SECTION 3: EXTERNAL WORK
-
Upload
others
-
View
1
-
Download
0
Embed Size (px)
Citation preview
GENERAL EARTH WORKS (PROVISIONAL)
---------------------
2135m2
Clearareaofsiteofallrubbish,debris,vegetation,
hedges,shrubsandtreesnotexceeding200mmgirth,
bush,etc.,includingreclearingofanysubsequent
vegetationgrowthduringthecontractperiodas
considerednecessarybytheRepresentativeand
removingallmaterialfromsite,Asitem1page124
1
3No Indigenoustreeexceeding200mmandnotexceeding 500mmgirth
2
Taking out and removing, grubbing up roots and filling in
holes
2No Indigenoustreeexceeding500mmandnotexceeding 1000mmgirth
3
3No Indigenoustreeexceeding1000mmandnotexceeding 1500mmgirth
4
-150-
SiteworksandPaving(Provisional) BillNo.1 SectionNo.3
RUBIQUANT QUANTITY SURVEYORS
810m3
150mmlayersofG5Materialandcompactedto95%
Mod,TheG5shouldbetheformofasugardolerite,
decomposedgraniteordecomposedsandstone
6
Earth filling supplied by the contractor compacted to 95% Mod
AASHTO density
771m3
150mmlayersofG7Materialandcompactedto95%
Mod,TheG7shouldbetheformofasugardolerite,
decomposedgraniteordecomposedsandstone
7
427m3
Stabilisationofsub-baseorin-situmaterialwithequal
partsofOrdinaryPortlandCementandroadlime,evenly
workedintofillingmaterial,includingwettingandcuring
tothesatisfactionoftheEngineer.
8
2135m2
Compactionofgroundsurfaceunderpavings,roads,
etc.includingscarifyingforadepthof150mm,breaking
downoversizematerial,addingsuitablematerialwhere
necessaryandcompactingto93%ModAASHTO
densityand100%ModAASHTOforsand.
9
-151-
SiteworksandPaving(Provisional) BillNo.1 SectionNo.3
RUBIQUANT QUANTITY SURVEYORS
WEED KILLER
Approved weed killer in strict accordance with manufacturers
instructions
PavingtobelaidinaccordancewithSABS1200MJ,
SABS1058andtheConcreteMasonryAssociation's specifications
PAVING
413m2Pavinginherringbonebondpatterntofalls12
Paving of 50 mm clay paving bricks of approved colour with butt
joints on 20 mm thick river sand bed (elsewhere measured)
351mExtraoverforstraightedgeblocks13
2135m2Pavinginstretcherbondtofalls14
Paving of 80 mm concrete paving bricks of approved colour with butt
joints on 20 mm thick river sand bed (elsewhere measured)
PRECAST KERBS
670m
Kerb(SABS927fig6)with45x125mmunreinforced
concretefooting,250x250mmtriangularconcrete
haunchingatbackofeachjointand300x150mm
concreteinfillinfrontwithcementgroutedjoints,
includingexcavation,backfilling,etc.
15
Precase concrete finished smooth on exposed surfaces including
bedding, cutting and pointing:
62m
Ditto,Kerb(SABS927fig6)butcircularonplannot
exceeding4mradiusformedwithshortlengthsof straightkerb.
16
-152-
SiteworksandPaving(Provisional) BillNo.1 SectionNo.3
RUBIQUANT QUANTITY SURVEYORS
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
Roadsignsandroadmarkingsshallconformtothe
requirementsgivenintheSouthAfricanRoadTraffic
ManualandrelevantSABSspecifications.
Theratetenderedforroadsignsshallcoverthecostof
suplyinganderectingthecompletedsignboardsupports,
face,frameandfixingbracketsandshallincludethe
costforprovidingretro-reflectivebackgrounds,symbols,
characters,legendsandbordersofthetypespecifiedin
theSouthAfricanRoadTrafficManual.Thetendered
rateshallincludeforexcavations,backfillingand
concretingofsignsupports.
RETRO-REFLECTIVE ROAD SIGNS, ETC.
