CBT 4 - CBT 4 - Safety Equipment - Maintenance & Safety Equipment - Maintenance & RecordsRecords & Safety Record Folder & Safety Record Folder

                           

                

Page 2: Satety

2

Course FormatCourse Format

Course is made up of this power point presentation accompanied by the short questionnaire next to you!

We will also review the Hanseatic Safety Records Folder (SRF) regularly throughout this course (references to HSC are printed in brownish colour)

Please ask an agency employee to assist whenever required.

You can advance through the presentation by hitting the “ENTER” key with your desired speed!

You should be able to complete in 2.5 hours

Page 3: Satety

3

Check on yourself

Please read the questionnaire and answerthe questions to your best knowledgewithout consulting this presentation or aninstructor. Be fair to yourself! Complete it (not more than 8-10 minutes), turn it around and continue here.

Page 4: Satety

4

Course ContentsCourse Contents1. Introduction (slide 5)

2. Maintenance and Recording of Maintenance, Test & Inspection for Life Saving Appliances (slide27)

3. Maintenance and Recording of Maintenance, Test & Inspection for Fire Fighting Appliances (slide 59)

4. Maintenance and Recording of Maintenance, Test & Inspection for Miscellaneous Items (slide 98)

Page 5: Satety

5

1. Introduction- References -

To assist the officers in charge of maintenance and those performing the inspection and maintenance, the following publications have been used as reference in the preparation of this presentation: -

HSC Safety Records Folder (Ref HSC/SER01/98 REV 00); HSC Quality & Fleet Manuals Volume 1, 2 & 3; HSC Operational Procedures & Contingency Plans Manual (OPCP); SOLAS 2001 Edition; OCIMF Vessel Inspection Questionnaire (2nd Edition 2000); CDI Ship Inspection Report 2000 Edition with further reference to the

IBC Code & BCH Code; & ISGOTT 23rd Edition.

! Important ! On board please consult the latest editions of above publications or documents!

Page 6: Satety

6

Cross Referencing

Wherever relevant publications are indicated - these documents MUST be consulted for more detailed information;

SOLAS is in a continual state of update and amendment and every effort is made by Hanseatic to keep the SRF updated.

Page 7: Satety

7

Instructions for Onboard Maintenance

Instructions should include: Checklist for use when carrying out the inspection; Maintenance & repair instructions; Schedule of periodic maintenance; Diagram of lubrication points with recommended

lubricant; List of replaceable spare parts; List of sources of spare parts (authorized dealers); Log for maintaining records of inspections &

maintenance.

Page 8: Satety

8

Responsibility for Maintenance

Overall responsibility lies with the Master;

However, the Chief Officer is designated as the Safety Officer onboard and he is to be assisted by the Second Engineer;

Actual inspection and maintenance work may be delegated to Junior Officers and Ratings, provided they are competent to carry it out.

Page 9: Satety

9

Responsibility for Maintenance

Duties must only be delegated if the Master & Chief Officer consider the Junior Officer and/or Rating proficient;

If required, training must be given to any person(s) delegated to carry out maintenance work;

However, under all circumstances, the responsibility lies with the Chief Officer and ultimately, the Master.

Page 10: Satety

10

Maker’s Instructions

Must be available for all safety equipment onboard the ship;

MUST always be referred to when scheduling maintenance and inspection;

If appropriate, can be kept in the relevant section of the SRF for easy reference;

Maker’s instructions and guidance must be complied with at all times.

Page 11: Satety

11

Safety of Personnel Crewmembers carrying out maintenance &

inspection of safety equipment MUST always follow laid down safety procedures to prevent accidents or injury;

Adhere to check lists where requiredand carry out a risk assessment;

Communication is important, as always; Equipment must be isolated (if required) and

warning notices posted; When working outside the accommodation,

etc assess the weather conditions and always use PPE and additional safety harness & working life vest; &

Verify that task is clearly understood by personnel and can be carried out

Page 12: Satety

12

State of Readiness

Information given on maintenance & inspection is for guidance only;

YOUYOU must determine the level of maintenance required in order to keep the equipment in a constant state of readiness.

Page 13: Satety

13

do not “OVER” inspect It is NOTNOT a requirement that

every piece of equipment listed in the SRF is inspected every week;

This leads to “over” inspection and it becomes a verification that the equipment is in place;

Such practices DO NOTDO NOT allow sufficient time for thorough maintenance and inspection of the equipment.

Page 14: Satety

14

do not “OVER” inspect

Many people believe it is the records that we must maintain;

This is NOT NOT true, records will NOTNOT save your life!!!; SOLAS II-2, Reg 21 & SOLAS III, Reg 20 give clear

information regarding the frequency of inspections and readiness for use of all fire fighting and life saving appliances;

Plan your inspections and maintenance to meet the stated requirements and ensure that all safety equipment is well maintained - take your time and do the job properly.

Page 15: Satety

15

Hanseatic Safety Records Folder (SRF)

Contains details of all Safety Equipment carried onboard your vessel; &

Identifies the maintenance & inspections that are to be carried out to the Safety Equipment so as to meet the requirements of SOLAS, CDI & the OCIMF VIQ.

Page 16: Satety

16

Hanseatic Safety Records Folder (SRF)

This is the only document onboard for maintaining records relating to the safety equipment;

The latest test certificates form shore side testing centres must be kept in Master’s File 2.0 (Minor Certificates - Safety);

MUST be maintained on the Bridge.

Safety RecordFolder (SRF)

.0fety

Page 17: Satety

17

Initial Completion of the SRF Indicate the number of units

carried onboard & the number required to be carried;

Vessel will usually carry more than is required;

Accurate information can be gathered from ship’s plans, certificates & Safety Equipment Survey attachment to the certificate.

Page 18: Satety

18

Not Applicable Sections of the SRF

Designed for use onboard any type of vessel; Includes requirements for equipment carried by all

ship types; Some parts of the folder may not apply to all

vessels; Can be removed and a notation “Not Applicable to

this ship” made against the relevant section in the List of Contents - refer to HSC Operational Bulletin QA/004/AW/98.

Page 19: Satety

19

Entries into SRF Entries must contain specific details

of what action or maintenance has been taken;

Entries must also include reference to other instruction, i.e. “checks carried out as per maker’s instructions section 8.5 - dogs on access doors lubricated and adjusted”;

Each entry must be signed by the appropriate person carrying out the work - if an engineer or electrician tests the emergency lighting, they must sign the entry.

Page 20: Satety

20

SRF v Deck Log Book

Is an appendix to the Deck Log Book and MUST be completed in INK;

Time & Type of drill must be recorded in the Deck Log Book;

Full details of Drills, Inspections and Maintenance of Safety Equipment must be made in the SRF;

Please note that the Official Logbook must still contain entries regarding Drills & Inspections and Maintenance of Safety Equipment.

