SECTION 5 SUGGESTED SOLUTIONS TO THE PROBLEM
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
48
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
PROJECT IMPLEMENTATION
EXPECTED RESULTS
Here below the list of all solutions that I will try to implement to resolve the problem:
1. Develop GST Turtle Diagram
2. Review and improve GST Contract Compliance Process
3. Create a Standard Operating Procedures’ (SOP) Matrix
4. Transfer to ISO/API format all GST official documents and practices
5. Create Current State Value Stream Map for GST Department
6. Propose solutions for improving GST maintenance strategy
It will be explained later in the document.
DIFFICULTIES ENCOUNTERED
In this project, I encountered difficulties which became obstacles in achieving my missions.
The main difficulty was to understand and assimilate the technical terms and complex
vocabulary of Fastener Industry. In fact, as a French student I had to use both English and
Spanish in order to communicate and accomplish my day-to-day work. Fastener Industry is
an industry that uses a very specific vocabulary; it is very important to fully grasp the
meaning of each term in order to sell the company’s products.
The second difficulty was to communicate in English with the team; I was unused to
speaking and writing English. I was slower in executing my work so it was difficult to
respect the time schedule of my OKR. Besides, I was an obstacle to participate in meetings
as I would like to.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
49
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
Generally, when I had a task to do, they gave me some very general instructions but no
precise guidelines. There were no steps in my tasks: I had to fully complete the task before
even beginning to review it with GST Leader. So, when the task was very complicated or
complex, I lost time looking for information or indications to perform it.
Finally, I found it hard working together as a tightly-welded team. As I said in the first
section, GST is located in three different places: Houston, México City and Toluca, so
communication flow and work relationship were reduced. To improve a maintenance
strategy for Sales Team processes, I worked with GST Client Relationship Analyst. But
every member was following its own objectives and goals; their work really needed to be
done on time and they had little time for me.
SOLUTIONS TO FACE DIFFICULTIES
To face all these difficulties, I used communication tools like video conference via skype,
chat on line, emails and phone calls etc. as much as possible. So, little by little I felt more
comfortable speaking with the team.
The fact that I had to work almost alone every day helped me become more autonomous,
do the best I could, and make an effort to be more self-disciplined in order accomplish tasks
on time.
Regarding difficulties of language and specific vocabulary of the Industry, I progressively
familiarized myself with the different terms which helped me to work faster and to be more
independent.
In order to make my work more effective in the plant, I directly worked with a newly
arrived Client Relationship Analyst: she tested all my processes to make sure they were
clear and efficient. Besides, at the end of my internship, I organized a 3 hour meeting with
all GST Client Relationship Analysts in order to review standard processes one more time.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
50
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
WORK PLAN & SOLUTIONS IMPLEMENTATION
As we said in the first part, the goal of process standardization is to create
foundations for best practices that ensure predictability and repeatability of AUGE’s
activities in Global Sales Team. In other words, my mission is to audit, develop and
improve GST standard processes to ensure conformance with AUGE’s Quality
Management System, and ISO & API requirements. In fact all documents created have to
be conformed to ISO and API requirements.
1. First I developed GST Turtle Diagram.
A Turtle Diagram is a diagram that illustrates the elements of a process, designed to help an
auditor that address the relevant question when conducting a process audit.
In fact, it helps to evaluate if the process is effective in meeting the customer’s
requirements, and to identify the process owner, responsibilities, resources, etc. It is part of
ISO standards.
Here below you can see GST Turtle Diagram:
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
51
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
Illustration 5.1 GST Turtle Diagram
Source: AUGE’s document
With the help of the GSTL and my observations, I could indicate material resources, staff
resources, available know-how and performance indicators for the processes under
examination.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
52
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
2. The second step was to review and improve GST Contract Compliance
This process is the key process for the department. It defines guidelines of the terms and
conditions on the purchase orders received from Global clients and it confirms AUGE’s
acceptance and compliance to those terms and conditions.
I reviewed with Client Relationship Analysts each step and information developed in the
document in order to ensure process is complete, effective and clear. The goal is that if a
new employee joins the team, he can rapidly understand the entire content.
