SCHEDULE A TO - New Tecumseth · 2020. 1. 8. · SCHEDULE "A" TO BY-LAW 2019-173 DEVELOPMENT ENGINEERING FEES. ... 3. The cost of peer reviews required for processing applications

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SCHEDULE A TO - New Tecumseth · 2020. 1. 8. · SCHEDULE "A" TO BY-LAW 2019-173 DEVELOPMENT ENGINEERING FEES. ... 3. The cost of peer reviews required for processing applications
Page 2: SCHEDULE A TO - New Tecumseth · 2020. 1. 8. · SCHEDULE "A" TO BY-LAW 2019-173 DEVELOPMENT ENGINEERING FEES. ... 3. The cost of peer reviews required for processing applications

DEVELOPMENT ENGINEERING FEES 2020 2021

Rates RatesSubdivision Engineering Review

A percent of the cost to construct the municipal services plus the cost of external consultants and legalto assist in the review of the engineering submission. The engineering fee shall be paid in two (2) installments.

3.65% 4.00%

Initial Application fee to process the engineering component of the plan of the subdivision (non-refundable).

1.13% 1.27%

The payment of the second installment shall be included as a condition of the subdivision agreementand due prior to or upon execution of agreement. The second installment is based on the totalEngineering Subdivision Review Fee in effect at the time of the Subdivision Agreement is beingexecuted, less the first installment paid previously.

2.50% 2.75%

The engineering fee shall be adjusted prior to the issuance of the guaranteed maintenance periodbased on the actual certified cost of the municipal services if the fee variance is greater than $500.00.

Cost

A maximum of 3 submissions are permitted before additional fees. 4 or more submissions are eachsubject to the additional fee. $

1,675.00 $ 1,850.00

Other AgreementsAmending Agreement $ 1,100.00 $ 1,200.00

Model Home Agreement $ 1,100.00 $ 1,200.00Earthworks Agreement $ 3,200.00 $ 3,500.00Pre-Servicing Agreement $ 3,200.00 $ 3,500.00Development Agreement (Simple) does not include the extension of municpal water or municipalsanitary sewer $

1,160.00 $ 1,320.00

Development Agreement (Complex) Includes the extension of municpal water and/or municipal sanitarysewer $

4,635.00 $ 5,270.00

Site Plan Fees

Application (per application, includes 4 submissions) $ 10,950.00 $ 15,225.00

Commercial (per square metre gross floor area) $ 2.55 $ 2.95

Industrial / Institutional (per square metre gross floor area) $ 1.60 $ 1.85

Residential (per unit) $ 210.00 $ 245.00

Additional Submission (applies to the fourth submission and each submission after the fourth) $ 1,565.00 $ 1,630.00

Request for Site Plan Exemption (per request) $ 650.00 $ 825.00

Small Scale Site Alteration & Fill (less than 1,000 m3)

Application Fee (per application) $ 2,500.00 $ 2,545.00

Plan & Reports Examination Fee (per application) $ 750.00 $ 763.50

Municipal Fee - Stripping, Cut, and Fill material (per cubic meter) $ 1.50 $ 1.53

Permit Renewal / Extension / Revision Fee (per application) $ 500.00 $ 509.00

Site Alteration / Fill Management Plan Amendment Fee (per application) $ 1,000.00 $ 1,018.00

Security Deposit (per application) $ 5,000.00 $ 5,090.00

Large Scale Site Alteration & Fill (1,000 m3 or more)

Application Fee (per application) $ 5,000.00 $ 5,090.00

Plan & Reports Examination Fee (per application)

Fee per Application $ 1,750.00 $ 1,781.50

Deposit per Application $ 10,000.00 $ 10,180.00

Municipal Fee - Stripping, Cut, and Fill material (per cubic meter) $ 1.50 $ 1.75

Permit Renewal / Extension / Revision Fee (per application) $ 1,500.00 $ 1,527.00

Site Alteration / Fill Management Plan Amendment Fee (per application) $ 1,000.00 $ 1,018.00

