Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
SKRIPSI
ANALISIS STRUKTUR JEMBATAN BOX GIRDER
DENGAN METODE KONSTRUKSI INCREMENTAL
LAUNCHING METHOD(ILM) DAN MOVABLE
SCAFFOLD SYSTEM(MSS)
FIDEL SAPUTRA
NPM: 2014410185
PEMBIMBING : ALTHO SAGARA, S.T., M.T.
UNIVERSITAS KATOLIK PARAHYANGAN
FAKULTAS TEKNIK PROGRAM STUDI TEKNIK SIPIL (Terakreditasi Berdasarkan SK BAN-PT No. 227/SK/BAN-PT/Ak-XVI/S/XI/2013)
BANDUNG
JUNI 2018
i
ANALISIS STRUKTUR JEMBATAN BOX GIRDER DENGAN
METODE KONSTRUKSI INCREMENTAL LAUNCHING
METHOD(ILM) DAN MOVABBLE SCAFFOLDING
SYSTEM(MSS)
Fidel Saputra
NPM: 2014410185
Pembimbing: Altho Sagara, S.T., M.T.
UNIVERSITAS KATOLIK PARAHYANGAN
FAKULTAS TEKNIK PROGRAM STUDI TEKNIK SIPIL
(Terakreditasi Berdasarkan SK BAN-PT No. 227/SK/BAN-PT/Ak-
XVI/S/XI/2013)
BANDUNG
JUNI 2018
ABSTRAK Pemilihan metode konstruksi jembatan bentang menerus merupakan hal yang penting dalam
proses desain jembatan, metode Incremental Launching dan Movabble Scaffolding sering kali
menjadi alternatif yang diajukan oleh konsultan perencana dalam melakukan desain jembatan
bentang menerus. Pada studi kasus ini akan dilakukan analisis jumlah strands yang dibutuhkan
untuk kedua metode tersebut yaitu Incremental Launching Method(ILM) dan Movabble Scaffold
System(MSS).Perbedaan strands kedua metode didapat dengan membandingkan jumlah strands
yang dipakai selama masa konstruksi dan masa layan dengan memperhatikan batas tegangan serat
atas dan serat bawah struktur atas jembatan. Jumlah strands yang dipakai pada kedua model
struktur tersebut harus memenuhi syarat tegangan izin tarik maupun tekan beton pada masing-
masing metode. Panjang jembatan kedua metode adalah sama yaitu sebesar 150 meter dan mutu
beton yang digunakan adalah sama yaitu 40 MPa. Didapatkan hasil analisis bahwa jumlah strands
yang dipasang pada metode ILM yaitu sebanyak 1248 strands sedangkan pada metode MSS yaitu
sebanyak 1056 strands. Pada metode ILM jumlah strands yang diperlukan lebih banyak 15,38%
dibandingkan dengan metode MSS.
Kata kunci: strands,metode konstruksi,mss,ilm,mutu beton
iii
THE STRUCTURAL ANALYSIS OF BOX GIRDER BRIDGE
BY USING INCREMENTAL LAUNCHING METHOD (ILM)
AND MOVABBLE SCAFFOLDING SYSTEM (MSS) Fidel Saputra
NPM: 2014410185
Advisor: Altho.Sagara,S.T,M.T
PARAHYANGAN CATHOLIC UNIVERSITY
DEPARTMENT OF CIVIL ENGINEERING (Accreditated by SK BAN-PT No. 227/SK/BAN-PT/Ak-XVI/S/XI/2013)
BANDUNG
JUNE 2018
ABSTRACT The selection of bridge construction methods is the most important thing in the process of bridge
desain. Incremental Launching and Movabble Scaffolding method often considered by consultant
in doing the design of bridge. In this study we will be conducting an analysis of the number of
strands required for both methods, Incremental Launching Method (ILM) and Movabble Scaffold
System (MSS). The difference between two method can be analyzed by comparing the number of
strands used during the period of construction and service time and by paying attention to the
upper section and bottom section of strands. The number of strands used in both structural models
must be smaller than the specified limit. The length of the bridge of both methods is the same that
is equal to 150 meters and the quality of concrete used is 40 MPa for both method. The result of
analysis shows that the number of strands on the ILM method is 1248 strands while in the MSS
method that is 1056 strands. In the ILM method the number of strands required is 15.38% more
than the MSS method.
