27
8/13/2019 SAP WCM_SCOPE[1] http://slidepdf.com/reader/full/sap-wcmscope1 1/27 SCOPE OF SAP WCM CMC Limited

SAP WCM_SCOPE[1]

  • Upload
    naviin

  • View
    221

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 1/27

SCOPE OF SAP WCMCMC Limited

Page 2: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 2/27

 

PurposeNecessary maintenance work at technical objects, such as

inspections, preventive maintenance or repairs, can only beexecuted once all the measures to ensure a safe working

environment have been implemented. These safety measures

can include, for example, lockout/tagout, fire protection and

radiation protection.In lockout/tagout, for example, technical objects are

isolated electrically or separated mechanically from other

parts of the technical system whilst maintenance work or

special tests are performed, so that work on these technicalobjects can be performed safely. You can ensure safe working

conditions for the employees in your maintenance

department.

1

Page 3: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 3/27

Safety Factors

Safety in the workplace can be influenced by the following

factors:

•  Type of tasks

 Technical specifications of technical systems•  Qualifications of employees

•  Organization within the maintenance department

2

Page 4: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 4/27

Assurance

If you use the Work Clearance Management component,

you can ensure the following:

•  Standardized process for enforcing safety measures

 Approvals and status tracking•  Adherence to legal and internal company safety standards

•  Verification (using change documents and time stamp for

changes) 

3

Page 5: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 5/27

 

Implementation Considerations 

The use of the work clearance management component

is recommended in all companies where specific safety

regulations apply. These regulations can include where

employees work in a critical environment such as

• exposed to high levels of danger. This can include high voltage,

radioactivity and gases.

•  Your employees have to work under difficult conditions. These

can include restricted space or visibility, heat, noise and dust.

•  In an industry, there are typical work-related illnesses that

necessitate special health and safety measures.

4

Page 6: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 6/27

 

Integration 

Work Clearance Management is integrated into the PlantMaintenance (PM) component. It is thereby possible to

consider aspects of safety in the workplace, in addition to the

traditional tasks of planning maintenance work (material

planning, scheduling).

The functions available include:

•  Approving, scheduling and controlling safety measures

 Combining orders for collective safety measures•  Printing shop papers

5

Page 7: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 7/27

Architecture 

ORDER

WORK CLEARANCE

 APPLICATION (WCA)

OPERATIONAL WORK

CLEARANCEDOCUMENT (OWCD)

6

Page 8: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 8/27

Master data for WCM

The following elements are required for WCM:• Equipment

• Functional location

• Catalogs

• Permits

• Usage defines permit validity

• Work e.g. Hot Work, Pressure testing, Lifting operation

• Requirement e.g. Fire Prevention, Depressurization, Prevent

Oil and Gas

• Operation type e.g. Open, Close, On, Off etc.

7

Page 9: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 9/27

Different Levels of Work Permits

Work Permits of Level 1

• High Risk

• Short Time Frame (1 Shift)

Work Permits of Level 2

• Lower Risk

• Longer time frame ( 1 day)

8

Page 10: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 10/27

 

Process flow

9

Page 11: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 11/27

 Maintenance order with WCM process

Create Maintenance Order through IW31

10

Page 12: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 12/27

Activate WCM for Maintenance order

WCM in Maintenance order can be activated by• Assigning Control Key ‘WCM’ in order operation 

11

Page 13: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 13/27

Activate WCM for Maintenance order

WCM in Maintenance order can be activated by• Assigning WCM Permit in Order header

12

Page 14: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 14/27

Create WCA from Maintenance order

Click WC Application from the Order header

13

Page 15: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 15/27

Assign Permits for WCA

Click the traffic light icon and assign permits.Note: The status of Traffic light turns from Green to Red after

permits are assigned.

14

Page 16: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 16/27

Create OWCD from Maintenance order

Click OWCM Create Icon from the WCA

15

Page 17: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 17/27

 

Create OWCD from Maintenance

order CONTI..Click OWCM application from the Order header

16

Page 18: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 18/27

Page 19: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 19/27

 

Hierarchy of WCM Objects

18

Page 20: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 20/27

Create OWCD Tagging process

Go to OWCD maintenance screen and Click

19

Page 21: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 21/27

Approval process for WCA

Click on the Traffic light icon and select the permit for approval

Once the approval is issued, the traffic light status turns to

Yellow (Additional approvals pending for approval)

20

Page 22: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 22/27

Approval process for OWCDClick on the Traffic light icon and select the permit for approval

Once the approval is issued, the traffic light status turns to

Yellow (Additional approvals pending for approval)

21

Page 23: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 23/27

Order Release for ExecutionOnce all the approvals in WCA/OWCD is issued, additional

function i.e Released for Execution is assigned in

Maintenance order.

Once the safety measures have been implemented, the status"Released for execution" for maintenance work to start can be

issued.

22

Page 24: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 24/27

Order status

23

Page 25: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 25/27

OWCD status flow

CONF : Conflict

ITG : Initial Status

ETG : Tagged

ETUG : Temporarily Untagged

EUG : Untagged

INAC : Inactive

24

Page 26: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 26/27

Order Work Complete statusOnce Un-tagging is performed in the OWCD, after

completion of Work order maintenance work, its status is set

to WOCO(Work Completed)

25

Page 27: SAP WCM_SCOPE[1]

8/13/2019 SAP WCM_SCOPE[1]

http://slidepdf.com/reader/full/sap-wcmscope1 27/27

  THANK YOU