    CJP2 Change Project Plan Adjustment

    CJP3 Display Project Plan Adjustment

    CJP4 Delete Project Plan Adjustment

    CJPN Number Range Maintenance: Proj.Items

    CJPU Execute Project Plan Adjustment

    CJR2 PS: Change plan CElem/Activ. input

    CJR3 PS: Display plan CElem/Activ. input

    CJR4 PS: Change plan primary cost element

    CJR5 PS: Display plan primary cost elem.

    CJR6 PS: Change activity input planning

    CJR7 PS: Display activity input planning

    CJR8 PS: Change revenue type planning

    CJR9 PS: Display Revenue Element Planning

    CJS2 PS: Change stat. key figure planning

    CJS3 PS: Display stat. key fig. planning

    CJS4 PS: Change stat. key figure planning

    CJS5 PS: Display stat. key fig. planning

    CJSA Data Transfer to SAP-EIS

    CJSB Select Key Figure and Characteristic

  • 8/12/2019 SAP PS Functionality

    10/177

    CJSG Generate WBS Element Group

    CJSN Number Range Maintenance: Projects

    CJT2 Project Actual Payment Line Items

    CJV1 Create project version (simulation)

    CJV2 Change project version (simulation)

    CJV3 Display project version (simulation)

    CJV4 Transfer project

    CJV5 Delete simulation version

    CJV6 Maintenance: Version administration

    CJV7 Display transfer log

    CJVC Value Category Checking Program

    CJW1 EURO: Adjust Project Budget

    CJZ1 Act. Int Calc.: Projects Coll. Proc.

    CJZ2 Actual Int.Calc.: Project Indiv.Prc.

    CJZ3 Plan Int.Calc.: Project Indiv.Prc.

    CJZ5 Plan Int.Calc.: Project Coll.Prc.

    CJZ6 Actual Int.Calc.: Indiv.CO Order Prc

    CJZ7 Planned Int.Calc: Indiv.CO Ord.Proc.

    CJZ8 Actual Int.Calc.: Coll.CO Order Prc.

    CJZ9 Plan Int.Calc.: Coll.CO Order Prc.

    Network and activity related transaction codes:

    CN01 Create Standard Network

    CN02 Change Standard Network

    CN03 Display Standard Network

    CN04 Edit PS Text Catalog

    CN05 Display PS Text Catalog

    CN06 MPX Download: Standard Network

    CN07 MPX Upload: Standard Network

    CN08 Allocate material -> stand. network

    CN09 Allocate material -> stand. network

    CN11 Create standard milestone

    CN12 Change standard milestone

  • 8/12/2019 SAP PS Functionality

    11/177

    CN13 Display standard milestone

    CN19 Display Activity (From DMS)

    CN20 Dsply network/act.bsc data init.scrn

    CN21 Create Network

    CN22 Change Network

    CN23 Display Network

    CN24 Overall Network Scheduling

    CN24N Overall Network Scheduling

    CN25 Confirm Completions in Network

    CN26 Display Mat.Comp/Init: Ntwk,Acty,Itm

    CN26N Display Mat. Components (From DMS)

    CN27 Collective confirm.

    CN28 Display Network Confirmations

    CN29 Cancel Network Confirmation

    CN2X Confirm Completions in Network

    CN30 Processing PDC error records

    CN33 PDM-PS interface

    CN34 Maintain release table TCNRL

    CN35 Control stock / account assignment

    CN36 BOM Transfer Profile

    CN37 BOM Allocation Field Selection

    CN38 Maintain Flexible Reference Point

    CN40 Project Overview

    CN41 Structure Overview

    CN42 Overview: Project Definitions

    CN42N Overview: Project Definitions

    CN43 Overview: WBS Elements

    CN43N Overview: WBS Elements

    CN44 Overview: Planned Orders

    CN44N Overview: Planned Orders

    CN45 Overview: Orders

    CN45N Overview: Orders

    CN46 Overview: Networks

  • 8/12/2019 SAP PS Functionality

    12/177

    CN46N Overview: Networks

    CN47 Overview: Activities/Elements

    CN47N Overview: Activities/Elements

    CN48 Overview: Confirmations

    CN48N Overview: Confirmations

    CN49 Overview: Relationships

    CN49N Overview: Relationships

    CN50 Overview: Capacity Requirements

    CN50N Overview: Capacity Requirements

    CN51 Overview: PRTs

    CN51N Overview: PRTs

    CN52 Overview: Components

    CN52N Overview: Components

    CN53 Overview: Milestones

    CN53N Overview: Milestones

    CN54N Overview: Sales Document

    CN55N Overview: Sales and Dist. Doc. Items

    CN60 Change Documents for Projects/Netw.

    CN61 Standard network

    CN65 Change documents order /network

    CN70 Overview: Batch variants

    CN71 Create versions

    CN72 Create Project Version

    CN80 Archiving project structures

    CN81 PS: Archiving project - preliminary

    CN82 PS: Archiving project structures

    CN83 PS: Archiving project - Info System

    CN84 PS: Archiving project - admin.

    CN85 PS: Delete operative structures

    CN98 Delete Standard Networks

    CN99 Archiving Standard Networks

    CNB1 Purchase requisitions for project

    CNB2 Purchase orders for project

  • 8/12/2019 SAP PS Functionality

    13/177

    CNC4 Consistency checks for WBS

    CNC5 Consistency checks sales order/proj.

    CNE1 Project Progress (Individual Proc.)

    CNE2 Project Progress (Collective Proc.)

    CNE5 Progress Analysis

    CNG1 Netw./Hier.: Maintain frame types

    CNG2 Netw./Hier.: Maintain form def.

    CNG3 Netw./hier.: maintain color definit.

    CNG4 Netw./Hier.: Maintain graph. profile

    CNG5 Netw./Hier: Maintain options profile

    CNG6 Netw./hier.: Maintain node type

    CNG7 Netw./Hier.: Maintain link types

    CNG8 Netw./Hier.: Maintain field def.

    CNG9 Graph. Cust. Netw./Hierarchy Graph.

    CNL1 Create delivery information

    CNL2 Change delivery information

    CNL3 Display delivery information

    CNMASS Mass Changes in Project System

    CNMASSPROT Display log f. mass changes PS

    CNMM Project-Oriented Procurement

    CNMT Milestone Trend Analysis

    CNN0 Number Range for Library Network

    CNN1 Number range maint.: ROUTING_0

    CNPAR Partner Overview

    CNPRG Network Progress

    CNR1 Create Work Center

    CNR2 Change Work Center

    CNR3 Display Work Center

    CNS0 Create deleivry from project

    CNS40 Project Overview

    CNS41 Structure Overview

    CNS42 Overview: Project Definitions

    CNS43 Overview: WBS Elements

  • 8/12/2019 SAP PS Functionality

    14/177

    CNS44 Overview: Planned Orders

    CNS45 Overview: Orders

    CNS46 Overview: Networks

    CNS47 Overview: Activities/Elements

    CNS48 Overview: Confirmations

    CNS49 Overview: Relationships

    CNS50 Overview: Capacity Requirements

    CNS51 Overview: PRTs

    CNS52 Overview: Components

    CNS53 Overview: Milestones

    CNS54 Overview: Sales Document

    CNS55 Overview: Sales and Dist. Doc. Items

    CNS60 Change Documents for Projects/Netw.

    CNS71 Create versions

    CNS83 PS: Archiving project - Info System

    CNSE5 Progress Analysis

    CNVL Variable Overviews

    CNW1 WWW: Confirmation

    CNW4 Project Documents

    PS Configuration / Customization related Transactions codes:

    OP00 Maintain Operation Control Key

    OP01 Customizing Routing/Work Center

    OP03 Factory Calendar C

    OP04 Word Processing

    OP07 Standard Text

    OP08 Standard Text

  • 8/12/2019 SAP PS Functionality

    15/177

    OP09 Maintain Alternative Activity Desc.

    OP10 Maintain Person Responsible

    OP11 Maintain Period Pattern Key

    OP12 Maintain Location

    OP13 Maintain Screen Sequence

    OP14 Maintain Type of Std. Value Determin

    OP15 Production User Profile

    OP16 Maintain Period Pattern

    OP17 Formula Parameters

    OP18 Maintain Setup Group/Setup Group Cat

    OP19 Standard Value Key

    OP20 Maintain Setup Type Key

    OP21 Define Formula

    OP22 Maintain Wage Groups

    OP23 Maintain Location

    OP24 Maintain period dependent oper. val.