To comply with ISO and API requirements, we have to use a certain format, respecting
English and Spanish translation:
Illustration 5.2 Contract Compliance Screen Shot
Source: AUGE’s document
Each process has to follow a specific structure:
• Objective: process goal
• Scope: reach covered by this process
• Reference documents: documents that help doing this process
• Definitions: explanation of specific terms
• Responsibilities: parts that are concerned by this process
• Activity Development: explanation of each step of the process
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
53
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
• Flow Diagram: graphical representation of the flow of data through process
• Changes Control: revision level, revision date and description of the change
• Annex
• Firms: person that create, review and approve process
Illustration 5.3 Contract Compliance Screen Shot
Source: AUGE’s document
Here below you can see the flow diagram of Contract Compliance Process. It permits to
understand and assimilate the process at a glance, following each step carefully.
Each step is translated in English and Spanish.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
54
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
Illustration 5.4 Contract Compliance Flow Diagram
Revisar nombre del cliente/Review client
name
Revisar que la orden de compra esté dirigida a Industrias AUGE /
Confirm Purchase Order is submitted to AUGE Industrial
Revisar dirección de entrega/Review delivery
address
Revisar dirección de facturación /Review
billing address
Revisar términos de pago e Incoterms /
Review payment terms and Incoterms
Ingresar en SAP numero de parte del cliente/Enter Clients Part Number in SAP
Ingresar en SAP cantidad del item/
Enter Item quantity in SAP
Revisar descripción del material en SAP con la orden
de compra y la nota de materiales /Review material
description in SAP against the Purchase Order and the Bill of
Material
Existe una discrepancia entre la orden de compra y SAP ?/Is there any
discrepancy between PO and SAP ?
Verificar nivel de revisión , subpartes,
especificaciones, planes de calidad y dibujo con LMD/Verify revision level , sub part, specifications, quality plans and drawing
match with Master Document List
Existe una discrepancia entre la orden de compra y SAP ?/Is there any discrepancy between PO and SAP?
Orden de Compra/Purchase Order
Orden de Compra/Purchase Order
Orden de Compra/Purchase Order
Orden de Compra /Purchase Order
Orden de Compra /Purchase Order
Orden de Compra/Purchase Order
Nota de Material/Bill of material
Listado Maestro de Documentos/Master
Document List
Existe una discrepancia entre la orden de compra y SAP ?/Is there any
discrepancy between PO and SAP?
YES
Buscarlo en el servidor: X:\Auge Sharing Folder\Estructure Catalogue \NF Corte /Go to the server : X:\Auge Sharing Folder\Estructure Catalogue\NF Corte
NF Corte
Revisar en SAP los precios unitarios con lista de precios
y/o con cotización/Review Unit Price in SAP against
price list and/or quote
Existe una discrepancia entre la orden de compra y SAP ?/Is there any
discrepancy between PO and SAP?
Orden de Compra/Purchase Order
Ingresar número de item en caja PosPed en SAP/Enter item number in PosPed box in SAP
Ingresar las fechas de entrega en caja EstModifClte en SAP /Enter PO Delivery Dates in EstModifClte box in SAP
Orden de Compra/Purchase Order
Orden de Compra/Purchase Order
Guardar la Orden de
Compra en SAP /Save order in SAP
Notificar a Ingeniería /Notify to Auge Engineering
YES
Notificar a Ingeniería /Notify to Auge Engineering
YES
Notificar a Ingeniería /Notify to Auge
Engineering
La instrucción de corte está escrito en SAP?/Is the cutting
Instructions referenced in SAP ?
Revisar si está bien
inscrito instrucción de corte/Review if the cutting instruction is
correctly entered
Revisar discrepencia con GAM y/o Ingenería /
Review discrepancy with Auge GAM and/or Auge
Engineering
Los precios totales están correcto?/Are the total amounts
correct?
Notificar a Ingeniería /Notify to Auge Engineering
YES
Confirmar la Orden de Compra al cliente /Confirm Purchase Order to the client
Inicio/Start
Aclaración de Ingenería/
Clarification from Engineering
NO
Aclaración de Ingenería/
Clarification from Engineering
NO
NO
Aclaración de Ingenería/
Clarification from Engineering
YES
YES
NO
NO
Aclaración de Ingenería/
Clarification from Engineering
Fin/End
NO
Source: Personal Data
Besides, I organized training and evaluations to ensure that each Client Relationship
Analyst is aware of Contract Compliance in details.