Keywords: strands, construction method, mss, ilm, concrete
v
PRAKATA
Puji dan syukur penulis panjatkan kepada Tuhan Yang Maha Esa atas
rahmat dan karunia-Nya, sehingga penulis pada menyelesaikan skripsi yang
box girder dengan metode konstruksi Incremental
Launching Method(ILM) dan Movabble Scaffolding System
disusun sebagai salah satu syarat kelulusan Sarjana Teknik Sipil di Jurusan
Teknik Sipil, Fakultas Teknik, Universitas Katolik Parahyangan, Bandung.
Dalam proses penyusunan skripsi ini, banyak halangan yang ditemui oleh
penulis, namun berkat bimbingan, saran, kritik, dan dorongan dari berbagai pihak,
skripsi ini dapat diselesaikan. Oleh karena itu, penulis mengucapkan terima kasih
yang sebesar-besarnya kepada semua pihak yang telah membantu, yaitu :
1. Bapak Altho Sagara, S.T., M.T. selaku pembimbing yang telah banyak
memberikan pengarahan,masukan yang sangat membantu dalam
penyusunan skripsi ini sehingga penulis dapat menyelesaikan skripsi tepat
pada waktunya.
2. Ibu Dr.-Ing Dina Rubiana Widarda sebagai Koordinator KBI Teknik
Struktur Jurusan Teknik Sipil Fakultas Teknik Universitas Katolik
Parahyangan Bandung.
3. Seluruh dosen di lingkungan Jurusan Teknik Sipil UNPAR, atas
pendidikan dan pengarahan yang diberikan selama masa perkuliahan
vii
DAFTAR ISI
ABSTRAK ............................................................................................................... iABSTRACT ........................................................................................................... iiiPRAKATA .............................................................................................................. vDAFTAR ISI ......................................................................................................... viiDAFTAR NOTASI DAN SINGKATAN .............................................................. ixDAFTAR GAMBAR .............................................................................................. xDAFTAR TABEL ................................................................................................. xv
PENDAHULUAN ................................................................................... 1-1BAB 1Latar Belakang .............................................................................................. 1-11.1Inti Permasalahan .......................................................................................... 1-21.2Tujuan Penelitian .......................................................................................... 1-21.3Ruang Lingkup Pembahasan ......................................................................... 1-31.4Metode Penelitian ......................................................................................... 1-41.5
STUDI PUSTAKA .................................................................................. 2-1BAB 2Jembatan Box Girder .................................................................................... 2-12.1Bagian-Bagian Jembatan .............................................................................. 2-22.2Metode Konstruksi Jembatan ........................................................................ 2-52.3Metode Incremental Launching .................................................................... 2-72.4Metode Movabble Scaffolding System ......................................................... 2-82.5Standar Pembebanan pada Jembatan ............................................................ 2-92.62.6.1 Faktor Beban dan Kombinasi Pembebanan ......................................... 2-92.6.2 Beban Mati (Dead Load) ................................................................... 2-112.6.3 Beban Mati Tambahan ....................................................................... 2-122.6.4 Beban Lalu Lintas .............................................................................. 2-122.6.5 Beban ................................................................................ 2-142.6.6 Beban Truk ......................................................................................... 2-172.6.7 Faktor Beban Dinamis (FBD) ............................................................ 2-182.6.8 Kombinasi Pembebanan ..................................................................... 2-19Struktur Beton Prategang ............................................................................ 2-222.7
STUDI KASUS DAN PEMODELAN .................................................... 3-1BAB 3Deskripsi Umum Jembatan ........................................................................... 3-13.1Dimensi Box Girder ...................................................................................... 3-23.2Spesifikasi Material ...................................................................................... 3-33.3
viii
viii
