1
COLLEGE OF INFORMATION TECHNOLOG DIVINE WORD COLLEGE OF VIGAN VIGAN CITY Scope and Limitations This project was limited to the development of the Ireene’s Cake Shop Online Ordering System. The development of the Ireene’s Cake Shop Online Ordering System features: the sign up of every customer, an organizer page where each customer is given exclusive profile; the administrator account where the authority to edit and delete the customer records is allowed. The Ireene’s Cake Shop Online Ordering System was especially designed and programmed to process large volumes of valuable data. The system was specialized to speed up customer process, and eliminate possible errors often committed in the manual process. The development of the system involved the proponent to implement the Agile Model in software development. The model is an iterative design process in which progress is seen as flowing steadily through the phases of planning, requirements analysis, designing, building and testing. 8

Scope and Delimitations

Embed Size (px)

DESCRIPTION

Paper Work; Manuscript of Thesis; IT; Capstone

Citation preview

Page 1: Scope and Delimitations

COLLEGE OF INFORMATION TECHNOLOGDIVINE WORD COLLEGE OF VIGANVIGAN CITY

Scope and Limitations

This project was limited to the development of the Ireene’s

Cake Shop Online Ordering System.

The development of the Ireene’s Cake Shop Online

Ordering System features: the sign up of every customer, an

organizer page where each customer is given exclusive profile;

the administrator account where the authority to edit and delete

the customer records is allowed. The Ireene’s Cake Shop Online

Ordering System was especially designed and programmed to

process large volumes of valuable data. The system was

specialized to speed up customer process, and eliminate possible

errors often committed in the manual process.

The development of the system involved the proponent to

implement the Agile Model in software development. The model is

an iterative design process in which progress is seen as flowing

steadily through the phases of planning, requirements analysis,

designing, building and testing.

8