After reviewing the process, we submit it for approval by AUGE’s Quality Management
System in order to verify that we comply with ISO/API requirements.
At that point, the document can be revised by an extern auditor.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
55
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
3. I created a Standard Operating Procedures’ (SOPs) Matrix
Illustration 5.5 SOPs’ Matrix Screen Shot
Source: Personal data
This matrix was very useful to know SOPs’ status. The table above provides creation date,
last revision, revision number, and the person that created, reviewed and approved
documents.
We can see that none of the procedures are in format and/or comply with ISO and API
requirements. Besides, procedures don’t transmit all information required.
Thanks to this matrix, the fact that GST is not 100% compliant is clearly demonstrated.
4. I transfered to ISO/API format all GST official documents and practices
Before transferring documents to format, I scheduled a meeting with the Quality System
Management Coordinator to determine which practice is considered as a “Local Work
Instruction” (LWI) or as a “Process” according to ISO/API standards. Indeed, each type of
procedure should respect a format, and should have its own reference number and
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
56
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
instructions.
Finally, we decided to use the following formats. Each practice has its specific objective:
a) New Client Entry & Update as a LWI (INS-CS-01.2): create a new global client
entry in the SAP system
b) New Purchase Order Entry as a LWI (INS-CS-01.3): create a new purchase
order entry in SAP system
c) Client Number Table as a Table (TB-CS-01.3.1): have at its disposal all client
number useful in SAP system
d) Code Creation Request as a LWI (INS-CS-01.4): send a code creation request for
the Engineering team
e) Purchase Order Confirmation as a LWI (INS-CS-01.5): confirm the purchase
order
f) Purchase Order Follow-up as a LWI (INS-CS-01.6): follow-up of purchase order
g) Picking Number as a LWI (INS-CS-01.7): retrieve the picking number
h) Shipping Work Plan as a Process (P-CS-02): inform the weekly work load
organization for orders that will be shipped to a client facility
To transfer practices to ISO/API formats, we basically used the same method as the one for
Contract Compliance Process:
• Transfer processes or LWI to formats, taking the Training Book as the reference.
The Training Book is not considered as an official document but it is used by all the team
on day-to-day operations. It is one component of a two-part package of materials for
training on sales and service for GST. The first part presents the GST model and the basis
to develop a mindset for success. The second part provides practical process guidance
throughout the entire purchase order life cycle.
• Follow ISO/API requirements and translate to English and Spanish.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
57
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
• Revise with Client Relationship Analysts of GST that process is efficient and
clearly explained. I used screen shot of SAP system or Client Purchase Order, in
order to make instructions more perceptible.
Illustration 5.6 Screen Shot of New PO Entry LWI
Source: AUGE’s document
• Submit practices for approval by GSTL and GAM, and then by Quality System
Management.
Each week I went to the plant in Toluca in order to revise LWIs with Client Relationship
Analysts one by one. It permitted me to have a good retro-alimentation of my work and to
provide operational processes for the team.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
58
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
5. I created Current State Value Stream Map for GST Department
Without adequate information about the value stream for a specific business operation,
implementing improvements and increasing efficiency would be much more difficult. A
Value Stream Map (VSM) is the key tool of Lean and Lean Six Sigma methodologies. It is
the series of steps that occur to provide a product or service in order to offer the customer
desires. A value stream map takes into account not only the activity of the product, but the
management and information systems that support the basic process.
Indeed, value stream defines all the activities required to fulfill a customer request from
order to delivery.
It helps to:
Visualize processes and task performance
Show links between information and material flow
Promote systems thinking, helping people to avoid sub-optimizing
Identify sources of waste
Depict and prioritize improvement activities
Focus attention on key activities that will improve the Lead Time and reduce the
Total Cost of Product
Illustration 5.7 Value Stream Analysis Planning
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
59
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
Source: http://courses.washington.edu/ie337/Value_Stream_Mapping.pdf
In fact, VSM permits to improve activities and provide freed capacities. For instance, it can
create new revenue streams, conduct ongoing continuous improvement activities, allow
additional workforce development and collaborations, talks with your customers, and
permit to do a better job with fewer errors and higher safety etc.
