    3G SITE DESIGN PACKAGE

    SEBERANG PERAI UTARA

    NORTHERN

    NWXXXX

    TELOK AIR TAWAR 2

    PULAU PINANG

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    2/41

    SITE ID : NWXXXX

    SITE NAME :

    SITE CONFIGURATION : 1+1+1

    FREQ. BAND : 3G

    CELCOM (M) BHD

    NORTHERN REGION

    SITE DESIGN PACKAGE

    Prepared by ;

    TELOK AIR TAWAR 2

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    3/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    Site Information

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    4/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    RF Design

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    5/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    Existing 2G Information

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    6/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    New 3G Information

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    7/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    Site Picture

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    8/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    Installation Plan

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    9/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    NORTHERN REGION

    Mobile Checklist / BOQ

    CELCOM (M) BHD

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    10/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    CME BOQ

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    11/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    NORTHERN REGION

    Transmission Checklist

    CELCOM (M) BHD

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    12/41

    SITE ID : NWXXXX

    SITE NAME : TELOK AIR TAWAR 2

    SITE CONFIGURATION : 1+1+1

    Site Management Unit

    CELCOM (M) BHD

    NORTHERN REGION

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    13/41

    CELCOM (M) BHD 1 Site Information

    NORTHERN REGION

    PULAU PINANG 2 RF Design

    3 Existing 2G Information

    4 New 3G Information

    5 Site Picture

    6 Mobile Checklist / BOQ

    7 Installation Plan

    NWXXXX 8 Transmission Check List

    TELOK AIR TAWAR 2 9 CME BOQ

    1+1+1 10 Site Management Unit

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    14/41

    Site Approval

     Survey Date : 16 Jun 2007

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NWXXXX TELOK AIR TAWAR 2

    Prepared by

    Name  Mohd Nizam Mohd Noor (019-3160900)

    Company  I-Convergence Sdn Bhd 

    Verified by

    Name

     Approved by

    Name

    Department

     Approved by

    Name

    Department

     Approved by

    Name

    Department

    SDP APPROVAL

    Mobile Access Planning, Group Network Date

    Date

    Date

    CME, Group Network Date

    Transmission, Group Network Date

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    15/41

    Site Informations

     Survey Date : 16 Jun 2007

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NWXXXX TELOK AIR TAWAR 2

    1.0

    1.1 Site Location and Access

    GPS Position

    Latitude: 05-29-27.6

    Longitude : 100-22-47.9

     Altitude : 70m

    1.2  Address : Telok Air Tawar 

    Seberang Perai Utara

    Pulau Pinang.

    SITE INFORMATIONS

    T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2T e l o k A i r T a w a r 2

    P D GP D GP D G

    P D G

    P D G

    P D GP D GP D G

    P D G

      B E N G G A L I  B E N G G A L I  B E N G G A L I

      B E N G G A L I

      B E N G G A L I

      B E N G G A L I  B E N G G A L I  B E N G G A L I  B E N G G A L I

    P M T G . B E R A HP M T G . B E R A HP M T G . B E R A H

    P M T G . B E R A H

    P M T G . B E R A H

    P M T G . B E R A HP M T G . B E R A HP M T G . B E R A H

    P M T G . B E R A H

    P M T G . B E N U A NP M T G . B E N U A NP M T G . B E N U A N

    P M T G . B E N U A N

    P M T G . B E N U A N

    P M T G . B E N U A NP M T G . B E N U A NP M T G . B E N U A N

    P M T G . B E N U A N

    P E K A N D A R A TP E K A N D A R A TP E K A N D A R A T

    P E K A N D A R A T

    P E K A N D A R A T

    P E K A N D A R A TP E K A N D A R A TP E K A N D A R A T

    P E K A N D A R A T

    B A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A TB A G A N B E L A T

    B A G A NB A G A NB A G A NB A G A NB A G A NB A G A NB A G A NB A G A NB A G A N

    T A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N GT A M B A N G

    K G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O LK G . S E T O L

    P M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U TP M T G . K A N C U T

    T I Y I M U K I MT I Y I M U K I MT I Y I M U K I M

    T I Y I M U K I M

    T I Y I M U K I M

    T I Y I M U K I MT I Y I M U K I MT I Y I M U K I MT I Y I M U K I M

    K G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R UK G . B A H A R U

    K G . S E L AR U N GK G . S E L AR U N GK G . S E L AR U N GK G . S E L A R U N GK G . S E L A R U N GK G . S E L A R U N GK G . S E L A R U N GK G . S E L A R U N GK G . S E L A R U N G

    G AJ A HG AJ A HG AJ A HG A J A HG A J A HG AJ AHG AJ AHG AJ AHG A J A H

    P M T G .P M T G .P M T G .P M T G .P M T G .P M T G .P M T G .P M T G .P M T G .