3.3.1 Struktur Beton Prategang ..................................................................... 3-33.3.2 Baja Tendon (Prategang) ...................................................................... 3-5Tahap-Tahap Konstruksi ............................................................................... 3-73.43.4.1 Tahap Konstruksi Metode MSS(Construction Stage) .......................... 3-73.4.2 Tahap Konstruksi Metode ILM(Construction Stage ILM) ................... 3-9Pembebanan ................................................................................................. 3-133.53.5.1 Berat Sendiri ....................................................................................... 3-133.5.2 Beban Mati Tambahan ....................................................................... 3-133.5.3 Beban Hidup ....................................................................................... 3-15Pengaturan Layout Tendon ......................................................................... 3-173.6Batas Tegangan ........................................................................................... 3-203.7
ANALISIS DAN PEMBAHASAN ......................................................... 4-1BAB 4Analisis Masa Konstruksi .............................................................................. 4-14.14.1.1 Diagram Momen akibat berat sendiri ................................................... 4-14.1.2 Diagram Momen akibat gaya Summation ............................................ 4-64.1.3 Diagram tegangan serat atas akibat Summation ................................. 4-114.1.4 Diagram tegangan serat bawah akibat Summation ............................. 4-164.1.5 Tegangan pada masa konstruksi ......................................................... 4-21Analisis Masa Layan ................................................................................... 4-234.24.2.1 Diagram Momen Akibat Masa Layan ................................................ 4-234.2.2 Tegangan akibat Masa Layan ............................................................. 4-244.2.3 Diagram tegangan serat bawah akibat Masa Layan ........................... 4-254.2.4 Tegangan pada Masa Layan ............................................................... 4-264.2.5 Analisis Jumlah Strands pada Tendon ................................................ 4-27Analisis Lendutan yang terjadi di setiap Construction Stage ..................... 4-354.34.3.1 Analisis Lendutan Metode ILM ........................................................ 4-354.3.2 Analisis Lendutan Metode MSS ......................................................... 4-40Pengecekan Geser Box Girder .................................................................... 4-424.4
KESIMPULAN DAN SARAN ................................................................ 5-1BAB 5Kesimpulan .................................................................................................... 5-15.1Saran .............................................................................................................. 5-25.2
DAFTAR PUSTAKALAMPIRAN
ix
DAFTAR NOTASI DAN SINGKATAN Ac = Luas penampang box girder
e = eksentrisitas
Ec = modulus elastisitas beton
fc = kuat tekan beton pada umur 28 hari
fci = kuat tekan beton pada umur tertentu
fpu = kuat tarik strands
fpy = kuat leleh strands
I = inersia penampang
Ybot = jarak titik berat terhadap serat bawah
Ytop = jarak titik berat terhadap serat atas
Zbot = tahanan momen serat bawah
Ztop = tahanan momen serat atas
bot = tegangan serat bawah
top = tegangan serat atas
= massa jenis
BGT = Beban Garis Terpusat
BTR = Beban Terbagi Rata
CS = tahap konstruksi (construction stage)
LL = beban hidup
SIDL = beban mati tambahan
x
DAFTAR GAMBAR
Gambar 1.1 Tampak 3d Jembatan .................................................................... 1-3
Gambar 1.2 Penampang Box Girder ................................................................. 1-4
Gambar 2.1 Single Cell and Multi Cell ............................................................ 2-2
Gambar 2.2 Struktur Atas dan Bawah Jembatan .............................................. 2-4
Gambar 2.3 Metode Incremental Launching(http://en.vsl.cz/incremental-
launching-method/) ....................................................................... 2-8
Gambar 2.4 Movable Scaffolding System ........................................................ 2-9
Gambar 2.5 BTR vs Panjang Beban yang dibebani........................................ 2-14
Gambar 2.6 Beban Lajur "D" ......................................................................... 2-16
Gambar 2.7 Susunan Pembebanan D .............................................................. 2-16
Gambar 2.8 .................................................. 2-17
Gambar 2.9 ......... 2-19
Gambar 2.10 Ilustrasi tegangan yang terjadi pada beton
prategang(www.slideshare.net/SariBaitiSyamsul/2-
Pci-girder) ................................................................................... 2-22
Gambar 2.11 Ilustrasi Beton Pre-Tension(www.ilmutekniksipilindonesia.