Based in my experience in the department, I followed different steps to create the current
state map:
Identify all blocks in the process for value stream
Include the function and the number of workers who perform the task
Identify all systems used in the process and information flow
Number the process blocks from left to right
Connect the process blocks with the systems
Add key metrics for all process blocks (Lead Time and Process Time)
Add obstacles to flow (batches, shared/inaccessible resources, system
availability/speed)
Create timeline & calculate summary metrics
Identify all value-adding (VA) and necessary non-value-adding (NVA) steps
Here below you can see the Current State Value Stream Map:
60
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
CUSTOMER
CUSTOMER
1. PO CREATION
CLIENT RELATIONSHIP ANALYST
2. PO RECEPTION
CLIENT RELATIONSHIP ANALYST
3. PO ENTRY
CLIENT RELATIONSHIP ANALYST
4. PO CONFIRMATION
CLIENT RELATIONSHIP ANALYST
5. PO FOLLOW-UP
CLIENT RELATIONSHIP ANALYST
6. PO DELIVERY
Price Agreement
Request for Quotation
Customer CRM
E-Mail Customer PO
SAP
OSR
Export Report
SAP
Shipping Work Plan
Packing List
O: Lack of product bill of material, lack of customer specifications, product out of AUGE’s scope, Quick Quote Rule
PT: 2 Days
LT: 2 – 7 Days
PT: 5 Minutes
LT: 15 Minutes
PT: 25 Minutes
LT: 1-3 Days
PT: 5 Minutes
LT: 10 Minutes
PT: 1-4 Weeks
LT: 3-8 Weeks
PT: 1 Day
LT: 2 Days
O: Customer CRM failures Outlook Failures Internet Issues
O: AUGE SAP Issues/Failures Internet Issues
O: Late response on delivery dates confirmation for special product
O: SAP Modules ZMPROD and CO03 not up to date
O: Delays in manufacturing, exportation schedule, transport, Issues with shipping docs. Change in shipping instructions
2 Days 5 Minutes 25 Minutes 5 Minutes 1-4 Weeks 1 Day
7 Days 15 Minutes 1-3 Days No Delay 3-8 Weeks 2 Days
PT: 4.3 Weeks
LT: 9 Weeks
Packing lists, Invoices, NTRs, Shipper Letter of Instructions, Certificates of
Origin
6.1 SHIPPING NOTE
Purchase Order Life Cycle – Value Stream Current State 04.09.2013 AUGE Global Sales Team
PO: Purchase Order O: Obstacles PT: Process Time LT: Lead Time CRM: Client Relationship Management
ACRONYMS
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
61
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
We can see on the chart above that the VSM is represented by 6 processes: PO Creation,
PO Reception, PO Entry, PO Confirmation, PO Follow-Up, and PO Delivery. Shipping
Note is a sub-process that is part of PO Delivery.
Each process has its own obstacles (O) and information flow. For instance, the Client
Relationship Analyst confronts diverse obstacles during the PO Delivery Process. Besides,
the Client Relationship Analyst needs information flows to achieve this process: the
Packing List and the Shipping Work Plan. The PT is one day. And its LT is equal to two
days.
The Process Time (PT) is the time it takes to actually perform the work, if one is able to
work on it uninterrupted. It includes task-specific doing, talking, and thinking. And the
Lead Time (LT) is the elapsed time from the time work is made available until it’s
completed and passed on the next person or department in the chain. It includes Process
Time, not merely waiting time.
To conclude, thanks to the VSM we realized that the process time for a PO Life cycle is 3
or 4 weeks but in practice it takes about 9 weeks.
6. I proposed solutions for improving GST maintenance strategy
The objective is to improve GST current state map, targeting all the waste and
removing all obstacles to flow. It will permit to improve GST maintenance strategy in the
future.
First of all, employee has to adopt the right behavior. So manager and leader should
stimulate and encourage contributors to do the least pleasant work. That is to say, it needs
an adjustment of culture and comportment.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
62
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
In order to focus on customer satisfaction and waste elimination, we should take into
consideration the following 4 tools:
1. Leadership
Leadership is a set of behavior that permits to angle efforts on a different manner in
order to achieve established objectives.
In fact, if we want that employees work in accordance with strategies of the
organization, it has to be explained through tactic and operational objectives. To do
so, leader should motivate and clearly explain what contribution employees bring to
achievement of those objectives, correcting him if necessary.
2. Innovation
Innovation is the capacity to discover new models, way of work, perspectives, and
original combinations, fetching original ideas.