      T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M T O K G E L A M

    K G .K G .K G .K G .K G .K G .K G .K G .K G .

    G E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B UG E L U N G B U B U

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    16/41

    Site Informations

     Survey Date : 16 Jun 2007

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NWXXXX TELOK AIR TAWAR 2

    1.3 Site Details (Existing)

    Type of Site : Land Cabin

    Height of Building : -

    Equipment Location : Cabin

    Cabin Dimension : 3630mm x 3030mm

     Air Conditioning : 2 unit

    Cable Ladder  : YesLightning Protection : Yes

    Type of Structure : 3 legged Tubular 

    Boom Height : -

    Type of terrain : Flat

     Access road : Tar/ Concrete

    Distance to main road : 15m

    Crane needed : N

    Site Access Information : From exit Sg Dua, turn left to Mak Mandin, go straight until traffic

    light. Turn left to Telok Air Tawar. The site located at left hand side.

    1.4 Contact Information

    Celcom : Mizazuddin Bin Muhiyuddin

    Telephone No. : 04-3973030 ext 1009

    Fax No. : 04-3974040

    Mobile No. : 019-5713060

    Contractor Name : Mohd Nizam Mohd Noor 

    Telephone No. :

    Fax No. :

    Mobile No. : 019-3160900

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    17/41

    a

    b

    c

    d

    a

    a

    b   √

    c

    a

    b

    c

    d

    e

    Tripod 6mtr 

    GI Pipe 2 mtr 

     Aesthetic Pole

    Maximum Load (A)

    Maximum Module

    CPS Source

    Rectifier -48V Data

    Equipment Power Source

     AC Power Supply Data

    Land Cabin

    Land Outdoor 

    Rooftop Cabin

    Tower 

    TNB

    3 Phase AC

    SBC

    Genset

    Single Phase AC

    Rectifier +24V

    DELTA Model

    √ Rectifier -48V

    Free DC Breaker (32A)

    √ NoYes

    Merlin Gerin

    NoYesFree DB Space For Additional Breaker 

    Free DC Breaker (60A)

    Free DC Breaker (32A)

    Current Module

    Free DC Breaker (60A)

    Current Load (A)

    Free DB Space for Additional Breaker 

    DC Breaker Type

    Specify

    Site ID

    Site Name

    NWXXXX

    TELOK AIR TAWAR 2

    H-Boom

    X-Pol Bracket Antenna Mounting

     Antenna Type Model & Part

    CodeDualband 900/UMTS

    Feeder Clamp

    7/8”

    2 in 1

    Feeder Type

    Horizon Micro

    2206 2102

    2302

    Type Of BTS

    2308

    Horizon OD

    4

    2G Vendor 

    E1 Status

    Celcom

     Available

     Alcatel

    3

    E1 Type

    E1 Owner TM Maxis Digi

    MBO1

    Ericsson

    MBI3

    M4M

    Motorola

    MBO3

    2202

    MOBILE INFORMATION

    MBI5

    √ Yes

    √ Yes

    Plinth

    Structure

    Fiber Optic

    TX INFORMATION

    Structure Height 45

    Lease Line

    Room Reno

    No

    No

    √ YesMGB Space Available

    √ MicroWave

    2106

    Horizon ID

    Utilise Free

    a

    Shelter Type

    V-PoleX-Pole

    NoFeeder Through Available

    meters

    Cabin Size

    Room Reno Size

    Plinth Size

    GI Pipe Boom

    Special Bracket

    Cabin

    Shelter 

    1 5/8”

    3 in 1

    Maxis

    TM

    2

    CME INFORMATION

    Power Supply

    Space Available

    Type Of Structure

    Room Reno Rooftop

    Roof top Outdoor 

    Guyed Mast

    GI Pipe 6mtr 

    Monopole

    Mini Structure

    1

    Type Of Site

    GENERAL INFORMATION

    Site Owner 

    Celcom

    Digi

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    18/41

    1

    a

    b

    a

    b

    c

    d

    e

    a

    2

    3

    a

    b

    c Type

    d

    e

    REMARKS:

