SAUDI ZAAS CONSTRUCTION CO.
P.O. BOX NO. : 28229 RIYADH : 11437 KINGDOM OF SAUDI ARABIA TEL. : (+966 1) 206 2121 : (+966 1) 206 3353 FAX : (+966 1) 206 2424 E-MAIL : [email protected] ; [email protected] WEB : www.saudizaas.com
Pre-qualification
TABLE OF CONTENTS:
Introduction & Organization Chart
Equipment, Vehicles and Manpower
Legal Documents
List of Major Projects
Location Map
Project Pictures
Section 1
Section 2
Section 3
Section 5
Section 6
Section 4
INTRODUCTION: Saudi Zaas Construction Company was established in 2005 (previously known as Zaas Cont. Inc. established in 1987) in Riyadh with the objective of providing complete contracting packages including supply of materials fabricate and construct projects such as buildings, stores, shades & supporting facilities etc. Saudi Zaas Construction Company has proven reliability in fulfilling its commitment towards the clients in both private and public sectors. The establishment also have a good experience in installation of siporex & pre-cast works. Our outstanding achievements has reached through the relentless effort exerted by this highly qualified work force who are continuing to provide our clients with top quality services. Keeping high quality standard is Saudi Zaas Construction Company prime goal.
EQUIPMENT
S. NO. MACHINE QTY.
1 Backhoe 3
2 Shovel big 2
3 Shovel small 2
4 Bobcat 4
5 Concrete mixture machine 4
6 Air compressor 4
7 Water tank 4
8 Diana 8
9 Pickup 6
10 Crane trolley 3
11 Crane small 3
12 Car small 12
13 Hydraulic punch machine 2
14 Drilling machine 8
16 Generator 5
17 Welding machine 8
18 Wood cutting saw 4
19 Total station 2
20 Theodolite 4
21 Level 4
22 Water pump 5
23 Girder Crane 1
24 Rod bender 5
25 Bending machine 4
26 Helicopter (concrete) 5
27 Vibrator 6
28 Jack Hummer big 3
29 Jack Hummer small 5
MANPOWER
S.NO. POSITION PERSION
1 Managing Director 1
2 General Manager 1
3 Finance Manager 1
4 Projects Manager 1
5 Designer 1
6 AutoCAD Operator 3
7 Accountant 2
8 Engineer 12
9 Supervisor 18
10 Secretary 4
11 Telephone Operator 1
12 Tea boy 2
13 Carpenter 17
14 Steel fixer 18
15 Meson 20
16 Electrician 10
17 Painter 10
18 Plumber 6
19 Driver 12
20 Mechanic 3
21 Tile Fixer 12
22 Unskilled labor 51
Total manpower 206
Note: If additional manpower required we make up to 350 persons.
Description of work Clients Value (SR) Completion
CRADLE SITE ACCMMODATION BLDG. PHASE IV (2015).
Al Marai Company Consultant: Al Marai Company
13,700,000
On going
CPP SITE ACCMMODATION BLDG. PHASE IX (2015).
Al Marai Company Consultant: Al Marai Company
26,000,000
On going
CPP SITE DEBAGGING AREA EXPANSION BMD1, (2014).
Al Marai Company Consultant: Al Marai Company
11,500,000
On going
Description of work Clients Value (SR) Completion
Dormitory building at Al Kharj (2014)
AL SAFI DAIRY CO. (Branch of Al Faisaliah Group Holding Co. ltd.) Project management office at Al Kharj
7,800,000
Completed in
time
Housing Project at Haradh, Nadec (2013) Labour Housing Villas Supervisor housing
National Agricultural Development Company Consultant: Technical Department of NADEC
8,826,220 4,810,010 2,386,060 1,630,150
Completed in
time
Al Safi unit – 130 at Al Kharj (2013)
AL SAFI DAIRY CO. (Branch of Al Faisaliah Group Holding Co. ltd.) Project management office at Al Kharj
45,666,435
Completed in
time
DAIRY - 7 at Haradh, Nadec (2013) Housing Barn Milking parlor Waste management system
National Agricultural Development Company Consultant: Technical Department of NADEC
98,000,000 66,000,000 23,500,000 8,500,000
Completed in
time
Description of work Clients Value (SR) Completion
Construction of Al Marai sales depot at Al Duwadme. (2013)
Al Marai Company Consultant: Al Marai Company
19,000,000
Completed in
time
6th Expansion of heifers breeding units at Haradh, Nadec, (2011)
National Agricultural Development Company Consultant: Technical Department of NADEC
9,900,000
Completed in
time
Construction of different buildings (Boys School, Girls School & Supervisor Housing) at Haradh, Nadec (2011)
National Agricultural Development Company Consultant: Technical Department of NADEC
4,557,803
Completed in
time
Civil work at cement silo weight bridge at white cement plant, at Muzahmiah
FCB groups (France)
FCB groups Consultant: Saudi white cement
$137,453
USD.