3No
900mmDiameterregulation"DISABLEDPARKING
SYMBOL"sign(R323)inaccordancewithS.A.B.S.
standardfittedandfixedoncreosotedpole,2700mm
highbeddedin450x450x600mmdeepconcrete
footing,includedallnecessaryexcavation,etc.
17
278m
20MPaConcreteopensurfacestormwaterchannel1
000mmwideand85mmthickwithV-shapechannel1
000mmwideand75mmdeepextremeformedinsame,
finishedsmoothonexposedfaceswithanglesslightly
rounded,laidtofallsinlengthsnotexceeding2m,
jointedin3:1cementmortarincludingexcavations,
necessaryformworkincluding150mmdeepselected
fillingunderneathandcompactingtoadensityof93%of
theMod.AASHTOMaximumdensity
18
Stormwater channels, V drains
333m2 Type193fabricreinforcementinconcretesurfacebeds,
slabs,etc.
19
18No Extraover1000mmwidechannelforangles,
intersections,ends,dressingintosidesofcatchpits,etc.
20
3No
Triangularshapedstormwaterchanneloutlet1mwideat
head,1.5mwideatbaseand1mlongatsidesformedof
85mmthickconcreteV-shapedbaseincludingall
excavations,formworkandsix150x150mmbroken
bricksorstonesprotruding150mmhighatbaseofthe spillbasin
21
-153-
SiteworksandPaving(Provisional) BillNo.1 SectionNo.3
RUBIQUANT QUANTITY SURVEYORS
1No
110mmuPVCgulleycompletewithandincluding380x
380x170mmprecastconcretegulleysurroundon
75mmClassCconcretebaseabdfittedwith187mm diameteruPVCgrating.
22
GULLIES
Sumps, catchpits, inspection chambers, etc (gratings and covers
elsewhere):
1No600x600x60kgDishedcastirongratingsetinmortar23
Gratings, covers, etc:
The following in soakaways, french drains, etc:
3m3Unreinforcedconcrete15Mpainbase.25
4m2150mmThickconcreteblockwall.26
3m3Selectedrubblefilling.27
28
12m2 Riskofcollapsetosidesofsoakawayexcavationsnot
exceeding1,5mdeep.
29
2m3
Extraoversoakawayexcavationsforcartingaway
surplusmaterialfromexcavationstoadumpingsiteto
belocatedbythecontractor.
30
2m3 Earthfillingobtainedfromexcavationsorstockpileson
sitecompactedto93%backfilledtosoakways.
31
-154-
SiteworksandPaving(Provisional) BillNo.1 SectionNo.3
RUBIQUANT QUANTITY SURVEYORS
The following in aprons
16m3Unreinforcedconcrete(20MPa)inapronslab33
109m2 Type193fabricreinforcementinconcretesurfacebeds,
slabs,etc.
34
91mHalfroundedangleonedgeofconcreteaprons.36
182m Roughformworktoedgeofconcretenotexceeding 300mmhigh.
37
9m
10mmExpansionjointsof10mmJointexfillerboard
betweenverticalconcretesurfacesnotexceeding 300mmhigh.
38
91m Ditto,betweenverticalconcretesurfacesandbrickwork
surfacesnotexceeding300mmhigh
39
100m
Rakeoutsoftboard25mmdeepandsealexpansion
joints"Thioflex600"polysulphidesealingcompound
includingbackingcord,bondbreaker,primer,etc,in aprons.
40
-155-
SiteworksandPaving(Provisional) BillNo.1 SectionNo.3
RUBIQUANT QUANTITY SURVEYORS
2No
8,85mmHighflagpolecomprising130mmand60mm
outsidediameteraluminiumtubingtaperedbywayofan
aluminiumconecasting,weldedandcompletewith
sphericaltopcap,twopulleys,twocleats,twohalyards
(ropes),fourflagropeclamps,swiveltypebasewithfour
M20x550mmlonganchorboltsforfixingflagpole
baseplateincludingconcretebase(Basesize1500x 1500x550mmdeep)
41
Thefollowingina8,85mhighStandardGovernment
typeAluminiumFlagpoleas"Aluweld"orotherapproved
anderectedon600x600x800mmdeepClassC
concretebase,inclexcavations,cartingaway,etc.