Security Deposit (per cubic metre for Cut and Fill material) or Maximum Flat Fee whichever is greater

Fee per Cubic Metre $ 1.00 $ 1.00

Maximum Flat Fee $ 100,000.00 $ 101,800.00

Replacement of Topsoil (Agricultural Purposes)

Application Fee (per application) $ 5,000.00 $ 5,090.00

Plan & Reports Examination Fee (per application)

Fee per Application $ 1,250.00 $ 1,272.50

Deposit per Application $ 10,000.00 $ 10,180.00

Municipal Fee - Stripping, Cut, and Fill material (per cubic meter) $ 1.50 $ 1.75

Permit Renewal / Extension / Revision Fee (per application) $ 1,500.00 $ 1,527.00

Site Alteration / Fill Management Plan Amendment Fee (per application) $ 1,000.00 $ 1,018.00

Security Deposit (per cubic metre for Cut and Fill material) or Maximum Flat Fee whichever is greater

Fee per Cubic Metre $ 1.00 $ 1.00

Maximum Flat Fee $ 100,000.00 $ 101,800.00

SCHEDULE "A"TO

BY-LAW 2019-173DEVELOPMENT ENGINEERING FEES

Page 3: SCHEDULE A TO - New Tecumseth · 2020. 1. 8. · SCHEDULE "A" TO BY-LAW 2019-173 DEVELOPMENT ENGINEERING FEES. ... 3. The cost of peer reviews required for processing applications
Page 4: SCHEDULE A TO - New Tecumseth · 2020. 1. 8. · SCHEDULE "A" TO BY-LAW 2019-173 DEVELOPMENT ENGINEERING FEES. ... 3. The cost of peer reviews required for processing applications
Page 5: SCHEDULE A TO - New Tecumseth · 2020. 1. 8. · SCHEDULE "A" TO BY-LAW 2019-173 DEVELOPMENT ENGINEERING FEES. ... 3. The cost of peer reviews required for processing applications
Page 6: SCHEDULE A TO - New Tecumseth · 2020. 1. 8. · SCHEDULE "A" TO BY-LAW 2019-173 DEVELOPMENT ENGINEERING FEES. ... 3. The cost of peer reviews required for processing applications

DEVELOPMENT ENGINEERING FEES 2020 2021

Rates Rates

SCHEDULE "A"TO

BY-LAW 2019-173DEVELOPMENT ENGINEERING FEES

5. Copies of third party invoices and a Town invoice will be forwarded to the applicant with payment due to the Townwithin 30 days. Any unpaid Town invoices will result in interest charges in accordance with the Town’s InterestBy-law.

6. Upon completion of the matter for which the deposit is being held by the Town, the applicant shall make a writtenrequest to the Chief Financial Officer/Treasurer for refund of the balance of the deposit. The applicable departmenthead shall authorize the release of the deposit or portion thereof and forward same to the Finance Department forprocessing.

7. Fifty percent of the required application fees submitted in respect of an Official Plan or Zoning Amendmentapplication may be refunded if the application is withdrawn prior to it having been scheduled for a public meeting.Notice of the withdrawal shall be in writing to the Manager of Planning and shall be signed by the applicant.

8. One hundred percent of the required application fees submitted in respect of a consent or minor variance may berefunded if the application is withdrawn prior to it having been scheduled for a committee of adjustment meeting.Notice of the withdrawal shall be submitted in writing to the Secretary, Committee of Adjustment and shall be signedby the applicant.

NOTES: GFA refers to Gross Floor Area unless otherwise noted.

Inactive File Carrying Fee: Any application submitted to the Town that has beeninactive for more than one year.

1. All Base Fees are payable at the time of submission of the application unless otherwise noted.

2. Fees payable upon draft plan approval shall apply notwithstanding the date of the submission of the plan ofsubdivision application.

3. The cost of peer reviews required for processing applications where resources outsideof Municipal Staff are required for the review shall be charged to the applicant in additionto the Base Fee.

