Overview

• General Information

• Current Licences Issued (HBML)

• Typical Type A Process

• Project Specific Considerations

• Amendments and Implications

Page 3: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

General Information

– Institution of Public Government established under Article 13 of the NLCA

– Regulation, use, and management of water in the NSA– Nunavut Land Claims Agreement (NLCA), Articles

13 and 20– Nunavut Waters and Surface Rights Tribunal Act

(NWSRTA). 2002 c.10– NWT Waters Regulations (NWTWR) (SOR/934-303)– Nunavut Specific Water Regulations (Pending)

Page 4: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Current Licences Issued (HBML)

1. 2AM-DOH0713 (Type A)– Term: September 19, 2007 to September 30, 2012– Allows for the use of water and the disposal of

waste in support of mining and milling activities

2. 2BE-HOP0712 (Type B)– Term: May 20, 2007 to June 30, 2012– Allows for the use of water and the disposal of

waste in support of mining exploration activities

Page 5: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Current Licences Issued (HBML)(Cont.)

3. 2BB-BOS0712 (Type B) – Term: July 6, 2007 to July 31, 2012– Allows for the use of water and the disposal of

waste in support of a bulk sampling program

Page 6: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Typical Type A Process

• Streamlined Coordinated Process for NIRB’s Part 5 Review and NWB Type A Water Licence

• Standard Process

Page 7: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Application to NPC for conformity

NIRB for Screening or Review

NWB Issues Guideline to the Proponent

NIRB Issue Project Certificate

Revised Water Licence Application

Review for Conformity to Guidelines

Technical Review of the Application

Pre-hearing/Technical Meeting

Public Hearing

NWB Decision/Licence to the Minister

Minister Decision

Licence Issued

Enforcement and Compliance by INAC

Processes governed by other IPGs’

NWB Licensing process for a Type A licence; may also apply to some Type B licences

Figure 1: Typical Type A process

Page 8: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Process Time Lines• NWB Issues Guideline to the proponent: 30 days• Revised Water Licence Application: Applicant driven• Review for Conformity to Guidelines: 15 Days• Notice of Application / Technical Review, and

Pre-hearing / Technical Meeting: 50 days• Public Hearing: 60 day notice required • NWB Decision/Licence to Minister: 30 - 45 days• Minister Decision: may take up to 45 - 90 days• Licence Approval by the Minister• Enforcement and Compliance by INAC: Ongoing

Page 9: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Project Specific Considerations

– Confirm amount of fuel required and for what purposes

– What project components require approval by June 2011

– Clarify the purposes for which water from Doris Lake will be used

– Clarify the volume of waste rock generated and infrastructure to be constructed from the rock

– Confirm whether the type A and type B licences will be amalgamated

– Clarify the phases of the project

Page 10: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Amendments & Implications

2AM-DOH0713 (Anticipated amendment No.2)– Commence construction of additional fuel storage &

containment facility by March 2011– Approval to construct other components by June 2011– Use of quarried rock during construction– Construct a short all-weather road bypassing airstrip

and extend airstrip

Page 11: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

– Change water source and pipe route from Doris Lake to Windy Lake

– Construct secondary containment for Cyanide storage and relocate the storage

– Use waste rock from underground mining activities to construct infrastructure

2AM-DOH0713 (Anticipated amendment No.3)– Expand waste rock and ore storage areas– Expand Doris North facilities– Renew Type A Licence to allow mining until 2017– Increase domestic water consumption and

construction of a water treatment plant

Page 12: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

• 2BE-HOP0712 (Anticipated Amendments)– Carry out underground exploration of Doris and

Madrid Deposit, Q4, 2011– Develop infrastructure for Hope Bay Greenstone

Belt including mining & milling for the Madrid and Boston deposit

• 2BB-BOS0712 (Anticipated amendments)– Not stated

Page 13: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Additional Information

• NWB has developed Supplemental Information Guidelines for Mine Development (MM3)

• Water Licence Application Process Guidelines 1 to 7, approved April 2010 (Guidelines 4, 5, 6 and 7 are of particular importance)

• NIRB/NWB Coordination Framework

Page 14: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Contact Information

Nunavut Water Board

P.O. Box 119

Gjoa Haven, Nunavut

X0B 1J0

Tel: 867-360-6338

Fax: 867-360-6369

Ftp site: http://nunavutwaterboard.org/ftp/

Web Site: www.nunavutwaterboard.org/en/home

Page 15: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Licensing & Technical Staff• Executive Director: D. Filiatrault

Email : [email protected]• Director of Technical Services: D. Hohnstein

Email: [email protected]• Manager of Licensing: P. Beaulieu

[email protected]• Licensing Administrator: R. Dwyer

[email protected]• Technical Advisor: K. Kharatyan

Email: [email protected]• Technical Advisor: S. Joseph

Email: [email protected]

Page 16: Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Thank You

Any Questions?