Page 21: Satety

21

Copying Pages

Only original pages of the present revision of the SRF must be used;

DO NOT make photocopies or reproduce pages on a computer; &

If you require additional pages use the pages in section 6 of the SRF or contact HSC QMS Dept.

Page 22: Satety

22

Form 67 A/B The SRF is an “onboard” record

of the testing, inspection and maintenance of all safety equipment;

Under ISM 10.2, details of such maintenance and testing must be reported to the Company;

Form 67 A/B has been issued for the purpose of reporting; &

Form is to be sent monthly to the Technical Dept.

Page 23: Satety

23

The SRF Section by Section

Section 1 - Introduction & Record of Revision; Section 2 - Life Saving Appliances; Section 3 - Fire Fighting Appliances; Section 4 - Miscellaneous Items; Section 5 - Records of Drills & Inspections; & Section 6 - Spare Record Sheets.

Page 24: Satety

24

1.1 Master’s Verification Once a month, the Master

is to inspect the SRF and ensure that all regulations and requirements are being met;

He must sign in the space provided as evidence that he accepts that the records are a true and accurate reflection of the status of the equipment and the drills carried out.

Page 25: Satety

25

1.2 Safety Officer Onboard This section is used to

identify the name of the ship’s Safety Officer and his time onboard;

The Safety Officer is the Chief Officer (QM Ch 4 Addendum 01);

His duties are clearly stated (FM Vol 3, Ch 3, Appendix 01), reference should also be made to the Code of Safe Working Practices.

Page 26: Satety

26

1.3 Onboard Review of Procedures

Reviewed once during each Master’s contract;

One review must be in October of each year to coincide with the annual Management Review ashore;

Any changes to onboard procedures MUST be forwarded to the Designated Person and reference to this message stated here;

If no changes are required - this must also be stated as “System Reviewed & Satisfactory”.

Page 27: Satety

27

Section 2 - Life Saving Section 2 - Life Saving AppliancesAppliances

Lifeboats; Rescue Boat; Liferafts; Lifejackets; Lifebuoys; Portable Radios/EPIRB/SART; Immersion Suits/TPA; Pyrotechnics; SOLAS Training Manual; Muster Lists; Emergency Lighting;& Safety Signs

Page 28: Satety

28

2.1 - Lifeboats2.1 - Lifeboats SOLAS III, Reg 20.6; OCIMF 5.16 &

CDI Section 10 - lifeboats and their launching equipment must be in good condition;

Weekly inspection of lifeboat & davits to confirm they are ready for use;

Falls are to be inspected to see that wires are undamaged and that the wire is laying correctly on the winch drum;

Securing devices, hooks, pennants, harbor pins, etc must be secure, yet easily released.

Page 29: Satety

29

Lifeboat - Weekly InspectionLifeboat - Weekly Inspection All items on the davits are to be thoroughly checked as

part of this inspection, particular attention must be paid to the brake cut-out (limit switches). These must be thoroughly tested each time the boat is lowered out of its stowed position - any deficiency must be rectified immediately;

All grease points are to well lubricated and fall wires are to be greased - during the routine lowering of the boat, check that all davit sheaves are turning smoothly;

The lifeboat hull is to be inspected to verify good order; CDI 10.28 - Markings (retro-reflective tape, identification

from above, etc.); & The disengaging gear is to be inspected.

Page 30: Satety

30

Weekly Inspection continuedWeekly Inspection continued A thorough external inspection is to be

made including: - Rudder & Propeller; All ropework (including painters if

applicable) is to be inspected to ensure that it is secured and in good condition;

Embarkation Ladders (if applicable) - SOLAS III Reg 11.7, CDI 10.32 - remove canvas cover, “air” the ladder and check condition of ropework and steps ; &

Records of weekly inspection & maintenance to be recorded in SRF Section 2.1.

Page 31: Satety

31

Lifeboat Monthly InspectionsLifeboat Monthly Inspections SOLAS III, Reg 20.7 - monthly

inspection of each item of lifeboat equipment is to be made to ensure that it is in place and in good order with particular attention to the following:

First Aid Kit, secure & dry; Pyrotechnics, secure & dry; Torch operational & spare

batteries available; Water tanks full (date last

changed); If freefall boat - one SART must

be located inside the boat; & Food Rations, secure & dry.

Page 32: Satety

32

Monthly Inspections continuedMonthly Inspections continued Fuel tank(s) full; Fire Extinguisher in good order -

recharged as required; Electrical & Hydraulic systems in

good order; Self contained air system fully

charged - date last serviced; Lifeboat Compass in good order; Oars & Crutches (if applicable); Drain valve cap or plug + marking; & Records of monthly inspection &

maintenance to be recorded in SRF Section 2.1.

Page 33: Satety

33

Seating Arrangements

CDI Section 10.21; Seating positions within the

lifeboat must be clearly marked;

For a freefall lifeboat, a seating arrangement plan must be posted at suitable locations around the vessel.

Page 34: Satety

34

Seat Belts

CDI Section 10.23; Lifeboat seatbelts must be

checked and their condition maintained;

The securing point is to be strong;

The webbing strap is to remain in good condition; &

The buckle is to be free to operate smoothly.

Page 35: Satety

35

Non Skid Surfaces

CDI Section 10.24; Lifeboat surfaces on which

persons might walk must have non skid surfaces;

This applies to both internal & external surfaces.

Non Skid Surface

Page 36: Satety

36

Watertight Hatches

CDI Section 10.25; Watertight hatches must be

maintained in good condition; Hinges & Rubber seals must

be in good condition; Hatch must provide a good

seal with all dogs secured; & All securing dogs must be

free to move with the open or closed position, marked.

Page 37: Satety

37

2.2 Rescue Boat SOLAS III, Reg 14, 17, 19

3.3.6 & 7, 20, 31.2, 35 & 36; CDI 10.48 - 10.59;

SOLAS III Reg 20.6.1 - Weekly inspection and maintenance as for lifeboat is to be carried out to ensure that Rescue boat is ready for use;

Records of weekly inspection & maintenance to be recorded in SRF Section 2.2.

Page 38: Satety

38

Rescue Boat Weekly Inspection Weekly inspection and

maintenance should include: - Engine & Propeller; Rudder, Tiller & Towing Device; Remote Launching Device must be

tested and reset; & SOLAS III Reg 20.6.2 - Weekly run

engine(s) for 3 minutes and test engaging of gear box provided the ambient temperature is above the minimum required for starting and running the engine.

Page 39: Satety

39

Rescue Boat Monthly Inspection

Monthly inspections must check the condition of: - Waterproof Torch/Flashlight; Searchlight; Thermal Protective Aids; & Other small equipment.

Weathertight stowage arrangements must also be checked; &

Records of monthly inspection & maintenance to be recorded in SRF under Section 2.2.

