Upload
craig-hooton
View
215
Download
2
Tags:
Embed Size (px)
Citation preview
Seabasing Operational Advisory Group Administrative Introduction
Shon BrodieHead, Requirements & Assessment BranchSeabasing Integration Division, HQMC, CD&[email protected]
Admin Remarks
• Liversedge Hosts• Parking• Gedunk• Smoking areas• Restrooms• Lunch• Phones• Assistance • No Host Social- Globe & Laurel
- 1800, Tuesday, 22 Jul
2
1. Provide seabasing COI (Community of Interest) info on key concepts, programs, and ongoing integration of emerging seabasing capabilities.
2. Examine current capabilities and identify gaps in required capabilities necessary for MAGTF to effectively operate from the seabase.
3. Develop list of required capabilities, prioritized gaps, and potential solutions to be used in Annual Report and as POM 16 submission to OPNAV.
SOAG-14 Goals
CD&I is the HQMC Seabasing Advocate.
SOAG is a forum to hear from those on whose behalf
we advocate.
3
SEABASING OAG CHARTER & ADVOCACY
Seabasing OAG Charter
•Purpose– Advise and assist DC, CD&I in fulfilling
the responsibilities of the Seabasing Advocate.
•Executive Steering Committee– Consists of O-6/GS-15 representatives
from DC, CD&I; DC, PP&O; DC, I&L; DC, P&R; DC, AVN; Director C4; COMMARFORCOM; COMMARFORPAC; COMMARCENT; COMMARFOREUR; COMMARFORAF; COMMARFORSO; COMMARFORNORTH; COMMARSOC; COMMARCORSYSCOM; and COMMARCORLOGCOM.
– Other organizations may be invited to participate in the ESC.
MCO 5311.6
•DC’s are assigned unique cross-functional responsibilities across broad range of roles.
DC CD&I:
–USMC integrator with authority and responsibility to conduct capabilities-based force development.
–Serve as the Maritime Expeditionary Capabilities & Requirements (Seabasing) Advocate
4
AGENDA
TUES, 22 JULY
0730-0900 Registration
0900-0930 Welcome
0930-1015 Expeditionary Force 21 Implementation
1015-1045 Seabasing Gaps
1045-1100 15 Minute Break
1100-1130 Amphibious Ships
1130-1200 MPF Ships
1200-1330 Lunch
1330-1400 S&T
1400-1415 15 Minute Break
1415-1700 Working Groups: Amphib Ships, MPF Ships, S&T
WEDS, 23 JULY
0715-0800 Registration
0800-0830 MARFORCOM
0830-0900 MARFORPAC
0900-0930 MARCENT
0930-1000 MARFORNORTH
1000-1015 15 Minute Break
1015-1045 MARFOREUR/AF
1045-1115 MARFORSOUTH
1115-1145 MAGTF to Ship Integration
1145-1215 Seabasing Integration Assessments
1215-1345 Lunch
1345-1415 Connectors
1415-1430 15 Minute Break
1430-1700 Working Groups: Seabasing Integration Assessments, Connectors
THURS, 24 JULY
0715-0800 Registration
0800-0900 International Updates (UK, JPN)
0900-0930 PEO Ships
0930-1000 Army Seabasing
1000-1030 Amphibious Ships Working Group Outbrief
1030-1045 15 Minute Break
1045-1115 Connectors Working Group Outbrief
1115-1145 S&T Working Group Outbrief
1145-1215 Seabasing Integration Assessment Working Group Outbrief
1215-1345 Lunch
1345-1415 MPF Ships Working Group Outbrief
1415-1515 SOAG 14 Wrap-up
5
Day 1: Plenary Sessions & Working Groups
0730-0900 Registration 0900-0930 Welcome Mr Strock0930-1015 Expeditionary Force 21 Implementation Mr King1015-1045 Seabasing Gaps Mr Brodie1045-1100 15 Minute Break1100-1130 Amphibious Ships Mr Betsinger1130-1200 MPF Ships Mr Betsinger1200-1330 Lunch1330-1400 S&T Mr Barilich1400-1415 15 Minute Break1415-1700 Working Groups: Amphibious Ships, MPF Ships, S&T Facilitators