com) ............................................................................................ 2-23
Gambar 2.12 Ilustrasi Beton Post-Tension(www.ilmutekniksipilindonesia
.com) ........................................................................................... 2-23
Gambar 2.13 Prategang kosentris dan eksentris ............................................... 2-24
Gambar 2.14 Ilustrasi kehilangan tegangan ...................................................... 2-25
Gambar 3.1 Permodelan jembatan pada Midas Civil Metode MSS ................. 3-1
Gambar 3.2 Pemodelan Jembatan Pada Midas Civil Metode ILM .................. 3-1
Gambar 3.3 Desain Penampang Box Girder ..................................................... 3-2
Gambar 3.4 Construction Stage 1 ..................................................................... 3-8
Gambar 3.5 Construction Stage 2 ..................................................................... 3-8
Gambar 3.6 Construction Stage 3 ..................................................................... 3-8
Gambar 3.7 Construction Stage 4 ..................................................................... 3-9
Gambar 3.8 Construction Stage 1 ................................................................... 3-10
Gambar 3.9 Construction Stage 2 ................................................................... 3-10
xi
Gambar 3.10 Construction Stage 3................................................................... 3-11
Gambar 3.11 Construction Stage 4................................................................... 3-11
Gambar 3.12 Construction Stage 5................................................................... 3-11
Gambar 3.13 Construction Stage 6................................................................... 3-12
Gambar 3.14 Construction Stage 7................................................................... 3-12
Gambar 3.15 Construction Stage 8................................................................... 3-12
Gambar 3.16 Construction Stage 9................................................................... 3-13
Gambar 3.17 Pembebanan Beton Aspal ........................................................... 3-14
Gambar 3.18 Desain Penampang Barrier ......................................................... 3-14
Gambar 3.19 Pembebanan Barrier metode ILM .............................................. 3-15
Gambar 3.20 Pembebanan BTR 1 .................................................................... 3-16
Gambar 3.21 Pembebanan BTR 2 .................................................................... 3-16
Gambar 3.22 Pembebanan BGT 1 .................................................................... 3-17
Gambar 3.23 Pembebanan BGT 2 .................................................................... 3-17
Gambar 3.24 Desain tendon primary ILM ....................................................... 3-18
Gambar 3.25 Desain tendon secondary ILM .................................................... 3-18
Gambar 3.26 Layout tendon prategang pada midas civil tampak 3d
metode ILM ................................................................................ 3-18
Gambar 3.27 Layout tendon prategnag pada midas civil tampak atas
metode ILM ................................................................................ 3-19
Gambar 3.28 Layout tendon prategang metode MSS ...................................... 3-19
Gambar 3.29 Layout tendon prategang tampak 3d Midas Civil metode
MSS ............................................................................................ 3-19
Gambar 3.30 Layout tendon tampak atas Midas Civil metode MSS ............... 3-20
Gambar 4.1 Diagram momen akibat Dead Load CS1 ..................................... 4-1
Gambar 4.2 Diagram momen akibat Dead Load CS2 ...................................... 4-2
Gambar 4.3 Diagram momen akibat Dead Load CS3 ...................................... 4-2
Gambar 4.4 Diagram momen akibat Dead Load CS4 ...................................... 4-2
Gambar 4.5 Diagram momen akibat Dead Load CS5 ...................................... 4-3
Gambar 4.6 Diagram momen akibat Dead Load CS6 ...................................... 4-3
Gambar 4.7 Diagram momen akibat Dead Load CS7 ...................................... 4-3
Gambar 4.8 Diagram momen akibat Dead Load CS8 ...................................... 4-4
xii
Gambar 4.9 Diagram momen akibat Dead Load CS9 ...................................... 4-4
Gambar 4.10 Diagram momen akibat Dead Load CS1 ...................................... 4-4
Gambar 4.11 Diagram momen akibat Dead Load CS2 ...................................... 4-5
Gambar 4.12 Diagram momen akibat Dead Load CS3 ...................................... 4-5
`Gambar 4.13 Diagram momen akibat Dead Load CS4 ...................................... 4-5
Gambar 4.14 Diagram momen akibat Summation CS1 ..................................... 4-6
Gambar 4.15 Diagram momen akibat Summation CS2 ..................................... 4-6
Gambar 4.16 Diagram momen akibat Summation CS3 ...................................... 4-7
Gambar 4.17 Diagram momen akibat Summation CS4 ...................................... 4-7