LANDSCAPING
Ground preparation
657m3 Topsoilsuppliedbythecontractorinplantbeds,grassed
areasandholesfortrees,shrubs,etc
43
4380m2"Kikuyu"sodsapproximately80mmthick44
SOFT LANDSCAPING
200000.00Item AllowthePCamountofTwoHundredThousandRand
(R200000.00)forSoftLandscapingcomplete
45
-156-
SiteworksandPaving(Provisional) BillNo.1 SectionNo.3
RUBIQUANT QUANTITY SURVEYORS
SectionNo.3
BillNo.1
-157-
SiteworksandPaving(Provisional) BillNo.1 SectionNo.3
RUBIQUANT QUANTITY SURVEYORS
AmountItem No
Quantity Rate
WATER SUPPLY AND FIRE SERVICES (PROVISIONAL)
Note:
Ratesforpiping,etc.,havetoincludealladaptors, flanges,etc.
WATER SUPPLIES
Whereeverpossible,abridgeddescriptionshavebeen
usedforthoseitemsinthisBillwhichappearunderthe
maintradeheadingsinprevious/subsequentBills.The
fulldescriptionsoftheseitemsinthePreambles,as
referredtoabove,tothevarioustradebillsareto,and
doapplyequallytothisSection.
General
SpecialreferenceismadetoSABS1200specifications forcivilworks.
SpecialreferenceismadetoSpecificationsanddetails
ofDepartmentofPublicWorksDrainageDetail (December1998).
Reference
-158-
RUBIQUANT QUANTITY SURVEYORS
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
Thecontractormustmakeallowanceagainstthe
relevantitemsforthefollowing:
(a) Necessarycaretobetakenwhenexcavating near
existingservicesinoracrossthepathof excavations.
(b) Protectionandmaintainingsuchservicein operation
bymeansoftemporarysupportorshoringas necessary.
(c) Delaysanddisruptionoftheprogressofthe workdue
totheexistenceoftheservice.
(d) Repairsnecessitatedbydamagecausedbythe Contractor.
Protection of existing services
WherereferenceismadetoSABS1200specifications
(allsections)itwillbedeemedtoexcludeclause8
"MeasurementsandPayment".
SABS specifications references
Thetenderermustacquainthimselfwiththematerialto
beexcavatedinandarerequestedtostudythe
GeotechnicalSurveyReportattachedtoPartC4:Site
Informationoftheprocurementdocument
Nature of ground
Descriptionsofcartingawayofexcavatedmaterialshall
bedeemedtoincludeloadingexcavatedmaterialonto
trucksdirectlyformtheexcavationsoralternatively,from
stockpilessituatedonthebuildingsite.
Carting away of excavated material
Allprescribedtestsaretobeexecutedbyanapproved,
accreditedlaboratory
Prescribed tests
RUBIQUANT QUANTITY SURVEYORS
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
Pipesshallbejointedwithogeejointswithrubbercollars
orsocketandspigotjointswithrubberrings
Concrete pipes
Polypropylenepipes42mmdiameterandundershall
beseamlesscoppercolouredclass16pipesjointedwith
brasscompressionfittingsasdesignedforusewith
copperpipesasstated.
Pipesshallbefirmlyfixedtowallsetc.withcoloured
nylonsnapinpipeclipswithprovisionfor
accommodatingthermalmovementandjointedand
fixedstrictlyinaccordancewiththemanufacturer's instructions.
Allpipediametersaretomatchsizesasutilisedfor copperpipes.
Polypropylene pipes
Polyethylenepipes75mmdiameterandunderupto42
mmshallbeseamlesscoppercolouredclass16Type
IVHDPEpipesjointedwithpolymercompression fittings.
Pipesshallbefirmlyfixedtowallsetc.withcoloured
nylonsnap-inpipeclipswithprovisionfor
accommodatingthermalmovementandjointedand
fixedstrictlyinaccordancewiththemanufacturer's instructions.