    OP26 Maintain suitability

    OP28 Maintain Perf. Efficiency Rate Key

    OP30 Maintain Move Time Matrix

    OP31 Maintain Time Segment (Per. Pattern)

    OP32 Maintain Capacity Category

    OP34 Maintain Work Center Planner Group

    OP35 Maintain Perf. Efficiency Rate Key

    OP36 Maintain Capacity Default Values

    OP37 Maintain Available Capacity Version

    OP38 Maintain Setup Type Key

    OP39 Maintain Graphics Profile

    OP40 Maintain Work Center Category

    OP41 Matchcode for work center

    OP42 Default work center

    OP43 Maintain Setup Group Categories

    OP44 Maintain Task List Usage

    OP45 Maintain Usage

  • 8/12/2019 SAP PS Functionality

    16/177

    OP46 Maintain Task List Status

    OP47 Maintain PRT Usage

    OP48 Maintain Planner Group

    OP49 Matchcode for Routings/Ref. Op. Sets

    OP4A Maintain Shift Sequences

    OP4B Overview variant: Routing

    OP4C Overview variant: Ref. oper. set

    OP4D Overview variant: Rate routing

    OP4E Overview variant: Ref. rate routing

    OP4F Overview var.:Scheduling of routings

    OP4G Overview var.:Scheduling ref.op.set

    OP4H Overview var.:Scheduling of rate rtg

    OP4I Overview var.:Scheduling RefRateRtgs

    OP50 Assign Material Types

    OP51 Formula Parameters

    OP52 Formula Parameters

    OP53 Formula Parameters

    OP54 Define Formula

    OP55 Define Formula

    OP56 Define Formula

    OP57 Define Formula

    OP58 Maintain Default Value Profiles

    OP59 Formula Parameters

    OP5A Field Selection: Task List Overview

    OP5B Field Selection: Task List Header

    OP5C Field Selection: Task List Sequence

    OP5D Field Selection: Task List Details

    OP5E Field selection task list overview

    OP5F Field selection std network -> PRT

    OP5H Field sel. insp.plan characteristics

    OP61 Number range maintenance: ROUTING_3

    OP62 Number ranges for routings

    OP63 Number Ranges for Ref.Operation Sets

  • 8/12/2019 SAP PS Functionality

    17/177

    OP64 Maintain Setup Group Key

    OP65 Formula Parameters

    OP66 Maintain Location Group

    OP67 Maintain Operation Control Key

    OP68 Maintain Move Time Matrix

    OP69 Maintain wage type

    OP70 Maintain PRT Control Key

    OP71 Maintain Wage Group

    OP72 PRT Control Key

    OP73 PRT Authorization Group

    OP74 Maintain PRT Group Key

    OP76 Define suitability

    OP77 Engineering Workbench for Task Lists

    OP78 Maintain Type of Std. Value Determin

    OP7A Customizing matchcode for PRTs

    OP7B Define Parameters

    OP80 Maintain PRT Status

    OP82 Define Formula

    OP84 Profiles: Default Values for Rtgs.

    OP85 Profiles: Default Values for QM

    OP87 Maintain Routing/Ref.Op.Set Usage

    OP88 Maintain Assignmt. of Task List Type

    OP8A Maintain operation value description

    OP8B Maintain standard value texts

    OP8C Record layout for background (APL)

    OP8D Data transfer APL

    OP8E Command file task lists Rel. 2.2A

    OP8F Maintain production scheduler

    OP8H Profiles: Default Values for Rtgs.

    OP91 Maintain Object Overview Version

    OP95 Assign Work Center Cat. to Applicatn

    OP96 Maintain Work Center Category

    OP97 Maintain Performance Efficiency Rate

  • 8/12/2019 SAP PS Functionality

    18/177

    OP98 Maintain Validity of Perf.Effic.Rate

    OPA0 Status selection profiles

    OPA1 Maintain combination definitions

    OPA2 Define selection profile

    OPA3 Define option profile

    OPA4 Define list profile

    OPA5 Define graphics profile

    OPA6 Define overall profile

    OPA7 Define columns

    OPA9 Maintain selection profiles

    OPB1 Define list versions

    OPB2 Define distribution function

    OPB3 Specify distribution functions

    OPB4 Specify distribution strategies

    OPB5 Specify distribution key

    OPC0 Axis representation selection

    OPC1 Maintain axis representation

    OPC2 Curve representation selection

    OPC3 Maintain curve representation

    OPC5 Max. no. of data records

    OPCD Capacity category

    OPCE Capacity planner

    OPCF Time units

    OPCG Maintain Operation Control Key

    OPCH Maintain production scheduler

    OPCI Setup group key/category

    OPCL Scheduling type

    OPCM Standard value key

    OPCN Maintain move time matrix

    OPCQ Efficiency rate

    OPCR Formula parameters

    OPCS Define formula

    OPCT Strategies

  • 8/12/2019 SAP PS Functionality

    19/177

    OPCU Strategy levels

    OPCW Planned order parameters

    OPCX Formula parameters

    OPCY Define formula

    OPD0 Resource planning overall profile

    OPD1 Resource planning selection profile

    OPD2 Capacity leveling - time profile

    OPD3 Resource planning evaluation profile

    OPD4 Resource planning period profile

    OPD5 Flow control definition

    OPD6 Flow control control table

    OPD7 Flow control statuses

    OPD8 Flow Control Actions

    OPD9 Flow Control Messages

    OPDA Transition matrix (setup matrix)

    OPDB Capacity Leveling Strategy Profile

    OPDD Factory calendar

    OPDE Resource planning control profile

    OPDF Define requirements grouping

    OPDH Capacity leveling - list profile

    OPDJ Define layout

    OPDK Define standard overview

    OPDL Cap. plan. detailed cap.list maint.

    OPDM Define detail list (leveling)

    OPDQ Profile for planning table (tab.)

    OPDR Define layout key

    OPDT Define detail list

    OPDU Maintain perf. efficiency rate key

    OPDV Com-file (Rel-Info/OLPK) KOP. Sets

    OPDW Com-file (Rel-Info/OLPK) KOP. Sets

    OPE0 Maintain Sort String

    OPE1 Maintain Value Type

    OPE2 Maintain Machine Type

  • 8/12/2019 SAP PS Functionality

    20/177

    OPE3 Maintain Planner Group

    OPE4 Maintain Control Parameters

    OPE5 Maintain rounding categories

    OPE6 Maintain Rounding Category

    OPE7 Maintain overhead key

    OPE8 Maint. Roundg. and Add.Val.Key (Def)

    OPE9 Maintain User Profile

    OPEA User selection

    OPEB Automatic selection

    OPEC PP user fields

    OPENPS Download Activities to Palm Pilot

    OPF0 Maintain User

    OPF1 Authorizations for CAPP

    OPFA Field selection: Work center

    OPFP Configuring the Fixed Price Version

    OPFR01 RPUCORF0PBS : IMG Link

    OPG0 Profile for planning table

    OPG1 Chart sequence - selection

    OPG2 Line representation

    OPG3 Scale time axis

    OPG4 Time scale profile

    OPG5 Graphic obj.type sel./repr.profile

    OPG6 Transition matrix setup fam.key

    OPG7 Line display selection

    OPG9 Graphical object type/obj.represent.

    OPGD Ref. Oper. Set-All Task Lists (PP)

    OPGE Ref. Oper. Set - Rate Routings (PP)

    OPGF Work Center - All Task Lists (PP)

    OPGG Work Center - Rate Routings (PP)

    OPGH Document PRT - All Task Lists

    OPGI Equipment PRT - All Task Lists

    OPGJ Material PRT - All Task Lists

    OPGK Misc. PRT - All Task Lists

  • 8/12/2019 SAP PS Functionality

    21/177

    OPGL Resource - Master Recipes (PI)

    OPGM Process Instr. Cat. - Master Recipe

    OPGN Document PRT - Maintenance Task List

    OPGO Equipment PRT-Maintenance Task Lists

    OPGP Material PRT - Maintenance Task List

    OPGQ Misc. PRT - Maintenance Task Lists

    OPGR Work Center - Standard Network (PS)

    OPGS Document PRT - Standard Network (PS)

    OPGT Equipment PRT - Standard Network(PS)

    OPGU Material PRT - Standard Network (PS)

    OPGV Misc. PRT - Standard Network (PS)

    OPH1 CO Cash Bgt Mgmt: Delete Actual Data

    OPH2 PS Cash Management: Delete Plan Data

    OPH3 CO Cash Bgt Mgmt: Delete Master Data

    OPH4 CO Cash Bgt Mgmt: MM Data Transfer

    OPH5 CO CBM: Successive FI Data Transfer

    OPH6 CO CBM: Take Over FI Completely

    OPH7 CO-CBM: Take Over All Data

    OPI1 Maintain Value Categories

    OPI2 Value Categories for Cost Elements

    OPI3 Update Control: File RPSCO

    OPI4 Commitment Item Value Categories

    OPI5 Value Categories for Stag.Key Figs

    OPI6 Activate CO Cash Budget Management

    OPI8 Display Value Category

    OPIA Interest Profile for Projects

    OPIB Maintain Interest Profile

    OPIC Intrst Relevance: Cost Els/Cmmt Itms

    OPID Proj.Int Calc: Account Determination

    OPIE Interest Indicator

    OPIF View Maintenance:Compound Int.Cont.

    OPIG View Maint.: Compound Int. Periods

    OPIH Interest Scale, General Conditions

  • 8/12/2019 SAP PS Functionality

    22/177

  • 8/12/2019 SAP PS Functionality

    23/177

    OPK0 Confirmation Parameters PP

    OPK0T Confirmation Parameters

    OPK1 Confirmation Parameters PP-PI

    OPK1T Confirmation Parameters

    OPK2 Formula Parameters

    OPK3 Define Formula

    OPK4 Confirmation Parameters

    OPK5 Maintain variances

    OPK6 List Layout

    OPK7 Accessing Customizing PDC transfer

    OPK8 Maintain print control prod. orders

    OPK9 Maintain Goods Receipt Valuation

    OPKA Maintain Movement Types

    OPKB Control parallel confirmation

    OPKC Control confirmation process chain

    OPKD Control confirmation process chain

    OPKE Screen Sequence for Components

    OPKF Control parallel confirmation

    OPKG Maintain Messages

    OPKH Maintain Breakpoints

    OPKI Maintain Collective Confirmation

    OPKJ Maintain PRT Control Key

    OPKK Standard Text

    OPKL Formula Parameters

    OPKM Define Formula

    OPKN Overview variant production control

    OPKO Command File for Production Orders

    OPKP Shop floor control profile

    OPKQ Customizing: Matchcode for Proc.Ord.

