SdeneA dgcatjonskiteeejoneIWorxyaton WBS # 1.2.9.1.4
Q N/A
April 27, 1969
TO: Distribution
SUBJECT: Contract I DE-ACQ8-87NV10576Project Master List of Controlled Documents
Enclosed for your information and use is the Yucca Mountain Project Master
List of Controlled Documents, identifying the versions current as of April 25,
1989. This listing of document status should be used to verify that documents
held for use are current and that out-of-date material is not used for the
conduct of Project work.
Copies of revisions to these documents are forwarded to controlled document
holders so the controlled sets can stay current. If deficiencies in the
controlled copies of these documents are identified, correct copies may be
obtained by forwarding deficiency listings to the attention of John H. Nelson
at the company address listed below:
John H. NelsonProject ManagerA'TTN: Document ControlScience Applications International Corporation101 Convention Center Drive, Suite 407Las Vegas, NV 89109
If you have any questions regarding this matter, please contact Elaine Cotten
at FTS 544-7047 or (702) 794-7047.
SCIENCE APPLICATIOINTERNMIIONAL .O9P0BATION
I jJohn H. NelsonProject Manager
JHN:EC:mdm
Enclosure:As stated
8905090369 890427PEIR WASTE PEIC
101 Convention Center Dr.. Ste. 407. LS$ Vegas. NVO910 (702)295-1204
Ofrer SAIC OffCobs An,- 4'oov Arefs AW lantA atoW ChCAw. iUntaR1 0 Li Jof Los Anqeas McL"n. Ortao. Sant jgatwoa. Srunwae ana ed 7 cson
PMLLTEXTASOB SCAN
S. C. Adams, Harza, M/S-517Harald Ahagan, Project Office, M/S-523C. G. Aiello, H&N, M/S-519S. B. Ailes, SAIC, M/S-517L. Akridge, EPA/NV, M/S-513D. H. Alexander, DOE/HQ (RW-332)C. A. Alm, SAIC, M/S-517K. L. Anderson, H&N, M/S-943W. B. Andrews, SAIC, M/S-517Gordon Appel, DOE/HQ (RW-332)M. R. Arenaz, SAIC, M/S-517R. J. August, DOE/HQ (RW-14)M. Azhikakath, REECo, M/S-625Gerri Babero, DOE/RMBDA. L. Baca, Project Office, M/S-523Dick Baehr, SNLR. J. Bahorich, Westinghouse, M/S-517L. B. Ballou, LLNLL. M. Barns, SAIC, M/S-517L. H. Barrett, DOE/HQR. V. Barton, Project Office, M/S-523S. J. Bauer, SNLCatherine Bautista, H&NG. K. Beall, SAIC, M/S-517W. L. Belke, NRC, M/S 4H-3Richard Belyea, SAIC, M/S-517C. B. Bentley, USGS/LVF. Bentley, EG&GC. L. Biddison, SAIC, M/S-517F. W. Bingham, SNLT. W. Bjerstedt, Project Office, M/S-523S. Black, EPA/NV, M/S-513M. B. Blanchard, Project Office, M/S-523James Blaylock, Project Office, M/S-523T. E. Blejwas, SNLJ. L. Blue, SAIC, M/S-517S. Bohlke, PBQ&DH. W. Booth, F&S/LVM. J. Borich, SAIC, M/S 517Judith Bradbury, SAIC/Oak RidgeMarge Brake, H&NEldron Bray, DOE/Grand JunctionKathy Brennan, Westinghouse, M/S-517B. J. Brent, SAIC, M/S-517J. C. Bresee, DOE/HQPatrice Brewington, DOE/ILC. M. Brizeno, SAIC, M/S-517Steve Brocoum, DOE/HQ (RW-221)J. J. Brogan, SAIC, M/S-517C. E. Brooks, DOE/HQDon Brown, H&N, M/S-519M. L. Brown, SAIC, M/S-517
R. E. Browning, NRCG. T. Bruesch, F&S, M/S-940B. A. Bryan, LLNLP. E. Bryant, SAIC, M/S-517R. L. Bullock, F&S, M/S-403Diana Burasco, H&N/Mercury, M/S-605A. E. Burer, H&N, M/S-258L. L. Byars, SNLM. E. Giampaoli-Buqo, SAIC, M/S-517H. H. Caldwell, SAIC, M/S-517J. C. Calovini, H&N, M/S-519S. D. Cameron, SAIC/SDLorie Campbell, SAIC, M/S-517M. K. Campbell, SAIC, M/S-517Julie Canepa, LANLN. E. Carter, SAIC, M/S-517S. A. Carter, Project Office, M/5-523A. P. Cavazos, SAIC, M/S-517Barbara Cerny, DOE/HQT. H. Chaney, USGS, M/S-421E. P. Chen, SNLK. K. Church, SAIC, M/S-517B. R. Chytrowski, F&S/LVE. M. Cikanek, Harza, M/S-517U. S. Clanton, Project Office, M/S-523James Clark, SAIC, M/S-517Joanne Clark, LLNLK. M. Cline, WestonTom Colandrea, EEIAngela Colarusso, SAIC, M/S-517Eric Cole, LLNLWilliam Colucci, EPA/NRAD, M/S-513Manny Comar, DOE/HQ (RW-223)Z. J. Conway, SAIC, MIS--17C. F. Costa, EPA/NRAD, M/S-513L. S. Costin, SNLElaine Cotten, Westinghouse, M/S-517I. R. Cottle, SAIC, M/S-517M. D. Cotter,SAIC,M/S-517William Cotter, H&N, M/S-223D. E. Cover, SAIC/C. PT.L. K. Cox, F&S, M/S-940N. D. Cox, SAIC, M/S-517Steve Craft, EEIBob Craig, USGS/L.V.R. A. Crawley, Project Office, M/S-523J. A. Cross, F&S, M/S-514Bill Cross, H&N, M/S-607Prof. J. Daemen, Univ. of AZ.Gary Daer, SAIC, M/S-517M. K. Daley, SAIC, M/S-517Steve Dalich, SAIC/C. PT.Joseph Daly, DOE/HQ (RW-123)
PAGE 1 OF 6