Allpipediametersaretomatchsizesasutilisedfor copperpipes.
Polyethylene pipes
Pipesshallbejointedwith"Triplex"couplings.A
lubricant(softsoap)istobeusedinconnectingthe
couplingstothepipeorfittings.Thecouplingsaretobe
unsupportedonthebeddingwhenpipesarelayed.
C.O.D. Fibre Cement Pressure Pipes
-160-
RUBIQUANT QUANTITY SURVEYORS
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
Seweranddrainagepipesandfittingsshallbejointed
andsealedwithbutylrubberrings.
Soil,wasteandventpipesandfittingsshallbesolvent weldjointed.
uPVC pipes and fittings
Pipesshallbeharddrawnandhalf-hardpipesofthe
classstated.Class0(thinwalledharddrawn)pipes
shallnotbebent.Class1(thinwalledhalf-hard),Class
2(half-hard)andClass3(heavywalledhalf-hard)pipes
shallonlybebentwithbenderswithinnerandouter
formers.Fittingstocopperwaste,ventandanti-syphon
pipes,capillarysolderfittingsandcompressionfittings
shallbe"CobraWatertech"type.Capillarysolderfittings
shallcomplywithISO2016.Onlycompressionfittings
shallbeusedinwallsoringround.
Copper pipes
Wherefittingshavereducingendsorbranchestheyare
describedas"reducing".Incaseofpipeswith
diametersnotexceeding60mmonlythelargestendor
branchsizeisgiven.Shouldthecontractorwishtouse
otherfittingsandbushesorreducershemaydosoon
theunderstandingthatnoclaiminthisregardwillbe
entertained.Incaseofpipeswithdiametersexceeding
60mmallsizesaregivenandnoclaimforextra
bushes,reducers,etc.,willbeentertained.
Reducing fittings
Exposedsurfacesofconcretestormwaterchannels,
coverslabs,inspectioneyemarkerslabs,gulleytops,
cleaningeyetops,catchpits,inspectionchambers,etc.
shallbefinishedsmoothwithplaster.
Exposed concrete surfaces
Noclaimforrockexcavationwillbeentertainedunless
thecontractorhastimeouslynotifiedtheQuantity
Surveyor/Engineerthereofpriortobackfilling.
"Softrock"and"hardrock"shallbeasdefinedin "Earthworks".
Excavations
-161-
RUBIQUANT QUANTITY SURVEYORS
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
SaddlestobetheMagnumuPVCtypewithstainless
steelboltsandscrewpiecescompletewithTalbot
lockableclampandcompressionexternalscrew-thread adaptor.
Saddles
Pipesforwatersupplyshallbeoftheclassstated.
Pipesof40mmdiameterandsmallershallbeplain
endedwithsolventweldeduPVCloosesocketsand fittings
Pipesof50mmdiameterandgreatershallhavesockets
andspigotswithpush-intypeintegralrubberringjoints.
BendsshallbeuPVCandallouterfittingsshallbecast
iron,allwithsimilarpush-intypejoints
uPVC pressure pipes and fittings
Exposedsurfacesofconcretestormwaterchannels,
coverslabs,inspectioneyemarkerslabs,gulleytops,
cleaningeyetops,catchpits,inspectionchambers,etc.
shallbefinishedsmoothwithplaster
Exposed concrete surfaces
Noclaimforrockexcavationwillbeentertainedunless
thecontractorhastimeouslynotifiedthequantity
surveyorthereofpriortobackfilling
"Softrock"and"hardrock"shallbeasdefinedin "Earthworks"
Excavations
-162-
RUBIQUANT QUANTITY SURVEYORS
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
Pipesshallbelaidandbeddedandtrenchesshallbe
carefullybackfilledinaccordancewithmanufacturer's
instructions.