Page 40: Satety

40

2.3 Liferafts SOLAS III Reg 11, 12, 13.4, .5, & .6,

16, 19.4.2.1 & 4.3, 20, 35 & 36; CDI Section 10.61 - 10.75; OCIMF 5.16.2;

Weekly inspection and maintenance to be carried out to ensure that liferafts are ready for use;

Records of weekly inspection & maintenance to be recorded in SRF Section 2.3.

Page 41: Satety

41

Liferaft Weekly Inspection Casing undamaged and seals

are intact; Container is correctly marked; Painter is correctly secured to

the hydrostatic release; Hydrostatic release “weak link”

is correctly secured between the ship and hydrostatic release or painter;

Holding cradle is securely attached to vessel; &

Removable handrails or chains are free and easy to release.

Page 42: Satety

42

Liferaft Monthly Inspection SOLAS III, Reg 20.7; CDI Section 10.72 & 10.77 & 10.78;

In addition to the weekly inspection, once a month, the following must be inspected and maintained: -

Condition of Embarkation ladder ropework and steps must be checked - remove the canvas cover and “air” the ladder;

Liferaft operating instructions must be displayed in the vicinity of the liferaft; &

Records of monthly inspection & maintenance to be recorded in SRF under section 2.3.

Page 43: Satety

43

Davit Launched Liferaft Operating Instructions

SOLAS III, Reg 9; CDI Section 10.78; Instructions for the use of davits

and davit launched life rafts must be posted in the vicinity of the liferaft embarkation area.

Remember two types of launchable liferaft – padeye inside or outside the casing! Check the label and familiarize your crew

Page 44: Satety

44

2.4 Lifejackets SOLAS III Reg 7.2, 20, 32, 35 & 36; CDI Section 10.80; Lifejackets need only to be inspected

and maintained monthly in order to verify: -

they are to be located as per list, including jackets for persons on watch or for use at remotely located survival craft stations;

tapes are secure; & vessel’s name is clearly indicated. Record of inspection and any

maintenance must be recorded under section 2.4 of the SRF.

Page 45: Satety

45

Lifejackets continued Monthly inspection and

maintenance must also include: - Jacket must be fitted with a whistle

and retro-reflective tape; Self Igniting Light is fitted and

expiry date or date of last battery change or battery expiry date is available;

Also check for manufacturer’s name or trade mark, class society endorsement (if any), name or brand of the lifejacket; &

The jacket should be marked with the words “Person of 32 Kg or more” in 12mm high letters.

Page 46: Satety

46

Lifejackets continued

Monthly inspection and maintenance must also include: -

Verification that the year of manufacture is shown on the jacket - maybe together with manufacturer’s details; &

The word “Front” is also visible on the front part of the jacket.

The location of lifejacket storage boxes must be identified by IMO approved signs; &

The condition of external lifejacket storage boxes must be verified - hinges, rubber seals and open/close arrangements.

Page 47: Satety

47

2.5 Lifebuoys SOLAS III Reg 7.1, 20, 32.1, 35 & 36; CDI Section 10.83 - 10.84; OCIMF VIQ 5.16.5; Lifebuoys need only to be inspected and

maintained monthly in order to verify that each lifebuoy: -

is marked with ship’s name & port of registry;

is fitted with 4 bands of retro-reflective tape - tape must be in good condition; &

has a grabline (of not less that 9.5mm diameter) secured around it in 4 places - line must be in good condition.

Page 48: Satety

48

Lifebuoys continued

For those lifebuoys fitted with a buoyant line, the line must be at least 8mm in diameter and non kinking;

Length of line should be not less than twice the height which it is stored above the waterline in the lightest sea going condition or 30 m whichever is greater;

It must also be resistant to deterioration from sunlight; &

Records of maintenance & inspection must be kept in section 2.5 of the SRF.

Page 49: Satety

49

Lifebuoys with Self Igniting Lights

For those lifebuoys fitted with a self igniting light: -

All attachments and securing arangements must be in good order;

Check condition of cabinet hinges and open/close arrangements;

Battery operated lights must be inspected monthly - watertightness & brightness of light verified;

Date that batteries were changed must be marked on body of the light and recorded in the maintenance section of the SRF under section 2.5. Check condition of

“o” ring or seal

Page 50: Satety

50

Lifebuoys with Self Activating Light & Smoke Floats

For those lifebuoys fitted with a self activating light & smoke float: -

All attachments must be in good order; Release lever must be free and easily

identified; Weight of the lifebuoy must be at least 4

Kg and the line between the float and the lifebuoy must be 4 m long;

Date that batteries were changed must be marked on body of the float and recorded in the maintenance section of the SRF under section 2.5.

Release Lever

Page 51: Satety

51

2.6 Portable Radios, EPIRB & Radar Transponder

SOLAS III, Reg 6; CDI 1.4.16 - 18; OCIMF VIQ 5.16.3; To be inspected at least monthly, follow

manufacturer’s test and maintenance instructions for individual units;

SART can be tested during lifeboat drills - their signal should be visible on the ship’s radar - if a freefall lifeboat is fitted, one SART must be permanently stored inside the boat;

Date of last battery change or battery expiry must be shown on the exterior of the unit;

For EPIRB, inspection and maintenance must also include hydrostatic release; &

Records of inspection, test and maintenance must be kept in the SRF under section 2.6.

Page 52: Satety

52

2.7 Immersion Suits & Thermal Protective Aids

SOLAS III, Reg 7.3, 32.3, 35 & 36; CDI Section 10.55; To be inspected at least monthly; Verify that suits are stored in the

correct location and that suits are suitably protected from damage;

Check condition of self igniting light and check battery expiration date; &

Records of inspection, test and maintenance must be kept in the SRF under section 2.7.

Page 53: Satety

53

2.8 Bridge Pyrotechnics & Line Throwing Appliances

SOLAS III, Reg 6, 18, 19, 20, 35 & 36; CDI Section 10.90 - 93; OCIMF 5.16.6; Line Throwing Appliances & 12

Parachute Flares and Hand flares - to be inspected monthly;

Verify that units are stored in the correct location and suitably protected from damage;

Check expiration date of projectiles and igniters (shown on unit casing); &

Records of inspection and maintenance must be kept in the SRF under section 2.8.

Page 54: Satety

54

2.9 SOLAS Training Manuals, Muster Lists & SOLAS Certificates

SOLAS III, Reg 35; CDI SIR 1.2.2; OCIMF VIQ 5.15; SOLAS Training Manual - to be inspected quarterly to

ensure that all information is up to date and ship specific;

SOLAS III, Reg 8 & 37; CDI Section 7.47; OCIMF 5.1.9; Fleet Manual Vol 1, Chapter 3, Section 9.1 Muster Lists - to be updated immediately after every crew

change; Must contain all information required by SOLAS; & Must give full name & rank of crewmember and be signed

by present Master.

