    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    SCOPE OF WORKSFOR ENGINEERING, PROCUREMENT, ONSHORE CONSTRUCTION,

    OFFSHORE INSTALLATION/TIE-IN & COMMISSIONINGFOR NEW CHEMICAL INJECTION SKIDS ON PQP-HT

    Revision

    Date Remarks Prepared by CheckedBy

    Approvedby

    B1 12-Sep-14

    Prepared for review !Pho"P!D!Don#

    D!D!$on# %!&!'am

    B2 1(-Sep-

    14

    Revised as comments !Pho"P!D!Don

    #

    D!D!$on# %!&!'am

    SC)P* )+ ,)R . '*, C&*/0CA$ 0'*C%0)' S0D - Rev B2 Pa#e 1

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    2/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    SC)P* )+ ,)R . '*, C&*/0CA$ 0'*C%0)' S0D - Rev B2 Pa#e 2

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    3/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    TABLE OF CONTENTS:

    1.0 OBJECTIES:.....................................................................................................

    !.0 GENERAL REQUIREMENTS:................................................................................

    2!1 C)D*SA'DS%A'DARDS!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!32!2 'A%0)'A$$A,SA'DR*5$A%0)'S!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!32!3 SP*C0+0CA%0)'6 PR)C*D5R*S!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!4

    ".0 BASIS OF DESIGN:.............................................................................................

    #.0 SCOPE OF WORKS:............................................................................................

    4.1 ENGINEERING SCOPES:...............................................................................................84.2 PROCUREMENT: Optional/TBA???..............................................................................104. ONS!ORE CONSTRUCTION T!E C!EMICA" IN#ECTION S$I%: Un&'( )ont(a)to( *)op'o+ ,o(-*.............................................................................................................................104.4 PREABRICATION OR OS!ORE UPGRA%ES/INSTA""ATION: Optional/TBA......... ..104. OS!ORE INSTA""ATION/!OO$ UP/TIEIN: Optional/TBA........................................104. OS!ORE INSTA""ATION:........................................................................................10

    SC)P* )+ ,)R . '*, C&*/0CA$ 0'*C%0)' S0D - Rev B2 Pa#e 3

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    4/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    1.0OBJECTIES:

    BDPOC $% % '()'%'*+( %) ' %2( '$( 23(2 4%'( 5'(6 ) PQP-HT%'76 85 %22*) 3$(6*3% 9*2 ' *)(3' 3$(6*3% *)' '$( 23(2 4%'(

    5'(6.

    !.0GENERAL REQUIREMENTS:

    %he p7rpose of this doc7ment is to o7t8ine BDP)C9s re:7irements for en#ineerin#6proc7rement6 onshore constr7ction6 o;shore insta88ation"tie-in and commissionin# fornew chemica8 in

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    5/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    1." S(3*;3%'*), P3(2(:

    BD-==-/-S-=331

    Specication for Protective Coatin#s

    BD-==-/-S-=332

    Specication for +abrication H ,e8din# for *:7ipment

    BD-==-/-S-=33@

    Specication for endor Drawin#s H Doc7mentation

    BD-==-/-S-=33(

    Specication for Skid /o7nted Packa#e *:7ipment

    BD-==-/-S-=34@

    Specication for Chemica8 0n

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    6/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    F*( 1: C$(6*3% *)(3'*) 7 P23(2 4%'( 5'(6

    %he chemica8 RB,@1( and RB, >23(G wi88 be in23(G is 1> $"&r!

    SC)P* )+ ,)R . '*, C&*/0CA$ 0'*C%0)' S0D - Rev B2 Pa#e F

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    7/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    F*( !: C$(6*3% *)(3'*) 6 7 RW

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    8/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    F*( #: I)'6()' %* 5 7 I)(3'*) 6.

