SEE Programme Document reg. no.: INTRA-5187985 This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 1/156 Application Form 4th Call for Proposals 1. Project Identification 1.1. Main data Call for proposal ID D Project acronym ACROSSEE Project title Accessibility improved at border CROSsings for the integration of South East Europe Application ID SEE/D/0093/3.3/X EoI Reference number SEE/D/0093/3.3/X Priority Axis Improvement of the accessibility Area of Intervention Improve framework conditions for multi modal platforms 1.2.Project summary The EC has recently published the Proposal for a Regulation on Union guidelines for the development of the trans - European transport network -COM (2011) 650/2, that defines the long term strategy for the Ten-T policy up to 2030/2050 and proposes Corridors relevant for the SEE area. By creating a multilevel formed by Transport Ministries, Regions, Universities, Chambers of Commerce, transport stakeholders and European transport association A large and coherent platform will contribute to rationalising and optimizing the existing network of South Eastern Europe with the aim to extend the Eu transport network ( core and comprehensive) to the western Balkans and develop a single transport system for SEE and forging new approach with infrastructure and transport services even in a time of austerity. The joint evaluation of the proposed extension of the comprehensive Eu network to the Western Balkans together with its implication at the internal level (on national spatial plan and on national budget perspectives) and at transnational level such as the level of the short term and long term intervention, the identification of the possible extension of the Eu core network will be clearly addressed in relation with Eu methodology and interfaced with the results of the transport model with the aim to balance the capacity of the Eu corridors with cost-effectiveness. Concrete initiatives for across the SEE will be jointly carried out in order to discourage the risk of an investment hiatus by addressing the cross border-issues and focusing on the identification of short medium term investments on bottleneck which will be considered both from a physical and administrative perspective. The first web-based ITC interface will be created for exchanging relevant information on technical and administrative aspects of rail and road border crossing points of the SEE.

SEE Programme Document reg. no.: INTRA-5187985 …€¦ · SEE Programme Document reg. no.: INTRA-5187985 ... SEE Programme Document reg. no.: INTRA-5187985 ... UETR Belgium 2.3

Embed Size (px)

Citation preview

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

1/156

Application Form

4th Call for Proposals

1. Project Identification

1.1. Main data

Call for proposal ID D Project acronym ACROSSEE

Project title Accessibility improved at border CROSsings for the integration of South East Europe

Application ID SEE/D/0093/3.3/X EoI Reference number SEE/D/0093/3.3/X

Priority Axis Improvement of the accessibility

Area of Intervention Improve framework conditions for multi modal platforms

1.2.Project summary

The EC has recently published the Proposal for a Regulation on Union guidelines for the development of the trans - European transport network -COM (2011) 650/2, that defines the long term strategy for the Ten-T policy up to 2030/2050 and proposes Corridors relevant for the SEE area. By creating a multilevel formed by Transport Ministries, Regions, Universities, Chambers of Commerce, transport stakeholders and European transport association A large and coherent platform will contribute to rationalising and optimizing the existing network of South Eastern Europe with the aim to extend the Eu transport network ( core and comprehensive) to the western Balkans and develop a single transport system for SEE and forging new approach with infrastructure and transport services even in a time of austerity. The joint evaluation of the proposed extension of the comprehensive Eu network to the Western Balkans together with its implication at the internal level (on national spatial plan and on national budget perspectives) and at transnational level such as the level of the short term and long term intervention, the identification of the possible extension of the Eu core network will be clearly addressed in relation with Eu methodology and interfaced with the results of the transport model with the aim to balance the capacity of the Eu corridors with cost-effectiveness. Concrete initiatives for across the SEE will be jointly carried out in order to discourage the risk of an investment hiatus by addressing the cross border-issues and focusing on the identification of short medium term investments on bottleneck which will be considered both from a physical and administrative perspective. The first web-based ITC interface will be created for exchanging relevant information on technical and administrative aspects of rail and road border crossing points of the SEE.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

2/156

In this context, in order for this axis to operate successfully, the efficiency of European freight transport must be improved and the WB considered as integrated. Greater interoperability and the easing of across borders procedures are critical to the corridor' success including identifying viable intermodal connections between rail, road and sea The project will focus on the implementation of common standards across the different administrative procedure that represent together with the company discrimination?s, the real hidden cost of the non integration of the SEE area. Moreover it will Contribute to the optimisation of international borders management, that includes reducing cross-border transit time, increase regional and international trade by improving border crossings, ensuring that national trade facilitation procedures are compatible with markets and administrative procedures The project will promote institutional and stakeholders permanent cooperation in order to provide concrete actions and projects to contribute to the Danube strategy for Danube regional, the Adriatic strategy and the Black sea synergy: this platform will serve as a basis for the implementation of the One stop shop along the selected corridor. A tree-layer approach will be used in order to combine and interlink the institutional dimension with the transport model analysis and the contribution of the transport economic dimension on solving the cross-border issues which remain the core part of the project. The project will adopt a common transport model for the entire South East Area, integrated with the rest of Europe and compatible with the current EU system, adequate to be exploited also by public administrations and transport operators The core part of the project will be consecrated on Improving the cross-border mobility of the rail freight flows. Adopt concrete measures in order to cut the running time in the cross-border points and to ease up the existing bottlenecks in the SEE area

Project Lead Partner (official name in English)