Completed in
time
Description of work Clients Value (SR) Completion
Extension of dairy-5 and dairy-9 at Haradh, NADEC for Civil, Mechanical & Electrical works. (2011)
National Agricultural Development Company Consultant: Technical Department of NADEC
6,800,000
Completed in
time
Concentrate store at Haradh, NADEC for Civil, Mechanical & Electrical works. (2011)
National Agricultural Development Company Consultant: Technical Department of NADEC
1,600,000
Completed in
time
Plant entrance at RCC, Muzahmiah for Civil, Mechanical & Electrical works. (2011)
Riyadh Cement Company Consultant: Suhaimi Design
800,000
Completed in
time
RCC office head building at Riyadh for Civil,
Mechanical & Electrical works.
Riyadh Cement Company Consultant: Suhaimi Design
24,000,000
Completed in
time
Description of work Clients Value (SR) Completion
Industrial training centre at Eskan-2 at Kharj road for Civil, Mechanical & Electrical works. (2010)
Technical and Vocational training centre
Consultant: Technical Department
35,882,469
Completed in
time
Civil, Mechanical & Electrical erections for HFO heating system at Riyadh Cement Co. plant (2010)
Riyadh Cement Company Consultant: Technical Department of RCC
5,140,602
Completed in
time
Extension of short stay building for security force hospital at Riyadh for Civil, Mechanical & Electrical erections. (2010)
Ministry of Interior
Consultant: Khatib & Alami consulting company
7,347,216
Completed in
time
Barley factory at Nadec Haradh for Civil, Mechanical & Electrical works. (2010)
National Agricultural Development Company Consultant: Technical Department of NADEC
1,900,000
Completed in
time
Civil work at Crusher & Stacker reclaimer for Line-2 at RCC plant (2010)
Riyadh Cement Company Consultant: Technical Department of RCC & Holtec India ltd.
8,550,000
Completed in
time
Description of work Clients Value (SR) Completion
Housing barn with supporting facilities (phase-ii) Haradh NADEC for Civil, Mechanical & Electrical works. (2009)
National Agricultural Development Company Consultant: Technical Department of NADEC
31,000,000
Completed in
time
Earth work at elite dairy-6 Haradh NADEC (2009)
National Agricultural Development Company Consultant: Technical Department of NADEC
3,850,000
Completed in
time
Housing project at Haradh NADEC (2009)
National Agricultural Development Company Consultant: Technical Department of NADEC
6,550,000
Completed in
time
Expansion of heifers breeding unit at dairy-9 Haradh NADEC for Civil, Mechanical & Electrical works. (2009)
National Agricultural Development Company Consultant: Technical Department of NADEC
2,823,437
Completed in
time
Milking parlor at elite dairy-6 at Haradh NADEC Civil, Mechanical & Electrical erections. (2008)
National Agricultural Development Company Consultant: Technical Department of NADEC
13,500,000
Completed in
time
Description of work Clients Value (SR) Completion
Housing Barns at elite dairy-6 at Haradh NADEC Civil, Mechanical & Electrical works. (2008)
National Agricultural Development Company Consultant: Technical Department of NADEC
20,000,000
Completed in
time
Additional family housing project at Haradh NADEC (2008)
National Agricultural Development Company Consultant: Technical Department of NADEC
4,465,490
Completed in
time
Water reservoir tank and treatment room at Haradh NADEC (2008)
National Agricultural Development Company Consultant: Technical Department of NADEC
5,300,000
Completed in
time
Additional work at MOI iskan-3 at Dirab, Riyadh (2008)
Ministry of Interior Consultant: Technical Department of MOI
691,750
Completed in
time
Primary school at Riyadh region (2008)
Ministry of Education Consultant: Technical Department of MOE
1,792,080
Completed in
time
Description of work Clients Value (SR) Completion
Housing Barns at Haradh NADEC Civil, Mechanical & Electrical works. (2007)
National Agricultural Development Company Consultant: Technical Department of NADEC
9,650,000
Completed in
time
Supporting Barns at Haradh NADEC. Civil, Mechanical & Electrical works. (2007)
National Agricultural Development Company Consultant: Technical Department of NADEC
8,815,815
Completed in
time
Technical Building at Riyadh Cement Co. Muzahmiah (2007)
Sinoma International
1,600,000
Completed in
time
Heifers Breeding unit at NADEC Haradh (2007)
National Agricultural Development Company Consultant: Technical Department of NADEC
4,400,000
Completed in
time
North Housing Barn at Haradh NADEC Civil, Mechanical & Electrical erections (2007)
National Agricultural Development Company Consultant: Technical Department of NADEC
10,900,000
Completed in
time
Description of work Clients Value (SR) Completion
Driver Rest Room at RCC Muzahmiah (2006)
Sinoma International
360,000
Completed in
time
Electrical Room at Riyadh Cement Co. Muzahmiah. Civil, Mechanical & Electrical erections (2006)
Sinoma International
360,000
Completed in time
Workshop & Warehouse Riyadh Cement Co. Muzahmiah (2006)
Sinoma International
2,500,000
Completed in