6
Day 1 WG Requirements
AMPHIBIOUS WARFARE SHIPS (ENSTICE) •LSD Mid-Life•LHD 1 Class Mid-Life: Stability & Aviation Sys Integration•LHA 8: LHA(R) Flight 1•LX(R): LSD Replacement•MV-22B Aviation Certification•Lithium Ion (Li-Ion) Battery•Armory/Weapon Storage: Amphibious Ships•Heavy UNREP: LHD 1 – LHA 7 (JSF Engine Modules)
MARITIME PREPOSITIONING SHIPS (BOYD)•MPF MLP (Mobile Landing Platform)•MPF Seabasing Enabled (SE) Modular Block Upgrades•MV-22B Aviation Certification•Lithium Ion (Li-Ion) Battery•Armory/Weapon Storage: MPF Ships•Command & Control Spaces
S&T Seabasing Technologies (BARILICH)•Advanced Mooring System (AMS)•Interface Ramp Technology (IRT)•Environmental Ship Motion Forecasting (ESMF)•Flexible Sea-based Force Projection (FSFP)•Ultra Heavy-lift Amphibious Connector (UHAC)•Large Vessel Interface Lift On/Lift Off (LVI LO/LO)•Dense Pack, Access Retrieval & Transit (DPART)
1. Review Major Programs
2. Review Requirements
3. Identify and Review Gaps
4. Discuss DOTMLPF Solutions
5. Prepare Major Findings
7
0800-0830 MARFORCOM LtCol Cagle
0830-0900 MARFORPAC Mr Neff
0900-0930 MARCENT Mr Brinegar
0930-1000 MARFORNORTH Maj Wellborn
1000-1015 15 Minute Break
1015-1045 MARFOREUR/AF Mr Harvey
1045-1115 MARFORSOUTH ??????
1115-1145 MAGTF to Ship Integration Mr Boisvert
1145-1215 Seabasing Integration Assessment Mr Bartlett
1215-1315 Lunch
1315-1345 Connectors Mr Groves
1345-1400 15 Minute Break
1400-1700 Working Groups: Connectors, Seabasing Integration Assessment Facilitators
Day 2: Plenary Sessions & Working Groups
8
Day 2 WG Requirements
CRAFTS & CONNECTORS (GROVES)
•LCAC (SLEP) & Sustainment
•Ship-to-Shore Connector (SSC) Program (LCAC-100)
•LCU Sustainment & Surface Connector (X)-Recapitalization
•Joint High-Speed Vessel (JHSV)
SEABASING INTEGRATION ASSESSMENT (BARTLETT)
•Validation from MARFORs, Uncover any other objectives we should be concentrating on from MARFOR concern perspective
•Seabasing Integration Objectives
•Opportunities
•Process
•METLs
1. Review Major Programs
2. Review Requirements
3. Identify and Review Gaps
4. Discuss DOTMLPF Solutions
5. Prepare Major Findings
9
Day 3: Plenary Sessions & Wrap-ups
0715-0800 Registration
0800-0900 International Updates (UK, JPN) Mr Gelder/ LCDR Oya
0900-0930 PEO Ships Update Col Thompson
0930-1000 Army Seabasing TBD
1000-1030 Amphibious Ships Working Group Outbrief Mr Enstice
1030-1045 15 Minute Break
1045-1115 Connectors Working Group Outbrief Mr Groves
1115-1145 S&T Working Group Outbrief Mr Barilich
1145-1215 Seabasing Integration Assessment Working Group Outbrief Mr Holbeck
1215-1345 Lunch
1345-1415 MPF Ships Working Group Outbrief Maj Boyd
1415-1515 Wrap-up Mr Brodie
10
After the OAG
• Working Group Gaps & Requirements will feed– Annual Report published NLT 15 Sept– POM16 Submission to OPNAV 15 Sept
• Quarterly OAG telecon– 15 October 2014– 14 January 2015– 15 April 2015
• Seabasing OAG 2015– 21-23 July 2015
11
Other Support
Registration1. Mr Mullin
2. LCDR Evans
3. Maj Stamps
4. Mrs Frisard
AV Support 1. LCDR Evans
12