Central European Initiative - Executive Secretariat

Lead Partner’s country

Italy

1.3. Financial summary

Total budget 3,025,246.64 EUR

Requested ERDF contribution

2,194,768.71 EUR ERDF contribution rate 85.00 %

Requested IPA contribution

219,587.30 EUR IPA contribution rate 85.00 %

Requested ENPI contribution

166,345.02 EUR ENPI contribution rate 90.00 %

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

3/156

10% flexibility rule (amount)

10,000.00 EUR 10% flexibility rule (rate) 0.39 %

20% flexibility rule (amount)

8,000.00 EUR 20% flexibility rule (rate) 0.31 %

The project generates revenue No

1.4. Project duration

From month/year 10 / 2012 To month/year 9 / 2014

Duration in months 24 months

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

4/156

2. Partnership

2.1. Project partners (calculation: Partners + ASP – Observers)

Number of partners from EU

Austria 2

Belgium 4

Bulgaria 1

Greece 3

Hungary 2

Italy 7

Romania 1

Slovenia 2

Number of partners from Non EU

Albania 1

Croatia 2

Montenegro 1

Serbia 1

Ukraine 1

Total number of Project Partners 28

2.2. List of Project Partners

Partner role Official name in English Abbreviation Country

LP Central European Initiative - Executive Secretariat

CEI Italy

ERDF PP1 ARISTOTLE UNIVERSITY OF THESSALONIKI- RESEARCH COMMITTEE

A.U.TH. Greece

ERDF PP2 AustriaTech - Federal Agency for Technological Measures Ltd.

ATE Austria

ERDF PP3 Regional Administration Smolyan

RA - Smolyan Bulgaria

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

5/156

ERDF PP4 TRAINOSE S.A. TRAINOSE Greece

ERDF PP5 Federal Ministry for Transport Innovation and Technology

Mot AUT Austria

ERDF PP6 The association of Chambers of Commerce of Veneto Region

UCV Italy

ERDF PP7 Autonomous Region of Friuli Venezia Giulia

FVG Italy

ERDF PP8 UNIVERSITY POLITEHNICA OF BUCHAREST

UPB Romania

ERDF PP9 Public Foundation for the Development of Industry

IFKA Hungary

ERDF PP10 Region of Epirus / Regional unit of Thesprotia

RUTH Greece

ERDF PP11 Venice International University

V.I.U. Italy

ERDF PP12 Logistics Unit - Veneto Region

RV Italy

ERDF PP13 Institute of Traffic and Transport Ljubljana l.l.c.

PIL Slovenia

ERDF PP14 GEA COLLEGE - FACULTY OF ENTREPRENEURSHIP

GEA COLLEGE - FP Slovenia

IPA-I PP1 Ministry of Public Works and Transport of Albania

MPWT Albania

IPA-I PP2 Pro-rail alliance Pro-rail alliance Croatia

IPA-I PP3 BELGRADE CHAMBER OF COMMERCE

BCC Serbia

ENPI PP1 ODESSA NATIONAL MARITIME UNIVERSITY

ONMU Ukraine

EU ASP1 MINISTRY OF NATIONAL DEVELOPMENT (Republic of Hungary)

NFM Hungary

EU ASP2 Ministry of infrastructure and transport of Italy

MIT-IT Italy

20% ASP1 Community of European Railway and Infrastructure Companies (CER)

CER Belgium

20% ASP2 ITALFERR ITALFERR Italy

10% PP1 Ministry of Transport and Marittime Affairs

MMAT-MNE Montenegro

10% PP2 Croatian Ministry of the Sea, MSTI Croatia

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

6/156

Transport and Infrastructure

OP1 European Union Road Federation

ERF Belgium

OP2 European Intermodal Association

EIA Belgium

OP3 European Road Haulers Association

UETR Belgium

2.3. Description of the Partnership

Institutional capacity and technical expertise are crucial for the successful achievement of the project aims. This was born in mind for the entire process of the definition and actual creation of the entire partnership. Each partner was chosen for its geographical position and relevance, institutional coverage and decisional power, technical expertise and know how. The latter parameters were observed according to the projects rationale and partners relevance to achieve the foreseen objectives. The selection was made through the CEI previously acquired contacts and through SEE portal. Therefore, the SEETAC partnership embraces institutional bodies (national and regional), transport experts provided through transport associations, external experts, researches and university academics and chambers of commerce. It therefore includes 14 ERDF PPs from 7 SEE countries, 3 IPA PPs from Albania, Croatia and Serbia, and one ENPI PP partner from Ukraine. More specifically, there are four Transport Ministries, two EU (Austrian and Italian) and two non-EU (Albania and Croatia), 4 Regional Authorities (FVG Region, Veneto Region, Smolyan Region, and Region of Epirus), 4 major Universities (A.U.T:H., VIU, and UPB), 2 Transport institute (ATE and PIL), 2 Chambers of commerce (UCV and BCC) and 2 transport operators. The project will ensure that different levels of administration as well as different types of organisations participate in project activities. Thus, all partners will be involved in transnational activities, by participating in partner meetings and events, collaborating with other project partners, by contributing with their experience, knowledge and their own national information to the realization of the project activities. What is more, the CEI and the EU transport network (CER, ERF and EIA) will assure broad dissemination of the project activities to the whole SEE area and beyond. Many partners have already worked together on other occasions (i.e. transport ministries through the SEETAC project, SEETO, etc) and have proven experience in EU funded projects, transport studies and analysis. This will for sure ease the exchange of experience and information and will ensure the correct development of activities. Regarding the project rationale all partners share In the South East Europe Area, there is a great number of border crossing stations that are characterized by long waiting times, unpredictable customs services, burdensome administrative procedures - all leading to additional transport and trade costs for manufacturers and importers/exporters, in particular in the rail freight transport. This fact will bring partners to cooperate closely since they have similar problems and must respond to the same criticalities in their own countries. The benefits will therefore be commonly shared and therefore they will also act in the interest of the country/organisation they represent. A lack of reliability, flexibility and interoperability, international disputes over cross-border sections, high