Wherenomanufacturer'sinstructionsexistpipesshall
belaidinaccordancewithclauses5.1and5.2eachof thefollowing:
SABS1200L: Medium-pressurepipelines LD: Sewers LE:
Stormwaterdrainage
Pipetrenchesetc.shallbebackfilledinaccordancewith
clauses3,5.5,5.6,5.7and7ofSABS1200
DB: Earthworks(Pipetrenches)
Pipeshallbebeddedinaccordancewithclauses3.1to
3.4.1.,5.1to5.3and7ofSABS1200
LB: Bedding(Pipes)
Unlessotherwisedescribedbeddingofrigidpipesshall
beclassBbedding
Laying, backfilling, bedding, etc. of pipes
Pipes of Nominal Bore up to 150 mm:
Substitute"screwed"inL3.4.2with"flanged".
Pipes of Nominal Bore over 150 mm: Addthefollowing:
"AllmildsteelpipesmustbemanufacturedfromGrade
Bsteelwithminimumplatethicknessof6,0mmexcept
wherespecifiedotherwise."
Steel pipes, fittings and specials
-163-
RUBIQUANT QUANTITY SURVEYORS
Cast Iron Pipes and Fittings:
SubstituteL3.9.1withthefollowing:
"AllinternalsurfacesshallbegritblastedtoSA2½
standardandthencoatedwithCoponEP2300epoxy
painttoaminimumthicknessof350micron."
Joints, Bolts, Nuts and Washers:
SubstituteL3.9.5withthefollowing:
"Alljoints,bolts,nutsandwashersshallbecadmium-
platedorstainlesssteel."
Corrosion protection
Ratesforpipeitemsaretobeallinclusivepricesand
rates(exceptwhereallowedforelsewhere)areforthe
completedworkasdescribedintherespectiveitems
andshallincludealllabour,pipes, bedding and filling complete in
layers not exceeding 300 mm (unless otherwise specified) and
compactedallsundrywork, equipmentcost,guards,lighting,profitand
maintenance.
Underpavedareasandbuildingsthesandbeddingand
fillingmustbestabilisedwith4%cement.
Ratesforinspectionchambers,etc.,aretobeall
inclusivepricesandrates(exceptwhereallowedfor
elsewhere)forthecompletedworkasdescribedinthe
respectiveitemsandshallincludealllabour,pipes,
concrete-floorsandslabs,brickwork,plastering,
compacting,allsundrywork,equipmentcost,guards,
lighting,profitandmaintenance.
TheContractorisreferredtoDrawingno's
208640VSO/15to17annexedtotheseBillof Quantities.
Rates
Allundergroundsteelpipesandfittings,after
installation,shallbeprotectedagainstcorrosion
accordingtoPSL1.2
Pipework, fittings, etc.
RUBIQUANT QUANTITY SURVEYORS
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
Themaintenanceperiodforthefollowingworkshallbe
12calendarmonths.
Maintenance period
15m 25mmPipeslaidinandincludingtrenchesnot
exceeding1000mmdeep
1
High density polyethylene class 16 piping complying with SABS 533
Part III
5m 32mmPipeslaidinandincludingtrenchesnot exceeding1000mmdeep
2
5m 40mmPipeslaidinandincludingtrenchesnot exceeding1000mmdeep
3
40m 50mmPipeslaidinandincludingtrenchesnot
exceeding1000mmdeep
4
78m 63mmPipeslaidinandincludingtrenchesnot
exceeding1000mmdeep
5
4No25x90°Elbow7
3No32x20Reducer8
3No32x90°Elbow9
2No40x90°Elbow11
1No40x32Reducer12
2No40x22Reducer13
6No50x90°Elbow15
3No50x32Reducer16
RUBIQUANT QUANTITY SURVEYORS
15No63x90°Elbow18
1No63x50Reducer19
The following in valves, etc
2No35mmIsolatingvalve21
1No35mmIn-linestrainer22
1No35mmNon-returnvalve23
2No54mmNon-returnvalve26
2No54mmIn-linestrainer27
6No54mmIsolatingvalve28
5No63mmIsolatingvalve30
5No
Standardvalvechambersize337x337x390mmhigh
comprisingofClass25/19concretefootingandcollar,
with200mmdiameterClassBCODfibrecementpipe
verticallyintogroundandcoveredwithBesaans-du
Plessissize115mmdiameterx102Type7stopcock
boxcastintoconcretecollar
31
The following in Valve Chamber
1.00No CutintoexistingHDPEpipeingroundandconnectnew
50mmHDPEwaterpipe
32
Sundries
-166-
RUBIQUANT QUANTITY SURVEYORS
BOREHOLE
260000.00Item AllowthePCamountofTwoHundredandSixty
ThousandRand(R260000.00)forBoreholecomplete
33
Borehole
Item
Allowfortestingthewholeofthewaterreticulation
systemandforanyre-testingnecessaryaftertakingout
andreplacinganydefectiveworktothesatisfactionof
theRepresentative.
