20
SB 1149 Schools Program Training Energy Auditor and Audit Report Requirements Oregon Department of Energy Webinar December 9, 2015

SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

SB 1149 Schools Program Training

Energy Auditor and Audit Report

Requirements

Oregon Department of Energy

Webinar

December 9, 2015

Page 2: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Agenda

• Presentation Goals

• Background

• Energy Audit Requirements

• Energy Audit Report Template & Requirements

• Technical Review Process

• Final Thoughts

• Future Revisions

• Q&A

Page 3: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Presentation Goals

• Provide information necessary to achieve

success

– Understand new program requirements and

expectations

– Understand specifics related to Audit Report

Template & Requirements

– Address questions and misconceptions

Page 4: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Background

Stakeholder Meetings (2014-15)

• 7 in-person and 2 online meetings held

• 117 stakeholder comments & 75 questions answered

Stakeholder Feedback and Goals

• Make SB 1149 Schools Program easier to use

• Maintain or improve information accuracy and

reliability

• Improve processes, increase efficiency

• More pathways to “graduation” from program

• Incorporate Stakeholder input

Page 5: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Program Changes

• Program Guidelines updated:

– Corrected errors or inconsistencies

– Better clarity and ease of use

– Incorporation of program changes

– Now posted online

• Tier System:

– Already eliminated

– All approved, eligible measures will be reimbursed up

to measure life

– No required order for EEM implementation

Page 6: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Energy Audits and Energy Audit

Reports

Issues:

• Clarity on expectations

• Energy audit approval process time

• Energy audit accuracy

• Energy audit cost

• Clarity on how long audit reports are valid

• Clarity on how often a building needs to be re-audited

• Desire for targeted energy audits

• Better integration with other ODOE Programs

Page 7: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Energy Audits and Energy Audit

Reports (cont)

Changes:

• Program Guideline changes

• Energy audit requirements and audit report updates

• New Qualified Auditor RFQ

• ODOE technical review enhancements

• Two types of energy audits (whole building and targeted)

• Single audit report template

• Eliminate the use of baseline adjustments

Page 8: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Questions

Page 9: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Energy Auditing & Requirements

Document Walk-through

Page 10: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Questions

Page 11: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Audit Report Template & Requirements

Document Walk-through

Page 12: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Questions

Page 13: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Technical Review Process

Page 14: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Technical Review Process

• Goal: Simplified review by ODOE with little

revision required. Few to no QC errors, all

information easy to find.

• ODOE review process

• Tech review time drivers

• New template -> new review

process: “triage”

• Quality expected, “built in” as

template fixes recurring issues

• Precision vs. Accuracy

Page 15: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Technical Review Process

• Revisions meant to improve efficiency and results of

technical review and QC process

• Help us address recurring issues that increase review time:

– Energy savings: overly aggressive, not substantiated

– Assumptions: not well documented, non-existent,

difficult to find or follow

– Calculations: difficult to find or follow, incorrect,

difficult to understand (“track back”)

– Lack of Quality Control:

• Simple errors/inconsistencies in language and values

• Inadequate documentation and/or validation

Page 16: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Final Thoughts

• Auditors and staff are responsible for knowing and

following guidelines and requirements, getting updates

• Auditing should investigate best options, not just school’s

projects or suggestions

• Access SID as individual, do not use district login

– We have training on how to use the Schools Interactive

Database (SID) if needed

• SOW Approval form: Follow templates, one per school

• Audit costs ≤10% of facility energy costs (align with

ASHRAE Standard 100)

Page 17: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Future Revisions

• Continued discussion with audit firms

• Future technical working groups

• Rolling out critical interim changes, as necessary

• Changes will be posted on SB 1149 website and

substantial changes noted in addendum

• Website:

www.oregon.gov/energy/SCHOOLS/Sb1149

Page 18: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Next Steps

ODOE ActivityEstimated

Timeframe

Qualified Auditor Training Webinar 12/9/15

SB 1149 Schools Program Work Group 1-2x/year

SB 1149 Schools Program Trainings - Schools 1-2x/year

SB 1149 Schools Program Trainings – Qualified Audit

Firms1-2x/year

Page 19: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Contact Information

Name Title Phone # Email

Jon Belmont Schools Sector Lead 503.373.7947 [email protected]

Christie SphoonEnergy Specialist

Schools Programs503.373.7430 [email protected]

Kaci Radcliffe Energy Analyst 503.378.4041 [email protected]

Tom Elliott Energy Analyst 503.373.7085 [email protected]

Blake Shelide Facilities Engineer 503.373.7809 [email protected]

SB 1149 Program General information 503.378.4040 [email protected]

Page 20: SB 1149 Auditor Training FINAL - oregon.gov · • Presentation Goals • Background • Energy Audit Requirements ... Final Thoughts • Auditors and staff are responsible for knowing

Questions