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

7/156

costs and long loading times in ports and terminals, which prompted the shift from rail to road transport in the mid 20th century, are again threatening to undermine rail freight's competitiveness, despite high oil prices and rail's superior capacity and environmental credentials. All partners have Proven experience Projects Partners are All partners will be involved in transnational activities Ministries , Chamber of Commerce, Regional Authorities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

8/156

2.4. Project parners data

2.4.1 LP

2.4.1.1. Legal Identification Data

Official name in English Central European Initiative - Executive Secretariat

Full name in original language

Segretariato Esecutivo dell'Iniziativa Centro Europea

Abbreviation CEI Country Italy

NUTS II Region Friuli-Venezia Giulia NUTS III Region Trieste

Type of institution International organisation

Legal status Governed by public law

National tax number 90072050322

Official address via Genova 9, Trieste, 34121 Italy

Phone (39)-040-7786777 Mobile

Fax (39)-040-360640 e-mail [email protected]

Homepage www.ceinet.org

Legal representative

Name of the legal representative

Amb. Gerhard Pfanzelter

Position of legal representative

Secretary General

Phone (39)-040-7786777 Mobile

Fax (39)-040-7786766 e-mail [email protected]

Contact Person

Name of contact person in project

Ms. Anna Marconato

Position of contact person in project

Project Officer

Phone (39)-040-7786748/749 Mobile (39)-366-6161445

Fax (39)-040-7786783 e-mail [email protected]

2.4.1.2. Geographic scope of the LP activities

Transnational

2.4.1.3. Relevance of the proposed LP in this project (thematic competence)

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

9/156

The Central European Initiative (CEI) is the oldest regional organisation of its kind: established in November 1989 by Italy, Austria, Hungary and Yugoslavia, it has become the largest regional initiative comprising 18 Member States of Central, Eastern and South-Eastern Europe. Once predominantly oriented towards policy dialogue, the CEI has progressively added economic growth and human development as pillars of cooperation with a focus on capacity building, sharing experience and know-how transfer. By promoting ?regional cooperation for EU integration?, the CEI has assisted its Member Countries in their European path and has developed a number of tools meant to encourage mutual confidence and teamwork in a transnational, interregional and cross-border perspective. The current CEI Membership includes 9 EU and 9 non-EU countries. In the last 10 years, the CEI has supported various initiatives with the ultimate aim to enhance regional cooperation and contribute to the EU integration process. Its member countries have benefitted from the CEI financial instruments, mainly from: a) the CEI Cooperation Fund (a multilateral financial tool for small scale regional projects such as seminars, workshops or short training courses which is totally funded by all Member States); b) the Italian Trust Fund at the European Bank for Reconstruction and Development - EBRD (funding technical assistance assignments setting the ground for EBRD investments); c) the Know-How Exchange Programme ? KEP (funding capacity building and transfer of good practice to CEI non-EU Member States). The CEI member states took also advantage of the CEI Science & Technology Network (supporting mobility of researchers across the CEI area) and the CEI University Network (promoting academic cooperation). From its establishment CEI has been committed by its associated countries to organise the Head of Government and ministerial yearly meetings and has a dynamic network of focal points composed by high level officials working for the SEE Ministries of Transport. Furthermore, since 2004 the CEI has been particularly active in the field of EU-funded projects, both as partner and lead partner. The CEI has successfully implemented 11 projects funded under various EU programmes in the timeframe 2004-2010. Currently, the CEI is implementing 5 projects out of which 3 as LP. Currently the CEI is leading two relevant transport projects: -South East Europe Transport Cooperation Axis (SEETAC) under the SEE programme -Accessibility and Development for the Re-launch of the Inner Adriatic Area (ADRIA A) funded under the Cross-border Cooperation Programme Italy ? Slovenia 2007-2013. In this context, the CEI has worked and is currently working with ministries, high level transport experts, regional authorities and transport operators in the SEE areas and beyond. Last but not least, the CEI has established institutional links with the European Commission- DG Mobility and Transport and the European Parliament-Transport and Tourism Committee. Recently it has been involved in the European Union Strategy for the Danube Region (EUSDR) implementation as full-fledged stakeholder in the transport EUSDR priority, thanks to several bilateral meetings with the Slovenian Transport Priority area Coordinator.