    New (mtr)

    New (mtr)

    New (qty)

     Additional Feeder Through (Qty)

    Extend Existing(m)

    Upgrade CPS System

    Upgrade AC System

    Cabin

    Plinth New

     Antenna Mounting New

    Change Existing

    Extend

    Structure

    TX ADDITONAL REQUIREMENTS

    Refer to Tx BQ

    MOBILE INSTALLATION METHODOLOGY

    Swap 2G Eqpt. Rearrange EqptEquipment

    Equipment Mobilization

    Lorry Crane

    45 tonne

    Day

    20 tonne

    Special crane

    Night

    Specific Day

     ADDITIONAL REQUIREMENTS FOR 3G IMPLEMENTATION

    Cable Ladder (Outdoor)

    Cable Gantry

    No

    Crane Requirements

    Crane Access

    Specific Times

    Open Roofing

    Manpower 

    Special Tools/ Requirements

    Qty

    Specify

     Antenna 2G

    New Upgrade DB

    Change to X-Pole

     Add Module (Qty) Change Breaker (A) 20amp to

    32amp

    Permit Requirements Yes

    Change To Triband

    Relocate Existing

    MGB

    Power Supply

    CME ADDITONAL REQUIREMENTS

    TNB Genset

    Shelter 

    Change to Dual Band UMTS/1800Change to 1800 wideband

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    19/41

    Site Requirements

     Survey Date : 16 Jun 2007

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NWXXXX TELOK AIR TAWAR 2

    2.0

    2.1 Exiting Equipment

    Existing Equipment Type

    No Of Cabinet

    Configuration

    Comments : Remain existing

    2.2 Exi sting A ntenna Data 2G

    Make

    Height AGL (m)

    Gain (dBi)

     Antenna Band

    Polarization

    Comments : Dualband antenna

    2.3 Feeder Data 2G

    Total no. of feeders (pcs)

    Type of feeders

    Feeder lengths (m) Tx

    Rx

    TOTAL

    Comments :

    2.4 Antenna Support Detail

    Type of antenna support : Special BracketNo. of H-Boom : -

    No. of G.I. Pipe : 3

    Length of G.I. Pipes (m) : 3

    Comments :

    EXISTING 2G

    900/UMTS

     Andrew DBXLH-6565C

    Cell 3

    45

     Andrew DBXLH-6565C

    Cell 1

     Andrew DBXLH-6565C

    Cell 2

    45

    342

    171

    17.1

    45

    Cell 3 TOTAL

    2 6

    900/UMTS

    114 114 114

    57 57 57

    57 57

    7/8"

    57 171

    7/8"7/8"

    17.1

    900/UMTS

    +-45 +-45+-45

    17.1

    2

    Cell 1 Cell 2

    2

    Ericsson RBS 2206

    1

    2+2+2

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    20/41

    Site Name:

    Site ID :

    Existing 2G Site Name:

    Existing 2G Site ID:

    Co-locate Operator: Cluster No:

    Version:

    Lat (N-WGS 84- Decimal):

    Long (E-WGS 84-Decimal):

    BTS room Type: BTS Type:

    BTS Configuration:

    Transmission Type on site:

    Cell Site RF Configuration

    Cell ID

     An tenn a Heigh t (mid. o f ant )

     An tenn a Direc tion (d eg)

    Electrical Tilt

    Mech. Tilt

    Cable Length (m)

    Cable Type (inch)

    Technical Site Survey Report (Existing Antenna System Locations)

    TELOK AIR TAWAR 2 Survey Date: 16/06/2007

    Sector 3

    05-29-27.6

    100-22-47.9 70

    Sector 1

    Others:

    Sector 1 :

    Phase:

     Ams l(m):

    Sector 2

    Kg Bagan Dalam residential area, Apartment.

    Sector 2 :

    Sector 3 :

    Kg Bagan Belat residential area, Sekolah Kebangsaan Bagan.

    Kg Bagan Belat residential area, Apartment.