S. R. Dana, SAIC, M/S-517J. M. Davenport, SAIC, M/S-517Ed Davis, ANECM. J. Davis, SAIC/ALBQD. M. Dawson, SAIC, M/S-517Richard DeKlever, H&N/LV, M/S-519Nello Del Gobbo, DOE/HQ (RW-3)Marie DeMartino, SAIC, M/S-517S. R. Dengler, SNLA. W. Dennis, SNLW. B. Devlin, SAIC, M/S-517George Dewey, SAIC, M/S-517W. R. Dixon, Project Office, M/S-523D. C. Dobson, Project Office, M/S-523Document Control*, SAIC, M/S-517H. Z. Dokuzoguz, SAIC, M/S-517John Doyle, SAIC, M/S-517J. J. Dronkers, LLNLW. W. Dudley, USGSM. M. Dussman, SAIC, M/S-517J. R. Dyer, Project Office, M/S-523George Dymmel, Project Office, M/S-523S. A. Edmund, SNLR. D. Edwards, Project Office, M/S-523S. R. Elliot, DOE/SHD, M/S-505R. K. Ely, H&Nr. C. Emerson, LLNLD. B. Eppler, SAIC, M/S-517J. W. Estella, SAIC, M/S-517G. A. Fasano, SAIC, M/S-517Gary Faust, WestonJ. E. Ferguson, F&S, M/S-403J. A. Fernandez, SNLLisa Fetzer, SAIC, M/S-517Ray Finley, SNLJ. H. Fiore, SAIC, M/S-517P. K. Fitzsimmons, DOE/HPED, M/S-505Michale Flanigan, DOE/Argonne, ILR. J. Flores, SNLM. I. Foley, SAIC, M/S-517B. D. Foster, SAIC, M/S-517Karen Foster, LATALynda Fox, SAIC, M/S-517M. A. Fox, REECo, M/S-408S. D. Francis, LANLD. L. Fraser, REECo, M/S-555M. W. Frei, DOE/HQ, (RW-22)W. K. Frey, SAIC, M/S-517C. J. Fridrich, Project Office, M/S-523T. A. Frisk, SAIC, M/S-517J. E. Frye, DOE/HQ (MA-231.4)D. A. Furbush, SAIC, M/S-517Robert Gamble, Weston
B. R. Gardella, REECo, M/S-408Les Gardine, National Inc.J. T. Gardiner, Project Office, M/S-523B. B. Garms, F&S, M/S-514E. C. Garnett, H&N, M/S-519C. W. Garvin, SAIC, M/S-517David Gassman, DOE/OCC, M/S-505Dick Gast, F&S, M/S-514R. E. Gates, MACTEC, M/S-502H. B. Gayle, H&N, M/S-519P. D. Gehner, H&N, M/S-519J. J. George, LATAC. P. Gertz, Project Office, M/S-523Dan Gillies, USGS/DenverJ. W. Gilray, NRCW. A. Girdley, Project Office, M/S-523V. M. Glanzman, USGSW. E. Glassley, LLNLM. A. Glora, SAIC, M/S-517Vincent Gong, REECo, M/S-408M. M. Gonzales, SNLDr. R. Gotchy, SAIC/McLeanF. L. Gowers, SAIC, M/S-517R. B. Graham, SAIC, M/S-517T. A. Grant, SAIC, M/S-517J. A. Gray, SAIC, M/S-517L. M. Gron, SAIC, M/S-517E. R. Gruer, SNLKimberly Guerino, SAIC, M/S-517Georgette Guzzetta, SAIC, M/S-517P. B. Hale, F&S, M/S-514H. J. Hall, H&N, M/S-519C. E. Hampton, Project Office, M/S-523S. P. Hans, SAIC, M/S-517L. J. Hansen, LLNLM. E. Happ, H&N, M/S-943E. L. Hardin, SAIC, M/S-517R. W. Hardwick, SAIC, M/S-517R. H. Harig, PBQ&DG. T. Harper, MACTEC, M/S-502David Harris, Bureau of ReclamM. A. Harris, SAIC, M/S-517K. K. Hatch, Project Office, M/S-523D. Y. Hattler, SAIC, M/S-517L. R. Hayes, USGS, DenverC. R. Head, DOE/HQ, (RW-322)HPE/Radiological Operation &
Defense Waste Branch, DOE/HPEGerald Heaney, SAIC, M/S-517J. A. Hedden, SAIC, M/S-517Dale Hedges, CER CorporationG. W. Heitland, SAIC, M/S-517E. J. Helley, USGS
PAGE 2 OF 6
R. G. Helms, SAIC, M/S-517C. C. Herrington, SAIC, M/S-517R. J. Herbst/LANLB. Y. Hersh, SAIC, M/S-517E. S. Hertel, SNLT. J. Higgins, SAIC, M/S-517R. R. Hill, SNLJ. H. Hines, DOEIALBQT. E. Hinkebein, SNLL. V. Hoffman, SAIC, M/S-517J. F. Holland, SNLG. Hollen, LATAJ. J. Holonich, NRC/High-Level WasteElgie Holstein, Rep. of Nye CountyB. C. Hopkins, SAIC, M/S-517D. T. Hoxie, USGS, DenverD. G. Hubbard, MACTEC, M/S-402S. L. Hughes, REECo, M/S-614W. T. Hughes, Project Office, M/S-523Jim Hughlett, DOE/TNT. 0. Hunter, SNLB. W. Hurley, SAIC, M/S-517Jerry Hyde, DOE/HQ (RW-223)K. L. Ingenthron, SAIC, M/S-517Vince Iorii, Project Office, M/S-523T. H. Isaacs, DOE/HQMartin Jablonski; SAIC, M/S-517Pamela Jackson, h&N, M/S-519R. E. Jackson, WestonE. V. Jankus, Project Office, M/S-523J. A. Jardine, SAIC, M/S-517L. J. Jardine, BechtelAndrea Jennetta, SAIC, M/S-517L. E. Jensen, SAIC, M/S-517D. R. Jerez, WestonCarl Johnson, State of Nev.Gladys Johnson, SAIC, M/S-517J. M. Johnson, F&S, M/S-697K. B. Johnson, SAIC, M/S-517R. L. Johnson, NRCL. F. Jones, SAIC, M/S-517S. B. Jones, Project Office, M/S-523D. B. Jorgenson, SAIC, M/S-517Tom Juarez, EG&G/EM, SBO/A-01R. D. Kaiser, Project Office, M/S-523S. H. Kale, DOE/HQH. N. Kalia, LANL/VBC/LV, M/S-527P. C. Kaplan, SNLJ. D. Kaprowicz, DOE/ChicagoN. R. Karas, SAIC, M/S-517P. J. Karnoski, SAIC, M/S-517Jefferry Kass, LLNLG. A. Kaufman, SAIC, M/S-517
Mike Kearney, WestonCarl Keller, Science & EngineeringD. D. Keller, SAIC, M/S-517J. Kennedy, NRCR. A. Kettell, SAIC, M/S-517C. J. Kilpatrick, SAIC, M/S-517J. K. Kimball, DOE/HQ (RW-221)J. L. King, SAIC, M/S-517G. C. Kingham, SAIC, M/S-517R. L. Kimble, SAIC, M/S-517A. R. Kirk, SAIC, M/S-517L. J. Klamerus, SNLK. A. Klein, DOE/HQ (RW-30)S. H. Klein, SAIC, M/S-517R. H. Klemens, SAIC, M/S-517Robert Klett, SNLD. A. Klimas, SAIC, M/S-517D. L. Koss, REECo, M/S-408L. E. Krivanek, Project Office, M/S-523M. P. Kunich, DOE/QADK. A. LaForest, SAIC, M/S-517Ram Lahoti, DOE/HQ (RW-223)Bill Langer, USGS, DenverB. S. Langkopf, SNLT. W. Laub, SNLJudith Leahy, DOE/HQ, (RW-23)H. E. Leake, SAIC, M/S-517Joanne Kane-Ledbetter, H&N, M/S-519Lynda Lee, Westinghouse, M/S-517R. C. Lee, SAIC, M/S-517Shan Chu Lee, EPA/NRAD, M/S-513R. A. Levich, Project Office, M/S-523B. D. Lewis, USGSChris Lewis, SMF-Area 25/NTSTerri Lezcano-Kirch, SAIC, M/S-517J. J. Linehan, NRC/Wash.Dr. E. N. Lindner, BattelleL. E. Little, Project Office, M/S-523D. E. Livingston, Project Office, M/S-523R. W. Lizut, SNLJ. J. Lorenz, Project Office, M/S-523Loren Lorig, ICGR. R. Loux, State of NVMike Lugo, WestonC. Lui, EPA/NV, M/S-513T. M. Luke, SAIC, M/S-517A. MacIntosh, H&N, M/5-223W. V. Macnabb, SAIC, M/S-517J. L. Madsen, MACTECB. J. Malcolm, WestonD. G. Malcolm, SAIC, M/S-517W. B. Mansel, Project Office, M/S-523Vilijia Markunas, SNL