35
TESTING :
Item
Galvanisedsteeltank(4x3x1highmodulePanels)on
9mhighgalvanisedsteelstand(elsewheremeasured)
completeinaccordancewithCKS114including100mm
diameterfloatvalveseries7354accordingtoVOSA
36
Item
Supply,delivertositeanderect9mhighgalvanised
steeltankstandfortheabovementionedtank,complete
withsideladder,bearers,excavations,backfill,formwork
allinstrictaccordancewiththenecessarysafetyacts, etc.
37
Item
Galvanisedsteeltank(6x5x3highmodulePanels)on
groundlevelcompleteinaccordancewithCKS114
including100mmdiameterfloatvalveseries7354 accordingtoVOSA
38
Item
PretreatmentGalvanisedsteeltank(4x4x4highmodule
Panels)ongroundlevelcompleteinaccordancewith
CKS114including100mmdiameterfloatvalveseries
7354accordingtoVOSA
39
REINFORCED CONCRETE
RUBIQUANT QUANTITY SURVEYORS
1.14t16mmDitto43
100000.00Item
ProvideanamountofR100000.00(OneHundred
ThousandRand)forIrrigationsystemwithJoJotanks Pumpetc
44
ItemProfitandattendanceonabove-mentioneditem45
-168-
RUBIQUANT QUANTITY SURVEYORS
-169-
RUBIQUANT QUANTITY SURVEYORS
AmountItem No
Quantity Rate
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
SECTION NUMBER 3
BILL NUMBER 3
SOIL DRAINAGE (PROVISIONAL)
Items,materialsormethodstobeusedspecifiedby
tradenamesorcataloguenumbersareonlyan
indicationofthequalityrequired.Items,materialsor
otherapprovedmaybeusedwithpriorapprovalfrom thearchitect
SUPPLEMENTARY PREAMBLES
1.00No
Breakintoexistingmanhole,buildinpipeasnecessary,
benchoutinconnectiontotheexistingsoildrainage
systemwithandincludingallexcavations,materialand
labourtotheapprovaloftheRepresentative.
1
REPAIR OF SEWER INFRASTRUCTURE
Sewer pipe repairs, all pipe and fittings to be checked with
Engineer before installing
97m110mmPipeandexcavationsnotexceeding1mdeep2
Free Flow uPVC drain pipes including bedding, backfilling and
compackting of pipe trenches
34m 110mmPipeandexcavationsexceeding1mandnot exceeding2mdeep
3
-170-
RUBIQUANT QUANTITY SURVEYORS
23No110mmAccessbend5
7No110mmAccessjunction6
11No110mmRoddingeye7
12m 15MPa/19mmMassconcreteencasingaround110mm
horizontaldrainpipeincludingallnecessaryformwork
9
Sundries
131m
Excavateinearthnotexceeding2mdeepforand
removeexisting110mmdiameterdrainpipeandfittings
includingbackfilling,compaction,etc
10
Work to existing
4m3 Extraoverexcavationstotrenches,holes,etc.,for
excavationsinsoftrock
11
Sundries
25m3
Importedsandinbeddingandsurroundtopipeworkwell
compactedinlayers,includinganyadditional
excavation,riskofcollapse,etc
13
1No
Standardprecastmanhole,notexceeding750mm
deepinternallycompletewithprecastconcreterings,
coverslab,doublesealcastironmanholecoverand
frame(SABS558Type2Aheavydutyinroadsand
Type8Amediumdutyelsewhere),unreinforced
concretefootingandbenchinginbottom,disheddown
tochannelsandfinishedsmoothwithplaster.
