SEE Port SEE Port DevelopmentDevelopment
A Variation on the Story A Variation on the Story of the Rabbit and the of the Rabbit and the TurtleTurtle
Erich Cossutta, Erich Cossutta, President Confindustria President Confindustria SerbiaSerbia
2
1. General description of port of Bar and Durres
2. Comparison of the two ports
• Port of Koper – as a model for growth
• Conclusions
Presentation Outline
2
3
Location // PositionGravitational field
3
Montenegro, Serbia, BiH, Kosovo, Macedonia,
Albania, Kosovo, Macedonia, South Serbia
Bar Durres
4
The Port of Bar
4
Port of Bar Container Terminal and General Cargo – joint stock company with the Government of Montenegro as majority holder (54% shares). Currently under privatization, working under concession of the Montenegro Port Authority
Capacity – 2 million tons of cargo
Modern and healthy infrastructure – good rail connections
Good expansion potential
Poor road connection with the gravitational field
5
The Port of Durres
5
Durres Port Authority
Biggest port of Albania
78 per cent of maritime trade at national level
Well positioned for Corridor VIII, good new road connection to Skopje and Pristina
Very poor or not existing rail connection with the gravitational field
6
Connection with gravitational field – BAR and DURRESRoad / rail distance
6
MARKET
PORT SKOPJE PRISTINA
DURRES 120km railway200km road
No direct railway260km road
BAR 642km railway428km road
651km railway335km road
7
Connection with gravitational field – BARRoad / rail distance
7
Bar
8
Current capacityInvestments – PLAN
8
acquisition of machinery : 2 reach stacker, 4 trailers, 1 spreader for 20’- 40’ containers
Planned implementation of a software - Container Terminal Operation Information System
New 54 reefer connections for reefer containers
Investments in the separation of the available storage space.
Bar Durres
60,000 TEU 80,000 TEU
…with minimum investments 150,000
already at max capacity
Project for the new area for the accommodation of the empty containers, approximately 24,300 m2
Supply of mobile cranes and STS cranes – planned in 2013
Reconstruction of the southern coast of Wharf 1, implementation of the forehead of Wharf 1
9
Other specifications
9
BAR DURRES
Shipping companyMaersk, MSC, Hapag Lloyd,
CMA CGM
CMA CGM, MSC, Evergreen Line ZIM
Type of service feeder, no direct services feeder, no direct services
Container block trainPresently no regular block train, possibility of single
vagon shipments no cargo rail infrastructure
Terminal total area80.000 m2 + 50.000 m2 possibility of expansion
50.000 m2
Lenght of operational quay 330 m 150 m
Draft 12 m 8 m
10
Other specifications
10
BAR DURRES
Special equipment
Gantry crane 40t;Reach stacker 45 ton;
Electric and diesel forklifts for loading/discharging of containers
1,5 t /3 t /5 t;2 frontal forklifts 42t/40t;
tag master sisu, 1 pc;trailers fm 8 to 35 tons
MHC 120 t, MHC 63 t, 1 reach stacker, 2
forklifts 32 t , forklift 12 t, 1 pcECH 7 ton
Reefer connections 184 92
Container traffic
2010 2011 2010 2011
30,47714.068
(full only)85,875
50.745 (full only)
11
Additional info
11
The entire area of AD "Container Terminal and General Cargo" has the status of Custom Free Zone.
Possibility to berth simultaneously 9 different types of vessel at docks under international rules.
Road and rail connections to each storage, vessel berth and warehouse
NEW! Serbian FIAT car production going via port of Bar, 90% on rail from August 2012
Slow and not attractive (Container terminal together with General Cargo) privatization process
Poor road connection
Bar Durres
No possibility for expansion, the port is located in the middle of the town
Very low draft and need for continuous dredging of the entry channel
Very poor railway infrastructure to Macedonia, no railway connection to Kosovo or Southern Serbia
Good road connection to Macedonia and Kosovo
Future highway planned to connect Pristina with Southern Serbia?
1212
The future?
13
Model for growthPort of Koper, Slovenia
1414
1515
1616
1717
18
Port of Koper Container traffic in years 1996 - 2009 (tons, TEU)
1919
2020
2121
2222
2323
HOW THEY DID IT?
2424
2525
2626
2727
28
Erich Cossutta, President Confindustria SerbiaErich Cossutta, President Confindustria Serbia
Thank you!Thank you!
28