PAGE 3 OF 6
G. A. Mansur, SAIC, M/S-517D. R. Martin, DOE/SHD, M/S-505S. C. Matthews, SAICA. C. Matthusen, SAIC, M/S-517D. E. McAlister, SAIC, M/S-517E. W. McCann, SAIC, M/S-517J. H. McConville, Harza, M/S-517K. T. McFall, SAIC, M/S-517Charles McFarland, Env. Eval. GroupB. L. McKinnon, SAIC, M/S-517J. E. McNeely, H&NJ. E. Mecca, SAIC, M/S-517E. E. Melander, SAIC, M/S-517P. C. Merkley, SAIC, M/S-517T. J. Merson, LANL, M/S-527Stephen Metta, SAIC, M/S-517M. B. Mirza, F&S/LV, M/S-514D. L. Mogar, SAIC, M/S-517Nancy Montgomery, EEIK. W. Moore, SAIC, M/S-517Carl Mora, SNLN. A. Morley, Project Office, M/S-523Kathleen Moroney, EPA/NRAD, M/S-513R. P. Morrisette, SAIC, M/S-517G. P. Morrison, SAIC, M/S-517Evert Mouser, H&NM. J. Mrug7ala, F&S/LVP. J. Mudra, SAIC, M/S-517R. B. Murthy, Project Office, M/S-523R. G. Musick, H&N, M/S-519T. N. Narasimhan, LBLJ. R. Narron, SAIC, M/S-517W. E. Narrows, SAIC, M/S-517J. H. Nelson, SAIC, M/S-517Judy Nelson, KOH SystemsRichard Nelson, DOE/HQ (CP-3)T. A. Nelson, LLNLNV Tech Library, OPAL, M/S-505C. M. Newbury, Project Office, M/S-523M. F. Nicol, ADV. SciencesD. L. Nidy, SAIC, M/S-517D. A. Nilsen, SAIC, M/S-517F. B. Nimick, SNLSteve Nolan, SAIC, M/S-517T. W. Noland, Westinghouse, M/S-523H. P. Nunes, SNLJ. W. Nunziato, SNLD. T. Oakley, LANLW. J. O'Connell, LLNLTom O'Farrell, EG&G/NV, M/S-570-PO3Office of External Relations and
Policy, DOE/HQ (RW-40)
Offiee of Facilities Siting andDevelopment, DOE/HQ (RW-20)
Office of Program Administrationand Resources Management, DOE/HQ (RW-10)
Office of Quality Assurance, DOE/HQ (RW-3)Office of Systems Integration and
Regulations, DOE/HQ (RW-30)P. K. Ortego, F&S, M/S-940Gabriel Ortiz, LANLW. R. Owel, SAIC, M/S-517L. J. Owens, Project Office, M/S-523T. L. Pane, SAIC, M/S-517James Panico, SAIC/C. PT.U-Sun Park, SAIC, M/S-517F. B. Parker, SAIC, M/S-517D. K. Parrish, RE/Spec.M. W. Parsons, SAIC, M/S-517W. C. Patrick, CNWRA/TXE. A. Patzer, Battelle/OHJohn Peck, SAIC, M/S-517J. P. Pedalino, H&N, M/S-J521, N-5M. W. Pendleton, SAIC, M/S-517F. D. Peters, SAIC, M/S-517R. R. Peters, SNLA. C. Peterson, SNLRobert Peterson, Bureau of ReclamE. H. Petrie, Project Office, M/S-523Chris Pflum, SAIC, M/S-517J. Phillips, SNLStan Phillips, SAIC, M/S-517Robert Philpott, DOE/HQ (RW-421)L. Pippin, DRIB. J. Plumley, SAIC, M/S-517K. A. Polivka, Harza, M/S-517R. B. Pope, SAIC/OakridgeDarrell Porter, SAIC/GoldenAllyn Pratt, LANLHoward Pratt, SAIC/C. PT.P. T. Prestholt, NRCR. H. Price, SNLJ. K. Prince, SAIC, M/S-517R. W. Prindle, SNLR. F. Pritchett, REECo, M/S-408G. H. Prowell, SAICK. Pruess, LBLC. D. Putz, SAIC, M/S-517Quality Assurance Division, DOE/QADFlorencio Ramirez, DOE/SFRobert Ramsgate, SAIC, M/S-517L. D. Ramspott, LLNLS. L. Randolph, SAIC, M/S-517J. L. Rast, SAIC/Oak Ridge
PAGE 4 OF 6
Dr. Joe Ratigan, RE/Spec.R. B. Raup, USGSChris Rautman, SNLBeverly Rawles, KOH SystemsLinda Raymer, SAIC, M/S-517M. J. Regenda, F&S, M/S-697E. C. Rehkop, Project Office, M/S-523Ina Reinhardt, SAIC, M/S-517J. M. Replogle, H&N, M/S-519M. A. Revelli, LLNLR. R. Richards, SNLResource Center, SAIC, M/S-517George Riling, DOE/HQ (RW-123)Ed Ripley, SAIC, M/S-517Gary Roberson, SAIC, M/S-517A. J. Roberts, DOE/RMB, M/S-505Janet Robertson, SAIC, M/S-517L. D. Robertson, SAIC, M/S-517J. K. Robson, Project Office, M/S-523J. M. Roccapriore, DOE/HQ (RW-122)W. J. Rodgers, SAIC, M/S-517E. T. Rodriguez, Project Office, M/S-523J. A. Roll, Westinghouse, M/S-517Samnuel Rousso, DOE/HQJ. L. Rue, F&S/LVDr. J. L. Russell, S.W. Research Inst.F. J. Ruth, SAIC, M/S-517J. F. Ryan, SAIC, M/S-517Ronald Sabol, H&N, M/S-605Angie Sacco, Project Office, M/S-523J. D. Saltzman, DOE/HQ (RW-20)R. P. Sandoval, SNLA. M. Sastry, MACTEC, M/S-402A. M. Scammell, Project Office, M/S-523F. J. Schelling, SNLJ. A. Schleef, SAIC, M/S-517D. L. Schleicher, USGSY. M. Schmitt, SAIC, M/S-517R. L. Schreiner, H&N, M/S-519Linda Schroeder, SAIC, M/S-517Ronald Schwartz, LLNLKeith Schwartztrauber, SAIC, M/S-517J. D. Scott, F&S, M/S-514L. W. Scully, SNLC. L. Sellards, SAIC, M/S-517Don Schlick, Project Office, M/S-523J. E. Shaler, SAIC, M/S-517S. E. Sharpton, SNLH. F. Shaw, LLNLG. R. Sheldon, SNLE. W. Shepherd, SNLL. E. Shepherd, SNLD. Short, LLNL