    Comment/ Problem:

    Structure type3 Legged Tubular

    Tower 

    3 3

    Special Bracket

    Height (m)

    Special Bracket

    Mount

    Type Special Bracket

    3

    No of Pole/ Tripod 1 1 1

    57 57

    3 Legged Tubular

    Tower 

    3 Legged Tubular

    Tower 

    0 0 0

    7/8" 7/8" 7/8"

    0 0 0

    57

    45 45 45

    20° 160° 320°

     Ant enna Type Model Number 

    Beam width (deg) 65 65 65

    DBXLH-6565C-VTMDBXLH-6565C-VTM

    2+2+2

    Cabin Ericsson RBS 2206

    Ericsson

    DBXLH-6565C-VTM

    NWXXXX  Area: Seberang Jaya

    N/A

    2

    NWXXXX Building Height(m): -

    TELOK AIR TAWAR 2 Structure Height(m): 45m

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    21/41

    Site Requirements

     Survey Date : 16 Jun 2007

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NWXXXX TELOK AIR TAWAR 2

    3.0

    3.1 Feeder Data

    Total no. of feeders (pcs)

    Type of feeders

    Feeder lengths (m)

    Comments :

    3.2 CABLING

    Cable required

    Comments :

    3.3 Antenna Support Detail

    Type of antenna support : Existing Boom

    No. of H-Boom : -No. of G.I. Pipe : -

    Length of G.I. Pipes (m) : -

    Other Special Bracket :

    Comments : This site use dualband antennas 900/UMTS

    58

    58

    116 348TOTAL 116116

    58

    Cable Lug / 35mm

    Length Needed

    6m

    1 5/8" 1 5/8"1 5/8"

    2 62

    Cell 1

    2

    Cell 3Cell 2 TOTAL

    174

    Rx 58 174

    58

    58

    Tx

    NEW SITE REQUIREMENTS

    8m

    DDF to DF Coax / 3C 2.5V Siemen Male 6m

    Node B to MGB Grounding / 35mm

    Cable Cable type / s ize Connec tor t ype / si ze

    Node B E1 to DF Coax / 3C 2.5V -

    Node B to Breaker Grounding / 35mm Cable Lug / 35mm 8m

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    22/41

    Site Requirements

     Survey Date : 16 Jun 2007

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NWXXXX TELOK AIR TAWAR 2

    3.4 OTHERS

    Comments :

    3.5 POWER SUPPLY SYSTEM

    Rectifier 

    Make Link Model Vout Iout

    Battery Installed : Everexceed

    Capacity : 12V 100Ah X 8

    Banks : 2

    Type / Model : ST-12230

    Comments :

    Breaker 

    Used: 5

    Required:

    Used:

    Free:

    Required: 1

    Free: 11

    -

    No

    No

    Yes

    No

    No

    No

    Capacity

    Yes

    400A54.5

    Lightning Protection

    CommentExisting Required

    Yes No

    BTS Location Cabin No

    Cable Inlet

     AC Ear th ing Busbar  Yes

    DC Earthing Busbar  Yes

    MGB Yes

    Delta HDS 3000

    Cable Ladder 

    Cabin Size 3630mm X 3030mm

    Plinth Size -

    -

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    23/41

    Site Name:

    Site ID :

    Existing 2G Site Name:

    Existing 2G Site ID:

    Co-locate Operator: Cluster No:

    Version:

    Lat (N-WGS 84- Decimal):

    Long (E-WGS 84-Decimal):

    Node B room Type: Node B Type:

    Node B Configuration:

    Transmission Type on site:

    Cell Site RF Configuration

     Ant enna Heigh t (mid. of ant )

     Ant enna Direc tion (deg)

    Electrical Tilt

    Mech. Tilt

    Cable Length (m)

    Cable Type (inch)

    MHA (Y/N)

    05-29-27.6

    100-22-47.9

    Others:

    Sector 2 :Kg Bagan Dalam residential area, Apartment.

    Sector 3 :

    Kg Bagan Belat residential area, Sekolah Kebangsaan Bagan.

    Comment/ Problem:

    Sector 1 :

    Kg Bagan Belat residential area, Apartment.

