    SECTION 8 SHIP PIPELINE

    81 BILGE SYSTEM

    One (1) bilge main pipe is to be arranged in double bottom pipe tunnel.Port side and starboard bilge well of each cargo hold to respectively have one

    (1) suction whose material to be galvanized steel plate.Each bilge well suction to be separately led to pipe tunnel main by means ofbranch pipe joint and to be connected with bilge pump of engine room.Bilge water branch pipe to be installed remote control butterfly valve.

    All eduction pipes of cargo hold bilge well to be installed check valve in thevicinity of bilge well.Chain locker sewage to be drained overboard through jet dredge pump whoseworking water comes from fire main pipe.Bilge water of steering gear room is to flow to engine room bilge well throughone (1) self-closing stop valve.Shore connection with one (1) stop valve and blind plate flange to be arranged

    on upper deck used for draining away engine room sludge and segregated slopin order to meet SOLAS Convention requirement.Sludge pump is to be installed emgergency stop device which to be placed in

    joint vicinity of slop drainage system. Cargo hold and engine room bilge wellshould be provided with high-level alarm.Bilge water of emergency fire pump is to be drained away by means of jetdredge pump.

    82 BALLAST SYSTEM

    Two (2) ballast main pipes to be arranged in double bottom pipe tunnel.Each ballast main pipe is able to be separately connected with ballast tank ofport side and starboard of double bottom through ballast branch pipe.

    Each ballast tank is to have one (1) suction.Ballast water suction is to be connected by flange and be easily dismantled.Suction surrounding structure is to have adequate drain holes. One (1) ballastwater branch pipe to be connected with fore peak. Fore peak to be installed one(1) stop valve which is able to be manually operated on upper deck.Hydrodynamic or electric-hydraulic butterfly valve or ball valve is to be installedin ballast branch pipe of pipe tunnel and is able to be remotely controlled inballast water control room.

    All remote control valve should be able to manually opened/closed when remotecontrol does not work.Ballast water main pipe is to be connected with two (2) ballast pumps, one (1)

    fire and general service pump and one (1) bilge general service pump.The totalballast time is not to be greater than 8 hours.Topside water tank ballast water is to be pumped into by pump, the ballastwater of double bottom ballast water tank is to be directly filled from sea chest inengine room.Ballast water of topside water tank is to be filled from deck filling pipe and to bedirectly drained away under gravity through discharge valve.The remote measuring liquid level in ballast water tank is to have reading

  • 7/27/2019 Section 8 Ship Pipeline

    2/4

    indication.Refer to Machinery Part for ballast pump and hydrodynamic butterfly valve.

    83 AIR SOUNDING PIPE

    83.1 AIR PIPE/ OVERFLOW PIPE

    All air pipes are to be arranged in accordance with international loadline

    convention requirement.All void spaces and cabins to be provided with air pipes whose terminal to befitted with air pipe head satisfying Classification Society requirement.Oil tank air pipe head is to be adopted closeable floating type with stainlesssteel fireproof net, and the air pipe head of fresh water tank should be installedrat & insect proof stainless steel net.

    Air pipes / overflow pipes which are in water tank or exposed to wide open deckpassing through water tank is to be galvanized.Overflow proof coaming plate is to be provided in the vicinity of air pipe used foroil tank, and discharge plug to be furnished as well.Cross section of air pipe/overflow pipe not to be allowed less than 125% of

    cross section of suction pipe in accordance with Rule requirement.All air pipes are to be arranged to keep a certain distance from outfitting partslike bollard etc.Sea chest should be provided with air pipes.

    83.2 SOUNDING PIPE

    Each oil tank, water tank, segregated void space and chain locker are to berespectively provided with one (1) sounding pipe. The sounding pipeterminal in double bottom tank of engine room is to be approx.800mm apartfrom the upside of checkered steel plate with slef-closing faucet and cock ofsurvey use.Sounding pipe, in general, to maintain straight line as far as practicable.

    Sounding pipe caliber size of oil tank to be 65mm, the sounding pipe calibersize of water tank, segregated void space and chain locker is to be 40mm whichto be galvanized pipe same as air pipe.The sounding pipe caliber size of bilge well of cargo hold is to be 65mm.Sounding pipes are to be as straightthrough as practicable and brass faucet tobe installed as well, the lower extreme is to extend to approx.50mm over bilgeand bumping proof plate with 10mm in thickness is to be installed in bilge.The lowest part of sounding pipe is to be of detachable.

    84 DAILY WATER SYSTEM

    84.1 FRESH WATER SYSTEM

    Caliber size of fresh water filling pipe is not to be less than 100mm.