time
Mosque at Riyadh Cement Co. Muzahmiah (2006)
Sinoma International
1,161,000
Completed in
time
Utility Store at NADEC Haradh (2006)
National Agricultural Development Company Consultant: Technical Department of NADEC
2,181,212
Completed in
time
Description of work Clients Value (SR) Completion
Water Treatment Room at Haradh NADEC (2005)
National Agricultural Development Company Consultant: Technical Department of NADEC
249,427
Completed
in time
Veterinary Laboratory at Madinah (2005)
Ministry of Agriculture Consultant: East Consulting Service
3,800,000
Completed
in time
Veterinary Laboratory at Tabuk
(2005)
Ministry of Agriculture Consultant: East Consulting Service
3,700,000
Completed in time
Veterinary Laboratory at Arar
(2005)
Ministry of Agriculture Consultant: East Consulting Service
3,900,000
Completed in time
Security Residential Building Dammam
(2004)
Ministry of Interior Consultant: East Consulting Service
580,000
Completed
in time
Security Residential Building Haql
(2004)
Ministry of Interior Consultant: East Consulting Service
690,000
Completed
in time
Description of work Clients Value (SR) Completion
Security Residential Building Arar (2004)
Ministry of Interior Consultant: East Consulting Service
730,000
Completed
in time
Security Residential Building Sulayel (2004)
Ministry of Interior Consultant: East Consulting Service
750,000
Completed
in time
Housing Barns and water reservoir tanks at dairy-4, at Haradh project, Haradh NADEC Civil, Mechanical & Electrical works. (2004)
National Agricultural Development Company Consultant: Technical Department of NADEC
8,450,000
Completed
in time
Temporary Housing & office Facilities at City Cement Co. (CCC) Marat (2004)
Sinoma International
3,780,000
Completed
in time
Outlets for Al-Jawwal and Zajoul Riyadh, Dammam, Jeddah, Qassim, Khamismushyat, Tabuk and Al-Kharj (2004)
Zajoul Consultant: Delta Consulting Service
3,400,000
Completed
in time
Temporary Housing & office Facilities at RCC Muzahmiah (2005)
Sinoma International
2,820,000
Completed
in time
Description of work Clients Value (SR) Completion
Explosive Store Facilities at RCC Muzahmiah (2005)
Riyadh Cement Company Consultant: Technical Department of RCC
575,000
Completed
in time
Housing and Guard House for National Guard Sabt-Al-Olya and Banisaad (2003)
Ministry of Information Consultant: Technical Department of Ministry of Information
2,580,000
Completed
in time
Sewage Treatment Plant at NADEC Haradh (2003)
National Agricultural Development Company Consultant: Technical Department of NADEC
1,500,000
Completed
in time
Extension of Supermarket at NADEC Haradh (2003)
National Agricultural Development Company Consultant: Technical Department of NADEC
850,000
Completed
in time
Public Security Building Riyadh (2003)
General Security Ministry of Interior
214,000
Completed
in time
Description of work Clients Value (SR) Completion
Workshop & Recreation at NADEC Haradh
(2002)
National Agricultural Development Company Consultant: Technical Department of NADEC
1,609,000
Completed
in time
Dates Lab at Mohammedia Al-Kharj (2002)
Mohammedia Dates farm
280,000
Completed
in time
Special Tile at Processing Unit at NADEC Haradh
(2002)
National Agricultural Development Company Consultant: Technical Department of NADEC
169,700
Completed
in time
Extension of Dairy farms and Housing units at NADEC Haradh (2001)
National Agricultural Development Company Consultant: Technical Department of NADEC
4,568,000
Completed
in time
Construction of Main office for Saudi Telecom at Jizan (2001)
Saudi Telecom (STC)
2,500,000
Completed
in time
Description of work Clients Value (SR) Completion
Construction of Building no. 5 & 7 at STC Mursalat Riyadh (2001)
Saudi Telecom (STC)
1,600,000
Completed
in time
Road Security Center in Waseea Riyadh-Dammam Highway (2000)
General Security Ministry of Interior
750,000
Completed
in time
Construction of Under ground water tank with pump room export of pumps Riyadh (2000)
Saudi Telecom (STC)
450,000
Completed
in time
Road Security Center in Rwaidah (2000)
General Security Ministry of Interior
653,640
Completed
in time
Extension of 24-class room at Indian International School Riyadh (2000)
Indian International School
720,000
Completed
in time
Construction of Main Office Building no. 4 & 12 at Mursalat Riyadh (2000)
Saudi Telecom (STC)
1,399,720
Completed
in time
Description of work Clients Value (SR) Completion
Construction of Boiler room at NADEC Haradh (2000)
National Agricultural Development Company Consultant: Technical Department of NADEC
223,000
Completed
in time
Installation of Fans at Dairy no. 2 & 3 at NADEC Haradh
(2000)
National Agricultural Development Company Consultant: Technical Department of NADEC
325,720
Completed
in time
Foundation of Pipe Support and water foam for fire fighting at PP-5 Riyadh (2000)
Saudi Electric Company
4,450,000
Completed
in time
Extension of Nakheel Palace at Haye-Al-Nakheel Riyadh (2000)
Khalid Al-Musaibi
1,600,000
Completed
in time