    %his chemica8 skid sho78d be 8ocated nearby the eistin# )y#en Scaven#er skid on/e?? deck PP as pict7re

    F*(

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    9/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    Chemica8 in4>-SS-B-$P&6 *'C) ca8ibration Pot6 1N +'P% /aim7m p7mp

    rate (@6(1 $"&r6>! =4 eachs SS-R4/>S> SS &i#h press7re proportiona8 re8ief va8ve6

    1"2N/'P%1"2in swa#e8ok ttin#G! =4 eachs SS-C&S>-1= SSPopet F=== psi#I413 bar#J check va8ve6 1"2 in

    Swa#e8ok t7be ttin#6 1= psi#I=!FG bar#J1=!=4 eachs SS-C&S12-1= SSPopet F=== psi#I413 bar#J check va8ve6 3"4 in

    Swa#e8ok t7be ttin#6 1= psi#I=!FG bar#J11!12 eachs SS->3S>6 SS 3-Piece &i#h-Press7re Ba88 a8ve6 PC%+* Seats6 1"2N

    Swa#e8ok %7be +ittin# F=== PS0 L 1==O+ "413 L BAR 3(OC

    SC)P* )+ ,)R . '*, C&*/0CA$ 0'*C%0)' S0D - Rev B2 Pa#e G

    Chemica8 t7bin# sho78b bero7ted from /e?? deck to 0n8etand )7t8et of 2ndsta#e

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    10/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    12!12= meters SS-%>-S-=4G-F/* %7bin# 31F"31F$ Seam8ess 1"2N )D !=4GN wa88 F meters6 a88owab8e workin# press7re3(== psiI5s7ed for chemica8 in23(GJ

    13!12= meters SS-%12-S-=4G-F/* %7bin# 31F"31F$ Seam8ess 3"4N )D !=4GN wa88

    F meters6 a88owab8e workin# press7re24== psiI5sed for chemica8 in1=-G 5nion e8bow 1"2N )D6 e8bow G= de#ree6 31F"31F$ Seam8ess1"2N )D ttin#6 a88owab8e workin# press7re@F== psi

    1@!3= eachs SS-121=-G 5nion e8bow 3"4N )D 6 e8bow G= de#ree6 31F"31F$Seam8ess 1"2N )D ttin#6 a88owab8e workin# press7re@F== psi

    1F!4= eachs SS->1=-F %7be +ittin# 5nion 1"2N)D6 a88owab8e workin#press7re@F== psi

    1(!4= eachs SS-121=-F %7be +ittin# 5nion 3"4N)D6 a88owab8e workin#press7re@F== psi

    1>!3= eachs SS->1=-36 SS Swa#e8ok %7be +ittin#6 5nion %ee6 1"2 in! %7be )D6

    a88owab8e workin# press7re@F== psi1G!3= eachs SS-121=-36 5nion %ee6 3"4 in! %7be )D6 Swa#e8ok6 a88owab8e workin#

    press7re24== psi2=!1= eachs SS->1=-1->6 SS Swa#e8ok %7be +ittin#6 /a8e Connector6 1"2 in! %7be

    )D 1"2 in! /a8e 'P%6 a88owab8e workin# press7re@F== psi21!1= eachs SS-121=-1->6 SS Swa#e8ok %7be +ittin#6 /a8e Connector6 3"4 in! %7be

    )D 1"2 in! /a8e 'P%6 a88owab8e workin# press7re24== psi!22!=4 Bifo8d So8enoid va8ve Q in 'P% port6 3 ways6 2 position SPR12-*1-32-'5-==-

    (>A-3(=!23!=4 Press7re #a7#e workin# ran#e 4=bar#24!=2 Press7re #a7#e workin# ran#e 1= bar#2@!/ateria8 for p7mps and day tanks base frame2F!Cab8e6 cab8e #8ands H accessories

    #.0SCOPE OF WORKS:

    *. ENGINEERING SCOPES:

    Contractor is re:7ested to perform a f788 detai8ed desi#n for chemica8 in

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    11/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    Prepare new Datasheets and %echnica8 Re:7isitions for C0 Packa#e

    Perform proc7rement en#ineerin# s7pport i!e! prepare %B* report and perform

    DR for new C0 Packa#e

    5pdate eistin# p8atform *:7ipment $ayo7ts for addition of new C0 Packa#e

    E(3'*3%

    5pdate eistin# p8atform 8i#htin# 8ayo7ts for addition of C0 e:7ipment

    Prepare *arthin# detai8 drawin# for C0 p7mp skidsI)'6()'

    5pdate eistin# p8atform t7bin# A drawin#s for new C0 t7bin# between %ote

    %anks and C0 p7mp skids

    Prepare t7bin# s7pport 8ocation p8ans and detai8 drawin#s for new C0 t7bin#

    between %ote %anks and C0 p7mp skids!