2.4.1.4. Partnership and management experience

CEI organises and holds annual meetings of the CEI Heads of Government, the CEI Ministers for Foreign Affairs and CEI Minsters of Transport or Economy. Regular meetings of the CEI Committee of National Coordinators, responsible for definition, co-ordination and implementation of the co-operation?s projects are also held. The CEI EU Projects' Unit was created in 2004 to facilitate the international partnership and to enhance the

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

10/156

involvement of the CEI member countries in the projects' management and to strengthen its relation with the European Union. Since 2004 the CEI has managed more than 17 EU Funded Projects, with 4 Projects as Lead Partner under different EU programmes. Throughout its 20 years of operation it has established strong link with national and local authorities of its member countries, as well as with other networks of the EU. The CEI team is composed by international staff, with proficiency in English and in other relevant tongues for the SEE region, with outstanding project management experience. The CEI is supported by a modern office with necessary infrastructure at the CEI premises in Trieste with a relevant administrative back up. The CEI expertise ranges from the content and financial management to administration and communication activities with internal staff properly trained. Moreover, the CEI staff, has acquired vast experience in the organisation of high level meetings (i.e. CEI Ministerial meetings, SEETAC Transport Ministries, SEETAC presentation before the European Parliament and European Commission and other relevant high level meetings). The CEI will involve in the ACROSSEE project 5 staff personnel: 1 Project Manager, 1 Financial officer, 1 Communication Officer, and other 2 project officers that will contribute to the overall coordination, administrative and financial management of the project. The CEI, besides the overall project management and coordination (WP1management) will also be de WP Leader of Wp4 (development of transport model).

2.4.1.5. Description of previous participation to other relevant EU funded projects

The CEI Executive Secretariat has build up a relevant and successful experience with different transnational projects by coordinating the related project activities financed trough different EU programmes and funds, both in the previous and in the current programming period, (i.e. INTERREG IIIB CADSES, in EU FP6 and other specific EU transnational and cross-border, INTEEREG IVC, SEE, FP7, CENTRAL EUROPE, Cross-border Cooperation Programme Italy Slovenia) -11 projects implemented with a total value of almost 10 Million (i.e. AB LANDBRIDGE, PORTUS, ZIPNET, PROTECTING ADRIATIC PORTS, CROSS-5, WINS-ICT etc.) -5 on going Projects, 3 as lead Partner and 2 as partner ( SEETAC, ADRIA A, CERES, SUGAR, ATTAC). Total value of CEI managed budget (6,5 Million) The majority of the aforementioned projects deal with transport issues: SEETAC" - South East European Transport Axis Cooperation (South East Europe Programme, 2009-2012), "SUGAR" - Sustainable Urban Goods logistics Achieved by Regional and local policies (Interreg IVc, 2008-2012), "ADRIA-A" - Accessibility and development for the re-launch of the Internal Adriatic Area. On transport and accessibility in cross border cooperation (Cross-border cooperation programme Italy - Slovenia, 2010-2013), "RAVE SPACE" - Raising Awareness of Values of Space through the Process of Education (CADSES, 2005-2007), "ADRIATIC-BALTIC LANDBRIDGE" on researching potential for the establishment of an Adriatic - Baltic corridor (CADSES, 2006-2008), "ZIP-NET" -Realization and networking of ZIP Enterprises Centres (Adriatic New Neighbourhood Programme INTERREG/CARDS-PHARE, 2007-2008), "PORTUS"- Perspectives on Inter-Regional Transport Unitary Systems (Adriatic New Neighbourhood Programme INTERREG/CARDS-PHARE, 2007-2008) and "FASTER" - Fostering Alliances for Sustainable Transport in European Research (6FP Framework Programme, 2004-2007). It is important to single out two relevant transport project where the CEI acts as Lead Partner: - Firstly, the SEETAC (South East European Transport Axis Cooperation) project, where the CEI is working

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

11/156

with Ministries of the South East European area, European Commission DG Transport and Mobility and with the EU Parliament Committee in charge of transport with the aim of contributing to the integration of the Western Balkans in the EU transport system. The overall project objective is the establishment and implementation of an effective and coordinated South Eastern Transport Axis (SETA) framework, promoting and fostering the institutional cooperation between Pan European Corridors? structures and Member States in order to reach the EU's objectives of (i) transparency & information reliability; (ii) harmonised and efficient institutional framework and; (iii) rapid implementation of the transport priority projects. - Second, the ADRIA A project also sees the leading role of the CEI in managing a project on accessibility and transport between Italy and Slovenia with the aim to contributing to the accessibility and transport reorganisation in the entire cross-border area, in order to form a unique integrated Italian ? Slovene metropolitan transport area. The overall objective is to define the missing links in the Italian and Slovene railway infrastructural network to guarantee a common transport model for the whole territory. ACROSSEE project will capitalise on the aforementioned project findings by creating synergies and relying on the results. For this purpose a cross-fertilisation seminar will be organised by the LP during the Kick off meeting.

2.4.1.6. Overview of the LP’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

401,245.48 85.00 70,808.03 15.00 0.00 0.00 0.00 0.00 472,053.50

Revenues generated by the project

No Amount: 0.00

Activities of the ERDF partner in non-EU countries of the Programme Area

Amount 0.00 Rate 0.00

Description and location of the activities implemented by applying the 10% flexibility rule

Amount 0.00 Rate 0.00

Description and location of the activities implemented by applying the 10% flexibility rule

Sponsored 10% ASP

Beneficiary partner 10% PP1

Amount 4,000.00 Rate 0.15

Description and location of the activities implemented by applying the 10% flexibility rule

The MInsitry of Transport of Montenegro's participation to project events will be sponsored by the LP.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

12/156

Sponsored 10% ASP

Beneficiary partner 10% PP2

Amount 6,000.00 Rate 0.23

Description and location of the activities implemented by applying the 10% flexibility rule

The Croatian participation to project events will be sponsored by the LP.