Gambar 4.18 Diagram momen akibat Summation CS5 ...................................... 4-7
Gambar 4.19 Diagram momen akibat Summation CS6 ..................................... 4-8
Gambar 4.20 Diagram momen akibat Summation CS7 ..................................... 4-8
Gambar 4.21 Diagram momen akibat Summation CS8 ..................................... 4-8
Gambar 4.22 Diagram momen akibat Summation CS9 ..................................... 4-9
Gambar 4.23 Diagram momen akibat Summation CS1 ..................................... 4-9
Gambar 4.24 Diagram momen akibat Summation CS2 ................................... 4-10
Gambar 4.25 Diagram momen akibat Summation CS3 .................................... 4-10
Gambar 4.26 Diagram momen akibat Summation CS4 ................................... 4-10
Gambar 4.27 Diagram tengangan serat atas CS1 ............................................. 4-11
Gambar 4.28 Diagram tegangan serat atas CS2 ............................................... 4-12
Gambar 4.29 Diagram tegangan serat atas CS3 ............................................... 4-13
Gambar 4.30 Diagram tegangan serat atas CS4 ............................................... 4-13
Gambar 4.31 Diagram Tegangan serat atas CS5 .............................................. 4-14
Gambar 4.32 Diagram tegangan serat atas CS6 ............................................... 4-14
Gambar 4.33 Diagram tegangan serat atas CS7 ............................................... 4-14
Gambar 4.34 Diagram tegangan serat atas CS8 ............................................... 4-15
Gambar 4.35 Diagram tegangan serat atas CS9 ............................................... 4-15
Gambar 4.36 Diagram tegangan serat atas CS1 ............................................... 4-15
Gambar 4.37 Diagram tegangan serat atas CS2 ............................................... 4-16
Gambar 4.38 Diagram tegangan serat atas CS3 ............................................... 4-16
Gambar 4.39 Diagram tegangan serat atas CS4 ............................................... 4-16
Gambar 4.40 Diagram tegangan serat bawah CS1 ........................................... 4-17
xiii
Gambar 4.41 Diagram tegangan serat bawah CS2 ........................................... 4-17
Gambar 4.42 Diagram tegangan serat bawah CS3 ........................................... 4-17
Gambar 4.43 Diagram tegangan serat bawah CS4 ........................................... 4-18
Gambar 4.44 Diagram tegangan serat bawah CS5 ........................................... 4-18
Gambar 4.45 Diagram tegangan serat bawah CS6 ........................................... 4-18
Gambar 4.46 Diagram tegangan serat bawah CS7 ........................................... 4-19
Gambar 4.47 Diagram tegangan serat bawah CS8 ........................................... 4-19
Gambar 4.48 Diagram tegangan serat bawah CS9 ........................................... 4-19
Gambar 4.49 Diagram tegangan serat bawah CS1 ........................................... 4-20
Gambar 4.50 Diagram tegangan serat bawah CS2 ........................................... 4-20
Gambar 4.51 Diagram tegangan serat bawah CS3 ........................................... 4-20
Gambar 4.52 Diagram tegangan serat bawah CS4 ........................................... 4-21
Gambar 4.53 Diagram Momen akibat Masa Layan metode ILM .................... 4-23
Gambar 4.54 Diagram Momen akibat Masa Layan metode MSS ................... 4-24
Gambar 4.55 Diagram tegangan serat atas akibat Masa Layan(ILM) ............. 4-25
Gambar 4.56 Diagram tegangan serat atas akibat masa layan (MSS).............. 4-25
Gambar 4.57 Diagram tegangan serat bawah akibat masa layan ..................... 4-25
Gambar 4.58 Diagram tegangan serat bawah masa layan (MSS) .................... 4-26
Gambar 4.59 Construction Stage 1 ILM .......................................................... 4-29
Gambar 4.60 Construction Stage 2 ILM .......................................................... 4-30
Gambar 4.61 Construction Stage 3 Metode ILM ............................................. 4-30
Gambar 4.62 Construction Stage 4 Metode ILM ............................................. 4-30
Gambar 4.63 Construction Stage 6 Metode ILM ............................................. 4-31
Gambar 4.64 Construction Stage 6 Metode ILM ............................................. 4-31
Gambar 4.65 Construction Stage 7 Metode ILM ............................................. 4-32
Gambar 4.66 Construction Stage 8 Metode ILM ............................................. 4-32
Gambar 4.67 Construction Stage 9 Metode ILM ............................................. 4-33
Gambar 4.68 Construction Stage 1 Metode MSS ............................................ 4-33
Gambar 4.69 Construction Stage 2 Metode MSS ............................................ 4-34
Gambar 4.70 Construction Stage 3 Metode MSS ............................................ 4-34
Gambar 4.71 Construction Stage 4 Metode MSS ............................................ 4-34
Gambar 4.72 Lendutan CS1 ............................................................................. 4-35
