8
Page 1 of 8 SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08 SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER DC Cable Holiday Testing CP- PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO. SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRA SAUDI ARAMCO USE ONLY SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-T A. TEST PROCEDURE AND CHECKLIST A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 SATR-X-3201 ITEM No. Conduct a visual and touch inspection of the impressed current anode cable insulation immediately adjacent to the head of the anode. Anode leads with noticeable "necking", or an obvious reduction in diameter of the insulation, shall not be used. SAES-X-400 Sec. 6.2.1.2 Inspect all cables and lead wires for burial for insulation damage immediately prior to installation. Inspect with a pulse type holiday detector set at 18,000 volts DC. SAES-X-400 Sec. 6.2.1.2 Check the holiday detector before using according to the manufacturer's instructions. SAES-X-600 Sec. 5.4.3 Conduct the inspection with a certified and calibrated pulse type holiday detector set at 18,000 volts DC. The calibration date shall not exceed 6 months. SAES-X-400 Sec. 6.2.1.2 Do not use anodes with cables that fail the dielectric test. SAES-X-400 Sec. 6.2.1.2 Repair of the insulation for buried positive cable by any method is prohibited. SAES-X-400 Sec. 6.4.3 a) Make sure that the detector is turned OFF. b) Select the specific voltage required by the CP manufacturer. c) Attach electrode to the voltage probe assembly and apply to the cable to be inspected. The electrode should always make intimate contact with the surface under inspection. Ref: Ref: Instrument Instruction Manual SAES-X-400 Sec. 6.4.3 OPERATING METHODS a) The cable to be inspected must be grounded from the bare cable to earth at some point along the cable. If individual joints of the cable are to be inspected that are not electrically connected, each joint must be grounded. Ref: Instrument Instruction Manual SAES-X-400 Sec. 6.4.3 c) Occasional checks of the detector operation should be made, particularly if no holidays are being found. Ref: Instrument Instruction Manual SAES-X-400 Sec. 6.4.3 b) Voltage Output Checks In case of LOW output voltage: a. Check position of voltage selector switches. b. Check battery (is it fully charged?). c. Check for "parted conductor in voltage probe and/or ground trail. SAES-X-400 Sec. 6.4.3 Inspect positive cables for insulation damage immediately prior to the burial of the cables. SAES-X-600 Sec. 5.4.3

SATR-X-3201 Rev 3

  • Upload
    mahdig

  • View
    217

  • Download
    0

Embed Size (px)