    OPKR Print flag

    OPKS Maintain Origins for CO Object

    OPKT Initial Screen: Settlement Structure

    OPKU Maintain Collective Confirmation

  • 8/12/2019 SAP PS Functionality

    24/177

    OPKV Print Flag

    OPKW Print shop papers

    OPKX Deletion Flag/Indicator

    OPKZ Customizing Matchcode for ProdOrder

    OPL1 Costing Variants: PP Prod. Order

    OPL2 Maintain trigger point group

    OPL3 Trigger point usage

    OPL4 Profile for missing parts list

    OPL5 Order type LIS parameters

    OPL6 Profile for documented goods mvmts

    OPL7 Order change management profile

    OPL8 Order type parameters: Overview

    OPL9 Parameters for order change mgmt

    OPLA Conditions: V_T682F for H CO

    OPLB CondTab: Create (batch, prod.)

    OPLC CondTab: Change (batchs, prod.)

    OPLD CondTab: Display (batches, prod.)

    OPLE Strategy types: Batch determ. (prod)

    OPLF Access: Maintain batch determ.(prod)

    OPLG Batch determ.: Procedure for prod.

    OPLH Overview variant - production orders

    OPLI Background job for goods movements

    OPLJ Job "Fast entry confirmation"

    OPLK Overall profile for order prog. rep.

    OPLL Order progress: Displayed fields

    OPLM Order progress: Displayed fields

    OPLO maintain selection profile

    OPLP Job "Convert planned order"

    OPLQ maintain filter for control keys

    OPLR Maintain filter for capacity version

    OPLS Parallel processing control

    OPLT Target System for Data Transfer

    OPLV Maintain Filter for Task List Usage

  • 8/12/2019 SAP PS Functionality

    25/177

    OPLW Maintain Filter for Task List Status

    OPLX Maintain Filter for BOM Usage

    OPLY Maintain Filter for BOM Status

    OPLZ Maintain POI Planned Order Selection

    OPM0 Maintain profile - field selection

    OPM1 Costing Variants - Production Order

    OPM2 Maintain Detail Screen Control Oper.

    OPM3 Maintain Detail Scrn Control Header

    OPMF Field Selection - BOM Transfer

    OPMI Import models activities

    OPMJ Determine progress values

    OPN0 Master Recipe Profile

    OPN1 Maintain Profiles for Master Recipes

    OPN2 Valuation Variants - Prod. Order

    OPN3 Overv.Var.: Master Recipe Scheduling

    OPN5 Field Seln: Std Network Overview

    OPN6 Field Selection Standard Network Hdr

    OPN7 Field Sel.:Std Ntwk Activity Detail

    OPN8 Field Sel.:Std.Ntwk Comp.Overview

    OPN9 Field Sel. Std Ntwk Comp.Detail

    OPO1 Create Cost Element Planning Layout

    OPO2 Change Cost Element Planning Layout

    OPO3 Display Cost Element Planning Layout

    OPO4 Create Stat. KF Planning Layout

    OPO5 Change Stat. KF Planning Layout

    OPO6 Display Stat. KF Planning Layout

    OPO7 View Maintenance V_TCJ41_7

    OPO8 View Maintenance V_TCJ41_8

    OPO9 View Maintenance V_TCJ41_9

    OPOA View Maintenance V_T003O_N0

    OPOB View Maintenance V_T003O_N1

    OPOC View Maintenance V_T399X_N0

    OPOD View Maintenance V_T399X_N1

  • 8/12/2019 SAP PS Functionality

    26/177

    OPOE View Maintenance T_T399X_N2

    OPP1 Customizing MRP

    OPP2 MPS

    OPP3 Customizing Repetitive Manufacturing

    OPP5 List Profile Component List

    OPPA PP/MRP Customizing Explosion

    OPPB Direct Procurement

    OPPC Period Grouping

    OPPD Customizing Planning Time Fence

    OPPE Conversion Plnnd Order -> Prod.Order

    OPPE01 General iPPE Customizing

    OPPE02 Define iPPE Node Type

    OPPE03 Define iPPE Variant Types

    OPPE04 Define iPPE Alternative Types

    OPPE05 Define iPPE Relationship Types

    OPPE06 Customer-Spec. Model Assgts (iPPE)

    OPPE07 Time Analysis: Partner Products iPPE

    OPPE11 Profiles: iPPE WB Professional

    OPPE12 Tabs: iPPE Workbench Professional

    OPPE13 User Assgmt: iPPE WB Professional

    OPPE14 Define Reports for iPPE WB Prof.

    OPPE15 Define Interface for iPPE Workbench

    OPPE20 Profile Maintenance iPPE PS

    OPPEACT01 Define Std Val. Determin. Type

    OPPEACT02 Object Dependency in Process Struct.

    OPPECHK01 Customizing: Consistency Check

    OPPEDOK Documentation

    OPPELUI01 Profile Definition: iPPE WB Express

    OPPELUI02 User Assignment: iPPE WB Express

    OPPERES01 Customizing for Production Resources

    OPPESCMPV Object Dependent Status Management

    OPPESTATUS Cross-Application Status Management

    OPPF Customizing for Order Report

  • 8/12/2019 SAP PS Functionality

    27/177

    OPPH Customizing Purchase Req. Conversion

    OPPI Available Stock

    OPPJ MRP Checking Rule

    OPPK Hierarchy Element

    OPPL MRP

    OPPM Evaluation Profiles

    OPPN Layout

    OPPO Hierarchy Element

    OPPP Customizing Direct Procurement

    OPPQ C M MRP Plant Parameters for MRP

    OPPR C M MRP MRP Group

    OPPS Strategy

    OPPT Strategy Group

    OPPU Strategy Group for MRP Group

    OPPZ MRP Group

    OPR1 Area of Responsibility Message

    OPR3 Definition of Breakpoints

    OPR4_ACT Multilevel Actual Settlement

    OPR4_CK Material Cost Estimate

    OPR4_CKMC Mass Costing - Sales Documents

    OPR4_CKML Closing and Calc. of Periodic Price

    OPR4_CKPF Price Update

    OPR4_FCO Collective Processing: Variances

    OPR4_KKA WIP Calculation

    OPR4_KKP Repetitive Mfg and Process Mfg

    OPR4_KKS Collective Processing: Variances

    OPR4_KKS1 Individual Processing: Variances

    OPR4_PPCO Production Order: Cost Calculation

    OPR5 Definition of Error Mgmt IDs (SAP)

    OPR6 Definition of Object IDs (SAP)

    OPR7 Def. of Areas of Responsibility

    OPR8 Def. of Minimum Message Types (SAP)

    OPR9 Def. of Reference Objects (SAP)

  • 8/12/2019 SAP PS Functionality

    28/177

    OPRCMFE User-Defined Messages

    OPRF Maintain Quotation Prefixes

    OPS Customizing for Project System

    OPS0 Maintain print control for networks

    OPS1 Maintain User Fields

    OPS2 Maintain Relationship Texts

    OPS3 Maintain PS Text Types

    OPS4 maintain simulation profile

    OPS5 Maintain Standard Network Profile

    OPS6 Maintain Project Manager

    OPS7 Maintain Applicant

    OPS8 Materialflow network

    OPS9 Budget Management Profile

    OPSA Maintain Project Profile

    OPSB Cost Planning Profile

    OPSC Create network types

    OPSCAS Command File Payments (PS)

    OPSCOS Command File Costs (PS)

    OPSD Maintain Profile for Report Lines

    OPSE Maintain Report Groups

    OPSF Maintain Report Variations

    OPSG Order change management profile

    OPSH Maintain ctrl. key for activity (PS)

    OPSI Edit PS validation rules

    OPSINS Command File Info System (PS-F)

    OPSJ Maintain Project Coding

    OPSK Maintain Special Characters

    OPSL Project Info System Overview Maint.

    OPSM Maintain Overall Profile PS InfoSys

    OPSN Edit PS substitution rules

    OPSO Maintain Project Types

    OPSP Capacity availability check

    OPSPAR1 Maintain Partner Functions

  • 8/12/2019 SAP PS Functionality

    29/177

    OPSPAR2 Define Lang.-Dep.Partner Functions

    OPSPAR3 WBS Partner Profile

    OPSQ Intervals for Cost/Revenue Types

    OPSR Maintain milestones

    OPSREV Command File Revenues (PS)

    OPSS Maintain milestones

    OPST Network Confirmation Parameters

    OPSU Maintain Activity Control Key

    OPSV Cost object ind.