    Provide 0nstr7ment inp7t to C0 packa#e

    Prepare 0nstr7ment &ook-7p drawin#

    5pdate eistin# p8atform %7bin# H 0nstr7ment /%) 5pdate eistin# p8atform 0nstr7ment 0nde

    5pdate eistin# p8atform 0") $ist

    5pdate eistin# p8atform Cab8e Sched78e

    5pdate eistin# p8atform $oop Dia#rams

    5pdate eistin# p8atform Ca7se and *;ect Dia#ram

    5pdate eistin# p8atform 0nstr7ment $ocation P8ans

    Provide 0nstr7ment s7pport to proc7rement en#ineerin# i!e! technica8 bideva87ation6 vendor data review of C0 packa#e

    Deve8op overa88 0CSS phi8osophy

    Deve8op the 0CSS Desi#n Basis

    Prepare a88 specications6 and data sheets to s7itab8e desi#n conditions! 0ncorporate a88 instr7ment and contro8 as detai8ed on the PH0Ds

    Deve8op P$C and 0CSS b8ock dia#rams

    Deve8op software for 0CSS system

    Prepare contro8 schematics and interconnection dia#ram

    Prepare 7pdate 0") 8ist

    Prepare instr7mentation 8ayo7ts

    Prepare detai8 cab8e ro7tin# inc87din# any s7pports 8ayo7ts!

    Prepare t7bin# inc87din# any s7pports 8ayo7t

    Prepare detai8 s7pport for instr7ments

    Prepare wirin# termination detai8 Prepare 8o#ic dia#rams for 0CSS6 Contro8 $o#ics!

    Deve8op the desi#n for re and #as detection systems if re:7ired

    Deve8op ca7se and e;ect ISA+*J charts6 as part of the desi#n to cover *SD 8o#ic

    and +H 8o#ic

    0nstr7ment Specications

    Ca7se and e;ect matri

    Preparation of Data sheets for new e:7ipment and instr7ments based on

    eistin# pro

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    12/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    0nstr7ment H contro8 p7rchase specications

    0ss7e s7mmari?e /%) inc87de misce88aneo7s materia8 for *CR

    0nstr7mentIsJ as mentioned here means process Ipress7re6 temperat7re6 Kow68eve8 6 va8ve contro8sJ

    S'3'%

    Provide Str7ct7ra8 inp7t to *:7ipment $ayo7ts

    Prepare 8oca8 *:7ipment S7pport detai8 drawin#s for p7mp skids and day tanks

    Perform 8oca8ised *:7ipment S7pport checks

    Provide Str7ct7ra8 inp7t to proc7rement en#ineerin# i!e! technica8 bid

    eva87ation6 vendor data review of C0 packa#e

    **. PROCUREMENT:

    /ateria8s for the new skids

    Contractor is re:7ested to o;er a 87mp s7m prices to cover a88 the permanentmateria8s to b7i8d a new chemica8 in

  • 5/19/2018 Scope of work for new chemical skid on PQP-HT Draft copy for information.doc

    13/13

    SCOPE OF WORKS FOR ENGINEERING, PROCUREMENT,ONSHORE CONSTRUCTION, OFFSHORE

    INSTALLATION/TIE-IN & COMMISSIONING FOR NEWCHEMICAL INJECTION SKIDS ON PQP-HT

    BDP)C wi88 be responsib8e for o;shore transportation to"from PP-&%! );shore beds Tmea8s wi88 be provided by BDP)C!

    +*. OFFSHORE INSTALLATION:

    +ina8i?e concept"+ina8i?e the re:7irements Sept-)ct 2=14 Contract na8i?e Dec 2=14!

    *n#ineerin# 'ov 2=14 . Dec 2=14 I7nder contractor scope of worksJ

    Proc7rement 8on# 8ead items an 2=1@ to Apri8 2=1@ IP7mps"fabrication ofskidsJ

    );shore modication"insta88ation 7ne 2=1@!