Sponsored 20% ASP

Beneficiary partner 20% ASP1

Amount 4,000.00 Rate 0.15

Description and location of the activities implemented by applying the 20% flexibility rule

Travel and Accommodation costs to be involved in project events and technical meetings. CER will support the LP in the dissemination of results at EU Level.

Sponsored 20% ASP

Beneficiary partner 20% ASP2

Amount 4,000.00 Rate 0.15

Description and location of the activities implemented by applying the 20% flexibility rule

Travel and Accommodation costs : ITALFER will be involved in all technical activities, as it has a wide experience in planning and data collection in South East European Countries.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

13/156

2.4.2 ERDF PP1

2.4.2.1. Legal Identification Data

Official name in English ARISTOTLE UNIVERSITY OF THESSALONIKI- RESEARCH COMMITTEE

Full name in original language

Aristotelio panepistimio thessalonikis (A.P.TH.) ? epitropi erevnon ? Eidikos Logariasmos Kondilion Erevnas A.P.TH.

Abbreviation A.U.TH. Country Greece

NUTS II Region Kentriki Makedonia NUTS III Region Thessaloniki

Type of institution University, higher education institution, research centre, scientific institution, college

Legal status Governed by public law

National tax number EL090049627

Official address Septemvriou 31s, Panepistimioupoli, 54636 Greece

Phone (30)-2-310995140 Mobile

Fax (30)-2-310853283 e-mail [email protected]

Homepage www.auth.gr

Legal representative

Name of the legal representative

Prof Dr Sofia Kouidou-Andreou

Position of legal representative

Chair of Research Committee A.U.Th.- Vice Rector

Phone (30)-2310-995140 Mobile

Fax (30)-2310-853283 e-mail [email protected]

Contact Person

Name of contact person in project

Mr. Christos Taxiltaris

Position of contact person in project

Professor

Phone (30)-2-310996154 Mobile (30)-6-974190116

Fax (30)-2-310996030 e-mail [email protected]

2.4.2.2. Geographic scope of the ERDF PP1 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

14/156

National

2.4.2.3. Relevance of the proposed ERDF PP1 in this project (thematic competence)

Since January 2000 the A.U.Th. is the Technical Secretariat of the Steering Committee of Pan-European Corridor X, chaired by Hellenic Ministry of Infrastructures, Transport and Networks. In this framework, apart from other activities, A.U.Th. has dealt with issues impeding the proper operation of the Corridor (incl. border crossings), and has performed extensive surveys and site visits at all the cross border stations along this Corridor. In period 2005 - 2009 A.U.Th. has been consultant to the Hellenic Ministry of Foreign Affairs in the implementation of the Hellenic Plan for the Economic Reconstruction of the Balkans in Serbia and FYROM, and specifically on road parts of Corridor X, while it provided technical assistance to the beneficiary countries by elaborating relevant feasibility studies and cost benefit analysis for the projects and by supporting the co-financing procedures. A.U.Th., in cooperation with the Hellenic Institute of Transport (HIT), has been also consultant (2006-2008) the Hellenic Railways in its assignment as Chair and Technical Secretariat of the Steering Committee for the development of the High Performance Railway Network in South East Europe in the framework of the SEE Cooperation Process.

2.4.2.4. Description of previous participation to other relevant EU funded projects

A.U.Th., in cooperation with HIT (LP), participated in the ?Efficient Integration of Cargo Transport Modes and Nodes in CADSES area? Project (IMONODE?Code 2A077), partly financed by INTERREG IIIB CADSES. The project elaborated solutions and actions to enhance the use of Corridors V and X and their accessibility for freight transport, with priority on rail. A.U.Th. participates in the Pedestrians? Quality Needs COST Action 358 (2006-2010) aiming to identify people?s needs for safe and agreeable mobility in public space and to show the added value of a systems approach compared to sectoral approaches. It participated in R&D European projects for DG TREN/DG7: GUIDE (Group for Urban Interchange Development and Evaluation UR-97-sc.2087), DESIRE (Designs for Interurban Road Pricing Schemes in Europe 2000-CM.10501), PORTAL (Promotion of Results in Transport Research and Learning PPC99-1314) and for DG16: PACTE/HERMES (Physical Measures to Improve Urban Transport and City Environment 1996). Currently A.U.Th. participates in the South East European Transport Axis Cooperation (SEETAC) project of the 1st call of the South-East Europe Trans-national Programme.

2.4.2.5. Overview of the ERDF PP1’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

255,000.00 85.00 45,000.00 15.00 0.00 0.00 0.00 0.00 300,000.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

15/156

2.4.3 ERDF PP2

2.4.3.1. Legal Identification Data

Official name in English AustriaTech - Federal Agency for Technological Measures Ltd.