Page 55: Satety

55

SOLAS Training Manuals, Muster Lists & SOLAS Certificates

SOLAS I, Reg 16; Fleet Manual Vol 1, Chapter 3, Section 2.5 Certified copies of ALL SOLAS certificates must be posted in

the accommodation: - Cargo Ship Safety Construction Certificate; Cargo Ship Safety Equipment Certificate; Cargo Ship Safety Radio Certificate; International Loadline Certificate; IOPP; & ISM DoC & SMC.

Records of inspection and amendment must be kept in the SRF under section 2.9.

Page 56: Satety

56

2.10 Embarkation Deck Emergency Lighting

SOLAS II, Reg 43 & SOLAS III, Reg 11.4 & 16.7; CDI 10.79;

Emergency Embarkation Lighting is to be tested at each Abandon Ship Drill;

Inspect and test all emergency lighting and ensure that it functions from the emergency power source;

If maintenance is required on “gas tight” fittings, ensure appropriate precautions are taken and power supply is isolated until fitting is secure; &

Records of inspection and maintenance must be kept in the SRF under section 2.10.

Page 57: Satety

57

2.10 Safety Signs SOLAS II-2, Reg 28.1.10 & III,

Reg 11.5; CDI 10.96; OCIMF VIQ 5.1.9;

To be inspected monthly and if necessary, luminescence verified;

Inspect condition of emergency exit signs and ensure that they “glow in the dark”;

If not, they must be replaced. Records of inspection and

maintenance must be kept in the SRF under section 2.10.

Page 58: Satety

58

Take a break, before you carry on! 10 minutes.

Page 59: Satety

59

Section 3 - Fire Fighting Section 3 - Fire Fighting AppliancesAppliances

Fire/Foam Hydrants; Fire/Foam Hoses & Nozzles; Fire/Foam Isolation Valves; Portable Extinguishers; Fixed Dry Powder System; Fixed CO2 System; Fixed Foam System; Fixed Halon System; Cargo Hold Sprinkler System; & Deck Water Spray Systems.

Page 60: Satety

60

Section 3 - Fire Fighting Section 3 - Fire Fighting AppliancesAppliances (cont) (cont)

Fireman’s Outfits; Paint Locker Extinguishing

System; Portable Foam Equipment; International Shore Connection; & Fire Control Plans.

Page 61: Satety

61

3.1/3.3 - Fire/Foam Hydrants3.1/3.3 - Fire/Foam Hydrants SOLAS II-2, Reg 4 & 21; CDI SIR 9.24;

OCIMF VIQ 5.9.2; Quarterly inspection of fire hydrants to

confirm they are in good condition & ready for use;

Check condition of rubber washers - correctly fitted and not perished;

Any leaks must be repaired; Protective caps must be fitted when not

in use; & If coupling has a spring clip

arrangement - must be inspected and lubricated to maintain good order.

Page 62: Satety

62

3.2/3.4 - Fire/Foam Main, 3.2/3.4 - Fire/Foam Main, Hoses & NozzlesHoses & Nozzles

SOLAS II-2, Reg 4, 21 & 61.7, FM Vol 2, Ch 4; CDI SIR 9.23, 9.26 - 9.29; OCIMF VIQ 5.9.2;

Each hose and hose box is to be marked with identification number corresponding to ID number in SRF;

Quarterly inspection & testing of hoses- ensure that hoses are in correct location; &

Verify condition of hose box - hinges and open/close arrangements.

Page 63: Satety

63

Fire/Foam Main, Hoses & NozzlesFire/Foam Main, Hoses & Nozzles

A Fire Box contains a workable nozzle, a fire hose and a spanner (in some cases the spanner might be located close to the hydrant)

If hose couplings have spring clip retainers, ensure these are lubricated, free to operate and undamaged; &

Condition of securing bands must also be inspected.

Page 64: Satety

64

Hose CouplingsHose Couplings

Quarterly inspection of fire hoses must also verify condition of hose couplings;

Rubber seals must be inspected to ensure they are fitted correctly and have not become brittle; &

In most cases, lubrication need NOT be applied to the couplings.

Page 65: Satety

65

Fire Hose - Pressure TestFire Hose - Pressure Test Refer FM Vol 2, Ch 4, Section 6.3 vii, Paragraph 91.25-20( 4); To be carried out ANNUALLY - Test to working pressure of

the system but not less than 100 psi; Fire pump running and one valve (anchor wash) or hydrant

open to release fire main pressure; THIS IS A 2 MAN JOB - One man to control the nozzle, one

man to control the hydrant; Hydrant and nozzle both open - once hydrant full open, nozzle

to be closed gradually - check hose and couplings for leaks; Close hydrant & drain hose - if OK, leave to dry and place in

hose box. If damaged, replace with spare. Make notation in SRF.

Page 66: Satety

66

Fire Hose - MiscellaneousFire Hose - Miscellaneous Fire hoses/nozzles are provided as

per ship’s Safety Plans; Such fire hoses are NOT to be

used for taking fresh water or washing down decks or cargo holds;

This will dramatically shorten the useful life of a fire hose;

Condemned, old or only hoses specifically provided for this purpose MUST be used; &

Hoses used for fresh water or washing down, MUST be marked accordingly.

Page 67: Satety

67

NozzlesNozzles

Should also be numbered and stored at the appropriate location;

Quarterly inspection must also verify condition of nozzles;

For Jet/Spray type nozzles - must be free to move and lubricated if necessary; &

Rubber seals must be inspected to ensure they are fitted correctly and have not become brittle.

Page 68: Satety

68

3.5 - Isolation Valves3.5 - Isolation Valves SOLAS II-2, Reg 4, Section 6.3 & 21;

CDI SIR 9.25; OCIMF VIQ 5.9.4; Quarterly inspection of isolation

valves to confirm they are in good condition & ready for use;

Valves should be lightly lubricated, turned the full length of the spindle and reset to their normal operating position;

Spindle to be lightly lubricated again.

Page 69: Satety

69

Fixed Fire Fighting System - Fixed Fire Fighting System - Isolation ValvesIsolation Valves

SOLAS II-2, Reg 4, Section 6.3 & 21; CDI SIR 9.25; OCIMF VIQ 5.9.4;

Quarterly inspection of isolation valves to confirm they are in good condition & ready for use;

Should be easily identified by color or number - marking to be renewed if required;

Valve numbers must always correspond to operating instructions;

Valves should be lightly lubricated, turned the full length of the spindle and reset to their normal operating position;

Spindle to be lightly lubricated again.

Page 70: Satety

70

3.6 - Portable Extinguishers3.6 - Portable Extinguishers SOLAS II-2, Reg 6 & 21; CDI SIR 9.36 - 9.42; OCIMF VIQ 5.9.5; FM Vol 2, Chapter 4.6 All portable extinguishers to be

individually numbered and entered into SRF;

Monthly inspection of portable extinguishers to confirm they are in good condition, correctly color coded, stored in their mounting brackets & ready for use; &

Spare charges and refills must be available and inventory recorded.