    Supply water system is to consist of one (1) fresh water hydrophore tank andtwo (2) electric driven fresh water pump and pipeline. One of the abovementioned two pumps is to be spare pump used for above mentioned system.Fresh water is to be sucked into by pumps from fresh water tank and fed intohydrophore tank through stop check valve.Fresh water is to supply drinking water system through drinking water sterilizer.Drinking water is to supply galley and pantry etc.Fresh water which is supplied by fresh water hydrophore tank located in engine

  • 7/27/2019 Section 8 Ship Pipeline

    3/4

    room is to be transported to the places required fresh water such as galley,panty, fresh water expansion tank, hot well, sink, wash basin, shower set, toilet,bathtub, laundry, provisions processing room, ward and wheelhouse frontwindow etc.Hydrophore tank is to be made of steel plate etc. Pumps, fluid level gage, safety

    valve discharge joint and compressed-air pipe joint are to be furnished byManufacturers.Automatic pressure controller is to be used for starting/stoping water pump andfor maintaining the pressure required by hydrophore tank.Fresh water tank on deck to be connected to cargo hold region, each cargo holdis to be provided with one (1) fresh water valve with joint, and caliber size to be25mm.

    After part of upper deck, boat deck, port side and starboard of wheelhouse to beprovided with one (1) fresh water valve with joint.

    84.2 HOT WATER SYSTEM

    Hot water circulation system is to be used for supplying hot water. Hot water

    system is to consist of one (1) electric/steam heating hot water tank, one (1) hotwater circulation pump, main circulation pump and branch pipe.This system is to be supplied water from fresh water hydrohpore tank throughcheck valve and hot water to be transported to the places required hot watersuch as galley, panty, wash basin, shower set, bathtub, laundry and ward etc.Hot water to be transported to wheelhouse front window used for flushing aswell.

    84.3 SANITARY SYSTEM

    Sanitary water is to be used in public toilet, sanitary unit and bathroom.Proper quantity of closing valves are to be provided in fresh water and sanitarysystem of accommodation space for the convenience of maintenance.

    Sanitary pipe is to be connected with fire and general service pump of engineroom for emergency use.Hydrophore tank is to be made of steel plate. Liquid level gage, pressure gauge,safety valve discharge joint and compressed-air pipe are to be well furnished bythe Manufacturers.

    Automatic pressure controller is to start/stop water pump and maintain thepressure required by hydrophore tank.

    84.4 DISTILLED WATER SYSTEM

    Distilled water is to be led off to distilled water tank and fresh water tank fromfresh water generator through water meter and salinity indicator.

    85 DRAINAGE SYSTEM

    All decks, deck house, galley, pantry, toilets, wheelhouse and food stuffrefrigerated storage are to be provided with drainage system.

    Accommodation space, walkway and other ambient region are to haveadequate drain holes. Scuppers are to be arranged far from space ladderway.Upper deck drain hole is to have grille, and drain holes in refrigeratory are tohave plugs.Drainage pipe is to be led off to open deck or overboard according to specificarrangement. Overboard drain hole is to be arranged keeping away from

  • 7/27/2019 Section 8 Ship Pipeline

    4/4

    accommodation ladder and pilot ladder etc.Waveproof valve is to be installed in necessary places of pipeline in accordancewith the requirement of Classification Society.Soil sewage to be gathered up to sanitary-treating arrangement of engine room,however,ward sewage to be separately led off to sanitary-treating arrangement.

    Sewage piping arrangement is to meet the requirement that the sewage fromsanitary-treating arrangement is able to be drained overboard from anyshipboard.Vent pipe of sewage pipe is to be led off to open deck.The waste water of sink, wash basin, laundry equipment and drainage water ofhold etc is to be drained overboard by means of waste water piping throughmain pipe storm valve.Floor drain is to be arranged in accessible place. The elbow bind of galley floordrain and soil water pipe is to be as big as possible.Galley drainage is to be equipped with oil remover.Funnel topside and engine room casing is to be provided with drain pipe.

    Drainage pipe is to be as straight as possible.86 DECK MISCELLANEOUS COMPRESSED AIR

    Compressed-air pipe used for pneumatic tool and paint fog gun is to be led toforecastle deck along upper deck.Compressed air main pipe is to be DN40mm, connection pipe is to have 15mmhose connection valve, the quantity is to be arranged as follows:Upper deck 12Forecastle deck 2Each tier of deck of deckhouse ( other than captain deck) 2(P/S,respectively, 1)CO2 room 1Emergency generator room 1

    Air source is to come from engine room air bottle and working compressor

    located in bow hydraulic pump room.