Full name in original language

AustriaTech - Gesellschaft des Bundes fuer technologiepolitische Massnahmen GmbH

Abbreviation ATE Country Austria

NUTS II Region Wien NUTS III Region Wien

Type of institution Other

Legal status Governed by private law

National tax number ATU 39393704

Official address Donau-City-Strasse 1, Vienna, 1220 Austria

Phone (43)-126-33 444 54 Mobile

Fax (43)-126-33 444 10 e-mail [email protected]

Homepage www.austriatech.org

Legal representative

Name of the legal representative

Mr. Martin Russ

Position of legal representative

General Manager

Phone (43)-126-33 444 22 Mobile (43)-664-46 30 332

Fax (43)-126-33 444 10 e-mail [email protected]

Contact Person

Name of contact person in project

Mr Florian Kressler

Position of contact person in project

Senior Project Manager

Phone (43)-126-33 444 25 Mobile (43)-676-614 00 44

Fax (43)-126-33 444 10 e-mail florian [email protected]

2.4.3.2. Geographic scope of the ERDF PP2 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

16/156

Transnational

2.4.3.3. Relevance of the proposed ERDF PP2 in this project (thematic competence)

Modelling and data infrastructure, sharing of experiences made in Austria and suporting compatible solutions accross the region

2.4.3.4. Description of previous participation to other relevant EU funded projects

So far the ERDF PP2 participated in two successful EU funded projects - Transtools 3, funded under the 7th Framework Programme and in EasyWay, funded by the Ten-T Network Programme.

2.4.3.5. Overview of the ERDF PP2’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

159,800.00 85.00 28,200.00 15.00 0.00 0.00 0.00 0.00 188,000.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

17/156

2.4.4 ERDF PP3

2.4.4.1. Legal Identification Data

Official name in English Regional Administration Smolyan

Full name in original language

OBLASTNA ADMINISTRATSIA SMOLYAN

Abbreviation RA - Smolyan Country Bulgaria

NUTS II Region Yuzhen tsentralen NUTS III Region Smolyan

Type of institution Regional public authority

Legal status Public

National tax number 1217067045

Official address Bulgaria Blvd 14, Smolyan, 4700 Bulgaria

Phone (359)- 301 6 01 92 Mobile

Fax e-mail [email protected]

Homepage http://www.region-smolyan.org/?lang=en

Legal representative

Name of the legal representative

Eng. Stefan Nikolov Staykov

Position of legal representative

District Governor

Phone (359)-301-60192 Mobile

Fax (359)-301-62333 e-mail [email protected]

Contact Person

Name of contact person in project

eng Momchil Karaivanov

Position of contact person in project

Manager of the department

Phone (359)-301 6 01 55 Mobile (359)-888889820

Fax (359)- 301 6 23 33 e-mail [email protected]

2.4.4.2. Geographic scope of the ERDF PP3 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

18/156

Regional

2.4.4.3. Relevance of the proposed ERDF PP3 in this project (thematic competence)

Regional Administration Smolyan participated as a partner in similar projects focused on the transport sector development in South East Europe (priory axis 3 ? Improvement of the accessibility). A major priority of the Development Strategy of the Smolyan region (2005-2015) is building, modernizing and re-constructing the transport infrastructure of the region.

2.4.4.4. Description of previous participation to other relevant EU funded projects

1.Project: RIMADIMA /Risk-, Disaster-Management & prevention of natural hazards in mountainous and/or forested regions/ ; 2.Project ?IBIS? under CBC Bulgaria ? Greece 2005 BG 2005/017-454.02.01-10.; 3.Mountain patrols safe system for integrated disaster management system (Acronym SKIPASS); 4.A Sustainable Development Model for Green Mountain Area (Acronym GREEN MOUNTAIN); 5.?Cross-border transport CONNECTIONs and communications - the basis for improving quality of life in border areas? Acronym CONNECTION; 6.?througt pREvention to Preserve the natural beauty Of the Rhodope mounTain? Acronym Report

2.4.4.5. Overview of the ERDF PP3’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

102,000.00 85.00 18,000.00 15.00 0.00 0.00 0.00 0.00 120,000.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

19/156

2.4.5 ERDF PP4

2.4.5.1. Legal Identification Data

Official name in English TRAINOSE S.A.

Full name in original language

TRAINOSE Metafores - Metaforikes Ypiresies Epivaton kai Fortiou Anonymi Sidirodromiki Etaireia A.E.

Abbreviation TRAINOSE Country Greece

NUTS II Region Attiki NUTS III Region Attiki

Type of institution Other

Legal status Governed by public law

National tax number 999645865

Official address Karolou 1-3, Athens, 10437 Greece

Phone (30)-210-5297628 Mobile (30)-6951935422

Fax (30)-210-5249131 e-mail [email protected]

Homepage www.trainose.gr

Legal representative

Name of the legal representative

Prof. Athanasios Ziliaskopoulos

Position of legal representative

President and CEO

Phone (30)-210-5297689 Mobile (30)-6951-785 307

Fax (30)-210-5249131 e-mail [email protected]

Contact Person

Name of contact person in project

Dr Vangelis Katsaros

Position of contact person in project

Safety, Security & Projects Special Adviser

Phone (30)-24210 74076 Mobile (30)-695-1785 307

Fax (30)-24210 74059 e-mail [email protected]