D. L. Siefken, WestonJ. E. Siefken, Weston/Wash. D.C.L. W. Simmons, SAIC, M/S-517Sue Simms, SAIC, M/S-517M. T. Simpson, SAIC/GoldenS. H. Sims, SAIC, M/S-517Scott Sinnock, SNLC. D. Smith, H&NC. M. Smith, DOE/HQ, (RW-421)H. D. Smith, SAIC, M/S-517J. V. Smith, SAIC, M/S-5170. D. Smith, SAIC, M/S-517S. C. Smith, SAIC, M/S-517Robert Snelling, EPA/LV, M/S-513N. J. Snyder, Project OfficeK. G. Sommer, DOE/HQ (RW-3)M. E. Spaeth, SAIC/SD, M/S-512E. L. Spangler, SAIC, M/S-517Charlene Sparkman, F&S/TulsaN. K. Stablein, NRCP. J. St. Marie, H&N, M/S-606Jan Statler, SAIC, M/S-517D. Steele, LATARalph Stein, DOE/HQJ. N. Stellavato, SAIC, M/S-719A. E. Stephenson, SAIC, M/S-517A. W. Stevens, SNLC. L. Stewart, SAIC, M/S-517,Site IntegraJ. E. Stiegler, SNL/6310R. E. Stinebaugh, SNLR. W. Stoffle, University of MichiganEd Straker, SAIC/C. PT.S. 0. Straub, REECo, M/S-408Study Plan Coordinator, DOE/HQW. R. Sublette, SAICe M/S-517Ruth Sutherland, KOH SystemsR. J. Sweeney, SAIC, M/S-517J. S. Szymanski, Project Office, M/S-523B. A. Tabaka, SAIC, M/S-517A. D. Tacelli, SAIC, M/S-517M. A. Tang, SNLR. D. Tate, H&N, M/S-605Chuck Taylor, SAIC, M/S-517J. G. Taylor, SAIC, M/S-517Howard Tewes, LLNLJ. E. Therien, SAIC, M/S-517D. W. Thomas, F&S/LVW. F. Thomas, SAIC, M/S-517C. M. Thompson, SAIC, M/S-517M. C. Thompson, REECo, M/S-408Mary Thompson, SAIC, M/S-517P. J. Thompson, SAIC, M/S-517Dawn Thomure, Project Office, M/S-523
PAGE 5 OF 6
D. Thome, EPA/NV, M/S-513M. S. Tierney, SNLJ. R. Tillerson, SNLP. Tillery, LATAR. L. Tome, SAIC, M/S-517Linda Townsend, SAIC, M/S-517J. S. Treadwell, SAIC, M/S-517Lorraine Trevino, SAIC, M/S-517Tom Trevino, SAIC/C. PT.Chao-Hsiung Tung,
EPA/NRAD, M/S-513C. W. Tucker, SNLH. R. Tuthill, H&N, M/S-605P. K. Vacca, F&S/LV, M/S-514Mike Valentine, Project Office, M/S-523Carleen Van House, SAIC, M/S-517R. L. Vasquez, SAIC, M/S-517A. R. Veloso, NTSO, M/S-701J. D. Verden, H&N, M/S-519M. D. Voegele, SAIC, M/S-517L. W. Vogel, SAIC/McLeanS. M. Volek, SAIC, M/S-517Nancy Voltura, Project Office, M/S-523J. D. Waddell, SAIC, M/S-517P. Wade Austin, SAIC/McLeanC. A. Wagner, SAIC, M/S-517P. A. Walden, LLNLDonna Waltjen, SAIC, M/S-517Charles Ward, H&N, M/S-519Peggy Warner, SAIC/GoldenD. R. Warriner, REECo, M/S-550R. S. Waters, Project Office, M/S-523Dick Watkins, USGS, DenverT. L. Watson, HarzaJ. A. Wayman, SAIC, M/S-517Dave Wayman, SAIC, M/S-517Robert Webb, EG&G/MS-Y05R. A. Weeks, SAIC, M/S-517Chris Weiss, SAIC, M/S-517Sharon Welch, SAIC, M/S-719K. A. West, LANLR. G. West, SAIC, M/S-517Merrick Whitfield, USGS, DenverV. F. Whitherill, DOE/NTS, M/S-701B. C. Whittet, SNLDale Wilder, LLNLA. C. Williams, Project Office, M/S-523Clarence Williams, BattelleS. H. Williams, H&N, M/S-519J. R. Willmon, USGS, M/S-421Cathy Wills, EG&G/NV, M/S-570 P03E. L. Wilmot, Project Office, M/S-523M. H. Wilson, F&S, M/S-403W. A. Wilson, Project Office, M/S-523
R. L. Wise, SAIC/GoldenDodie Witham, EPA/NRAD, M/S-513K. M. Wolverton, SAIC, M/S-517G. D. Woodard, H&N, M/S-519S. W. Woolfolk, SAIC, M/S-517B. R. Woolsey, H&N, M/S-258Barbara Wright, SAIC, M/S-517C. 0. Wright, H&N, M/S-519William Wright, SAIC/C. PT.J. G. Yeager, SNLD. A. York, LANLJ. L. Younker, SAIC, M/S-517K. D. Young, SNLJ. L. Yow, LLNLR. S. Ziegenbein, H&N, M/S 605Susan Zimmerman, State of NV
PAGE 6 OF 6
TABLE OF CONTENTS
PAGEOffice of Civilian Radioactive Waste Management Documents .1.. . . . . . IOffice of Geologic Repositories Documents . . . . . . . . . . . . . . . . 3Yucca Mountain Project Documents . . . . . . . . . . . . . . . . . . . . 4Yucca Mountain Project Office Documents ... . . . . . . . . . . . . . . 15Technical & Management Support Services Documents . . . . . . . . . . . . 17
i
April 25, '39a
OFFICE OF CIVILIAN RADIOACTIVE WASTE MANAGEMENT DOCUMENTS
EffectiveDateDocument ID Title Revision
DOE/RW-0042** (notebook)
DOE/RW-0043
DOE/RW-0119
DOE/RW-0051
DOE/RW-0223
N/A**(notebook)
DOE/RW-0091
DOE/RW-0063
DOE/RW-0197** (notebook)
QAAP 2.1QAAP 2.5
Program Management SystemPolicies and Procedures(Manual)
Program Management SystemManual
OCRWM Safety Plan
Systems Engineering ManagementPlan (SEMP)
Program Change Control Procedure
Program Baseline Documents
* Program Reference ScheduleBaseline
* Waste Management SystemsRequirements and Descriptions (SRD)
Quality Assurance AdministrativeProcedures
Indoctrination and TrainingQuality Assurance ProgramDocument Review
Readiness ReviewTechnical Document ReviewDesign ReviewPeer ReviewPreparation of Quality AssuranceAdministrative Procedures
Corrective ActionCertification of Audit PersonnelAudit ProgramSurveillance Program
2
0
0
12/22/86
12/18/86
10/01/85
1 02/01/89
1
0
07/28/87
01/01/86
0
00
02/24/89
03/27/8903/27/89
03/27/8903/27/8903/27/8903/27/8903/27/89
QAAPQAAPQAAPQAAPQAAP
QAAPQAAPQAAPQAAP
2.63.13.23.35.1
16.118.118.218.3
00000
0000
03/27/8903/27/8903/27/8903/27/89
* Baseline Document**(notebook) This is a notebook binder to hold the
it in the list.documents indented below
1
I
April 25, 1989
OFFICE OF CIVILIAN RADIOACTIVE WASTE MANAGEMENT DOCUMENTS (CONTINUED)
EffectiveDateDocument ID Title Revision
DOE/RW-0214Q AR)DOE/RW-0215(QAPD)**(notebook)
Quality Assurance Manual
Quality Assurance RequirementsDocument, QAR (DOE/RW-0214)
1 N/A
1 11/03/88
Qaulity Assurance ProgramDescription Document, QAPD(DOE/RW-0215)
