Upload
omar-cherkaoui
View
222
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Files and slides of SCOPE sessions AM12
Citation preview
SCOPE Sessions AM12Day 4
Roll Call
Excemption 40% unilateral quota
• Argentina
Bylaw discussions
Candidate Presentations 2012- 13
SCOPE D:
David Ekow Arku (FGMSA Ghana)
LORMA:
Maria Aroca (AECS Catalonia)
Presentation new NMOs
• Kenya• Morocco• Belgium• China
New Database
• http://www.ifmsa.org
• Login > sign up > register with username: firstname.lastname and official NEO E-mail address
• Approval by NTSDD or SCOPE D
New Database: Contracts 2013- 14
1. Back- up: sign contracts in old database (www.ifmsa.net) but DON‘T USE THEM
2. Postponed contracts: postpone them in old database + transfer them later manually to the new database
3. TRIAL of new database August 13th to August 31st 2012: all NEOs sign contracts and go through all „normal steps“ of exchange
4. Google document: sharing of problems, bugs, improvement tips ONLY NEOs
5. Start September 1st 2012: New database on „reset“. Official signing of contracts 2013- 14 in new database (www.ifmsa.org) and start of OFFICIAL USE OF NEW DATABASE
Timeline New Database
• Contract with old database (www.ifmsa.net) valid until July 2013 (with option to prolong) = BACK- UP
• August 13th – August 31st final TRIAL all NEOs
• September 1st: FULL USAGE NEW DATABASE
http://www.ifmsa.org
SWGs SCOPE sessions AM12
SWGs SCOPE sessions AM12
Check- out