Page 71: Satety

71

Portable ExtinguishersPortable Extinguishers Quarterly inspection of portable

extinguishers to check: - Activation & delivery devices in

good order; Water level verified; Liquid foam level to verify (if

possible); & Open up casing top, inspect,

remove and weigh CO2 charges - full and empty weight is stamped on neck of CO2 cartridge.

Page 72: Satety

72

Portable ExtinguishersPortable Extinguishers Quarterly inspection of portable

extinguishers to check: - Carbon Dioxide extinguishers -

take off bracket and weigh; If showing less than 90% of

specified weight - extinguisher to be replaced and shore based servicing arranged; &

Dry Powder extinguishers must be removed from bracket and shaken in order to “fluff up” powder.

Page 73: Satety

73

E/Room Dry Powder E/Room Dry Powder ExtinguishersExtinguishers

Quarterly inspection of portable extinguishers to check: -

Activation & delivery devices in good order;

Every 6 months - pressure of activation cylinder to be verified;

Dry Powder extinguishers must be opened and the powder “fluffed up”.

Page 74: Satety

74

3.7 - Fixed Dry Powder Systems3.7 - Fixed Dry Powder Systems SOLAS II-2, Reg 6 & 21; CDI SIR 9.55 - 9.59; OCIMF VIQ 5.9.10; Quarterly inspection to check: - All valves to be clearly numbered and

corresponding to operating instructions; Valves tested (where possible) for ease

of operation - DO NOT activate N2 cylinders; &

Pressures of pilot & activation bottles to be verified; &

Every 6 months, open up tank and fluff up powder.

Page 75: Satety

75

Fixed Dry Powder SystemsFixed Dry Powder Systems

Quarterly inspection of hoses & nozzles to check: -

Nozzles are in good condition; Free to open and close; Lubricated as required; & Strongly connected to discharge

hose.

Page 76: Satety

76

Fixed Dry Powder SystemsFixed Dry Powder Systems

Quarterly inspection of hoses & nozzles to check: -

Hose box hinges and securing arrangements are in good condition;

Rubber seals are in good condition to prevent water ingress;

Hoses are in good condition - no splits, cuts or tears; &

No damage due to kinking or incorrect stowage.

Page 77: Satety

77

Fixed Dry Powder - MonitorsFixed Dry Powder - Monitors

Quarterly inspection of monitors to check: - Unit is lubricated and free to turn; Test monitor and remote activation points where

feasible - refer maker’s instructions.

Page 78: Satety

78

3.8 - Fixed CO3.8 - Fixed CO22 Systems Systems SOLAS II-2, Reg 5 & 21; CDI SIR 9.33 - 9.35;

OCIMF VIQ 5.9.10; Provided for E/Room, Cargo Pump Room,

Cargo Holds or a combination of any or all of these areas;

Monthly inspection to verify that all CO2 cylinders are secure - check the securing arrangements for each cylinder;

Check activation mechanism and confirm that links to each bank of cylinders are in good condition;

Operating instructions are clearly posted; & If room is locked - key(s) must be readily

accessible close to the door - lock must be lubricated and easy to operate.

Page 79: Satety

79

Fixed COFixed CO22 Systems Systems Quarterly inspection to check: - All valves are clearly numbered and corresponding to

operating instructions; & Alarms tested in the spaces being protected. Alarms must

be tested in an organized manner, with warnings issued to advise all personnel - combine test with E/Room fire drill for onboard training; &

Every 6 months - fixed piping is to be “blown through” with compressed air. Visual inspection must be made to ensure that all fixed piping is clear and free from blockage or damage. Follow maker’s instructions.

Page 80: Satety

80

3.9 - Fixed Foam Systems3.9 - Fixed Foam Systems SOLAS II-2, Reg 8, 9, 21 & 61; CDI SIR 9.47 - 9.54; OCIMF VIQ 5.9.10; Provided for E/Room, Boiler Room, Cargo Pump Room,

Main Deck or a combination of any or all of these areas; Quarterly inspection to check that: - All valves, hydrants, nozzles, etc are located and

maintained as per previous instructions; Nozzles are clean and free from obstruction; & Foam pumps/metering pumps are tested - can be part of a

Manifold Fire Drill, used as a Foam System demonstration for applicable crew members.

Page 81: Satety

81

Foam Sample AnalysisFoam Sample Analysis

A sample of the foam concentrate is to be sent ashore for analysis ANNUALLY; &

Certificate of this test must be maintained in the SRF.

Page 82: Satety

82

3.10 - Fixed Halon Systems3.10 - Fixed Halon Systems SOLAS II-2, Reg 5.3 & 21; CDI SIR 9.33 - 9.35; OCIMF VIQ 5.9.10; Provided for E/Room, Cargo Pump Room and Cargo Spaces

intended solely for carriage of vehicles which are not carrying any cargo;

Quarterly inspection to check that: - All cylinders and activation mechanisms are in good

condition - follow maker’s instructions; & Alarms tested in the spaces being protected. Alarms must

be tested in an organized manner, with warnings issued to advise all personnel - combine test with fire drill for onboard training.

Page 83: Satety

83

3.11 - Cargo Hold 3.11 - Cargo Hold Sprinkler SystemsSprinkler Systems

SOLAS II-2, Reg 21 & 53; Quarterly inspection to check that: - Hose couplings and valves are lubricated and in

satisfactory condition; Each time a cargo hold is empty, make a visual inspection

of the sprinkler nozzles; &

Test the system ANNUALLY whilst the holds are empty - incorporate the test into a fire drill and use for crew training/familiarization.

Page 84: Satety

84

3.12 - Deck Water Spray Systems3.12 - Deck Water Spray Systems SOLAS II-2, Reg 21 & 54 Section

2.1.3; CDI SIR 9.60 - 9.64; & OCIMF VIQ 16.15.1 Quarterly inspection to check that

pipelines, couplings, valves and spray heads are secure and in good condition;

Lubricate as necessary; & Ensure that activation points are

clearly marked.

Test the system at EACH DRILL and verify that spray heads are free from obstruction- use for crew training/familiarization.

Page 85: Satety

85

3.13 - Fireman’s Outfits3.13 - Fireman’s Outfits SOLAS II-2, Reg 17 & 21; CDI SIR 9.8 - 9.14; OCIMF VIQ 5.9.6;

Location must be clearly marked by SOLAS label!

Consists of: - Suit of Protective Clothing; Boots & Gloves; A rigid helmet; Safety Lamp; An Axe with insulated handle; Fireproof line; & Self Contained Breathing Apparatus.