1 12/20/88
**(notebook) This is a notebook binder to hold the documents indented belowit in the list.
2
April 25, 1969
OFFICE OF GEOLOGIC REPOSITORIES DOCUWMS
EffectiveDateDocument ID Title Revision
DOE/RW-0068
DOE/RW-0090
N/A** (notebook)
* Program Baseline ProceduresNotebook OGR/B-1
* Generic Requirements for a MinedGeologic DisposalSystem OGR/B-2
* Office of GeologicRepositoriesBaseline Documents OGR/B-4through OGR/B-13
7.1
4
02/23/88
02/23/89
N/A * OGR Work Breakdown Structure andDictionary-Development andEvaluation Phase (OGR/B-4)
0 11/84
DOE/RW-0142
DOE/RW-0147
N/A
* Annotated Outline for SiteCharacterization Plans (OGR/B-5)
* Annotated Outline for the SCPConceptual Design Report (OGR/B-6)
* Systems Engineering ManagementPlan for the OGR,(OGR/B-7)
2
1
08/31/87
06/05/87
03/06/892
DOE/RW-0125
DOE/RW-0136
DOE/RW-0101
N/A
N/A
* Waste Acceptance PreliminarySpecifications for the DefenseWaste Processing Facility HighLevel Waste Form (OGR/B-8)
* Waste Acceptance PreliminarySpecifications for the WestValley Demonstration ProjectHigh-Level Waste Form (OGR/B-9)
* Issues Hierarchy For A MinedGeologic Disposal System (OGR/B-10)
* Project Charter for the NNWSI(OGR/B-12)
* Office of Geologic RepositoriesQuality Assurance Requirements forHigh-Level Waste Form ProductionOGR/B-14)
0 12/05/86
0 4/87
1 08/31/87
0 6/87
0 2/88
* Baseline Documents**(notebook) This is a notebook binder to hold the documents indented below
it in the list.
3
I
April 25, 1989
Document ID
YMP/CC-0001
YMP/CC-0002
YMP/CC-0003
YMP/CC-0004
YMP/88-2
NNWSI/88-3
YMP/88-4
YMP/CM-0001
YMP/CM-0002 thruYMP/CM-0005
N/A
NNWSI/88-9
NVO-196-41
SAIC 84/7600DOE/NV-10270-5
SAIC 80/8013
SAIC 87/8000DOE NV/10576-6NNWSI/88-14
NNWSI/88-15
* Baseline Documeni
YUCCA IUJNTAIN PROJECT DOCUMENTS
Title Revision
YMP Work Breakdown N/AStructure Dictionary
YMP Reference 4Information Base
ESF Subsystem Design Requirements 0Document for Title II
YMP QA Level Assignment Records 0
YNP Project Management Plan 0
NNWSI Project Systems Engineering 0Management Plan
Yucca Mountain Project Configuration 1Management Plan
* YMP Project Baseline Document N/A- YMP Project Budget Baseline- YMP Project Cost Plan- YMP Project MSA Milestone
* YMP Quality Lists 0(lists generated by applicationof AP-6.8Q, AP-6.9Q, AP-6.10Q,& AP.6.11Q)
Change Control Board (CCB) N/ARecords - Volume VIII FY-89
NNWSI Quality Assurance Plan 2
NNWSI Project Plan N/A
Meteorological Monitoring Plan 0
EffectiveDate
03/17/88
02/01/89
04/11/89
04/12/89
02/89
7/88
01/89
12/13/8807/07/8807/07/8807/07/88
04/12/89
01/10/89
12/09/88
02/86
07/19/85
05/04/88NNWSI Radiological EnvironmentalMonitoring Sampler Location
Radiological Monitoring Plan forthe NNWSI Project Volume 1 & 2
0
0 05/25/88
07/14/88NNWSI Project Records Management Plan 0
ts
4
April 25, :389
YUCCA W(UNTMIN PROJECT DOCUMENTS (CONTIMuJE)
EffectiveDateDocument ID Title Rauvi sion
---------
ETP-1 Environmental Technical Procedurefor Identification of TraditionalCultural Values and American IndianConsultation
0 07/15/87
NNWSI/88-11
SAIC 88/8015NNWSI/88-13
N/A
NNWSI Project Regulatory DocumentManual Volumes 1 and 2
SCP Management Plan
NNWSI Project EnvironmentalRadiological Monitoring TechnicalProcedure Manual
14
2
N/A
1/31/89
04/05/88
01/26/89
BTP-ER-001
TP-ER-002
TP-ER-006
TP-ER-007
TP-ER-010
TP-ER-012
TP-ER-013
TP-ER-014
BTP-ER-015
VOLUME I BRANCH TECHNICAL PROCEDURESPreparation And Control ofEnvironmental RadiologicalMonitoring Procedures
Receipt, Operation, Exchange,Termination, And Shipment ofIntegrating Radon Samplers
Receipt Inspection And AcceptanceTesting of a Continuous Air SamplerAnd Associated Timer Calibration
Operation And AccuracyVerification/Calibration ofContinuous Air Samplers
Preparation of Quality Control
Installation of IntegratingRadon Samplers Stations
Alpha Survey Instrument
Beta/Garma Survey Instrument
Environmental MonitoringRadiological DocumentationControl And Distribution,General Maintenance, AndCalibration of Systems
2
0
02/02/88
05/04/87
0
0
0
0
0
0
1
05/04/87
05/04/87
08/13/87
05/04/87
08/13/87
08/13/87
06/10/88
5
April 25, 1989
YUCCA !NDNTAIN PROJECT DOCUMENTS (CONTINE)
EffectiveDateDocument ID Title Revision
TP-ER-016
BTP-ER-017
TP-ER-018
BTP-ER-020
JPA-ER-910
JPA-ER-911
JPA-ER-916
Electrical Safety Inspectionof 110 Volt AC Powered Equipment
Environmental Monitoring RadiologicalPlan/Reports, Analyses, ComputerProgram Usage and Readiness Review
Receipt Inspection forRadiological MonitoringProgram Materials And Equipment
General Acceptance Testing Procedurefor Radiological MonitoringEquipment
VOLUME II JOB PERFORMANCE AIDS
RFPB Calibration Records Database:Data Retrieval Operations
RFPB Calibration Records Database:Data Modification Operations
RFPB Calibration Records Database:Archive Retrieval Operations
VOLUME III APPENDICES
0 08/13/87
0 06/10/88
0
0
08/13/87
06/10/88
0
0
02/10/89
02/10/8 9
0 02/10/89
A-1
A-2.1
A-2.2
A-2 .3
A-2 .4
A-2.5
A-2.6
Personnel Authorized - Senior HealthPhysicist Authorization
Radiological Field Programs BranchTraining Reqirmnts. & Quali. Documts.