    1

    Y Y Y

    Special Bracket

    Height (m) 3 3 3Mount

    Type Special Bracket Special Bracket

    No of Pole/ Tripod 1 1

    Structure type3 Legged Tubular

    Tower 

    3 Legged Tubular

    Tower 

    3 Legged Tubular

    Tower 

    58 58 58

    1 5/8" 1 5/8" 1 5/8"

    2 2 2

    0 0 0

    45 45 45

    20° 160° 320°

    DBXLH-6565C-VTM

    Beam width (deg) 65 65 65 Ant enna Type

    Model Number  DBXLH-6565C-VTM DBXLH-6565C-VTM

    Existing Existing Existing

    Sector 1 Sector 2 Sector 3

    1+1+1

    Ericsson

     Ams l(m): 70

    Cabin Huawei 3812E

    Phase: 2

    NWXXXX  Area: Seberang Jaya

    N/A

    NWXXXX Building Height(m): -

    TELOK AIR TAWAR 2 Structure Height(m): 45

    Technical Site Survey Report (Proposed Antenna Location)

    TELOK AIR TAWAR 2 Survey Date: 16/06/2007

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    24/41

    SECTORIAL RF VIEW

    Sector 1 20° degree

    Sector 2 160° degree

    Sector 3 320° degree

    NEW SITE RF PHOTO

     Apartment

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    25/41

    PANORAMIC VIEW

    View at 0°

    View at 40°

    View at 80°

    NEW SITE RF PHOTO

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    26/41

    PANORAMIC VIEW

    View at 120°

    View at 160°

    View at 200°

    NEW SITE RF PHOTO

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    27/41

    PANORAMIC VIEW

    View at 240°

    View at 280°

    View at 320°

    NEW SITE RF PHOTO

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    28/41

    Existing Site Pictures

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXX TELOK AIR TAWAR 2

    Photo 1 : Site View

    SITE PICTURES

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    29/41

    Existing Site Pictures

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXX TELOK AIR TAWAR 2

    SITE PICTURES

    Photo 2: Dualband 900/UMTS Antenna Location.

      .

    Photo 3 : BTS location

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    30/41

    Existing CME

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXX TELOK AIR TAWAR 2

     Photo 1 : Existing DB

     Photo 2: Rectifier 

    SITE PICTURES

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    31/41

    Existing CME

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXX TELOK AIR TAWAR 2

    SITE PICTURES

     Photo 3: Breaker for Node B

     Photo 4: Existing MGB.

    at middle tower  at top tower 

    inside cabin

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    32/41

    Existing CME

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXX TELOK AIR TAWAR 2

    SITE PICTURES

     Photo 5: Battery Bank.

     Photo 6:Cable Ladder.

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    33/41

    Existing Tx

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXXTELOK AIR TAWAR 2

    Photo 1 : Ericsson Microwave.

    Tx Rack

     SITE PICTURES

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    34/41

    New Requirement

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXX

    Photo 1 : Node B location

    Photo 2 : Proposed DDF and alarm box location (beside RBS2206)

    SITE PICTURES

    RBS 2206

    BTS Alarm Box

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    35/41

    New Requirement

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXX

    SITE PICTURES

    Photo 3 : To modify existing feeder inlet to huawei standard feeder inlet.

    Photo 4 : Cabin

    To modify

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    36/41

    New Requirement

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXX

    SITE PICTURES

    Photo 5 : Entrance.

    Photo 6 : Feeder route to antennas

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    37/41

    New Requirement

     Survey Date : 16 Jun 2007

     

    Si te: NWXXXX

    SITE PICTURES

    Photo 7 : Top View

    Photo 8 :To rearrange feeder due to limited space at top tower 

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    38/41

    BILL OF QUANTITY SITE NWXXXX

    NO TYPE ITEMS ART NO. PACKING REQUEST SUPPLY

     IRON WORK Fill in your requested item(s)