Page 86: Satety

86

Fireman’s OutfitsFireman’s OutfitsMonthly inspections must include: Inspection of all pieces of equipment to ensure that

outfits are ready for immediate use; Safety lamp - test for brightness, replace batteries as

required; BA Set - inspection of mask (faceplate and rubber

material), securing straps, harness and waistband, demand valve and low pressure whistle are to be tested and satisfactory;

If any problems are discovered, BA set is to be immediately removed from service until repairs are completed.

Page 87: Satety

87

Fireman’s OutfitsFireman’s Outfits

BA sets should be stored in two widely separate locations, each location must be clearly marked;

Individual units must be stored in readily accessible condition to enable any user to “don” the set in minimum time;

BA set inspection including verification of all cylinder pressures (in use & spares); &

Each BA cylinder must have been pressure tested within the last 6 years - date stamped on neck of bottle and recorded in SRF.

Page 88: Satety

88

Fireman’s OutfitsFireman’s Outfits All BA cylinders must be

numbered, individual pressures recorded and any alarming reduction in pressure must be considered as leakage and cylinder sent ashore for repair; &

Leaking cylinders must stored away from spare cylinders for use and marked accordingly.

Page 89: Satety

89

3.14 - Paint Locker 3.14 - Paint Locker Extinguishing SystemExtinguishing System

SOLAS II-2, Reg 18.7 & 21; CDI SIR 9.67; OCIMF VIQ Activation Valve must be clearly

marked; Quarterly inspection of operating

valve - ensure lubricated and free to turn;

Inspect internal sprinkler heads, ensure they are not blocked.

For fixed gas type - activation alarm must also be tested.

Page 90: Satety

90

3.15 - Portable Foam 3.15 - Portable Foam ApplicatorApplicator

SOLAS II-2, Reg 6.4 & 21; CDI SIR 9.36; OCIMF VIQ 5.9.5;

Consists of: - Portable tank containing 20 litre of

foam making liquid; Fire Hose; Air-Foam nozzle, inductor type; & One spare 20 litre tank.

Page 91: Satety

91

Portable Foam ApplicatorPortable Foam Applicator Inspect MONTHLY to verify that: - All parts are complete and in good

condition; Check hose for heat degeneration, &

that coupling rubber seals and bindings are not damaged; &

Foam liquid containers are full.

Pressure test fire hose ANNUALLY as per section 3.2;

Foam making liquid will have an expiry date - ensure that it is marked on each container and in the SRF.

Page 92: Satety

92

3.16 - International Shore 3.16 - International Shore ConnectionConnection

SOLAS II-2, Reg 19 & 21; CDI SIR 9.30 - 9.31; OCIMF VIQ 5.9.9; This equipment must NEVER

be used for routine ship’s activities or connecting to shore based water supply during repair periods;

It is supplied SOLELY to connect the shore based emergency services to the ship’s fire main.

Page 93: Satety

93

International Shore ConnectionInternational Shore Connection

Inspected MONTHLY to ensure that: -

Rubber seal is in good condition and fitted correctly;

Connection is complete, including gasket, nuts, bolts and washers; &

Properly secured in its designated place with clearly identifiable markings.

Page 94: Satety

94

3.17 - Fire Control Plans3.17 - Fire Control Plans SOLAS II-2, Reg 20 & 21; CDI SIR 9.1 - 9.7; OCIMF 5.1.8; Fire Control Plan must be posted within the accommodation

detailing the location of all fire fighting appliances and other fire control measures;

IMO standard symbols must be used to identify the various pieces of equipment;

Additionally, all instructions concerning maintenance and operation of all firefighting equipment are to be kept under ONE cover, readily available and in an accessible position;

The SRF is the ideal place to keep operation and maintenance instructions - if upon inclusion of maker’s instructions the folder is too bulky - it can be split into different sections in different folders.

Page 95: Satety

95

Fire Control PlansFire Control Plans ISGOTT 4.7; A duplicate plan is to be stored in a

watertight container, located outside of the accommodation for assistance of the shorebased fire fighting personnel;

Container should include: - General Arrangement Plan indicating

location of all fire fighting appliances and other fire control measures;

Copy of the present load/discharge plan including stability information; &

A copy of the very latest crewlist.

Page 96: Satety

96

Fire Control PlansFire Control Plans Ensure that container is inspected

MONTHLY to ensure that: - Contents are dry and in good readable

condition; Open/Close arrangements are free and

easy to operate - lubricate if necessary; & Ensure that information is maintained up

to date at all times - each time info is updated, it must be recorded in the SRF.

Page 97: Satety

97

Take a break, before you carry on! 10 minutes.

Page 98: Satety

98

Section 4 - Miscellaneous Section 4 - Miscellaneous ItemsItems

General Alarm System; Fixed Fire Detection System; Cargo Hold Smoke/Fire Detection

System; Fixed Sensor Gas Detection

System; Remote Trips/Shut Offs Lifeboat Engine; Emergency Power Supplies; Fire Pumps; & Watertight & Fire

Doors/Emergency Escapes.

Page 99: Satety

99

Section 4 - Miscellaneous Section 4 - Miscellaneous ItemsItems

Breathing Air Compressor; Oxygen Resuscitation Equipment; Vents/Fire Dampers; Gas Tanker Additional Rqmnts; Chemical Tanker Additional

Requirements; Signaling Lamp; Safety Training Videos; Personal Protective Equipment; & Miscellaneous Alarms.

Page 100: Satety

100

4.1 - General Alarm System4.1 - General Alarm System SOLAS II-2, Reg 13 & 21; CDI SIR 9.45 - 9.46; OCIMF 5.11; If possible, General Alarm activation

points must be tested on a rotation basis;

The general alarm should be activated from a different location at each drill;

The SRF record should state which activation point was tested;

The alarm bells or sirens must also be inspected and it must be confirmed that each unit is in good working order.

Page 101: Satety

101

4.2 - Fixed Fire Detection 4.2 - Fixed Fire Detection SystemSystem

SOLAS II-2, Reg 13, 14 & 21; CDI 9.43 - 9.44; OCIMF 5.11.1; Weekly, one detector head/sensor from each zone is to

be tested; Ensure that within 3 months, ALL detectors/sensors in

the entire system have been tested; C/O & C/E to draw up a plan and designate person(s)

responsible for carrying out tests; Each weekly test need not be recorded - only the

completion of the system test schedule & system maintenance need be recorded in the SRF.

Page 102: Satety

102

4.3 - Cargo Hold Smoke/ Fire 4.3 - Cargo Hold Smoke/ Fire Detection SystemDetection System

SOLAS II-2, Reg 53; System is to be tested on a monthly

basis and must be continuously running when cargo is being carried in the holds;

For routine maintenance - refer to maker’s instructions; &

Open ended detector lines must be blown through with compressed air once every 6 months.