2.4.5.2. Geographic scope of the ERDF PP4 activities

Transnational

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

20/156

2.4.5.3. Relevance of the proposed ERDF PP4 in this project (thematic competence)

Trainose is the Greek National Railway Company implementing multimodality in freight transport for national and international goods transportation. Excellent cooperation stands with other railway carriers in Southeastern Europe, Freight forwarders, Ports and all relevant stakeholders. Close cooperation with private sector can optimize the model of freight transport in implementation area. Trainose participates in all railway associations and entities in Europe, Southesten Europe and Black Sea, working in committees together with other railway companies and relevant stakeholders, in legislative framework, strategies, policies etc in alignment with Greek Ministry of Transport. TRAINOSE is participating in GIFT SEE Strategic Project Proposal on freight tranportation to integrate the SEE region. Additionally, TRAINOSE is implementing passengers transportation in Greece and will restart soon international passengers transportation in cooperation with other railway companies of the area, providing also services such as sinle ticket for multi modal transportation (including, ferries, buses, taxis, airplanes, rent cars, and door to door transportation. In that framework TRAINOSE is participating in RAIL4SEE Strategic Project Proposal on passenger tranportation to integrate the SEE region and improve investments, mobility, tourism, entrepreneurship...

2.4.5.4. Description of previous participation to other relevant EU funded projects

Although TRAINOSE R&D department has been recently established, TRAINOSE participated as a subcontractor in FP6 transport project CREAM and is a partner of the FP7 ICT project REDUCTION, officially started September 2011 on CO2 emissions reduction and optimizing multimodal routing. Also few projects proposals TRAINOSE is participating in are under evaluation in National and European Initiatives (e.g. Greek National Research Programme "COOPERATION", Interreg Greece - Bulgaria, Interreg MED Strategic Projects...), Interreg SEE Strategic Project Proposals RAIL4SEE & GIFT-SEE

2.4.5.5. Overview of the ERDF PP4’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

155,176.00 85.00 27,384.00 15.00 0.00 0.00 0.00 0.00 182,560.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

21/156

2.4.6 ERDF PP5

2.4.6.1. Legal Identification Data

Official name in English Federal Ministry for Transport Innovation and Technology

Full name in original language

Bundesministerium für Verkehr, Innovation und Technologie

Abbreviation Mot AUT Country Austria

NUTS II Region Wien NUTS III Region Wien

Type of institution National public authority

Legal status Governed by public law

National tax number 533-0262-16

Official address Radetzkystrasse 2, Vienna, 1030 Austria

Phone (43)-1 71162 - 65 1101 Mobile

Fax (43)- 1 71162 - 65 1199 e-mail [email protected]

Homepage www.bmvit.gv.at

Legal representative

Name of the legal representative

Dr. Thomas Spiegel

Position of legal representative

department head Infra 5 (Internationale Netze und Generalsverkehrsplanung)

Phone (43)-1-71162651104 Mobile (43)-664 81 88 900

Fax (43)-1-71162651199 e-mail [email protected]

Contact Person

Name of contact person in project

Ms. Barbara Zimmermann

Position of contact person in project

Person in charge

Phone (43)-0 71162 - 65 1109 Mobile

Fax (43)-1 71162 - 65 1199 e-mail [email protected]

2.4.6.2. Geographic scope of the ERDF PP5 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

22/156

National

2.4.6.3. Relevance of the proposed ERDF PP5 in this project (thematic competence)

Bmvit is in charge for general transport infrastructure planning in Austria and TEN-T issues in Austria. Bmvit is the owner of and runs the Austrain Transportation Model and has sifnificant experiences in data collection and surveys, which creates synergies for the task 2 of ACROSSEE.

2.4.6.4. Description of previous participation to other relevant EU funded projects

South East Transport Axis SETA: The main aim oft he SETA project is the stabilisation of the economic development in the project regions by developing a competitive railroad network. By identifying the requirements of the involved regions and by analysing the existent railroad network possible existing deficits should be shown. Funding body: ERDF South East Europe ? SEETAC: The aim of SEETAC ist the advancement of traffic infrastructur and cross-border cooperation. Measures to increase the safety to traffic, traffic information and prevention of crime should be developed together. Also to aspire the harmonisation of environmental standards on high level is a main aim. Funding body: ERDF

2.4.6.5. Overview of the ERDF PP5’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

110,500.00 85.00 0.00 0.00 0.00 0.00 19,500.00 15.00 130,000.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

23/156

2.4.7 ERDF PP6

2.4.7.1. Legal Identification Data

Official name in English The association of Chambers of Commerce of Veneto Region

Full name in original language

Unioncamere del Veneto

Abbreviation UCV Country Italy

NUTS II Region Veneto NUTS III Region Belluno

Type of institution Chamber of commerce, collective business support actor

Legal status Governed by public law

National tax number 80009100274

Official address Via delle Industrie 19/d, Venice, 30175 Italy

Phone 0039-0410999411 Mobile

Fax 0039-0410999401 e-mail [email protected]

Homepage www.ven.camcom.it

Legal representative

Name of the legal representative

Mr Gian Angelo Bellati

Position of legal representative

General Secretary of the association of Chambers of Commerce of Veneto Region

Phone 0039-0410999411 Mobile

Fax 0039-0410999401 e-mail [email protected]

Contact Person

Name of contact person in project

Mr Pitingaro Serafino

Position of contact person in project

Project Manager

Phone (39)-041-0999335 Mobile

Fax (39)-041-0999411 e-mail [email protected]

2.4.7.2. Geographic scope of the ERDF PP6 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

24/156

Transnational

2.4.7.3. Relevance of the proposed ERDF PP6 in this project (thematic competence)

UCV will be the WPL of the cross border analysis (WP 5), through support of the Research Centre of the UCV will contribute to the implementation of the project activities with the data from national statistics, WTO, OECD, FMI, World Bank, in particular the outcomes of ?Doing Business? enquires and the selection of the indicators of ?Trading Across Borders? in order to compare time/costs/procedures of the shipping goods abroad. Moreover UCV will provide a benchmarking evaluation of efficiency standards.

