SCATS Adaptive Traffic SystemTRB Adaptive Traffic Control Workshop
January 2000Session 2 - Equipment Requirements
For further information contact: Neil R. Gross
2
SCATS Architecture
CentralManagement
System
RegionalComputer
RegionalComputer
RegionalComputer
RegionalComputer
RegionalComputer
ManagementFunctions
StrategicTrafficControl
Traffic Controllers -Tactical Traffic Control
1 to 32
up to 250 perRegional Computer
3
SCATS System ArchitectureMinimal System - Single Region
RegionalComputer
SCATS TrafficControllers
Up to 250 perRegional Computer Point-to-Point or Multidrop
connected Traffic Controllers
Dial-inWorkstation(s)
OperatorWorkstations - serial
or LAN connected
4
SCATS System ArchitectureSCATS 1 - with Integration Server
DEC VAXSCATS Management Computer
SCATS LANDatalink
OperatorWorkstations
SCATS Interface Server
ExternalLAN
Ramp MeteringControllers
Up to 32 Regional Computers
Mixed Connection
Remote RegionalComputer(s)
Local RegionalComputers
SCATS TrafficControllers
Up to 128 perRegionalComputer
Point-to-Pointconnected Traffic
Controllers
Multidrop connected Traffic Controllers
Dial-inWorkstation(s)
RegionalATMS,ATIS
Services,ITMS
5
Configuration - SCATS2
DatalinkSCATS ManagementComputer
SCATS LAN
OperatorWorkstations
Ramp MeteringControllers
Up to 32 Regional Computers
Mixed Connection
Remote RegionalComputer(s)
Local RegionalComputers
SCATS TrafficControllers
Up to 250 perRegionalComputer
Point-to-Pointconnected Traffic
Controllers
Multidrop connected Traffic Controllers
Dial-inWorkstation(s)
Regional ATMS,ATIS Services,
ITMS
6
SCATS Sensors
• Controller collects number of spaces and total space time during green of each movement, each cycle for use by SCATS adaptive algorithm.
• Actual movement data collected by stop line detectors allows accurate split determination.
7
SCATS Sensors • Loop Detectors or
equivalent (video detection in Oakland County MI) in most lanes at the stop line.
• Some lanes can be left without detectors.
8
Communications - SCATS1
CMS(Central
managementComputer)
OperatorWorkstations
Other ITSSystems
LAN orRAS/PPP
Controllers
300 Bps Point-to-Point (Bell 103)
or1200/2400 BpsMultidrop (V22/
V22bis)
LAN-TCP/IPor FD Data
line
Delta 3NSCATS 170
LAN/WAN
TCP/IP
RegionalComputers
9
Communications - SCATS2CMS
(CentralmanagementComputers)
OperatorWorkstations
Other ITSSystems
LAN orRAS/PPP
SCATS Protocol(TCP/IP-PPP-V34)
orNTCIP Standard
Global Objects (plusselected special
MIB)
RegionalComputers
LAN-TCP/IPor FD Data
line
NTCIPCenter -to
CenterNTCIP
Class B
Other TrafficDevices (e.g.
Signs)
SCATS 170SCATS 2070
SCATS 2070NUS NTCIP
Controllers
LAN/WAN
10
SCATS Traffic Controllers -Existing
• AWA Delta 170 upgrades existing 170 controller to support SCATS.
• Relay Module added for sense/control of cabinet status.
• AWA Delta 3N controller replaces existing NEMA controller.
• Connections are via existing A, B and C connectors.
• One back-panel link required.
170 NEMA
12
SCATS Hardware Requirements• Management Computer - Database and Mgt Systems
– SCATS 1 DEC VAX/ALPHA, OpenVMS
– SCATS 2 Networked PCs
• Regional Computer - Strategic Control– Personal Computer with Windows NT
– Digi Serial Interface system.
13
SCATS Hardware Requirements
• Operator Workstations - Up to 15– Personal Computer with Windows NT or Windows 98
• SCATS Controllers - Tactical Control– up to 250 per Regional Computer
14
SCATS Installation Cost Ranges 64 Intersection System
• Central Hardware approx. $ 30,000 (small VAX)• Central Software approx. $40K to $70K
• Regional Hardware approx $20K• Regional Software approx $70K
15
SCATS Installation Cost Ranges 64 Intersection System
• Local Controllers approx. $3.5K to 5.5K, total say $300K
• Communication Network - Included above• Detection Sensors …. Standard loop amplifiers
and 6 x 15 loops…..$230K?• Total - approx $650K for single Regional (No
CMS)
16
SCATS Operations & Maintenance Cost Ranges - 64 Intersection System
• Central Hardware approx $3K per annum• Central Software approx $4K per annum• Regional Hardware - negligible.• Regional Software approx $8Kpa• Regional Setup & Support - similar to current
support level plus quarter to half man year per annum.
17
SCATS Operations & Maintenance Cost Ranges - 64 Intersection System
• Local Controllers - similar to current controllers• Communication Network - User owned TWP? or
VG Leased Line approx $22/month• Detection Sensors …loop maintenance? Depends