Page 103: Satety

103

4.4 - Fixed Sensor Gas 4.4 - Fixed Sensor Gas Detection SystemDetection System

SOLAS II-2, Reg 13-1, ISGOTT 7.8, 8.2, 18.5 & OCIMF VIQ 5.12;

Usually fitted on tankers and maybe of the combustible element or infra red type;

The equipment must be in operation at all times whilst the vessel is in service;

For full system maintenance, refer to maker’s instructions; &

It is not necessary to record the zero and span test results in the SRF, these should be recorded on HSC Form 70 - Calibration Records.

Page 104: Satety

104

Fixed Sensor Gas Detection SystemFixed Sensor Gas Detection System

Zeroing & Spanning of the system must be carried out as per the following schedule: -

Zero Test - Mechanical Weekly Zero Test - Nitrogen Daily Span Test Weekly & prior to

commencing cargo operations.

Page 105: Satety

105

4.5 - Remote Trips/Shut Offs4.5 - Remote Trips/Shut Offs Maybe electrically,

mechanically, pneumatically or hydraulically activated;

ALL remote trips and shut off devices are to be tested on a QUARTERLY basis;

Testing must be carefully planned and with the full knowledge and agreement of all parties concerned; &

For further details, refer to maker’s instructions.

Page 106: Satety

106

Remote Trips/Shut OffsRemote Trips/Shut Offs

Entries into the SRF are only required to show the actual date that any inspection or maintenance work was carried out;

The actual result of testing each individual trip or shut off must be recorded elsewhere, i.e. cargo log book, engine log book or QMS forms.

Page 107: Satety

107

4.6 Lifeboat Engines4.6 Lifeboat Engines SOLAS III, Reg 20.6 CDI Section 10, item 20; OCIMF VIQ 5.16.1; Lifeboat engine operating instructions are

to be legible and mounted in a conspicuous place;

Weekly run engine(s) for 10 minutes and test engaging of gear box unless operation without the propeller submerged will cause damage - in which case refer to maker’s instructions.

CDI 10.29 - Ensure that batteries & battery charging system are in good condition.

Page 108: Satety

108

Lifeboat EnginesLifeboat Engines An engineer must conduct a

thorough inspection of the lifeboat engines, reversing gear etc on a MONTHLY basis;

Routine maintenance as per maker’s instructions must also be carried out at this time; &

This is to include checks on oil and fuel levels.

SRF records must be in detail, all tests and maintenance carried out on the lifeboat engines.

Page 109: Satety

109

Testing in the Water

SOLAS III, Reg 19, 3.3.3; CDI 10.30/31; OCIMF 5.17.1; Davit Launched lifeboat shall be launched and

manoeuvred in the water at least once every 3 months during an abandon ship drill;

SOLAS III, Reg 19, 3.3.4; Free Fall lifeboat can be lowered into the water every 3

months, provided that it is free fall launched once every 6 months

The Fire Protection System is to be tested when any lifeboat is waterborne; &

Records of each launching must be recorded in the SRF Section 5.4.

Page 110: Satety

110

4.7 - Emergency Power 4.7 - Emergency Power SuppliesSupplies

SOLAS II-1 Part D, Reg 43; OCIMF VIQ 12.6.2 - 12.6.5; The emergency source of electrical

power (generator or batteries) is to be tested on a weekly basis; &

Weekly checks must also include oil levels and verification that the fuel tank is full.

Emergency generator maintenance must be carried out as per maker’s instructions and details recorded in the SRF.

Page 111: Satety

111

4.8 - Fire Pumps4.8 - Fire Pumps SOLAS II-2 Reg 4; CDI SIR 9.18 - 9.22;

OCIMF VIQ 5.9.2; The main and emergency fire pumps

are to be test run on a weekly basis; & Test must ensure that 2 jets of water

can be maintained, one from the bridge wing and one from the foc’sle;

All valves must be clearly labeled and correspond to the posted starting instructions.

Fire Pump maintenance must be carried out as per maker’s instructions and details recorded in the SRF.

Page 112: Satety

112

4.9 - Watertight Doors/Fire 4.9 - Watertight Doors/Fire Doors/Emergency EscapesDoors/Emergency Escapes

SOLAS II-1 Reg 24; All watertight doors, fire doors &

emergency escapes must be kept clear of obstructions at all times;

Watertight doors are to be tested on a weekly basis from both remote and local operating positions; &

Internal fire doors must be inspected and tested to ensure they close properly including doors that are held open magnetically.

All dates of testing, and details of maintenance done must be recorded.

Page 113: Satety

113

4.10 - Breathing Apparatus 4.10 - Breathing Apparatus CompressorCompressor

CDI SIR 9.15 - 9.17; OCIMF 15.13.3 & 16.14.2; A log of the running hours is

to be maintained at the compressor;

For maintenance - refer to maker’s manual; &

Details of equipment maintenance and servicing are to be recorded in the SRF.

Page 114: Satety

114

4.11 - Oxygen Resuscitation 4.11 - Oxygen Resuscitation EquipmentEquipment

OCIMF VIQ 5.16.7; Inspect unit monthly; Verify that cylinders in use and

spares are full and that empty bottles are re-charged ashore as soon as possible; &

Ensure that all required components are kept within the unit and the unit is maintained in a clean and hygienic condition.

Details of recharging or unit maintenance must be recorded in the SRF.

Page 115: Satety

115

4.12 - Vents & Fire Flaps4.12 - Vents & Fire Flaps OCIMF VIQ 5.10 - All vents, flaps and

dampers etc are to be regularly inspected and operated - a good routine must be established to ensure none are omitted;

They must be greased/lubricated, rubber seals inspected & replaced as necessary;

All dogs, clips, operating handles, wires, etc are to be well maintained;

Open & Closed markings must be clearly visible as an indicator to identify which position the vent is in; &

Vent type doors must be kept free of obstructions.

Page 116: Satety

116

4.13 - Gas Tanker 4.13 - Gas Tanker Additional RequirementsAdditional Requirements

OCIMF VIQ Chapter 16; Contained in IMO publication “Code

for the Construction & Equipment of Ships Carrying Liquefied Gases in Bulk”;

Additional requirements include fireman’s outfits, gas masks, escape sets, showers and eye washes, deck water spray systems and ESD’s etc; &

Actual requirements depend upon ship type, age of vessel & cargoes carried - consult the Code.

Page 117: Satety

117

Gas Tanker Additional Gas Tanker Additional RequirementsRequirements

The SRF must contain details of all additional equipment carried or fitted;

It’s location and activation point (if relevant); &

Details of maintenance and test must also be recorded in the SRF; &

Under the IGC Code - PPE and BA sets are to tested by an expert annually.