    OPSW Info System Profile

    OPSX PS: Reset "Budgeted" Status

    OPT1 Maintain PS Transaction Types

    OPT2 Matchcode for project definition

    OPT3 Matchcode for WBS elements

    OPT4 Matchcode for standard network

    OPT5 Customizing matchcode for network

    OPT6 Maintain std. milestone group

    OPT7 Project planning board profile

    OPT8 Maintain hierarchy graphic / dates

    OPT9 Network parameters for PS-SD

    OPTA Command file for PS -> FI area

    OPTB Command file for WBS

    OPTC Command file for network

    OPTD Command file for standard network

    OPTE Command file for PS info system

    OPTF Command file for PS graphic

    OPTG Maintain PS Info Summztn Criteria

    OPTH PS info system maintenance

    OPTI Maintain Progrss Analysis Overview

    OPTJ Maintain PS Info Unit Conversion

    OPTK Exclude Cost Elems from Avlbty Cntrl

    OPTL Maintain PS Info Comparison Criteria

    OPTM Fincl Budgeting Profile for Projects

  • 8/12/2019 SAP PS Functionality

    30/177

    OPTN Maintain priorities

    OPTO Change costing variants

    OPTP Sub-network parameters

    OPTQ Maintain WBS scheduling parameters

    OPTR Strategies for settlement rules

    OPTS Maintain project version profile

    OPTT Maint. acct.assgnm.types for orders

    OPTU Maint. PS Info System field settings

    OPTV Maint. PS Info System sort criteria

    OPTW Maint.PS Info System group. criteria

    OPTX Maint. PS Info System database set.

    OPTY Capacity leveling - Time profile/PS

    OPTZ Matchcode for standard WBS elements

    OPU0 Matchcode for standard project def.

    OPU3 Production order control parameters

    OPU4 Maintain Capacity Planning (SOP)

    OPU5 Parameter long term planning PlndOrd

    OPU6 Production order control parameters

    OPU7 Control parameters plant maintenance

    OPU8 Overview Var.: Header Line Info Sys.

    OPU9 Overview Variant: Item Line

    OPUA Field selection: Network: Header

    OPUB Field selection: Network: Overview

    OPUC Field selection: Network: Details

    OPUD Field selection:Network confirmation

    OPUH Field sel: Std. project definition

    OPUI Field selection: Std. WBS elements

    OPUJ Field selection: Project definition

    OPUK Field selection: WBS element

    OPUL PS: Maintain reduction strategies

    OPUM Maintain Subprojects

    OPUN Capacity overviews

    OPUO Project schedule overviews

  • 8/12/2019 SAP PS Functionality

    31/177

  • 8/12/2019 SAP PS Functionality

    32/177

    12. CN25 Confirmation of activities

    13. CJ20n Maintain actual dates to milestones of WBS Elements/activities

    14. CJ37 Supplement in project

    15. CJ38 Return in project

    16. KB21n Direct Activity Allocation

    17. CNL1 Create Delivery Information

    18. CNL2 Change Delivery Information

    19. CNS0 Delivery from project

    20. CNL3 Display Delivery Information

    21. CJ2c/CJ20N Display Project

    22. CJ41 Display cost planning

    23. CJ31 Display Budget

    24. CN28 Display Confirmations

    25. CJ3B Display Document (BUDGET)

    26. CN29 Cancel/Reverse of Confirmations

    27. CN41 Structure Overview

    28. CN42N Overview of Project Definition

    29. CN43N Overview of WBS Elements

    30. CN46N Overview of Networks

    31. CN47N Overview of Activities

    32. CN55N Overview of Sales Document items

    33. CN53N Overview of Milestones

    34. CN52N Components Overview

    35. CN42 Enhanced Overview of Project definition

    36. CN43 Enhanced Overview of WBS Elements

    37. CN44 Enhanced Overview of Planned Orders

    38. CN45 Enhanced Overview of Orders

    39. CN46 Enhanced Overview of Networks

    40. CN47 Enhanced Overview of Activities

    41. CN48 Enhanced Overview of Confirmations

    42. CN52 Enhanced Overview of Components

    43. CN53 Enhanced Overview of Milestones

    44. CNS54 Enhanced Overview of Sales and Distribution Documents

  • 8/12/2019 SAP PS Functionality

    33/177

    45. CNS55 Enhanced Overview of Sales Document items

    46. ME5J Purchase requisitions for Project

    47. ME2J Purchase Orders for Project

    48. CNMM Project Oriented Procurement

    49. CN60 Display change documents

    50. S_ALR_87013542 Actual/Commitment/Total/Plan in Control Area Currency

    51. S_ALR_87013557 Budget/Actual/Variance

    52. S_ALR_87013560 Budget Updates

    53. S_ALR_87013532 Plan/Actual/Variance

    54. S_ALR_87013533 Plan/Actual/Commitment/Rem.Plan/Assigned

    55. S_ALR_87013534 Plan1/Plan2/Act/Commitment

    SAP Project System SPRO Tcodes List 1

    CJ20N is basic Tcode most of the functions can be accessed with this.

    Usually it involves:

    - Create proj definition -- cj20n

    - Create wbs elements (more than one wbs can be defined for a project) -- cj20n

    - Create network -- cj20n

    - Define activity for network -- cj20n- Assign component to the activity

    - Post a goods issue for the component -- MIGO mvt type 281

    T-Codes List Used In SAP-PS For Customization Part 1

    OP00 Maintain Operation Control Key

    OP01 Customizing Routing/Work Center

    OP03 Factory Calendar C

    OP04 Word Processing

    OP07 Standard Text

    OP08 Standard Text

    OP09 Maintain Alternative Activity Desc.

    OP10 Maintain Person Responsible

    OP11 Maintain Period Pattern Key

  • 8/12/2019 SAP PS Functionality

    34/177

    OP12 Maintain Location

    OP13 Maintain Screen Sequence

    OP14 Maintain Type of Std. Value Determin

    OP15 Production User Profile

    OP16 Maintain Period Pattern

    OP17 Formula Parameters

    OP18 Maintain Setup Group/Setup Group Cat

    OP19 Standard Value Key

    OP20 Maintain Setup Type Key

    OP21 Define Formula

    OP22 Maintain Wage Groups

    OP23 Maintain Location

    OP24 Maintain period dependent oper. val.

    OP26 Maintain suitability

    OP28 Maintain Perf. Efficiency Rate Key

    OP30 Maintain Move Time Matrix

    OP31 Maintain Time Segment (Per. Pattern)

    OP32 Maintain Capacity Category

    OP34 Maintain Work Center Planner Group

    OP35 Maintain Perf. Efficiency Rate Key

    OP36 Maintain Capacity Default Values

    OP37 Maintain Available Capacity Version

    OP38 Maintain Setup Type Key

    OP39 Maintain Graphics Profile

    OP40 Maintain Work Center Category

    OP41 Matchcode for work center

    OP42 Default work center

    OP43 Maintain Setup Group Categories

    OP44 Maintain Task List Usage

    OP45 Maintain Usage

    OP46 Maintain Task List Status

    OP47 Maintain PRT Usage

    OP48 Maintain Planner Group

  • 8/12/2019 SAP PS Functionality

    35/177

    OP49 Matchcode for Routings/Ref. Op. Sets

    OP4A Maintain Shift Sequences

    OP4B Overview variant: Routing

    OP4C Overview variant: Ref. oper. set

    OP4D Overview variant: Rate routing

    OP4E Overview variant: Ref. rate routing

    OP4F Overview var.:Scheduling of routings

    OP4G Overview var.:Scheduling ref.op.set

    OP4H Overview var.:Scheduling of rate rtg

    OP4I Overview var.:Scheduling RefRateRtgs

    OP50 Assign Material Types

    OP51 Formula Parameters

    OP52 Formula Parameters

    OP53 Formula Parameters

    OP54 Define Formula

    OP55 Define Formula

    OP56 Define Formula

    OP57 Define Formula

    OP58 Maintain Default Value Profiles

    OP59 Formula Parameters

    OP5A Field Selection: Task List Overview

    OP5B Field Selection: Task List Header

    OP5C Field Selection: Task List Sequence

    OP5D Field Selection: Task List Details

    OP5E Field selection task list overview

    OP5F Field selection std network -> PRT

    OP5H Field sel. insp.plan characteristics

    OP61 Number range maintenance: ROUTING_3

    OP62 Number ranges for routings

    OP63 Number Ranges for Ref.Operation Sets

    OP64 Maintain Setup Group Key

    OP65 Formula Parameters

    OP66 Maintain Location Group

  • 8/12/2019 SAP PS Functionality

    36/177

    OP67 Maintain Operation Control Key

    OP68 Maintain Move Time Matrix

    OP69 Maintain wage type

    OP70 Maintain PRT Control Key

    OP71 Maintain Wage Group

    OP72 PRT Control Key

    OP73 PRT Authorization Group

    OP74 Maintain PRT Group Key

    OP76 Define suitability

    OP77 Engineering Workbench for Task Lists

    OP78 Maintain Type of Std. Value Determin

    OP7A Customizing matchcode for PRTs

    OP7B Define Parameters

    OP80 Maintain PRT Status

    OP82 Define Formula

    OP84 Profiles: Default Values for Rtgs.

    OP85 Profiles: Default Values for QM

    OP87 Maintain Routing/Ref.Op.Set Usage

    OP88 Maintain Assignmt. of Task List Type

    OP8A Maintain operation value description

    OP8B Maintain standard value texts

    OP8C Record layout for background (APL)

    OP8D Data transfer APL

    OP8E Command file task lists Rel. 2.2A

    OP8F Maintain production scheduler

    OP8H Profiles: Default Values for Rtgs.

