SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50 Panelists: Tarek Arafat, NYC Department of Citywide Administrative Services (DCAS) Chris Diamond, NYC Department of Design & Construction (DDC) Mikael Amar, NYC Department of Environmental Protection (DEP) Bomee Jung, NYC Housing Authority (NYCHA) Jessica Wurwarg, Caitlin Churchill, NYC Department of Transportation (DOT) Moderator: Ellen Honigstock, Urban Green Council

SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50

Panelists:

• Tarek Arafat, NYC Department of Citywide Administrative Services (DCAS)

• Chris Diamond, NYC Department of Design & Construction (DDC)

• Mikael Amar, NYC Department of Environmental Protection (DEP)

• Bomee Jung, NYC Housing Authority (NYCHA)

• Jessica Wurwarg, Caitlin Churchill, NYC Department of Transportation (DOT)

Moderator:

• Ellen Honigstock, Urban Green Council

Page 2: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

• Largest combined water and wastewater utility in the United States:

• 9 million New Yorkers served by 6000 employees

• 1.1 billion gallons per day (gpd) of water delivered

• 7000 miles of water mains, 2000 square-mile watershed

• 1.3 billion gpd of wastewater and stormwater treated

• 7500 miles of sewers, 14 WWT plants (WWTPs)

• Air, noise, and hazardous waste policy & enforcement

About NYC DEP

How NYC Agencies Will Reach 80x50

Page 3: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

• 2nd largest municipal emitter of GHG,

3rd largest municipal energy consumer

• Over 700 utility accounts at over 300 locations

• Annual spend on building & transportation

energy ~$95-110 million

• Annual WWT energy usage = 4.3 trillion Btu

• 695 million kWh electricity

• 6.5 million therms natural gas

• 2.5 million gallons fuel oil

• 192,500 mlbs steam

• 1.2 billion cu-ft anaerobic digester gas (ADG)

• 3.6 BCF annual production = ~35% ben. use

GHG Profile and Energy Use at DEP

How NYC Agencies Will Reach 80x50

-

100

200

300

400

500

600

700

800

Tho

usa

nd

Met

ric

Ton

s o

f C

O2

e

Greenhouse Gas Emissions by Fiscal Year

-

1

2

3

4

5

6

Trill

ion

Bri

tish

Th

erm

al U

nit

s

Site Energy Usage by Fiscal Year

GHG emissions or energy usage, removing mandated* increases

*Several water supply facilities, biological nutrient removal, and

combined sewer overflow facilities

Page 4: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

Wastewater Treatment Process

How NYC Agencies Will Reach 80x50

Page 5: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

Wastewater Treatment Plants asResource Recovery Factories

How NYC Agencies Will Reach 80x50

Processing

Manufacturing

Inputs

Raw Materials

Outputs

Products

Stormwater

Food Waste

Residential/Commercial

Wastewater

Industrial

Wastewater

Fit-for-Purpose

Water

Clean Water

Biosolids Products

Renewable Energy

Next Generation Products

Process Water

Reuse

Heat Reuse & Loss

Digester Gas

Reuse

Page 6: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

• 80% reduction in GHG emissions by 2050

• Carbon neutrality in new 1.5 degree Celsius Plan

• Energy-neutral wastewater treatment plants by 2050

• Maximize digester gas production

• Maximize digester gas beneficial use

• Minimize digester gas fugitive emissions

• 100 MW of solar on City-owned properties by 2025

• Zero waste to landfills by 2030

• Maximize biosolids beneficial use

• Maximize food waste beneficial use

• 50 MW enrolled in Demand Response Program by 2017

Citywide Drivers for Change

How NYC Agencies Will Reach 80x50

Page 7: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

• DEP is a major player in citywide DR efforts:

• Historical commitment of 16-20 MW and performance of 120% or greater.

• Has accounted for as much as ~10% of citywide reductions during events.