Where agreements are to be registered on title, the costs associated with the registeringof the agreement on title and the costs of the Town’s legal review of the agreement are inaddition to the Base Fee and shall be paid by the applicant prior to the execution of theagreement by the Town.

The applicant shall provide the Town with a deposit in the following amounts:

Subdivision Agreement $ 5,000.00Site Plan Agreement $ 2,500.00Consent Agreement $ 1,500.00

4. All monies paid as a deposit for subdivision, site plan, and consent agreements and peer review shall be consideredas a deposit on account, from which expenses+A67:A71 incurred in processing the agreement including but notlimited to legal review, registration on title, and consultant review and expenses, will be invoiced to the applicant.

Page 7: SCHEDULE A TO - New Tecumseth · 2020. 1. 8. · SCHEDULE "A" TO BY-LAW 2019-173 DEVELOPMENT ENGINEERING FEES. ... 3. The cost of peer reviews required for processing applications

DEVELOPMENT PLANNING FEES 2020 2021

Rates RatesMinor Variance $ 965.00 $ 980.00

Per provision $ 51.00 $ 52.00

Consent $ 4,275.00 $ 4,350.00

Revisions to Conditions of Decision requested by applicant: $ 203.00 $ 207.00

Retained Lands Certificate of Official Fee $ 153.00 $ 155.00

Official Plan Amendment $ 20,155.00 $ 20,520.00

Zoning By-law Amendment $ 14,965.00 $ 15,235.00

Lift H Holding Symbol $ 4,580.00 $ 4,660.00

Part Lot Control Exemption By-law $ 3,460.00 $ 3,520.00

Plan of Condominium $ 22,190.00 $ 22,590.00

Residential (on submission of application) - Per Unit $ 44.75 $ 45.50

Industrial/Commercial - Per Ha $ 111.00 $ 113.00

Plan of Condominium Exemption $ 11,500.00 $ 11,700.00

Plan of Subdivision $ 26,977.00 $ 27,463.00

Upon Submission of Application

Single, Semi and Multi-unit Blocks - Per Unit $ 224.00 $ 228.00

Commercial - Per Ha $ 2,260.00 $ 2,300.00

Industrial - Per Ha $ 560.00 $ 570.00

Institutional - Per Ha $ 560.00 $ 570.00

Upon Draft Plan Approval

Single, Semi and Multi-unit Blocks - Per Unit $ 224.00 $ 228.00

Commercial - Per Ha $ 2,260.00 $ 2,300.00

Industrial - Per Ha $ 560.00 $ 570.00

Institutional - Per Ha $ 560.00 $ 570.00

All Plans of Subdivision

Revision to Draft Plan, requiring circulation $ 4,685.00 $ 4,765.00

Revision to Condition(s) of Draft Approval $ 3,765.00 $ 3,830.00

Extension of Draft Approval $ 2,750.00 $ 2,800.00

Registration of Each Phase $ 2,445.00 $ 2,490.00

Referral of a Plan to LPAT $ 510.00 $ 520.00

Miscellaneous

Inactive File Carrying Fee $ 510.00 $ 520.00

Additional Public Meetings Beyond One $ 1,525.00 $ 1,550.00

Deeming By-law $ 2,645.00 $ 2,690.00

New Telecommunications Facility $ 8,755.00 $ 8,910.00

Co-location Telecommunication Facility $ 8,855.00 $ 9,015.00

Feed-in-tariff (FIT) Application for Renewable Energy $ 4,375.00 $ 4,450.00

Urban Design Review/Addendum (Where no lift hold required) $ 1,750.00 $ 1,780.00

Pre-Consultation $ 1,525.00 $ 1,550.00

Temporary Use By-law $ 1,020.00 $ 1,035.00

Temporary Use By-law Extension Legal fee Legal fee

SCHEDULE "A"TO

BY-LAW 2019-173DEVELOPMENT PLANNING FEES