    OP91 Maintain Object Overview Version

    OP95 Assign Work Center Cat. to Applicatn

    OP96 Maintain Work Center Category

    OP97 Maintain Performance Efficiency Rate

    OP98 Maintain Validity of Perf.Effic.Rate

  • 8/12/2019 SAP PS Functionality

    37/177

    SAP Project System SPRO Tcodes List 2

    How to delete PS master data and transaction data?

    This is a complex one. SAP usually does not allow you to delete anything. You will haveto archive and then delete the objects. If there are "bad" projects without any

    transactional activity, you can mark the projects with status DLFL. To archive, use

    transaction code SARA.

    You will have to get your entire functional team - MM, SD, FI, CO, PS - and decide on a

    module-by-module and transaction-by-transaction basis on the best approach to purge

    this data. You will also have to think about auditing and retrieval if this is production

    data.

    Solution is Archiving. It's a seperate process better consult you basis consultants for

    this.

    Archiving object you should be looking at is PS_PROJECT (T Code SARA)

    T-Codes List Used In SAP-PS For Customization Part 2

    OPA0 Status selection profilesOPA1 Maintain combination definitions

    OPA2 Define selection profile

    OPA3 Define option profile

    OPA4 Define list profile

    OPA5 Define graphics profile

    OPA6 Define overall profile

    OPA7 Define columns

    OPA9 Maintain selection profilesOPB1 Define list versions

    OPB2 Define distribution function

    OPB3 Specify distribution functions

    OPB4 Specify distribution strategies

    OPB5 Specify distribution key

  • 8/12/2019 SAP PS Functionality

    38/177

    OPC0 Axis representation selection

    OPC1 Maintain axis representation

    OPC2 Curve representation selection

    OPC3 Maintain curve representation

    OPC5 Max. no. of data records

    OPCD Capacity category

    OPCE Capacity planner

    OPCF Time units

    OPCG Maintain Operation Control Key

    OPCH Maintain production scheduler

    OPCI Setup group key/category

    OPCL Scheduling type

    OPCM Standard value key

    OPCN Maintain move time matrix

    OPCQ Efficiency rate

    OPCR Formula parameters

    OPCS Define formula

    OPCT Strategies

    OPCU Strategy levels

    OPCW Planned order parameters

    OPCX Formula parameters

    OPCY Define formula

    OPD0 Resource planning overall profile

    OPD1 Resource planning selection profile

    OPD2 Capacity leveling - time profile

    OPD3 Resource planning evaluation profile

    OPD4 Resource planning period profile

    OPD5 Flow control definition

    OPD6 Flow control control table

    OPD7 Flow control statuses

    OPD8 Flow Control Actions

    OPD9 Flow Control Messages

    OPDA Transition matrix (setup matrix)

  • 8/12/2019 SAP PS Functionality

    39/177

    OPDB Capacity Leveling Strategy Profile

    OPDD Factory calendar

    OPDE Resource planning control profile

    OPDF Define requirements grouping

    OPDH Capacity leveling - list profile

    OPDJ Define layout

    OPDK Define standard overview

    OPDL Cap. plan. detailed cap.list maint.

    OPDM Define detail list (leveling)

    OPDQ Profile for planning table (tab.)

    OPDR Define layout key

    OPDT Define detail list

    OPDU Maintain perf. efficiency rate key

    OPDV Com-file (Rel-Info/OLPK) KOP. Sets

    OPDW Com-file (Rel-Info/OLPK) KOP. Sets

    OPE0 Maintain Sort String

    OPE1 Maintain Value Type

    OPE2 Maintain Machine Type

    OPE3 Maintain Planner Group

    OPE4 Maintain Control Parameters

    OPE5 Maintain rounding categories

    OPE6 Maintain Rounding Category

    OPE7 Maintain overhead key

    OPE8 Maint. Roundg. and Add.Val.Key (Def)

    OPE9 Maintain User Profile

    OPEA User selection

    OPEB Automatic selection

    OPEC PP user fields

    OPENPS Download Activities to Palm Pilot

    OPF0 Maintain User

    OPF1 Authorizations for CAPP

    OPFA Field selection: Work center

    OPFP Configuring the Fixed Price Version

  • 8/12/2019 SAP PS Functionality

    40/177

    OPFR01 RPUCORF0PBS : IMG Link

    OPG0 Profile for planning table

    OPG1 Chart sequence - selection

    OPG2 Line representation

    OPG3 Scale time axis

    OPG4 Time scale profile

    OPG5 Graphic obj.type sel./repr.profile

    OPG6 Transition matrix setup fam.key

    OPG7 Line display selection

    OPG9 Graphical object type/obj.represent.

    OPGD Ref. Oper. Set-All Task Lists (PP)

    OPGE Ref. Oper. Set - Rate Routings (PP)

    OPGF Work Center - All Task Lists (PP)

    OPGG Work Center - Rate Routings (PP)

    OPGH Document PRT - All Task Lists

    OPGI Equipment PRT - All Task Lists

    OPGJ Material PRT - All Task Lists

    OPGK Misc. PRT - All Task Lists

    OPGL Resource - Master Recipes (PI)

    OPGM Process Instr. Cat. - Master Recipe

    OPGN Document PRT - Maintenance Task List

    OPGO Equipment PRT-Maintenance Task Lists

    OPGP Material PRT - Maintenance Task List

    OPGQ Misc. PRT - Maintenance Task Lists

    OPGR Work Center - Standard Network (PS)

    OPGS Document PRT - Standard Network (PS)

    OPGT Equipment PRT - Standard Network(PS)

    OPGU Material PRT - Standard Network (PS)

    OPGV Misc. PRT - Standard Network (PS)

    OPH1 CO Cash Bgt Mgmt: Delete Actual Data

    OPH2 PS Cash Management: Delete Plan Data

    OPH3 CO Cash Bgt Mgmt: Delete Master Data

    OPH4 CO Cash Bgt Mgmt: MM Data Transfer

  • 8/12/2019 SAP PS Functionality

    41/177

    OPH5 CO CBM: Successive FI Data Transfer

    OPH6 CO CBM: Take Over FI Completely

    OPH7 CO-CBM: Take Over All Data

    OPI1 Maintain Value Categories

    OPI2 Value Categories for Cost Elements

    OPI3 Update Control: File RPSCO

    OPI4 Commitment Item Value Categories

    OPI5 Value Categories for Stag.Key Figs

    OPI6 Activate CO Cash Budget Management

    OPI8 Display Value Category

    OPIA Interest Profile for Projects

    OPIB Maintain Interest Profile

    OPIC Intrst Relevance: Cost Els/Cmmt Itms

    OPID Proj.Int Calc: Account Determination

    OPIE Interest Indicator

    OPIF View Maintenance:Compound Int.Cont.

    OPIG View Maint.: Compound Int. Periods

    OPIH Interest Scale, General Conditions

    OPIN Number range maintnce: VHU_PINST

    OPJ2 Production order stock determination

    OPJ4 Schedule batch function request

    OPJ6 Maintain Status Profiles

    OPJ7 Maintain Routing Usage

    OPJ8 Maintain Operation Control Key

    OPJ9 Maintain prod. scheduler group

    OPJA Maintain setup group/group category

    OPJB Specify system messages

    OPJC Maintain Wage Groups

    OPJD Item Categories

    OPJE User Selection

    OPJF Automatic Selection

    OPJG Maintain Default Values

    OPJH Order types production order

  • 8/12/2019 SAP PS Functionality

    42/177

    OPJI BOM Usage Priorities

    OPJJ Maintain Scope of Check

    OPJK Maintain Control

    OPJL Maintain Checking Rule

    OPJM Application-Specific Criteria

    OPJN Maintain Scheduling Type

    OPJO C MM-BD units of measurement

    OPJP Maint. acct.assgnm.types for orders

    OPJQ Standard Value Key

    OPJR Maintain move time matrix

    OPJS PP: Maintain reduction strategies

    OPJT Maintain Strategy Levels

    OPJU Production order control parameters

    OPJV Maintain Capacity Category

    OPJW Maintain Capa.Planr.Grp for WrkCentr

    OPJX Factory Calendar C

    OPJY Maintain perf. efficiency rate key

    OPJZ Maintain Release Periods

    OPK0 Confirmation Parameters PP

    OPK0T Confirmation Parameters

    OPK1 Confirmation Parameters PP-PI

    OPK1T Confirmation Parameters

    OPK2 Formula Parameters

    OPK3 Define Formula

    OPK4 Confirmation Parameters

    OPK5 Maintain variances

    OPK6 List Layout

    OPK7 Accessing Customizing PDC transfer

    OPK8 Maintain print control prod. orders

    OPK9 Maintain Goods Receipt Valuation

    OPKA Maintain Movement Types

    OPKB Control parallel confirmation

    OPKC Control confirmation process chain

  • 8/12/2019 SAP PS Functionality

    43/177

    OPKD Control confirmation process chain

    OPKE Screen Sequence for Components

    OPKF Control parallel confirmation

    OPKG Maintain Messages

    OPKH Maintain Breakpoints

    OPKI Maintain Collective Confirmation

    OPKJ Maintain PRT Control Key

    OPKK Standard Text

    OPKL Formula Parameters

    OPKM Define Formula

    OPKN Overview variant production control

    OPKO Command File for Production Orders

    OPKP Shop floor control profile

    OPKQ Customizing: Matchcode for Proc.Ord.