Level A: Theoretical TrainingModule 1 General Program Data
Level A: Theoretical TrainingModule 2 Basic Health Physics
Level A: Theoretical TrainingModule 3 Radon Monitoring
Level A: Theoretical TrainingModule 4 Airborne Radionuclides
Level A: Theoretical TrainingModule 5 Worker Safety
7a-7c
B 08/24/88
0 12/29/86
0 12/30/86
0 12/22/86
0 12/29/86
0 02/26/87
6
April 25, :98;
YUCCA NMDNTAIN PROJECT DOCUMENTS (CONTINUED)
Document ID
N/A
AP 1.1Q
AP 1.2
AP 1.3Q
AP 1.4
AP 1.5Q
AP 1.6Q
AP 1.7Q
AP 1.9
AP 1.10Q
Title Re,
YMP AdministrativeProcedures Manual
Administrative Procedure Preparation
Conduct and Minutes of TPO Meetings
Publications Review and Approval
Distribution of Information Products
Issuance & Maintenance of ControlledDocuments
Release of Unpublished Information
Records Management
Waste Management Project Office(WMPO) Action Item Tracking System
Preparation, Review, and Approvalof SCP Study Plans
Weekly Highlights Reports
Major System Acquisitions Report
NNWSI Project Quarterly TechnicalReport
NNWSI Project Monthly Report
NNWSI Project Bibliography
Monthly Forecast Calendar
Monthly Technical Data TransferReport
Monthly Reporting and Analysis
Change Control Process
Configuration Management
vision
25
EffectiveDate
04/11/89
1
0
1
1
0
06/03/87
01/15/85
04/11/88
07/27/87
04/11/88
0
1
0
06/17/88
04/19/89
11/24/87
0 12/14/88
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
2.1
2.3
2.4
1
0
0
06/17/88
01/15/85
01/15/85
2.5
2.6
2.7
2.8
0
0
0
0
01/15/85
01/15/85
01/15/85
09/29/87
3.2
3. 3Q
3. 6Q
0
1
0
01/15/85
01/17/89
01/17/89
7
April 25, '38a
YUCCA MOUNTAIN PROJECT DOCUMETS (CONTI)E)
Document ID
AP 5.2Q
AP 5.3Q
AP 5.4Q
Title Ri
Technical Information Flow to andfrom the Yucca Mountain ProjectTechnical Data Base
Information Flow into the ReferenceInformation Base
Assignment of Quality AssuranceLevels
evision
0
EffectiveDate
01/26/89
01/11/890
0 01/25/89
AP 5.6Q
AP 5.9Q
AP 5.10Q
AP 5.12
AP
AP
AP
AP
AP
5.13Q
5.14Q
5.17Q
5 . 18Q
6.8Q
Exploratory Shad: Facility Technical 1Element and Interface ControlProcedure
Qualification of Data or Data Analyses 0not Developed Under the Yucca MountainProject Quality Assurance Plan
Use of NTS Contractors on The NNWSI 0Project
T&MSS Technical Support Represen- 0tatives for the NNWSI Project ESF
Readiness Review 0
Design Review 0
Application of Graded QA 0
ESF Design Control 0
Identification of Items Important 1to Waste Isolation
Identification of Items and Activ- 0ities Subject to the Quality LevelAssignment Process
Identification of Items Important 0to Safety
Identification of Activities to be 0Placed on the Quality Activities List
NNWSI Project Participant and 0Public Interaction
Electronic Transfer of Corres- 0pondence Files
12/27/88
04/19/89
08/30/88
06/17/88
12/29/88
12/29/88
01/25/89
01/31/89
01/19/89
01/04/89
01/04/89
01/04/89
01/15/85
04/11/88
AP 6.9Q
AP 6.10Q
AP 6.l1Q
AP 9.1
AP 11.1
8
April 25, 1989
YUCCA MOIUNTAIN PROJECT DOCUMENTS (CONTINUED)
Document ID
NNWSI/88-16
N/A
1.2.6-0001
1.2.6-0002
1.2.6-0006
1.2.6-0007
1.2.6-0011
1.2.6-0012
6.2.1-0001
6.2.2-0001
6.2.2-0002
6.2.2-0003
6.2.2-0004
6.2.2-0005
6.2.2-0006
6.2.2-0009
6.2.2-0010
Title
NNWSI Project Training ManagementPlan
NNWSI Exploratory Shaft Facility(ESF) Quality Assurance LevelAssignment Sheets (QALAS)
Fluid Control
Rock Excavation
Rock Excavation from ES-1, ES-2and Drifts
Shaft Liners and UndergoundOpenings
Shaft Internals and Conveyances
Shaft Internals and Conveyances
Site and Roads
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Revision
1
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
EffectiveDate
1/89
05/02/88
07/01/87
05/13/87
02/03/88
02/03/88
02/03/88
02/03/88
04/30/87
04/30/87
05/13/87
05/13/87
05/13/87
05/13/87
04/30/87
03/21/88
03/21/88
9
I
April 25, 1.989
YUCCA IDUNTAlI PROJECT DOCUMENTS (CONTINUED)
Document ID
6.2.2-0011
6.3.1-0001
6.3.1-0003
6.3.1-0006
6.3.1-0007
6.3.1-0009
6.4.1-0001
6.4.1-0002
6.4.1-0004
6.4.1-0005
6.4.2-0001
6.4.2-0002
6.4.2-0003
6.5.1-0004
6.5.2-0002
6.5.2-0003
6.5.2-0004
6.7.1-0001
6.7.1-0002
6.7.1-0004
6.7.1-0005
6.7.1-0006
Title Revision. tilities and Coimnunicat-ons
Utilities and CommunicationsSystems (Surface)
Surface Facilities - Buildinc
Surface Facilities - Buildinc
Surface Facilities - Buildinc
Surface Facilities - Buildinc
Surface Ficilities - Buildinc
0
ps
ps
ES-1 Shaft and Liner
ES-1 Shaft and Liner
ES-1 Shaft and Liner
ES-1 Shaft and Liner
Hoists and Head Frame - ES-1
Hoist(s) and Head Frame - ES-1
Hoist(s) and Head Frame - ES-i
ES-2 Shaft and Liner
Hoist and Head Frame - ES-2
Hoist and Head Frame - ES-2
Hoists and Head Frame - ES-2
Undergound Service Systems
Underground Utility Systems
Underground Utility Systems
