ENVIRONMENTAL QUALITY (SCHEDULED WASTES)
REGULATIONS 2005
Environmental Quality Act 1974
EQ (Scheduled Waste) RegulationsJangan buang begitu saja!!! Kamu
mencemarkan alam sekitar dan membahayakan orang lain!! Anda
boleh didakwa!Apa??? Kenapa
??
Schedules
1st Schedule - Classification of SW
2nd Schedule - Notification of SW
3rd Schedule - Labeling Requirement for SW
4th Schedule - SW of Potential incompatibility
5th Schedule - Inventory of SW
6th Schedule - Consignment Note for SW
7th Schedule - Information of SW
EQ (Scheduled Waste) Regulations
EQ (Scheduled Waste) Regulations
Main regulations EQ (Scheduled Wastes) Regulations,
2005 EQ (Prescribed Premise) (Scheduled
Wastes Treatment and Disposal Facilities) Regulations, 1989
EQ (Prescribed Conveyance) (Scheduled Wastes) Order, 2005
Context in this Regulations
"scheduled wastes" means any waste falling within the categories of waste listed in the First Schedule"waste generator" means any person who generates scheduled wastes"contractor" means any person licensed by the Director General of Environmental Quality under subsection 18(1A) of the Act"prescribed premises" means premises prescribed by the Environmental Quality (Prescribed Premises) (Scheduled Wastes Treatment and Disposal Facilities) Order 1989 [P.U. (A) 140/1989].
EQ (Scheduled Waste) Regulations
Main Issues
(1)Identification of Scheduled Wastes
(2) Notification of Scheduled Wastes to DOE
(3) Disposal/Treatment of Scheduled Wastes
(4) Storage of Scheduled Wastes of Potential incompatibility
(5) Labeling Requirement for Scheduled Wastes
(6) Inventory of Scheduled Wastes
(7) Transportation of Scheduled Wastes - Consignment Note
(8) Scheduled Wastes Information
EQ (Scheduled Waste) Regulations
1) Identification of Scheduled Wastes
Groups of waste generated by industrial and services sectors are categorized and listed in First Schedule of the Regulations.
EQ (Scheduled Waste) Regulations
2) Notification of generation of new scheduled wastes
To notify Director General of DOE regarding generation of new scheduled wastes within 30 days from the date of generation
By using the form as shown in Second Schedule
EQ (Scheduled Waste) Regulations
Calling DOE only is not enough
3a) Disposal of scheduled wastes
Disposal of scheduled wastes at Prescribed Premises only
Only licensed scheduled wastes contractors can collect and transport these wastes
The licensed scheduled wastes contractors need to get their licences renewed annually
EQ (Scheduled Waste) Regulations
Licensed contractors available at DOE web-site
www.jas.sains.my
3b) Treatment of scheduled wastes
Scheduled wastes can be only treated By licensed scheduled wastes
contractors by on-site treatment facility (within
company’s compound).
EQ (Scheduled Waste) Regulations
Residuals from treatment of Scheduled Wastes shall be treated or disposed of at prescribed premises (by Licensed scheduled wastes contractors).
3c) What about certain Scheduled Wastes that are not toxic or hazardous?
Generators of Scheduled Wastes may apply to the DG in writing to have scheduled wastes from their particular facility or process to be excluded from the disposal of, treatment of or recovery of material or product from such scheduled waste at the prescribed premises.