xiv
Gambar 4.73 Lendutan CS2.............................................................................. 4-36
Gambar 4.74 Lendutan CS3.............................................................................. 4-36
Gambar 4.75 Lendutan CS4.............................................................................. 4-37
Gambar 4.76 Lendutan CS5.............................................................................. 4-37
Gambar 4.77 Lendutan CS6.............................................................................. 4-38
Gambar 4.78 Lendutan CS7.............................................................................. 4-39
Gambar 4.79 Lendutan Masa Layan metode ILM ............................................ 4-39
Gambar 4.80 Lendutan CS1.............................................................................. 4-40
Gambar 4.81 Lendutan CS2.............................................................................. 4-40
Gambar 4.82 Lendutan CS3.............................................................................. 4-41
Gambar 4.83 Lendutan Masa Layan metode MSS ........................................... 4-42
xv
DAFTAR TABEL Tabel 2.1 Kombinasi Beban Dan Faktor Beban .............................................. 2-11
Tabel 2.2 Berat Isi untuk beban mati .............................................................. 2-12
Tabel 2.3 Jumlah lalu lintas rencana ............................................................... 2-13
Tabel 2.4 Faktor Beban akibat berat sendiri.................................................... 2-20
Tabel 2.5 Faktor beban akibat beban mati tambahan ...................................... 2-20
Tabel 2.6 Faktor beban akibat beban pelaksanaan .......................................... 2-21
Tabel 2.7 Faktor beban akibat beban lajur "D" ............................................... 2-21
Tabel 2.8 Faktor Beban akibat beban Truk "T" .............................................. 2-21
Tabel 2.9 Faktor beban akibat susut dan rangkak ........................................... 2-21
Tabel 2.10 Faktor beban akibat prategang ........................................................ 2-21
Tabel 3.1 Nilai Konstanta Beton ....................................................................... 3-3
Tabel 3.2 Karakteristik material yang dipengaruhi waktu ................................ 3-4
Tabel 3.3 Spesifikasi material beton prategang................................................. 3-5
Tabel 3.4 Dimensi Strand (www.vsl.com) ........................................................ 3-6
Tabel 3.5 Diameter duct strands ........................................................................ 3-6
Tabel 3.6 Spesifikasi kabel baja prategang ....................................................... 3-7
Tabel 4.1 Tegangan maksimum dan minimum Metode MSS ......................... 4-21
Tabel 4.2 Tabel tegangan maksimum dan minimum Metode ILM ................. 4-22
Tabel 4.3 Tegangan izin pada saat Layan ....................................................... 4-24
Tabel 4.4 Tegangan Masa Layan .................................................................... 4-26
Tabel 4.5 Jumlah Strands Per Construction Stage metode MSS ..................... 4-27
Tabel 4.6 Jumlah strands metode ILM ............................................................ 4-28
1-1
BAB 1
PENDAHULUAN
Latar Belakang 1.1
Jembatan dapat dikatakan sebagai salah satu peralatan tertua di dalam peradaban
manusia. Pada zaman dahulu, jembatan mula-mula dibuat dengan menggunakan
balok kayu yang besar dan kuat untuk menyeberangi sungai-sungai kecil.
Indonesia sebagai negara tropis yang terdiri dari berbagai pulau besar dan kecil
serta memiliki banyak sungai memerlukan jembatan untuk penghubung antara
wilayah yang terpisahkan oleh sungai dan laut. Jembatan sebagai prasarana
transportasi mempunyai manfaat yang dominan bagi pergerakan lalu lintas.
Jembatan adalah istilah umum untuk konstruksi yang dibangun sebagai jalur
transportasi yang melintasi sungai, danau, rawa, jurang maupun rintangan lainnya.
Pada dasarnya pembangunan jembatan tidak hanya 2 bertujuan untuk alat
penghubung saja, tetapi juga mempunyai tujuan dan fungsi luas.
Seiring dengan berkembangnya ilmu pengetahuan dan teknologi
pembangunan jembatan semakin berkembang. Mulai dari metode-metode yang
digunakan, alat-alat yang digunakan, serta kemampuan manusia yang semakin
lama semakin meningkat. Metode yang digunakan dalam pembangunan jembatan
bentang panjang antara lain adalah Incremental Launching Method & Movable
Scaffolding System. Metode Incremental Launching Method sangat efektif dalam
membangun jembatan dengan panjang 150m dan panjang tiap bentang antara 30-
60m (Vsl Internation Ltd 1977). ILM pertama kali ditemukan oleh Prof Dr. Ing. F.
Leonhardt dan partnernya Willi Baur sejak tahun 1967. Dengan menggunakan
metode ILM akan sangat membantu dalam proses konstruksi jembatan karena
dengan menggunakan metode ini tidak menganggu area di bawah jembatan
(dengan tidak digunakannya perancah). Dan juga kebutuhan lahan di belakang
jembatan relative minim karena lokasi fabrikasi segment tidak berpindah tempat.