15
RUBIQUANT QUANTITY SURVEYORS
1No
Standardprecastmanhole,1050mminternaldiameter
exceeding750mmandnotexceeding1000mmdeep
internallycompletewithprecastconcreterings,cover
slab,doublesealcastironmanholecoverandframe
(SABS558Type2AheavydutyinroadsandType8A
mediumdutyelsewhere),unreinforcedconcretefooting
andbenchinginbottom,disheddowntochannelsand
finishedsmoothwithplaster.
16
2No
Standardprecastmanhole,1050mminternaldiameter
exceeding1000mmandnotexceeding1250mmdeep
internallycompletewithprecastconcreterings,cover
slab,doublesealcastironmanholecoverandframe
(SABS558Type2AheavydutyinroadsandType8A
mediumdutyelsewhere),unreinforcedconcretefooting
andbenchinginbottom,disheddowntochannelsand
finishedsmoothwithplaster.
17
Item
Allowfortestingthewholeofthesoildrainagesystem
andforanyre-testingnecessaryaftertakingoutand
replacinganydefectiveworktothesatisfactionofthe
Representative.
18
TESTING :
-172-
RUBIQUANT QUANTITY SURVEYORS
-173-
RUBIQUANT QUANTITY SURVEYORS
AmountItem No
Quantity Rate
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
SECTION NUMBER 3
BILL NUMBER 4
Fencingpricesaretoincludeforsiteclearanceand
gradingtoevenlines1meachsideoffencelineunless
otherwisedescribed,allnecessaryexcavationsinearth,
riskofcollapseanddisposalofsurplusexcavated material
FENCING AND GATES (PROVISIONAL)
DEMOLITIONS
525m
Takedownandremoveexistingwiremeshfencing2
400mmhighincluding300mmflatwrapped,withpost
asindicatedbytheengineer
1
125m
Takedownandremoveexistingsteelpalisadefencing2
100mmhighincludingpostsasindicatedbythe engineer
2
525m
Allowfordiggingupandremovalofallgrass,shrubs,
rubbishandvegetablesoilforawidthof500mmon
eithersideofnewfencelineincludingforming50mm
highfreespacebetweenundersideoffenceandground
surfacebyreducingormakinguplevelsasrequired
3
-174-
RUBIQUANT QUANTITY SURVEYORS
SECURITY FENCING
Powder coated steel security fencing as per COCHRANE PRODUCTS 358
HIGH SECURITY FENCING MESH. All details and specifications to be
verified with manufacturer
430m
2900mmhigh"CochraneClearVu"fencewithspikeson
toporsimilarapproved,completewithbases
excavationsetc.accordingtomanufacturersdetail,see
detailsatthebackofthebillsofquantities
4
2100mmhigh"CochraneClearVu"fencewithspikeson
toporsimilarapproved,completewithbases
excavationsetc.accordingtomanufacturersdetail,see
detailsatthebackofthebillsofquantities
5
1No
3500x2900mmHigh"CochraneClearVu"orsimilar
approvedDoublegatecompleteasperdetailsatthe
backofBillofQuantities.
6
1No
4500x2100mmHigh"CochraneClearVu"orsimilar
approvedDoublegatecompleteasperdetailsatthe
backofBillofQuantities.
7
1No
4500x2900mmHigh"CochraneClearVu"orsimilar
approvedslidinggatecompleteonandincludinggate
rail,stopedend,guiderollersandgatemotor.
8
1No
5500x2900mmHigh"CochraneClearVu"orsimilar
approvedslidinggatecompleteonandincludinggate
rail,stopedend,guiderollersandgatemotor.