Underground Service SystemsUtilities and Communications
Underground Utility Systems
EffectiveDate
09/16/87
05/13/87
05/13/87
04/29/88
03/01/88
04/29/88
05/13/87
05/13/87
03/21/88
03/21/88
09/16/97
04/29/88
04/29/88
03/21/88
06/05/87
04/29/88
04/29/88
04/30/87
04/20/88
07/01/87
06/05/87
07/01/87
10
April 25, 3 e
YUCCA H)UNTAIN PROJECT DOCUMENTS (CONTINUED)
Document ID
6.7.1-0007
6.7.1-0011
6.7.1-0012
6.7.1-0013
6.7.1-0015
6.7.1-0017
6.7.2-0001
R07048A
R07048A/1
R07048A/2
R07048A/3
R07048A/4
R07048A/5
R07048A/6
R07048A/7
R07048A/8
Title R
Underground Service SystemsUtilities and Communica'-7ns
Underground Utility Systems
Underground Utility Systems
Underground Utility Systems
Underground Utility Systems
Underground Utility Systems
Mine Plant
* Nuclear Waste Repository In TuffSubsurface Facility ConceptualDesign Drawings
ESF Repository Interface ControlDrawing (sheet 1 of 15)
ESF Main Test Level (sheet 2 of 15)
ESF Main Test Level (sheet 3 of 15)
Main Test Level Sections(sheet 4 of 15)
ESF Drainage (sheet 5 of 15)
Upper and Lower Test Levels(sheet 6 of 15)
Imbricate Fault Exploratory DriftPlan & Cross-Section
Imbricate Fault Exploratory DriftPlan & Cross-Section
Revision
0
0
0
0
0
0
N/A
EffectiveDate
06/05/87
02/03/88
04/29/88
07/01/87
04/29/88
08/04/87
02/29/88
N/A
2 06/01/88
1
1
1
1
1
06/01/88
06/01/88
06/01/88
06/01/88
06/01/88
1 06/01/88
1 06/01/88
* Baseline Documents
11
I
April 25, 1989
YUCCA (XONTAIN PROJECT DOCUMENTS (CONTINED)
EffectiveDateDocument ID Title Revision
R07048A/9
R07048A/10
R07048A/11
R07048A/12
R07048A/13
R.07048A/14
R07048A/15
Ghost Dance Fault Exploratory DriftPlan & Cross-Section
Drill Hole Wash Exploratory DriftPlan & Cross-Section
Drill Hole Wash Exploratory DriftPlan & Cross-Section
Cross-Section AA-AA'
Cross-Section BB-BB'
Cross-Section CC-CC'
Cross-Section DD-DD'
1 06/01/88
2 06/01/88
1
1
1
1
06/01/88
06/01/88
06/01/88
06/01/88
06/01/881
N/A NNWSI Exploratory Shaft FacilityESF Development Study Report(Study No. 1 of 11)
1 04/06/87
ESF-FSTL-002
ESF-FSTL-003
ESF-FSTL-004
ESF-FSTL-005
ESF-FSTL-006
ESF-FSTL-007
NNWSI Exploratory Shaft FacilityESF Future 1400 Level Development(Study No. 2 of 11)
NNWSI Exploratory Shaft FacilityExcavation Methods Study Report(Study No. 3 of 11)
NNWSI Exploratory Shaft FacilityESF Controlled Blasting StudyReport (Study No. 4 of 11)
NNWSI Exploratory Shaft FacilityESF Hoisting System Study ReportFor Shafts ES-1 And ES-2(Study No. 5 of 11)
NNWSI Exploratory Shaft FacilityESF Ventilation Study Report(Study No. 6 of 11)
NNWSI Exploratory Shaft FacilityESF Dust Abatement Study Report(Study No. 7 of 11)
1
1
05/12/87
05/20/87
1 09/21/87
1 07/17/87
1 06/26/87
1 08/27/87
12
I
April 25, 19E9
YUCCA MOUNTAIN PROJECT DOCUMENTS (CONTINUED)
EffectiveDateDocument ID Title Revision
ESF-FSTL-008
ESF-FSTL-009
ESF-FSTL-010
N/A
N/A
NNWSI Exploratory Shaft FacilityESF Water And Waste Water ControlStudy Report (Study No. 8 of 11)
NNWSI Exploratory Shaft FacilityESF Compressed Air System StudyReport (Study No. 9 of 11)
NNWSI Exploratory Shaft FacilityESF Use Of GOE Equipment StudyReport (Study No. 10 of 11)
NNWSI/ESF Special Study No. 1Surface Site Layout
NNWSI/ESF Special Study No. 2Environmental PermittingRequirements
1 09/16/87
05/20/87
10/07/87
09o/18/87
02/02/88
08/27/87
06/18/87
06/13/88
N/A NNWSI/ESF Special Study No. 3Utilization Of The Off-Site A/EBuilding Area 25
N/A
N/A
NNWSI/ESF Special Study No. 5Sanitary Waste Treatment
NNWSI/ESF Special Study No. 6ALife Safety Systems
N/A Technical Assessment Review PlanExploratory Shaft Facility Title-I-Design Acceptability Analysis andComparative Evaluation of AlternativeESF Locations
0 02/03/89
YMP/88-18
YMP/89-3
Yucca Mountain Project TechnicalData Management Plan
Review Record MemorandumExploratory Shaft Facility (ESF)Tilte I Design AcceptabilityAnalysis & Comparative Evaluationof Alternative ESF Locations
0
0
01/89
02/03/89
13
April 25, 1989
YUCCA MUNTAIN PROJECT DOCUENTS (CONTINUED)
EffectiveDateDocument ID Title Revision
8.3.1.4.2.2
8.3.1.15.2.1
8.3.1.2.2.4
8.3.1.15.1.5
8.3.1.2.2.2
STUDY PLANS
Characterization of StructuralFeatures in the Site Area
Characterization of the SiteAmbient Stress Conditions
Characterization of the YuccaMountain Unsaturated ZonePercolation Exploratory ShaftFacility Study
Excavation Investigations
Water Movement Tests
0
0
02/89
01/8 9
0 01/89
0
0
01/89
01/89
14
April 25, 3969
YUCCA MOUNTAIN PROJECT OFFICE DOCUENTS
EffectiveDateDocument ID Title Revision
WMPO/88-1
N/A
QMP-01-01
QMP-01-02
QMP-02-01
QMP-02-02
WMPO ICN
QMP-02-08
QMP-02-09
QMP-03-01
QMP-04-01
QMP-05-01
QMP-05-02
QMP-05-03
WMPO ICN
QNP-06-02
WMPO ICN
WMPO ICN
