4
SCOTTSDALE WATER CAMPUS WATER CAMPUS Scottsdale, AZ Application: Municipal Drinking Water Membrane Pretreatment AquaDA F ® Membrane Pretreatment Turbidity, Algae & TOC Removal

SCOTTSDALE AquaDAF WATER CAMPUS - Cornerstone€¦ · INFILCO DEGREMONT INC. 8007 DISCOVERY DRIVE RICHMOND, VA 23229 USA TEL 804 756-7600 | FAX 804 756-7643 . Scottsdale Water Campus

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SCOTTSDALE AquaDAF WATER CAMPUS - Cornerstone€¦ · INFILCO DEGREMONT INC. 8007 DISCOVERY DRIVE RICHMOND, VA 23229 USA TEL 804 756-7600 | FAX 804 756-7643 . Scottsdale Water Campus

SCOTTSDALE WATER CAMPUSWATER CAMPUSScottsdale, AZ

Application:Municipal Drinking WaterMembrane Pretreatment

AquaDAF®

Membrane PretreatmentTurbidity, Algae & TOC Removal

Page 2: SCOTTSDALE AquaDAF WATER CAMPUS - Cornerstone€¦ · INFILCO DEGREMONT INC. 8007 DISCOVERY DRIVE RICHMOND, VA 23229 USA TEL 804 756-7600 | FAX 804 756-7643 . Scottsdale Water Campus

Scottsdale Water Campus

QUICK FACTS:> CAPACITY: 25 0 MGD

SITUATION/BACKGROUNDThe City of Scottsdale, AZ has seen a populationgrowth of roughly 35% over the past 10 years

Scottsdale Water CampusScottsdale, Arizona

> CAPACITY: 25.0 MGD

> APPLICATION: Membrane Pretreatment

> NO. OF UNITS: 2

> DAF LOADING RATE: 10.3 gpm/ft2

> REP FIRM: Coombs-Hopkins, Inc.

> COMPLETION DATE: 2009

growth of roughly 35% over the past 10 years,which put pressure on the existing drinking watersupply. In 2006, the Scottsdale Water Campusconsulted a local firm to assess and expand theexisting 53 MGD facility to a 75 MGD facility. Theexisting facility consists of a conventionalsedimentation and granular media filtrationsystem. Rather than expand the existingprocesses, the city wanted to explore a more> COMPLETION DATE: 2009 processes, the city wanted to explore a moreadvanced treatment line to include high-rateclarification and membrane filtration.

In 2006, the Water Campus undertook anextensive pilot study, which included theevaluation of high-rate DAF, high-rate sand-ballasted clarification for pretreatment and severalmembrane filtration technologies.

SOLUTIONg

The high-rate AquaDAF® system was selected as the best solution based on overall performance,footprint, and operational costs for pretreatment to membrane filtration. The DAF process was the clearchoice with regard to effective removal of turbidity, algae and TOC prior to membranes. And unlike thesand-ballasted system the DAF will operate without the need for a flocculant polymer and ballastmaterial, which is undesirable as it is potentially detrimental to the fouling potential and longevity of themembrane fibers. Additional favorable factors in the selection of DAF were low waste flow, thickenedsolids of 2 4% ease of use and low maintenance requirements

SOLUTION

solids of 2-4%, ease of use and low maintenance requirements.

INFILCO DEGREMONT INC.8007 DISCOVERY DRIVE

RICHMOND, VA 23229 USATEL 804 756-7600 | FAX 804 756-7643www.DEGREMONT-TECHNOLOGIES.com

Page 3: SCOTTSDALE AquaDAF WATER CAMPUS - Cornerstone€¦ · INFILCO DEGREMONT INC. 8007 DISCOVERY DRIVE RICHMOND, VA 23229 USA TEL 804 756-7600 | FAX 804 756-7643 . Scottsdale Water Campus

Scottsdale Water Campus

SITUATION/BACKGROUND

Scottsdale Water CampusScottsdale, Arizona

PARAMETER CRITERIA

DESIGN CRITERIA

DAF Design Loading Rate 25 MGD

No. of DAF Basins 2

DAF Loading Rate 10.3 gpm/ft2

Flocculation Time 12 minutes

Sludge Removal Method Mechanical Scraping

Raw NTU < 100 NTU, DAF < 2 NTUDAF Process Performance

Raw NTU > 100 NTU, DAF < 5 NTU

Full Scale AquaDAF Performance Testb h

PERFORMANCE RESULTS

February 25 – March 4, 2010

RUN #DAF Flowrate (MGD) DAF Effluent Turbidity (NTU)

Daily Average Daily Maximum Daily Average

1 18.4 21.5 0.87

2 18.6 21.4 0.85

3 18.5 21.0 0.83

4 18.4 22.3 0.97

5 18.7 21.5 1.00

6 18.5 20.8 1.09

7 18.8 20.0 1.06

8 17.1 22.1 1.66

9 18.9 23.9 1.89

10 18.9 24.6 1.35

11 18.7 22.5 1.02

12 19.0 22.6 0.85

13 19.1 22.2 0.81

14 19.2 22.1 0.77

INFILCO DEGREMONT INC.8007 DISCOVERY DRIVE

RICHMOND, VA 23229 USATEL 804 756-7600 | FAX 804 756-7643www.DEGREMONT-TECHNOLOGIES.com

Page 4: SCOTTSDALE AquaDAF WATER CAMPUS - Cornerstone€¦ · INFILCO DEGREMONT INC. 8007 DISCOVERY DRIVE RICHMOND, VA 23229 USA TEL 804 756-7600 | FAX 804 756-7643 . Scottsdale Water Campus

Scottsdale Water CampusScottsdale Water CampusScottsdale, Arizona

New Membrane Buidling

New AquaDAFSystem 25 MGD

Existing Conventional

Floc/Sed Basins

60 MGD Capacity

INFILCO DEGREMONT INC.8007 DISCOVERY DRIVE

RICHMOND, VA 23229 USATEL 804 756-7600 | FAX 804 756-7643www.DEGREMONT-TECHNOLOGIES.com