    OPKR Print flag

    OPKS Maintain Origins for CO Object

    OPKT Initial Screen: Settlement Structure

    OPKU Maintain Collective Confirmation

    OPKV Print Flag

    OPKW Print shop papers

    OPKX Deletion Flag/Indicator

    OPKZ Customizing Matchcode for ProdOrder

    OPL1 Costing Variants: PP Prod. Order

    OPL2 Maintain trigger point group

    OPL3 Trigger point usage

    OPL4 Profile for missing parts list

    OPL5 Order type LIS parameters

    OPL6 Profile for documented goods mvmts

    OPL7 Order change management profile

    OPL8 Order type parameters: Overview

    OPL9 Parameters for order change mgmt

    OPLA Conditions: V_T682F for H CO

    OPLB CondTab: Create (batch, prod.)

  • 8/12/2019 SAP PS Functionality

    44/177

    OPLC CondTab: Change (batchs, prod.)

    OPLD CondTab: Display (batches, prod.)

    OPLE Strategy types: Batch determ. (prod)

    OPLF Access: Maintain batch determ.(prod)

    OPLG Batch determ.: Procedure for prod.

    OPLH Overview variant - production orders

    OPLI Background job for goods movements

    OPLJ Job "Fast entry confirmation"

    OPLK Overall profile for order prog. rep.

    OPLL Order progress: Displayed fields

    OPLM Order progress: Displayed fields

    OPLO maintain selection profile

    OPLP Job "Convert planned order"

    OPLQ maintain filter for control keys

    OPLR Maintain filter for capacity version

    OPLS Parallel processing control

    OPLT Target System for Data Transfer

    OPLV Maintain Filter for Task List Usage

    OPLW Maintain Filter for Task List Status

    OPLX Maintain Filter for BOM Usage

    OPLY Maintain Filter for BOM Status

    OPLZ Maintain POI Planned Order Selection

    OPM0 Maintain profile - field selection

    OPM1 Costing Variants - Production Order

    OPM2 Maintain Detail Screen Control Oper.

    OPM3 Maintain Detail Scrn Control Header

    OPMF Field Selection - BOM Transfer

    OPMI Import models activities

    OPMJ Determine progress values

    SAP Project System SPRO Tcodes List 3

    How to schedule the network within the dates provided in the network

    header?

  • 8/12/2019 SAP PS Functionality

    45/177

    The problem is that every time I schedule the network, scheduling happens

    as per the date given in assigned WBSE & not as per the dates specified in

    NTW Header.

    Go to Project Planning Board. Click on the "Options" icon.

    - Select the "Scheduling" option.

    - On the tab "Scheduling parameters for activities", the "Scheduling method" selected

    should be "X Network determines dates". In your case I believe it is "WBS determines

    dates".

    You can set this in SPRO-->Project System-->Dates-->Date Planning in WBS-->Define

    parameters for WBS scheduling--> Select Scheduing method as "X Network determinesdates"

    T-Codes List Used In SAP-PS For Customization Part 3

    OPN0 Master Recipe Profile

    OPN1 Maintain Profiles for Master Recipes

    OPN2 Valuation Variants - Prod. Order

    OPN3 Overv.Var.: Master Recipe Scheduling

    OPN5 Field Seln: Std Network Overview

    OPN6 Field Selection Standard Network Hdr

    OPN7 Field Sel.:Std Ntwk Activity Detail

    OPN8 Field Sel.:Std.Ntwk Comp.Overview

    OPN9 Field Sel. Std Ntwk Comp.Detail

    OPO1 Create Cost Element Planning Layout

    OPO2 Change Cost Element Planning Layout

    OPO3 Display Cost Element Planning Layout

    OPO4 Create Stat. KF Planning Layout

    OPO5 Change Stat. KF Planning Layout

    OPO6 Display Stat. KF Planning Layout

  • 8/12/2019 SAP PS Functionality

    46/177

    OPO7 View Maintenance V_TCJ41_7

    OPO8 View Maintenance V_TCJ41_8

    OPO9 View Maintenance V_TCJ41_9

    OPOA View Maintenance V_T003O_N0

    OPOB View Maintenance V_T003O_N1

    OPOC View Maintenance V_T399X_N0

    OPOD View Maintenance V_T399X_N1

    OPOE View Maintenance T_T399X_N2

    OPP1 Customizing MRP

    OPP2 MPS

    OPP3 Customizing Repetitive Manufacturing

    OPP5 List Profile Component List

    OPPA PP/MRP Customizing Explosion

    OPPB Direct Procurement

    OPPC Period Grouping

    OPPD Customizing Planning Time Fence

    OPPE Conversion Plnnd Order -> Prod.Order

    OPPE01 General iPPE Customizing

    OPPE02 Define iPPE Node Type

    OPPE03 Define iPPE Variant Types

    OPPE04 Define iPPE Alternative Types

    OPPE05 Define iPPE Relationship Types

    OPPE06 Customer-Spec. Model Assgts (iPPE)

    OPPE07 Time Analysis: Partner Products iPPE

    OPPE11 Profiles: iPPE WB Professional

    OPPE12 Tabs: iPPE Workbench Professional

    OPPE13 User Assgmt: iPPE WB Professional

    OPPE14 Define Reports for iPPE WB Prof.

    OPPE15 Define Interface for iPPE Workbench

    OPPE20 Profile Maintenance iPPE PS

    OPPEACT01 Define Std Val. Determin. Type

    OPPEACT02 Object Dependency in Process Struct.

    OPPECHK01 Customizing: Consistency Check

  • 8/12/2019 SAP PS Functionality

    47/177

    OPPEDOK Documentation

    OPPELUI01 Profile Definition: iPPE WB Express

    OPPELUI02 User Assignment: iPPE WB Express

    OPPERES01 Customizing for Production Resources

    OPPESCMPV Object Dependent Status Management

    OPPESTATUS Cross-Application Status Management

    OPPF Customizing for Order Report

    OPPH Customizing Purchase Req. Conversion

    OPPI Available Stock

    OPPJ MRP Checking Rule

    OPPK Hierarchy Element

    OPPL MRP

    OPPM Evaluation Profiles

    OPPN Layout

    OPPO Hierarchy Element

    OPPP Customizing Direct Procurement

    OPPQ C M MRP Plant Parameters for MRP

    OPPR C M MRP MRP Group

    OPPS Strategy

    OPPT Strategy Group

    OPPU Strategy Group for MRP Group

    OPPZ MRP Group

    OPR1 Area of Responsibility Message

    OPR3 Definition of Breakpoints

    OPR4_ACT Multilevel Actual Settlement

    OPR4_CK Material Cost Estimate

    OPR4_CKMC Mass Costing - Sales Documents

    OPR4_CKML Closing and Calc. of Periodic Price

    OPR4_CKPF Price Update

    OPR4_FCO Collective Processing: Variances

    OPR4_KKA WIP Calculation

    OPR4_KKP Repetitive Mfg and Process Mfg

    OPR4_KKS Collective Processing: Variances

  • 8/12/2019 SAP PS Functionality

    48/177

    OPR4_KKS1 Individual Processing: Variances

    OPR4_PPCO Production Order: Cost Calculation

    OPR5 Definition of Error Mgmt IDs (SAP)

    OPR6 Definition of Object IDs (SAP)

    OPR7 Def. of Areas of Responsibility

    OPR8 Def. of Minimum Message Types (SAP)

    OPR9 Def. of Reference Objects (SAP)

    OPRCMFE User-Defined Messages

    OPRF Maintain Quotation Prefixes

    OPS Customizing for Project System

    OPS0 Maintain print control for networks

    OPS1 Maintain User Fields

    OPS2 Maintain Relationship Texts

    OPS3 Maintain PS Text Types

    OPS4 Maintain simulation profile

    OPS5 Maintain Standard Network Profile

    OPS6 Maintain Project Manager

    OPS7 Maintain Applicant

    OPS8 Materialflow network

    OPS9 Budget Management Profile

    OPSA Maintain Project Profile

    OPSB Cost Planning Profile

    OPSC Create network types

    OPSCAS Command File Payments (PS)

    OPSCOS Command File Costs (PS)

    OPSD Maintain Profile for Report Lines

    OPSE Maintain Report Groups

    OPSF Maintain Report Variations

    OPSG Order change management profile

    OPSH Maintain ctrl. key for activity (PS)

    OPSI Edit PS validation rules

    OPSINS Command File Info System (PS-F)

    OPSJ Maintain Project Coding

  • 8/12/2019 SAP PS Functionality

    49/177

    OPSK Maintain Special Characters

    OPSL Project Info System Overview Maint.

    OPSM Maintain Overall Profile PS InfoSys

    OPSN Edit PS substitution rules

    OPSO Maintain Project Types

    OPSP Capacity availability check

    OPSPAR1 Maintain Partner Functions

    OPSPAR2 Define Lang.-Dep.Partner Functions

    OPSPAR3 WBS Partner Profile

    OPSQ Intervals for Cost/Revenue Types

    OPSR Maintain milestones

    OPSREV Command File Revenues (PS)

    OPSS Maintain milestones

    OPST Network Confirmation Parameters

    OPSU Maintain Activity Control Key

    OPSV Cost object ind.