    1 SPECIAL BRACKET SET

    2 6m Tripod NA SET

    3 6m BOOM N/A PC

    4 WALL BRACKET N/A SET

     POWER / RF CABLES & ACCESSORIES

    1 Power Cable METER

    2 METER

    3 AC ARMOURED CABLE, 4CORE, 16mm AC.ARM.4C.16mm METER

    4 PVC/PVC AC CABLE 5 CORE, BLACK, 10mm 5C/10mm METER

    5 CABLE TIE 4" (WHITE) CBL. TIE -W-IND-4" PC

    6 CABLE TIE 8" (WHITE) CBL. TIE -W-IND-8" PC

    7 CABLE TIE 14" (WHITE) CBL. TIE -W-IND-14" PC

    8 CABLE TIE 14" (BLACK) CBL. TIE -W-OUD-14" PC

    9 7/8" COAXIAL CABLE EC5-50 METER

    10 1/2" COAXIAL CABLE LDF4-50A METER

    11 TX JUMPER CABLE (716M - 716M), 2 MTR F4A-PDMDM-2M PC

    12 RX JUMPER CABLE (716M - NM), 2 MTR F4A-PNMDM-2M PC

     EARTHING SYSTEM 

    1 COPPER BARE WIRE, 35MM, MULTI STRAND N/A METER

    2 ANDREW CONNECTOR EARTHING KIT (INDOOR) 244495 PC

    3 ANDREW FEEDER EARTHING KIT (OUTDOOR) SGL5-06B1 PC

    CONNECTORS

    1 RFS ANGLE ADAPTER N-TYPE (MALE TO FEMALE) 15852401 PC

    2 H+S BNC CONN. (JACK FULL), 75 OHM, FOR RG59 21BNC-75-4-4 PC

    3 RFS 7/16 FEMALE CONNECTOR FOR 7/8" CABLE 15570560 PC

    4 H+S N-MALE CONNECTOR FOR 7/8" CABLE 11N-50-23-10 PC5 H+S N-MALE CONNECTOR FOR 1/2" CABLE 11N-50-12-10 PC

    6 H+S TNC-MALE TO BNC FEMALE ADAPTOR 33-TNC-BNC50-1 PC

    7 H+S N-MALE TO N-MALE ADAPTOR 32N-50-0-2 PC

    8 RFS FEEDER COUPLING (SPLICER) 155 730 60 PC

     MISCELLANEOUS ITEMS

    1 AC TRUNKING, 2" X 2", ORANGE C/W ACCESS N/A PC

    2 METAL CABLE TRAY, 4" X 1", H.D.G., C/W ACCESS N/A PC

    3 CABLE LUG 35MM N/A PC

    4 CABLE LUG 150MM N/A PC

    5 C-CLAMP (C-TYPE) COMPRESSED FOR 35MM N/A PC

    6 3M COOL SHRINK N/A PC

    7 CABLE GLAND (FEEDER THROUGH) N/A PC

    8 3M ELECTRICAL TAPE, SUPER 33+, 3/4 X 66' 6132 PC

    9 3M ELECTRICAL PUTTY , SCOTCHFILL, 1 1/2" X 60" 15140 PC

    10 FEEDER CLAMP (2 IN 1) N/A PC11 FEEDER CLAMP (3 IN 1) N/A PC

    12 PVC TRUNKING (GREY), 4" X 2" X 1.8M 7 LENGTH

    13 SYW RAWL PLUG (M6X450MM) PC

    14 SYW RAWL PLUG (M12) with rod PC

    15 SYW RAWL PLUG (M12) w/o rod PC

    TOTAL COST (FOR INSURANCE PURPOSES)

    Requester: _________________________ Checked By: _________________________

    (SIGNED & STAMPED) (SIGNED & STAMPED)

    TELOK AIR TAWAR 2

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    39/41

    A. SITE DETAILS

    TELOK AIR TAWAR 2

    1 . X OWN TRANSMISSION SOLUTION

    X  MICROWAVE VSAT FIBER OPTIC

    REMARKS

    REMARKS :

    2 . LEASED LINE

     TM LEASED LINE POI/POP : .  2 E1

     3 E1

    REMARKS :

    C . ADDITIONAL REQUIREMENT FOR TRANSMISSION SOLUTION.

    1 . CME

     TRM/TOC  DC POWER SUPPLY ( Pls specify : )

     TRIPOD  SHELTER ( Pls specify : )

     PLINTH DDF

    REMARKS :

    Prepared by,

    E1 SHARING ( MAXIS / DIGI) POI/POP : .

    SITE B

    PENAGA

    INSTALLED FREEUSED RESERVED

    TK AIR TAWAR2

    SITE A

      SITE NAMESITE ID

    RNC HOME

    NODE B TYPE

    TSS TRANSMISSION CHECKLIST FOR 3G

    Isriadi Ngaliman 019-3116551

    B . TRANSMISSION MEDIA FOR NODE-B CONNECTION.

      REGIONSURVEY BY

    SURVEY DATE

     NORTHERNMOHD NIZAM NWXXXX

    Verify by,

      (Name, TX Region. HP num)

    06/16/2007

    INDOOR 

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    40/41

  • 8/19/2019 SDP 3G SR Telok Air Tawar 2

    41/41