Waste Management Project OfficeQuality Assurance Program Plan& Quality Management Procedures
WMPO Quality Management ProceduresTable of Contents
Organization
Stop Work
Qualification, Proficiency,Indoctrination, and Training ofWaste Management Project Personnel
Qualification of Quality AssuranceProgram Audit Personnel
WMPO Interim Change Noticeto QMP-02-08 (ICN f1)
Technical Assessment Review
Development and Conduct of Training
Peer Reviews
Procurement Document Control
Preparation and Control ofQuality Management Procedures
Preparation and Control ofBranch Technical Procedures
Preparation and Control of theNNWSI Project QAP and the WMPOQAPP
WMPO Interim Change Noticeto QMP-06-02 (ICN 1)
Document Control
WHPO Interim Change Noticeto QtP-06-03 (ICN #2)
WMPO Interim Change Noticeto QMP-06-03 (ICN #1)
0 02/18/88
N/A 04/02/89
1
0
1
05/27/88
04/11/88
09/02/88
02/22/88
02/07/89
08/08/88
03/31/8 9
01/11/89
04/11/88
04/11/88
05/27/88
05/27/88
04/02/ 89
12/01/88
08/01/88
05/05/88
15
I
Apri' 25, :9q9
YUCCA MOUNTAIN PROJECT OFFICE DOCUMENTS (CONTINUED)
Document ID
QMP-06-03
QMP-07-03
QMP-15-01
QMP-16-01
QNP-16-02
QMP-16-03
QMP-17-01
QMP-18-01
WMPO ICN
WMPO ICN
QMP-18-02
BTP-RMD-001
BTP-RMD-002
Title
Document Review/Acceptance/Approval
Control of Purchased Itemsand Services
Control of Nonconformances
Corrective Action
Trend Analysis
Standard Deficiency ReportingSystem
Record Source and Record UserResponsibilities
Audit System for the WasteManagement Project Office
WMPO Interim Change Noticeto QMP-18-02 (ICN #2)
WMPO Interim Change Noticeto QMP-18-02 (ICN #1)
Surveillances
YMPO BTP for the Local RecordsDivision
YMPO BTP for the Central RecordsDivision
Revision
1
0
1
0
2
0
0
3
EffectiveDate
02/22/88
04/11/88
05/27/88
12/10/84
05/27/88
03/27/87
01/11/89
10/03/88
1 04/02/89
1
1
0
02/06/8 9
05/27/88
01/16/89
0 01/16/89
16
I
April 25, 39E9
TECHNICAL & MANIAGEMENT SUPPORT SERVICES DOCMENTS
Document ID
SAIC-86/8000
SAIC-85/8002
N/A
ICG
AP 1.1
ICG
AP 1.7
AP 1.8
ICG
AP 1.9
ICG
AP 1.10
AP 1.11
AP 1.24
AP 1.25
Title Re
NNWSI Project MeteorologicalMonitoring Program Instructionsfor Operation and CalibrationChecks of Meteorological MonitoringEquipment
NNWSI Project MeteorologicalMonitoring Program Instructionsfor Receipt, Acceptance Testing,and Performance Auditing ofMeteorological Monitoring Equipment
T&MSS Project Guide ManualAdministrative ProceduresHandbook (Volumes 2 of 5)
Table of Contents
Interim Change Guidance toT&MSS AP 1.1
T&MSS Administrative ProcedurePreparation
Interim Change Guidance to 1.7
Graphics Control
Forms Control
Interim Change Guidance to 1.9
Word Processing Control
Interim Change Guidance to 1.10
Editing Control
Document Preparation and Production
T&MSS Software Developmentand Maintenance
T&MSS Internal Procedure forDeveloping or Revising NNWSIProject Administrative Procedures
.vision
0
EffectiveDate
04/30/86
1 07/19/85
0 11/18/87
10
2
0
1
0
03/10/89
08/08/88
09/17/87
11/05/87
05/31/85
01/17/8 9
11/05/87
05/31/85
11/05/87
06/30/85
01/17/89
01/27/87
0
0
0
0 09/09/88
17
April 25, :929
TECHNICAL & WMNAGEMENT SUPPORT SERVICES DOCDMERNTS (COITINUED)
Document ID
AP 1.26
AP
AP
AP
2.1
2.3
3.1
AP 3.15
AP 3.16
ICG
AP 4.1
ICG
AP 4.2
AP 4.3
AP 5.1
AP 5.2
AP 5.3
AP 5.9
AP 6.2
Title Re,
Transfer of T&MSS GeneratedDOE Correspondence andEnclosures to WMPO
Action Tracking System
T&MSS Formal Internal Review
Training and Orientation ofT&MSS Personnel
T&MSS Verification of Informa-tion Education and Experience
Familiarization Program Implemen-tation
Interim Change Guidance to 4.1
Radiological Safety Training
Interim Change Guidance to 4.2
Personnel Dosimetry
Possession, Procurement, Shipment,and Receipt of Radioactive Material
Preparation and Control of theContract Work Breakdown Structureand the Responsibility AssignmentMatrix
Cost Account Planning, Budgeting andAuthorization
Schedule Development, Control, andMaintenance
Earned Value Techniques
Access to and Retrieval of T&MSSProject Files By Non-T&MSSIndividuals
vision
0
0
4
3
03/10/89
01/17/89
11/16/87
EffectiveDate
03/23/88
1
0
01/08/88
11/16/87
10/21/88
01/29/87
10/21/88
01/29/87
07/28/88
0
0
0
0 05/24/88
0
0
03/31/88
09/09/88
0
1
10/21/88
10/13/87
18
I
April 25, :989
TECHNICAL & HANAGEMENT SUPPORT SERVICES DOCUMENTS (CONTINUED)
Document ID
N/A
N/A
QP 3.1
QP 3.2
SAIC 86/8006
N/A
Title Rev
T&MSS Project Guide ManualStyle Guide (Volume 3 of 5)
T&MSS Quality Assurance ProgramPlan and Supporting Documents
Scientific Investigation Controland Design Control
Use and Control of Computer Programs
NNWSI Project Safety Plan forT&MSS Field Activities
SAIC Administrative Handbook
ision
0
EffectiveDate
12/31/87
N/A 03/23/8 9
2 12/20/86
2 12/20/86
01/22/881
0 12/01/88
19