    OPSW Info System Profile

    OPSX PS: Reset "Budgeted" Status

    OPT1 Maintain PS Transaction Types

    OPT2 Matchcode for project definition

    OPT3 Matchcode for WBS elements

    OPT4 Matchcode for standard network

    OPT5 Customizing matchcode for network

    OPT6 Maintain std. milestone group

    OPT7 Project planning board profile

    OPT8 Maintain hierarchy graphic / dates

    OPT9 Network parameters for PS-SD

    OPTA Command file for PS -> FI area

    OPTB Command file for WBS

    OPTC Command file for network

    OPTD Command file for standard network

    OPTE Command file for PS info system

    OPTF Command file for PS graphic

  • 8/12/2019 SAP PS Functionality

    50/177

    OPTG Maintain PS Info Summztn Criteria

    OPTH PS info system maintenance

    OPTI Maintain Progrss Analysis Overview

    OPTJ Maintain PS Info Unit Conversion

    OPTK Exclude Cost Elems from Avlbty Cntrl

    OPTL Maintain PS Info Comparison Criteria

    OPTM Fincl Budgeting Profile for Projects

    OPTN Maintain priorities

    OPTO Change costing variants

    OPTP Sub-network parameters

    OPTQ Maintain WBS scheduling parameters

    OPTR Strategies for settlement rules

    OPTS Maintain project version profile

    OPTT Maint. acct.assgnm.types for orders

    OPTU Maint. PS Info System field settings

    OPTV Maint. PS Info System sort criteria

    OPTW Maint.PS Info System group. criteria

    OPTX Maint. PS Info System database set.

    OPTY Capacity leveling - Time profile/PS

    OPTZ Matchcode for standard WBS elements

    OPU0 Matchcode for standard project def.

    OPU3 Production order control parameters

    OPU4 Maintain Capacity Planning (SOP)

    OPU5 Parameter long term planning PlndOrd

    OPU6 Production order control parameters

    OPU7 Control parameters plant maintenance

    OPU8 Overview Var.: Header Line Info Sys.

    OPU9 Overview Variant: Item Line

    OPUA Field selection: Network: Header

    OPUB Field selection: Network: Overview

    OPUC Field selection: Network: Details

    OPUD Field selection:Network confirmation

    OPUH Field sel: Std. project definition

  • 8/12/2019 SAP PS Functionality

    51/177

    OPUI Field selection: Std. WBS elements

    OPUJ Field selection: Project definition

    OPUK Field selection: WBS element

    OPUL PS: Maintain reduction strategies

    OPUM Maintain Subprojects

    OPUN Capacity overviews

    OPUO Project schedule overviews

    OPUP Subnetwork schedule overview

    OPUQ Overall network scheduling overview

    OPUR Info System: Structure overview

    OPUS Maintain Version Number Entry Mask

    OPUT Maintain overview variants

    OPUU Maintain Network Profile

    OPUV Network Type Parameters

    OPUW Standard Network Status

    OPUX Maintain overview variants std netwk

    OPUY Overview var.:Std.ntwrk scheduling

    OPUZ Control parameters plant maintenance

    OPVC Convert Avlability Cntrl Tol.Limits

    OPVP Collective availibility checkProfile

    Planned Cost Differs from Actual Cost

    Question :I have a problem. I have a standard activity which the price is $1 / hr. I have created

    a project in which a activity has a planned hr of qty 1. But my planned cost comes in as '$0.83'.

    But when I comfirm my activity, the actual cost comes in as '$1'.

    Why is my planned cost differing? What is the cause of the $0.83 instead of $1. Where can i

    check and change this.

    Answer :I guess that you use different costing (and valuation) variants. so the system might

    valuate plan and actuals differently.

    Question :Where and how do i control it?

  • 8/12/2019 SAP PS Functionality

    52/177

    Answer :In the network header are two fields: one for the plan costing variant and one for the

    actual costing variant.

    You maintain the costing variants in the customizing: PS -> Costs -> Planned Costs ->

    Automatic

    Costing in Networks -> Costing -> Define Costing Variants. Display the costing variant and

    jump to the valuation variant. There you find how the determines the costs.

    Validations in PS

    Question :I am trying to use validation in the Project. Can any one tell when are the call up

    points 110 and 120 trigerred ?

    I want to validate one of the user defined fields in WBS.

    Everything is working fine when I simulate the validation. But when I enter a value in the user

    defined field and save the project then I do not get the error message as expected.

    Does anybody have an idea what could be wrong ??

    Answer :Please see if you have checked the check box for Automatic validation in the relevant

    project profile.

    Question :I want to validate the customer number in one of the user fields in WBS. The

    formula builder in the validation screen, it seems, does not support table fields other than fields

    from PRPS. Can this be done thru some user exits ?? If yes how ?? Can u guide me in this ??

    Answer :To use a user exit in validations, you have to perform following steps;

    - copy SAP standard program GGBS002 to ZGGBS002

    - create a user exit in this program (such as U902, U903 etc)

    - the user exit you defined in the above mentioned program will be visible in validations on

    screen tab 'Exits'

    - configure your validation with 'User exit' as option

    WBS description doesnt appear completely in hierarchical

  • 8/12/2019 SAP PS Functionality

    53/177

    Question :In the hierarchical reports in PS de WBS description is not showed completely. Do

    you know a way to make this appear completely?

    Answer :-

    We are on 4.6B and this is what you can do. :-

    1) Execute report

    2) Expand your results, if necessary

    3) Click on any WBS line description

    4) Follow the menu path Settings/Characteristic display

    5) Choose lead column

    6) Move object short description to the value set side of the panel

    7) Move object long description to the lead column side of the panel

    Save (if you have authorization). Note you can use this procedure for any other object that may

    show up on the report display. i.e. navigation characteristics change the objects displayed.

    Anyway to put checks before setting to TECO?

    Question :Can anyone pl let me know about the followings:

    Is there any way to put checks (in the form of tick mark etc) before setting the system status to

    "TECO"- e.g. some documents are received or not etc.

    Answer :You can set the system status to Technically completed TECO which can be later on

    withdrawn. The necessary changes are reflected in the system status on saving the Network

    With the setup of user statusses (tr. OIBS), you have the ability to disable the 'TECO' as long as a

    certain user status 'e.g. waiting for documents' is active

    Links to documents stored on the Web

    Question :Is there a way to create a document (under a project) which refers to a URL and not

    to a document stored on a content server?

    Answer :Yes you can, but you need define in DMS customizing some points.

  • 8/12/2019 SAP PS Functionality

    54/177

    1.- Inner "Define Data Carriers" in Define data carrier type external "DMS" a record with this

    information: TYP = IE, Description = That you want, Check ONLINE and EX, the inside this in

    Define External DMS create a record with DATACAR = INTERNET, TYP = IE, Description =

    That you want, Check EX.

    2.- Inner "Define Workstation Applications" define an application for web pages without file

    format, inside this in "Define Workstation applications in network" create records for options 1,

    2, 3, the path of location of your navigator in your PC or you can put "%AUTO% iexplore.exe

    %f". Then when you create a document in the Original field you can put the URL and in the

    Data Carrier field put the name that you define in the customizing.

    How to settlement auc to asset in PS?

    Question :The cost of project have settled to auc(investment asset), but when the project is

    finished, in AM or in PS i can't settle auc to asset?

    Pls give me some suggestion! Any idea is appreciation!

    Answer :You must set technically complete for your WBS & NW before settle AUC to Assets.

    Updating the current Order cost plan

    Question :We are in 46C. Starting a project, we establish an Order cost plan. We plan the

    amount of work (in hours) and specify the work center for each of the activities. For material

    components, we enter the forecast material costs in the field "Material planning". We see the

    total and detailed by activity cost plan in CNS41 (Structure overview) in the column "Order cost

    plan 000". At some point in time, the project advancement shows that we have to reconsider the

    original cost plan, for instance because the actual costs collected so far are much higher than

    foreseen at start-up. Management decides to change the cost plan 000 to reflect the new

    forecasted budget. Management already told that they would like to be able to specify a newtotal value for the Order cost plan 000 of the activity rather then to play with the amount of work

    (hours) in the activity. They say it should be something like this (for labor): (actual cost) +

    (number of hours to do * cost of work center) = order cost plan 000.

    What options do we have to modify the "Order cost plan 000"??

  • 8/12/2019 SAP PS Functionality

    55/177

    Answer :There is a functionality called cost forecast (transaction CJ9L/CJ9M). I think this is

    exactly what you require. The forecasted costs are saved in a separate CO version. You could try

    to display this version in CNS41.

    Create network from Sales Order

    Question :

    We are currently running 4.6C and have implemented SD and PS. The situation is we want to be

    able to create a network automatically from the sales order during creation.

    I've assigned the strategy group 85 to the material master and I've defined the network

    parameters from sales order (via transaction CN08).

    The result...

    During creation of the sales order (transaction VA01), the network is created successfully but the

    components are not transferred to the network. Is it supposed to or not? If so, what additional

    configuration should I look at?

    I'm not very familiar with the standard functionality so I'm hoping someone out there has

    experience with this topic.

    Answer :The components in assembly processing remain on the sales order only.

    In case you are working with reasonably complex scenario on BOM and procurement, where

    material items have their own dependencies schedulewise e.g to design, you should put the

    materials on the network. The best way to accomplish this is to do the BOM allocation (transfer)

    to activities and have only the invoicing item at sales order.