EQ (Scheduled Waste) Regulations
EQ (Scheduled Waste) Regulations
Storage of scheduled wastes
Storage of scheduled wastes
Containers for storage shall be compatible with the
Scheduled Wastes (SW)
Containers for storage shall be compatible with the
Scheduled Wastes (SW)
Containers containing SW shall always be closed during storage, except
to add or remove Scheduled Wastes
Containers containing SW shall always be closed during storage, except
to add or remove Scheduled Wastes
DG may direct waste generator to send any SW for recovery, treatment
or disposal for such a period or quantity as he may direct
DG may direct waste generator to send any SW for recovery, treatment
or disposal for such a period or quantity as he may direct
Storage of SW shall be 180 days or less, and the quantity shall be less than 20 metric tons
Storage of SW shall be 180 days or less, and the quantity shall be less than 20 metric tons
4a) Storage of Schedule Waste
EQ (Scheduled Waste) Regulations
4b) Storage of Schedule Waste
Incompatible Scheduled Wastes shall be stored in separate containers
For guidance, refer to Fourth Schedule
For example Acidic and Alkaline scheduled wastes shall not be stored together
EQ (Scheduled Waste) Regulations
4c) Storage of scheduled wastes
Stored in containers that durable to prevent spillage or leakage
Storage area shall be designed, constructed and maintained to prevent spillage or leakage
Not this way!
Labeling of
Scheduled wastesLabeling of
Scheduled wastes
Date of generation, name, address and telephone numbers of the SW generator shall be clearly marked on the containers
Date of generation, name, address and telephone numbers of the SW generator shall be clearly marked on the containers
Labelled according to Third Schedule - Labeling Requirement for Scheduled Wastes
Labelled according to Third Schedule - Labeling Requirement for Scheduled Wastes
No person is allowed to alter the labelsor markings.No person is allowed to alter the labelsor markings.
EQ (Scheduled Waste) Regulations
5) Labeling of Schedule Wastes
EQ (Scheduled Waste) Regulations
5) Labeling of Schedule Wastes What’s wrong with this?
6) Inventory of scheduled wastes
Inventory of scheduled wastes being generated, treated and disposed shall be kept accurate and up-to-date, using forms as shown in Fifth Schedule
The inventory shall include - Categories - Quantities of scheduled wastes- etc.
Records shall be kept for 3 years.
EQ (Scheduled Waste) Regulations
SW can be transported by licensed contractors onlySW can be transported by licensed contractors only
Waste generator is to fill up 6 copies of Part 1 of 6th Schedule (consignment note) and give to Waste ContractorWaste generator is to fill up 6 copies of Part 1 of 6th Schedule (consignment note) and give to Waste Contractor
Waste Contractor shall fill up Part 2 of Consignment Note and hand over 2 copies to the waste generator, waste generator to submit to DOE one copy within 30 Days from the date of transportation of SW
Waste Contractor shall fill up Part 2 of Consignment Note and hand over 2 copies to the waste generator, waste generator to submit to DOE one copy within 30 Days from the date of transportation of SW
Transport contractor must deliver SW to waste treatment plant within 10 days, waste treatment plant shall complete Part 3 of Consignment Note and hand over one copy each to waste generator, transport contractor and DOE, within 20 Days from the date of receipt of SW. If the Consignment Note is not received within 30 days, notify DOE
Transport contractor must deliver SW to waste treatment plant within 10 days, waste treatment plant shall complete Part 3 of Consignment Note and hand over one copy each to waste generator, transport contractor and DOE, within 20 Days from the date of receipt of SW. If the Consignment Note is not received within 30 days, notify DOE
7) Transportation and Delivery of SW
EQ (Scheduled Waste) Regulations
Waste generator must provide information in 7th Schedule to Waste ContractorWaste generator must provide information in 7th Schedule to Waste Contractor
Waste generator must inform Waste Contractor of purpose and use of7th Schedule Waste generator must inform Waste Contractor of purpose and use of7th Schedule
Waste Contractor must carry 7th Schedule for all types of SW being transported,observe and comply with instructions in 7th Schedule Waste Contractor must carry 7th Schedule for all types of SW being transported,observe and comply with instructions in 7th Schedule
7) Other Information during Transportation and Delivery
EQ (Scheduled Waste) Regulations
8) Schedule Wastes Infromation
Delivery of scheduled wastes Waste generator shall provide
information for every category of scheduled wastes delivered. - Use 7th Schedule
Waste generator shall assist the waste contractor if there is any spillage or accidental discharge.- by providing technical expertise - by supporting assistance in clean up operation
EQ (Scheduled Waste) Regulations