Page 118: Satety

118

4.14 - Chemical Tanker 4.14 - Chemical Tanker Additional RequirementsAdditional Requirements

OCIMF VIQ Chapter 15; For ships built before 01 July 1986, contained in

IMO publication “Code for the Construction & Equipment of Ships Carrying Dangerous Chemicals in Bulk - BCH Code)”; or

For ships built after 01 July 1986, contained in IMO publication “International Code for the Construction & Equipment of Ships Carrying Dangerous Chemicals in Bulk - IBC Code)”.

Page 119: Satety

119

Chemical Tanker Additional Chemical Tanker Additional RequirementsRequirements

Additional requirements include fireman’s outfits, gas masks, escape sets, showers and eye washes, deck water spray systems and ESD’s etc; &

Actual requirements depend upon ship type, age of vessel & cargoes carried - consult the applicable Code;

The SRF must contain details of all additional equipment carried or fitted;

It’s location and activation point (if relevant); Under the IBC Code - PPE and BA sets are to

tested by an expert annually. & Details of maintenance and test must also be

recorded in the SRF.

Page 120: Satety

120

4.15 - Signalling Lamp4.15 - Signalling Lamp SOLAS V, Reg 11; OCIMF 4.1.10;

Must be available for use at all times;

Monthly, inspect the casing and electrical connections for condition and tightness;

Ensure that a spare bulb is always available.

Page 121: Satety

121

4.16 - Safety Training 4.16 - Safety Training VideosVideos

HSC has a rental contract with Videotel to place 12 training videos on board. Additional 12 Waalport training videos are supplied!

Additionally videos maybe placed permanently onboard by HSC - these are normally topic specific and remain the property of HSC; &

The SRF must list any titles permanently carried onboard.

Page 122: Satety

122

4.17 - Personal Protective 4.17 - Personal Protective EquipmentEquipment

An up to date inventory must be maintained for all equipment carried;

Certain items must be available to all personnel i.e. safety helmets, therefore the SRF inventory should only indicate items in excess of this requirement; &

Master & Safety Committee must decide on the minimum stock to be carried.

Page 123: Satety

123

Personal Protective EquipmentPersonal Protective Equipment

The SRF contains a detailed list of the PPE that is mandatory and recommended for use when working onboard - Master & Safety Committee must refer to this when making up list of minimum stock;

OCIMF VIQ 5.1.10 - Inspection of PPE and inventory list must be updated QUARTERLY and requisitions submitted (every 4 months) to replenish diminished stock;

Condition should be reported as new, used or poor.

Page 124: Satety

124

4.18 - Miscellaneous Alarms4.18 - Miscellaneous Alarms Used to identify alarms onboard

that are not covered elsewhere in the testing program;

i.e. Provision Room Alarm or Hospital Alarm; Dead Man Alarm

Once identified, additional alarms must be added to the list provided - their frequency of test & department or rank responsible for testing must also be indicated; &

Dates of each test must also be maintained in the SRF.

Page 125: Satety

125

Section 5 - Records of Section 5 - Records of Drills & InspectionsDrills & Inspections

Weekly SOLAS inspections; Monthly SOLAS inspections; Emergency Situation Drill

Program; Record of Emergency Drills; Emergency Steering Drills; & Oil Spill & Pollution Drills.

Page 126: Satety

126

5.1 - Weekly SOLAS Inspection5.1 - Weekly SOLAS Inspection SOLAS III, Reg 20.6; CDI SIR 10.97; Following tests & inspections must be carried out: - All survival craft, rescue boats and launching appliances to

ensure they are ready for use; Lifeboat engine(s) run as per SRF 4.6; The General Alarm must be tested as per SRF 4.1; &

This is only a record of the inspection - details of any maintenance or testing carried out on SOLAS equipment, MUST be recorded under sections 2, 3 or 4 of the SRF.

Page 127: Satety

127

5.2 - Monthly SOLAS Inspection5.2 - Monthly SOLAS Inspection

SOLAS III, Reg 20.7; CDI SIR 10.98; Following tests & inspections must be carried out: - All Life Saving Appliances including lifeboat equipment; Refer to HSC Form 67 A/B to assist with this inspection; &

This is only a record of the inspection - details of any maintenance or testing carried out on SOLAS equipment, MUST be recorded under sections 2, 3 or 4 of the SRF.

Page 128: Satety

128

5.3 - Emergency Situation Drill 5.3 - Emergency Situation Drill ProgramProgram

ISM Code Section 8.2; HSC requires that a drill covering at

least one of the emergency situations shown in this section of the SRF is conducted each month;

This must be in addition to drills specified elsewhere;

Senior Officers are to make maximum use of the OPCP Manual when planning & preparing drill scenarios; &

Drill analysis including recommendations must be forwarded to HSC QMS Dept.

Page 129: Satety

129

5.4 - Record of Emergency Drills5.4 - Record of Emergency Drills

SOLAS III, Reg 19; A record of every emergency drill

carried out onboard is to be retained on board;

Date, Time and Type of Drill in the Deck Logbook; &

Full details (date, description of drill & outcome of drill etc) to be recorded in the SRF 5.4.

Page 130: Satety

130

5.5 - Emergency Steering Drills5.5 - Emergency Steering Drills

SOLAS V, Reg 19-2; To be carried out at intervals

not exceeding 3 months; In Deck Logbook record date,

time and type of drill; Full Details of Emergency

Steering Drill (persons involved, situations simulated, outcome, etc) to be recorded in SRF section 5.5.

Page 131: Satety

131

5.6 - Oil Spill & Pollution Drills5.6 - Oil Spill & Pollution Drills

Drills should also include familiarization with garbage disposal, sewage and atmospheric pollution regulations and related HSC procedures and instructions;

Senior Officers should refer to the OPCP Manual & SOPEP and/or VRP when planning such drills;

Drills should be varied and involve as many crewmembers as possible.

Page 132: Satety

132

Oil Spill & Pollution DrillsOil Spill & Pollution Drills

A record of all oil spill and pollution drills carried out onboard are to be retained on board;

Date & Type of drill must be recorded in the Deck Logbook and SOPEP;

Full details, persons involved, outcome of drill, etc are to be recorded in the SRF 5.6.

Page 133: Satety

133

Drill PlanDrills are carried out in accordance with

• SOLAS requirements• ISM Code requirements• company requirements

It is recommended

• to vary scenarios• to interchange roles of crew member• to repeat drills if unsatisfactory carried out

Page 134: Satety

134

End of course – Safety(maintenance)End of course – Safety(maintenance)

The final session has now been completed!Now you have had an review on different requirements on the maintenance of your safety equipment on board!

If there is any open or unanswered question, please consult SOLAS or contact your agency instructor.

With the knowledge you have now, please take the questionnaire and check on all questions again!!

Page 135: Satety

135

We hope you will find this course useful and the content will help you to prepare for the next forthcoming audit!

If you have any comments please write them down and send them to the HSC Crew Operation Manager!

Thanks for participating and we wish you always safe sailings!