    IM and FM

    Question :

    Is that possible to use IM to control investment projects and FM to control general costs?

    What is needed to be done in order to avoid conflicts between IM and PS ?

  • 8/12/2019 SAP PS Functionality

    56/177

    Answer :

    Investment Management() IM Module is highly integrated with controlling(CO) , project

    system(PS), and Asset Management(FI-AA) components.

    IF you would like to implement IM & PS you might ask yourself what additional advantages are

    offered by using IM .

    These Include:

    1- in PS you can represent the planned and the budgeted values of all projects . using IM you can

    represent the budgeting process from the organization pointview. IM helps you track of budget

    amounts that you carry forward for projects that were approved in prior fisical year.

    2- Using AR in IM CAN help you decide what budget will be assigned to your organization

    Unit.

    IM Handles Cost Planning & Budget Approval and PS Manages Project Execution with AVAC

    for the Budget for each project.

    Multiple Root WBS

    Question :Can any one tell me in detail of advantages and Dis-advantages of Multiples Root

    WBS in the project.And one more why do you using the same coding Mask for PD and Root

    WBS.

    Answer :Multiple Root WBSEs helps in budgeting scenarios where these WBSEs are funded

    from different sources say a customer project has part scope of R&D (funded by R&D).

    You may also want to fund these root WBSEs from IM programs (linking to position IDs.)

    Question : Subject : PS Assets under Construction

    I know that I can maintain the Plant for the WBS Element, what I would like to know is if it is

    also possible to maintain the Location as well? I've heard that it is not possible but I would like

    to hear other opinions. Any suggestions? We are on version 4.0B.

  • 8/12/2019 SAP PS Functionality

    57/177

    I would like to know since the Asset Management people here are asking if it's possible to

    maintain it in PS or if this can only be done in AM.

    MM is not included in this implementation, but we did set up the Plants and Locations.

    Reply : Subject : PS Assets under Construction

    you can maintain a location for a WBS element as well. Select WBS element, follow path Details

    > Orgainsation. This screen has a field called Functional Location, apart from other orgainsation

    details such as Controlling Area, Company Code, Business Area, Plant, Calender etc

    Question : Subject : PS Network Status's & Confirmations

    Is there a status that can be set for a network activity that will stop time confirmations from being

    processed? TECO stops changes to the basic data, but allows further time confirmations.

    Reply : Subject : PS Network Status's & Confirmations

    you can lock account assignment for the network/activity in consideration depending on whether

    the network is header/activity

    assigned. This disallows the confirmation of the activities.

    Any Variant Capabilities in CM07 Report

    I am executing the CM07 report whuich is the Variable Capacity Planning Report.

    Out of which, I like the results because I obtain the fields I need by going thru the

    individual ''choose fields'' button.

  • 8/12/2019 SAP PS Functionality

    58/177

    However in 4,6c) it does seem to have any variant capabilities ???

    I have to reenter the fields selection every item I back out of the report ... Which is a bit

    anoying !!!

    Anyone has any recipes for this so that columns/criterias selected can be save guarded for

    the next time ???

    There are Variant list capabilities for CM07 Capacity report.

    Mainly via PS-> Information Systems->Resources->Tools->Resources->Selection->General

    Profile (OPA6) and also via PS-> Information Systems->Resources->Tools->Resources-

    >Selection-> Variant List Poifile Details (OPDT).

    You create a new ''Z'' Variant Profile list with all the fields that you want to select and show in

    yopur CM0? report .

    Be carefull to click correctly on the greenish/yellowish arrow to bring up the field selections pop

    up window...

    Than associate this new Z Variant Profile to a newly defined ''Z'' General Profile...

    Then after you can override with othe Variant Lists in the profile selection of the CM07 report

    txn. itself if needed

    Change Documents in SAP Project

    In the Customising for Create Project Profile (OPSA) there are 2 fields for "Change

    Documents".

    Where and how is this useful during implemenation?

    There are 2 outcomes for change documents and they should both be implemented if it's

    important that you keep track of changes made to a project:

    General changes (the one at the top)

  • 8/12/2019 SAP PS Functionality

    59/177

    - any field content changes made to a project WBS after it was first saved will be recorded in a

    file. eg. if you changes the WBS description, the old value and the new value will be recorded, or

    if you changed a person responsible, it would also be recorded etc. This information can be

    reviewed in Info Systems report CN60 to old/new values and who/when.

    Status Managment (the one checked in Status Management)

    - any changes to System and User Status will be recorded, including the status history and

    who/when. Changes can be seen in any project maintenance transaction (eg. CJ02, CJ20N) by

    clicking on the "i" icon for a PD or WBS, then following the internal pull-down menu path:

    Extras>Change Documents> For Status/All.You can then drill-down on the satus to see its

    history.

    SAP PS Interview Questions

    Q1. For raising Client billing, is there any possibility of linking line items in SD module

    with Activities / WBS in PS module?

    A1. It can be linked through DIP Profile and do Resource Related Billing for raising billing.

    Q2. Can Revenues be linked with Activities?

    A2. No, it can be done at WBS level with 'Billing' operative indicator.

    Q3. Can progress be updated in WBS elements?

    A3. Yes, You can use Progress Analysis (EVA) for this.

    Q4. We would like to compare the planned cost, actual cost & revenue for line items in SD

    module. For this as what object should we consider the line item in PS module.

    A4. You can use Billing level WBS in PS module.

    Q5. In easy cost planning/ cost models, the resource requirement details (quantity and rate)

    are given to get the cost of each line item. But to get planned cost of each activity, the

    consultant is asking us to assign resources separately again in activities. If we consider the

  • 8/12/2019 SAP PS Functionality

    60/177

    line items as activities, should we assign the resources again or the same in easy cost

    planning / cost models can be linked to get the resources assignment in a simpler method.

    A5. Instead of this, you can use costing variant for Easy Cost Planning (not for the activities)

    Is there any way by which we can lock two specific wbs elements say overheads and other

    expenses, so that the user cannot release PR?

    The easiest way would be to define the project release process in the bottom-up fashion. That

    means, you will only release the activities/WBS elements that you need from time to time during

    the course of the project. That way, charges won't be accrued on a WBS element until it's

    released (so, don't release it until it's ready for collecting costs).

    Is there any way by which we can stop the network from attaching further materials after

    it is released?

    This is controlled through the change profile, which is assigned to the network profile. In the

    change profile, under the Component tab, you can define the release status of the activity at

    which you can create/change/delete material components.

    How can we set the options for capacity reports CM01?

    This will possible depend on your config, but the options I use are:

    Settings>General>

    Tick, Cumulation of reqmts, Dyn. capacity cumul. and then select the hierarchy you have set

    up.

    I then select the financial year (as we are budget driven) using Entry type A and the start/finish

    of the financial year.

    I select period Month.

    Then click tick.I then select the work centre I require. or arm of the hierarchy.

    You can then select standard overview and also select graphs or if you need a detailed list press

    that button. *-- Jim Carter

    Short Interview Q& As on SAP PS

  • 8/12/2019 SAP PS Functionality

    61/177

  • 8/12/2019 SAP PS Functionality

    62/177

    of the above phases is marked by an user status and on completion of a phase the user sets

    the next user status for the object.

    Requirement : An ABAP report is required to be developed which shows the date and time

    at which each of the user staus was set and released.

    Go to transaction SE38, and enter RBSVCDOC in the field "Program". Select the Execute

    button. Insert your WBS's object number, and select the tick box "SHOW_ALL" Execute the

    program.

    If the results is what you are looking for, then follow these steps to have your required report on

    User Status Change Log:

    1. Ask your ABAP program to copy function RBSVCDOC to a Z-Program, and 2. assign a Z-

    transaction code this copied Z-program. 3. You can also ask the programmer if he is able to

    design a user defined input screen to this program.

    Creating an Internal Activity at the Network Level

    Trying to create an internal activity at the network level and whenever I go to the menu to

    add an internal activity, the level moves up to the project level instead of remaining at the

    nework level. This of course prevents me from creating the internal activity. Why this ishappening?

    Work out the following path :

    1) Go to "Structure Tree" (Top-left pane of Project Builder), click on Network Header.

    2) In "Work Area" (Right pane) click on "Activities Overview" icon. Go to "Int. Processing Tab"

    and define activity with relevant field details and Confirm.

    This will create Int activity in the selected Network only. *-- Nabada More

    Time calculation in work Center

    My requirement is to calculate the time taken for a component which contains 4

    Operations. Using Work Centers in PS Module.

  • 8/12/2019 SAP PS Functionality

    63/177

    Details of the Operations:

    1. Chain cutting

    2. Soldering

    3. Lock fitting

    4. Assembly

    Time taken for soldering operation = 15 sec/soldering operation

    One component contains = 20 soldering operation

    Total time taken to finish one component = 300 sec

    In one day we can make = 8 hr(28800sec)/300sec=96 nos.

    How we can calculate this in the system Using Work Center.

    You need to do folowing....1) Define 4 activity type with these names and give the unit of operation as second - and assign

    it to a cost center in kp26

    with cost

    2) Define a work center in CNR1...using usage project management 0006

    3) Assign formulae SAP004 in the other formulae in scheduling tab and SAP008 in capacity

    Tab.

    4) Assign working hours for your WC in capacity tab header data as 8