Demand Response Program at DEP

How NYC Agencies Will Reach 80x50

6,200

6,250

6,300

6,350

6,400

6,450

6,500

6,550

6,600

6,650

3:3

0 P

M

3:5

0 P

M

4:1

0 P

M

4:3

0 P

M

4:5

0 P

M

5:1

0 P

M

5:3

0 P

M

5:5

0 P

M

6:1

0 P

M

6:3

0 P

M

6:5

0 P

M

7:1

0 P

M

7:3

0 P

M

7:5

0 P

M

8:1

0 P

M

8:3

0 P

M

Meg

awat

ts

New York City (NYISO Zone J)Electric Demand on 3/2/2016

Data source: NYISO & DEP RTMs

216 MW

reduction

citywide

DEP peak

reduction

of 22 MW

7,700

7,750

7,800

7,850

7,900

7,950

8,000

8,050

8,100

8,150

11

:10

AM

11

:30

AM

11

:50

AM

12

:10

PM

12

:30

PM

12

:50

PM

1:1

0 P

M

1:3

0 P

M

1:5

0 P

M

2:1

0 P

M

2:3

0 P

M

2:5

0 P

M

3:1

0 P

M

3:3

0 P

M

3:5

0 P

M

4:1

0 P

M

Meg

awat

ts

New York City (NYISO Zone J)Electric Demand on 8/27/2015

250 MW

reduction

citywide

DEP peak

reduction

of 24 MW

Actual Citywide Load

Business-as-Usual Load

DEP Contribution

Page 8: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

Strategies for GHG Reduction at DEP

How NYC Agencies Will Reach 80x50

• Energy conservation and efficiency

• Equipment and operational improvements

• Water demand management

• On-site energy generation using anaerobic digester gas

• Other beneficial uses of ADG

• Non-ADG renewable energy

• Hydro, solar PV, etc.

GHG

Reduction

Strategies

Demand

Side

Supply

Side

Renew-

ables

Offsets• Beneficial use of biosolids & biogas offsite

• Sequestration by green infrastructure, wetlands, and watershed

Page 9: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

• Energy Conservation Measures:

• Energy audits completed at WWTPs. Developing plan to integrate ECMs

into State-of-Good-Repair capital projects.

• Analytics, Education, and Accountability:

• Ensuring data is clean and reliable. Creating performance metrics.

Tracking progress of project implementation. Energy in employee reviews.

Energy reports and meetings increase transparency. Training and classes.

• Design Guidelines:

• Update and implement for more energy-efficient alternatives.

Energy Profile Report for each new or reconstruction project.

• Others:

• Incentivizing fixture replacements and water reduction challenges.

Green infrastructure (Water-Energy Nexus tool).

Ongoing Demand-Side Initiatives at DEP

How NYC Agencies Will Reach 80x50

Page 10: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

Energy Projects at DEP

How NYC Agencies Will Reach 80x50

Port Richmond WWTP

Rooftop Solar PV

Fuel Switching, Cogeneration, &

Electrification (Multiple Facilities)

Newtown Creek WWTP

Food Waste Co-Digestion & Renewable Natural Gas / Biogas-to-Grid

Page 11: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

Energy Projects at DEP (cont.)

How NYC Agencies Will Reach 80x50

Behavior-Change Projects, Trainings, Etc.

(Multiple Facilities)

Cannonsville Dam

Hydroelectric

LED Lighting Upgrades

(Multiple Facilities)

Page 12: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

Next-Generation Projects

How NYC Agencies Will Reach 80x50

WWTPs as Resource Recovery Facilities Altering Secondary Treatment

Land Management Chemical Conversion

Solar Over Process Tanks

Potential Creative Solution

Page 13: SCALE IT UP: HOW NYC AGENCIES WILL REACH 80X50...• 7000 miles of water mains, 2000 square-mile watershed •1.3 billion gpd of wastewater and stormwater treated • 7500 miles of

Mikael Amar

Senior Policy Analyst, Office of Energy

NYC Environmental Protection

[email protected]

Contact

How NYC Agencies Will Reach 80x50