9
-175-
RUBIQUANT QUANTITY SURVEYORS
-176-
RUBIQUANT QUANTITY SURVEYORS
REPAIR AND RENOVATIONS
BERGVILLE MAGISTRATE OFFICE
Bill No
Page No
169Watersupplies(Provisional)2
173SoilDrainage(Provisional)3
176Fencing,etc(Provisional)4
CARRIED TO FINAL SUMMARY R
SECTION 4:
TendersareadvisedtostudyAdditionalSpecification
SL:EmploymentandTrainingofLabouronthe
ExpandedPublicWorksProgramme(EPWP)
InfrastructureProjects:NationalYouthService,as
boundelsewhereintheBillsofQuantities,andthen
pricethisBillaccordingly
TRAINING OF YOUTH WORKERS Target : 20 Youth Workers
PREAMBLES
150000.00Item
OrientationandLifeskillsdevelopmenttraingforyouth
workersforanavarageof10daysperyouthworker(ref. SL11.01.01)
1
Skillsdevelopment,LifeSkillsandTechnicaltraining:
400000.00Item Technicalskillstrainingforyouthworkersforanavarage
of45daysperyouthworker(ref.SL11.01.01)
2
ItemAllowforattendanceontheabove,ifany4
PenaltyduetonotmeetingthetargetasinSL11.01.02 (R
2'000.00perYouthWorker)
5
10000.00ItemTraveling(basedonR30perdayreturntrip/trainer)6
Orientation,Lifeskillstrainingfor10dayseach(SL)
25000.00Item Accomodation(basedon10daysperweekand R150p/n)
7
-178-
EmploymentandTrainingofLabour BillNo.1 SectionNo.4
RUBIQUANT QUANTITY SURVEYORS
10000.00ItemTraveling(basedonR30perdayreturntrip/trainer)9
Skilldevelopmentandtechnicaltraining(ref.SL)
30000.00Item Accomodation(basedon5nightsperweekand R150/N)
10
1935W/D
Skillsdevelopmentandtechnicaltrainingforyouth
workersforaperiodof45daysperyouthworker(ref: SL11.03.01)
12
112200.00Item
Employmentofyouthworkers
NOTE: Theunitofmeasurementshallbethenumberof
youthworkersatthelabourrateofR1100permonthas
theagreedbyMINMECmultipliedbytheperiod
employmentinmonthsandtheratetenderedshall
includefullcompensationforallcostsassociatedwith
theemploymentofyouthworkersandforcomplyingwith
theconditionsofcontract.Thecostfortrainingshallbe
excludedfromthisitem.Thisitemisbasedon6months
appointmentforyouthworkers
13
ItemAllowforattendanceontheabove,ifany15
30600.00Item Supply2xEPWPbrandedoveralls,1xEPWPbranded
hardhatand1xpairsafetybootstoyouthworkers
16
ItemAddprofitonaboveifrequired17
ItemAllowforattendanceontheabove,ifany18
-179-
EmploymentandTrainingofLabour BillNo.1 SectionNo.4
RUBIQUANT QUANTITY SURVEYORS
13600.00Item
Supplyofsmalltoolstoyouthworkers.Specificationto
besuppliedbytheEPWP-NYSServiceProviderforthe
respectivetrades.Thesetoolswillbecometheproperty
oftheyouthworkersafterthecompletionofthe
programme(RefSL11.06.01)
19
ItemAddprofitonaboveifrequired20
ItemAllowforattendanceontheabove,ifany21
54000.00Item Appointmentofyouthteamleaderforthedurationofthe
contract(ref:SL11.07.01)
22
100HrsLiaisonwithserviceprovider(refSL10.08)23
Liaison with Service provider
500000.00Item ProvideabudgetaryallowanceofFiveHundred
ThousandRand(R500'000.00)forCLOcomplete
24
-180-
EmploymentandTrainingofLabour BillNo.1 SectionNo.4
RUBIQUANT QUANTITY SURVEYORS
SectionNo.4
BillNo.1
-181-
EmploymentandTrainingofLabour BillNo.1 SectionNo.4
RUBIQUANT QUANTITY SURVEYORS
FINAL SUMMARY
RSUBTOTAL
Index_Part24
PA40_Declaration_of_designated_groups_for_Preferential_Procurement
dpw21_ec
dpw15_ec
dpw22_ec
Index_Part37
Index_Part38
dpw23_ec
Index_Part25