Metode ini sangat efektif dilakukan di tebing yang tinggi, serta jembatan yang
memiliki pilar yang tinggi.
1-2
Movable Scaffolding System (MSS) pertama kali di design oleh the
Norwegian Company (STRUKTURAS) sejak tahun 1973. Metode ini dapat
membangun jembatan dengan panjang tiap bentang sampai dengan 70m. MSS
adalah metode yang digunakan pada pelaksanaan Cast In Situ dimana pengecoran
dilakukan dilokasi setelah selesainya bekisiting. Prinsipnya adalah dengan
memindahkan scaffolding dengan cara digeser ke segmen berikutnya setelah
beton mengeras.
Pemilihan metode konstruksi jembatan bentang menerus merupakan hal
yang penting dalam proses desain jembatan, kedua metode diatas(ILM dan MSS)
sering kali menjadi alternatif yang diajukan oleh konsultan perencana dalam
melakukan desain jembatan bentang menerus. Jumlah kebutuhan material(dalam
hal ini strand), waktu konstruksi menjadi hal penting untuk ditinjau pada kedua
alternatif metode konstruksi ini. Dengan menggunakan mutu beton dan dimensi
box girder yang sama pada kedua metode ini akan berpengaruh pada jumlah
strands pada tendon di jembatan.
Inti Permasalahan 1.2
Analisis jembatan box girder dengan menggunakan metode Incremental
Launching Method (ILM) dan Movable Scaffolding System (MSS) akan
menghasilkan tegangan yang berbeda pada serat bawah dan serat atas. Serta
momen positif dan negative yang terjadi akan mempengaruhi berapa banyak
strands yang dibutuhkan dalam pembangunan jembatan.
Tujuan Penelitian 1.3
Adapun Tujuan penelitian yang dilakukan sebagai berikut:
1. Melakukan permodelan dan analisis struktur jembatan dengan 2 metode
yaitu ILM dan MSS
2. Melakukan analisis tegangan pada setiap segmen jembatan
3. Membandingkan jumlah strands yang dihasilkan dengan menggunakan
2 metode yang ILM dan MSS
1-3
4. Membandingkan tegangan kritis yang terjadi di masing2 model
jembatan (masa konstruksi dan masa layan)
5. Menghitung efisiensi pengurangan jumlah strands yang dapat dilakukan
Ruang Lingkup Pembahasan 1.4
Ruang lingkup pembahasan skripsi ini adalah sebagai berikut:
1. Jembatan yang dianalisis adalah jembatan box girder prategang
2. Analisis dilakukan pada saat tahap konstruksi dan masa layan.
3. Mutu beton yang digunakan dalam analisis kedua metode adalah sama
yaitu 40 MPa.
4. Spesifikasi dimensi jembatan yaitu
a) Panjang 1 segmen : 50m
b) Lebar Jembatan : 12,5m (dua lajur dua arah)
c) Panjang jembatan : 150m
d) Jumlah segmen : 3
e) Jumlah Pilar : 3
Gambar 1.1 Tampak 3d Jembatan
1-4
Gambar 1.2 Penampang Box Girder
5. Jembatan diasumsikan menggunakan perletakan sendi dan rol
6. Desain hanya dilakukan pada box girder prategang
7. Pembebanan jembatan mengikuti SNI-1725-2016, dan perencanaan struktur
beton untuk jembatan mengikuti RSNI-T-012-200X
8. Pengecoran beton dilakukan di tempat (In Situ)
9.Jenis tendon yang digunakan pada beton prategang adalah tendon
0,5inch(12,7mm) dengan kekuatan Tarik 1860 MPa
Metode Penelitian 1.5
Pada penelitian ini , metode yang akan digunakan yaitu :
1. Studi Literatur
Studi literature adalah studi adalah cara untuk menyelesaikan persoalan
dengan berbagai sumber-sumber. Sumber-sumber yang digunakan
diperoleh dari buku, jurnal, artikel dan tulisan-tulisan yang dibuat
sebelumnya. Sumber-sumber tulisan yang dipakai dalam penelitian ini d
ilampirkan pada daftar pustaka.
2. Studi Analisis
Permodelan dan Analisis jembatan pada skripsi ini menggunakan program
Midas Civil