It could be very useful to achieve the status of a thoughtful organization that uses
continuous improvement each and every day. To secure it, organization needs
guided creativity in order to propose innovative products, services and processes.
3. Communication
Communication means oral or written propagation of correct information, shared
opinions, establishment of dialogue, and creation of a win-win situation.
All of those values play a capital part in achieving new decision making, and
continuous improvement.
4. Teamwork
Teamwork is the capacity to collaborate with others, being connected to the team
through team spirit. Team has to act together in order to achieve objectives.
Without a strong team spirit where everyone knows its role and correctly acts, a
process cannot obtain optimal results.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
63
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
To influent on those 4 tools, we should work with 5 essential elements:
Individual and team capacities
It refers to know-how, ability, behavior of individual and team against its tools.
Team will have to possess necessary abilities to be involved in common objectives,
acting with self-critical reflection and commitment.
Context and background
It refers to identity, general sphere, characteristics, and rules of the organization.
Feedback, gratuity, formal consultation, common vision, followed and stimulated
innovation play a vital role in this part. Teamwork is crucial so a gratuity system
based on individual performance is to avoid.
Adequate framework
Lean office management permits to give a central part to clients while attaching
importance to productivity.
Focus on important things
The visualizing of wastes and the achievement of customer requirements clearly and
continuously explain to employee what is important or not, on a day-to-day work.
Discipline and sense of responsibility
Employees should work with creativity and innovation, in order to propose
improvement. Besides, manager should indicate to employee if he goes off the
objectives.
In this particular case, we have seen that the main waste is due to a lack of information or to
system failure.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
64
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
In the first step on the map, PO Creation, we mentioned that the obstacles were a
lack of product bill of material, a lack of customer specifications, a product out of AUGE’s
scope, or a quick quote rule. So the main issue is that there is a lack of communication flow
between Client Relationship Analyst and Customer.
In fact, this lack of information has a real impact on the entire order process. For each new
order, Engineering Team has to verify that they are capable of manufacturing the material
requested; they need to review aspects and drawing if and when there is something that is
not in accordance to SAP system. So, without this information, Engineering Team loses
time, and Production Team cannot start manufacturing process: the process is interrupted
and it will have an impact on delivery dates, lead time and obviously on client’s
satisfaction.
A first solution could be to reinforce the importance of having material specifications,
drawing, and technical specific requirements from the customers. GST could organize a
training conference to explain the point to the customer and to raise awareness about this
issue.
Another solution could be to create a new format in order to collect feedback about client’s
satisfaction regarding GST service. Then, the team could show results to the corresponding
department to better improving the service. This format can allow Client Relationship
Analyst to save 7 days in total process lead time.
In the second step, PO Reception, the obstacles were Customer CRM failures,
Outlook failures, or Internet issues. In such a case, Client Relationship Analyst is a victim
of system failures. Only Information Technology Analysts can help them to resolve this
problem.
The issue is the same for the third step.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
65
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
In the fourth step, the obstacles to flow were a late response on delivery dates
confirmation for special product. This issue is an internal issue because Production Team
doesn’t confirm delivery dates.
For instance, it can be due to a lack of raw materials into the plant, or to a manufacturing
failure during the process.
Regarding standard materials, Production Team generally gives a suggested delivery date
because they are aware of manufacturing time but, it can happen that they don’t respect this
date so client is not satisfied.
The solution, in the case of standard material manufacturing, is that Client Relationship
Analyst should directly send PO confirmation after processing the order in SAP system. In
this way, the process is continuous and efficient. For no standard material, GST should
impose delivery time to Production Manager.
In the fifth step, PO Follow-up, the main obstacle is that SAP Modules ZMPROD
and CO03 are not up-to-date. Those two modules provide information about work order
status. Client Relationship Analyst can see if the order is ready to ship or if the order has
been manufactured. In this case, the issue is that Planning & Production Team are late in
updating material information through SAP system, so SAP system is not always reliable. It
can be due to a lack of productivity or manufacturing process in the plant. This issue is a
real problem; it affects product delivery dates, and as a consequence client requirements
too.
To resolve this issue, GST could ask planning archives to Production Team in order to be
aware of order status. Therefore, GST will be able to give priority to parts that are about to
expire and to better fulfill their work towards clients.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
66
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
In the last step, PO Delivery, the issue is that there are delays in manufacturing,
exportation schedule, transport, or issues with shipping documentations. All this obstacles
are connected with Planning & Production and Shipping Departments.
