ObjectiveTo help DMCs provide reliable, adequate and affordable energyfor inclusive growth in a socially, economically andenvironmentally sustainable way
Support renewable energy development Promote knowledge management
Advocate technology transfer and deployment
Encourage private sector participation to enhance efficiency
Collaborate with development partners
ADB ENERGY POLICY 2009
8/6/2019 Satoshi Fukushima Len George - Support for Development of Solar Parks
3/11
ASIA SOLAR ENERGY INITIATIVESalient Features
Catalyze 3,000 MW of Solar Power
Asia Pacific Solar Forum Knowledge Platform
http://en.wikipedia.org/wiki/File:PS20andPS10.jpg8/6/2019 Satoshi Fukushima Len George - Support for Development of Solar Parks
4/11
Solar Program in IndiaJawaharlal Nehru National Solar Mission (JNNSM) wasunveiled to support solar power development by 2022
Phase 1
(2010-2013)
Grid 1,100 MW
Off Grid 200 MW
Phase 2
(2014-2017)
Grid 4,000 MW
Off Grid 1000 MW
Phase 3
(2018-2022)
Grid 20,000 MW
Off Grid 2000 MW
Source: JNNSM Document, GoI
Phase 2 and 3 figures are cumulative
8/6/2019 Satoshi Fukushima Len George - Support for Development of Solar Parks
5/11
Public Sector lending (solar park related) Covers infrastructure development including water
supply and treatment facilities, power transmissionsystems within and outside the park, specialized
equipment for efficient grid operations etc. Private Sector lending / financial products
Direct loans
Credit guarantee facility for banks lending to solar
projects (with related capacity building)
ADBs lending support for largescale solar
8/6/2019 Satoshi Fukushima Len George - Support for Development of Solar Parks
6/11
TA support for solar parks
Technical Assistance (TA) (Solar Parks)* Overall concept
Master plans, site assessment, phasing plans
Engineering studies
Institutional arrangements, business plan and investment
models Socio-economic studies, environmental and resettlement plans
Consultation among stakeholders
Capacity building
* Some activities by partner institutions
8/6/2019 Satoshi Fukushima Len George - Support for Development of Solar Parks
7/11
SARDs support for solar powerin India
Central Level
Implementation Support for JNNSM
Possible demo CSP Projects under JNNSM
Possible non sovereign CSP Project
Credit lines for solar power financing
State Level
Gujarat Solar Park (Transmission Evacuation)
TA for preparatory work for Rajastan Solar Park Capacity Development for ICASET at IIT Rajasthan
JNNSM: Jawaharlal Nehru National Solar Mission
ICASET: International Center for Application of Solar Energy TechnologiesIIT: Indian Institute of Technology
8/6/2019 Satoshi Fukushima Len George - Support for Development of Solar Parks
8/11
Gujarat Solar Park (India)
Just put solar power
generation systemsDevelopers
GPCL prepares
basic infrastructures
Gujarat Solar Park
GETCO constructs transmission
systems for evacuation.
$100 million Loan
StudyingSmart Grid
TA
Vocational Trainingfor Solar Park
TA
GETCO: Gujarat Energy Transmission Corp. Ltd.
500MW of both Solar Photo Voltaic (PV)and Concentrated Solar Power (CSP)
in 2,000 ha area.
GPCL: Gujarat Power Corp. Ltd.
8/6/2019 Satoshi Fukushima Len George - Support for Development of Solar Parks
9/11
ADB LoanGujarat Solar Transmission Project
Gujarat Solar Park
Under Ground Cablewithin the Park
Substation
Transmission Lines
for Evacuation
Executing Agency: GETCO
Total Project Cost: Approximately $150 million
ADB Loan: $100 million
8/6/2019 Satoshi Fukushima Len George - Support for Development of Solar Parks
10/11
ADB TAGujarat Solar Park
Gujarat Solar Park Vocational Training for Solar Park To support local people to getoperation and maintenance job forSolar Park and transmission
Electrical and mechanical engineering
Administrative and Computer literacy
Substation Existing Grid
Studying Smart Grid To mitigate output fluctuation of the Solar Park
Voltage Regulations
Power Storage Batteries
Protection Scheme
Solar Power Prediction etc.
8/6/2019 Satoshi Fukushima Len George - Support for Development of Solar Parks
11/11
For further details, please contact:
Yongping Zhai - Director, Energy Division, South Asia [email protected]
Naoki Sakai - Senior Climate Change Specialist,Energy Division, South Asia [email protected]
Len George - Energy Specialist, Energy Division,South Asia [email protected]
Satoshi Fukushima - Energy Specialist, Energy Division,
South Asia [email protected]
Thank you!!!
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]