DESCRIPTION

SATR-X-3201 Rev 3

Citation preview

Multipage SATR Page 1SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)REV 330-Jun-08SAUDI ARAMCO TEST REPORTSATR NUMBERDATE APPROVEDQR NUMBERDC Cable Holiday TestingSATR-X-3201CP-PROJECT TITLEWBS / BI / JO NUMBERCONTRACTOR / SUBCONTRACTOREQUIPMENT ID NUMBER(S)EQUIPMENT DESCRIPTIONEQPT CODESYSTEM ID.PLANT NO.LAYOUT DRAWING NUMBERREV. NO.PURCHASE ORDER NUMBEREC / PMCC / MCC NO.SCHEDULED TEST DATE & TIMEACTUAL TEST DATE & TIMEQUANTITY INSP.MH's SPENTTRAVEL TIMESAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBERSAUDI ARAMCO ACTIVITY NUMBERWORK PERMIT REQUIRED?SAUDI ARAMCO INSPECTION LEVELCONTRACTOR INSPECTION LEVELITEM No.TEST PROCEDURE ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-TEST DATEA. TEST PROCEDURE AND CHECKLISTA1Conduct a visual and touch inspection of the impressed current anode cable insulation immediately adjacent to the head of the anode. Anode leads with noticeable "necking", or an obvious reduction in diameter of the insulation, shall not be used.SAES-X-400Sec. 6.2.1.2A2Inspect all cables and lead wires for burial for insulation damage immediately prior to installation. Inspect with a pulse type holiday detector set at 18,000 volts DC.SAES-X-400Sec. 6.2.1.2A3Check the holiday detector before using according to the manufacturer's instructions.SAES-X-600Sec. 5.4.3A4Conduct the inspection with a certified and calibrated pulse type holiday detector set at 18,000 volts DC. The calibration date shall not exceed 6 months.SAES-X-400Sec. 6.2.1.2A5Do not use anodes with cables that fail the dielectric test.SAES-X-400Sec. 6.2.1.2A6Repair of the insulation for buried positive cable by any method is prohibited.SAES-X-400Sec. 6.4.3A7CHECK-OUT INSTRUCTIONS a) Make sure that the detector is turned OFF. b) Select the specific voltage required by the CP manufacturer.c) Attach electrode to the voltage probe assembly and apply to the cable to be inspected. The electrode should always make intimate contact with the surface under inspection. Ref: Ref: Instrument Instruction ManualSAES-X-400Sec. 6.4.3A8OPERATING METHODS a) The cable to be inspected must be grounded from the bare cable to earth at some point along the cable. If individual joints of the cable are to be inspected that are not electrically connected, each joint must be grounded. Ref: Instrument Instruction ManualSAES-X-400Sec. 6.4.3A9c) Occasional checks of the detector operation should be made, particularly if no holidays are being found. Ref: Instrument Instruction ManualSAES-X-400Sec. 6.4.3A10b) Voltage Output Checks In case of LOW output voltage: a. Check position of voltage selector switches. b. Check battery (is it fully charged?). c. Check for "parted conductor in voltage probe and/or ground trail.SAES-X-400Sec. 6.4.3A11Inspect positive cables for insulation damage immediately prior to the burial of the cables.SAES-X-600Sec. 5.4.3A12Make sure that all cable area was covered by the Holiday Detector.SAES-X-600Sec. 5.4.3

Multipage SATR Pages 2,3,4...SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)REV 330-Jun-08SAUDI ARAMCO TEST REPORTSATR NUMBERDATE APPROVEDQR NUMBERDC Cable Holiday TestingSATR-X-3201CP-PROJECT TITLEWBS / BI / JO NUMBERCONTRACTOR / SUBCONTRACTORITEM No.TEST RESULTS ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-TEST DATEA13If a holiday is detected, the entire anode/cable assembly shall be replaced.SAES-X-400Sec. 6.4.3A14Negative cables and bond cables to be used for buried service need to be only checked visually for obvious insulation defects.SAES-X-400Sec. 6.4.5B. TEST EQUIPMENT AND MATERIALS CRITERIAC. TEST RESULTSITEM No.C.TEST RESULTS ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-TEST DATECable No.Tested Cable description and labelC. TEST RESULTSC1: There was no single holiday detected with the CP cable tester.D. CONCLUSIONSITEM No.TEST RESULTS ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-TEST DATED1No Holidays were detected.D2Test results are acceptable and in accordance with Saudi Aramco Engineering Standards and contractual requirements.N/AREMARKS:REFERENCE DOCUMENTS:1. Schedule Q -- Quality Requirements (Pro Forma Contract), February 20082. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 20063. SAES-X-400 Cathodic Protection of Buried Pipelines 22 October, 20074. SAES-X-600 Cathodic Protection of Plant Facilities 25 June, 2007Contractor / Third-PartySaudi AramcoTechnician Performing Test*PMT RepresentativeName, Title, Department,Company, Initials and Date:Test Performed Successfully and Results are Acceptable:Name, Initials and Date:T&I WitnessedQC Record ReviewedWork VerifiedQC InspectorPID RepresentativeName, Initials and Date:Witnessed TestWork / Rework May ProceedName, Initials and Date:T&I WitnessedQC Record ReviewedWork VerifiedQC SupervisorProponent and OthersName, Sign and Date:Quality Record Approved:Name, Organization,Initials and Date:T&I WitnessedQC Record ReviewedWork Verified*Person Responsible for Implementation of Test and Analysis of ResultsY = YES N = NO F = FAILED

MBD02825C37.docCALIBRATION CERTIFICATE

CERTIFYING COMPANY:

EQUIPMENT NAME AND SERIAL NUMBER:

CALIBRATION STARTING DATE:

CALIBRATION EXPIRATION DATE:

Note: Maximum accepted certification time is 6 month within ARAMCO.