After analyzing all steps, we understand that the only issue in relation with GST
Client Relationship Analyst is due to a lack of information or/and communication flow
between them and customers.
Regarding Planning & Production and Shipping Department, the main issue is about
employees’ organization and work plan that manager should seriously take in account.
Planning & Production Team doesn’t advise in advance how many products will be
shipped, so the Shipping Department don’t plan in advance their orders to ship. Besides,
they don’t sufficiently report to Client Relationship Analyst.
Therefore, managers should take time to better organize their team in order to develop lean
management on a long term basis.
After eliminating all wastes and obstacles in the current state map, we can:
1) Validate the future state map doing a simulation.
The simulation considers existing variability and uncertainty in the process. So, the
impact of changes in future state in comparison with current state is quantitatively
evaluated regarding process time, delays, necessary resources, service levels, response
time, and other wastes. Besides, the simulation permits to show a visual management in
order to perceive problem issues.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
67
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
2) Implement the future state map. The management should ensure that:
a) Any changes through the organization receive the attention they need,
b) Everyone takes responsibility
c) Establish a structure to provide this implementation
d) Employees should work with those 4 tools (leadership, innovation, communication,
teamwork).
To finish I would like to specify that all this solutions can be implemented only if team
manager really decides to improve the system and to form work crew.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
68
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
ANALYSIS OF THE RESULTS
During my time in AUGE, I accomplished different tasks that helped GST to improve its
service, by:
1. Contributing to the development, improvement and success of GST Process
Process standardization of best practices allowed GST to build an effective standard
library. I reviewed each process step with Client Relationship Analysts to make it
more clear, effective and up-to-date. For instance, when they have a doubt about a
specific process or methods, they can refer to this standard library. All information
is concentrated in one document. Indeed, it can be very useful if GST hires a new
person; it will save time in training the person, because she or he will be provided
with all best practices registered as standard processes.
Besides, all processes were transferred to ISO and API formats. So now, GST
documents can be revised by an external auditor in order to certify team practices
according to those norms.
Standard processes are considered as a foundation for best practices those ensure
predictability and repeatability of AUGE’s activities. It permits to control and to
avoid mistakes; stabilizing day-to-day operations in business support.
2. Designing a matrix to better identify and use Sales Team Processes
The Value Stream Map of GST was a key tool to identify wastes and understand
why processes were inefficient or slow. Indeed, we have eliminated wastes to
increase information and communication flow between process blocks. For
instance, it allowed to visualizing management and processes. This centralization of
sensitive information also facilitates decision making and evaluation of good
methods follow-up, in order to analyze and improve practices.
Fundación Universidad De Las Américas Puebla Departamento de Negocios Internacionales – Emilie Bechet 144866
April 30th, 2013
69
PROYECTO DE TITULACION 2 INDUSTRIAS AUGE – SECTION 5 – SUGGESTED SOLUTIONS TO THE PROBLEM
3. Designing a maintenance strategy for Sales Team Processes
I proposed to implement several solutions to better organize and maintain Sales
Team processes, as leadership, communication, innovation and teamwork. In fact,
each manager should constantly keep in mind those lean office tools in order to
correctly train their work crew and motivate them to do this same work.
As I said in the previous part, an adequate context and framework are indispensable
to obtain those expected results. Lean office management should become a reflex on
day-to-day operations; it is only at this time that continuous improvement can be
implemented.
The appointment of working groups can be the starting point. For instance, the
working groups can present solutions to the project manager and bring innovated
ideas to improve existing work methods. The project manager analyzes these
recommendations before submitting it for approval by the Director. Then, the
Director makes the final decision by establishing priorities and ensuring all the
necessary elements for future good behavior (good understanding of processes and
desired changes is essential).
The meeting of working groups will directly have a consequence on group
collaboration thanks to team spirit and work. The team will have the same
objectives and will evaluate measurable results. Finally, discipline and individual
responsibility will be implemented.
4. Increase quality, efficiency, productivity of the organization
All this solutions will permit to increase quality, efficiency and productivity of the
service. On a long-term basis, if managers successfully train their team, it will bring
organization and leadership in every mind.