2.4.7.4. Description of previous participation to other relevant EU funded projects

SEE.NET2 Vertical action 1A - The Program aims to foster dialogue among states, institutions and local communities in the South East Europe for the effective development of the territories involved in the Programme and in a long-term partnership at regional level and with the Italian system of decentralized cooperation; - SoNorA (Central Europe) Transnational cooperation project aiming at developing multimodal accessibility in South North direction, between the Adriatic and Baltic Seas; - Cluster Club (IPA Adriatic CBC) improve the innovation?s possibility of territorial and productive system through cooperation, business opportunities and market research. It aims also to accelerate the creation and reinforcing of cluster?s system, in particular the creation of SMEs network, PA, public and private institutes of research, consumers and potential products and services purchasers and related associations of the Adriatic Basin;WE-EEN (CIP-EIP SA ENV2) enhancing the provision of environmental services to SMEs through the EEN in waste management, surface treatment and manufacturing of electric and electronic components; BATCO (Central Europe) -aims to develop a network of the railway network Baltic and Adriatic in order to create a strong links between the Countries; -CNCB (Central Europe) update the International network of cluster and to improve the cooperation

2.4.7.5. Overview of the ERDF PP6’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

170,388.74 85.00 30,068.60 15.00 0.00 0.00 0.00 0.00 200,457.34

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

25/156

2.4.8 ERDF PP7

2.4.8.1. Legal Identification Data

Official name in English Autonomous Region of Friuli Venezia Giulia

Full name in original language

Regione Autonoma Friuli Venezia Giulia

Abbreviation FVG Country Italy

NUTS II Region Friuli-Venezia Giulia NUTS III Region Trieste

Type of institution Regional public authority

Legal status Public

National tax number IT00526040324

Official address via Giulia 75/1, Trieste, 34126 Italy

Phone (39)-040-3774745/4720 Mobile (39)-334-6261606

Fax (39)-040-3774732 e-mail [email protected]

Homepage www.regione.fvg.it

Legal representative

Name of the legal representative

Dr. Mauro Zinnanti

Position of legal representative

Director of Mobility Division within Central Directorate for infrastructure, mobility, spatial planning and public works

Phone (39)-040-3774745 Mobile (39)-335-7860490

Fax (39)-040-3774732 e-mail [email protected]

Contact Person

Name of contact person in project

Mr. Massimiliano Angelotti

Position of contact person in project

Project and Financial Manager

Phone (39)-040-3774720 Mobile (39)-334-6261606

Fax (39)-040-3774732 e-mail [email protected]

2.4.8.2. Geographic scope of the ERDF PP7 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

26/156

Regional

2.4.8.3. Relevance of the proposed ERDF PP7 in this project (thematic competence)

The Autonomous Region of Friuli Venezia Giulia, Central Directorate for infrastructure, mobility, spatial planning and public works, has a long lasting experience and competence in the management of EU projects and in cooperating with partners at regional, national and international level. Within its organization, it has established since 2006 a specific Unit which is in charge of all the administrative and financial issues related to EU cofinanced project management, supporting the participation of the various technical Divisions in which the Directorate is composed by (Mobility division, Infrastructure division, Spatial planning division). Furthermore, FVG is member of the Working group on transport of Alps Adriatic Working Community and member of the Commission for transport and infrastructure of Adriatic Euroregion. The Mobility division has competence in the field of freight transport and logistics, in particular it ensurs the study and development of programs relating to transport and freight logistics, the promotion and the development of related services with reference to the rail axes and the trans-European transport network, and it promotes, coordinates and implements interventions of regional interest to promote, support and develop freight transport, intermodality and logistics. Mobility division has furthermore competence in the project field, with particular reference to planning regional and local public transports, also with the aim of integrating tariffs and modes. It also has competence on regional public transport services via road, rail, tram, sea and air.

2.4.8.4. Description of previous participation to other relevant EU funded projects

In the past FGV Region was partner in project ALPFRAIL - Alpine Freight Railway (Interreg IIIB ALPINE SPACE Programme) for the development of railway freight transport through the Alps and in project IMONODE - Efficient Integration of Cargo Transport Modes & Nodes in CADSES area (Interreg IIIB CADSES) for the development of a logistic nodes network in Central Europe and was Lead Partner e of the project PORTUS - Perspectives On Inter-Regional Transport Unitary System: development of integrated logistic system between the main central and northern Adriatic ports (Interreg IIIA ADRIATIC CROSSBORDER Programme), aiming to develop a common strategic strategy for improving competitively of Adriatic maritime system, throughout improving the connections among major regional ports and TEN-T, with many Italian and IPA partners and experienced partnership. During the present programming period 2007-2013 FVG Region is partner in n.8 projects (TRIM; SONORA; TRANSITECTS, BATCO, ADRIA-A, INTERBIKE, TIP and CROCTAL) under implementation and Lead partner in two ongoing Interreg IV Italy-Austria Projects named CAAR and MICOTRA. FVG region is also currently applying as Lead applicant with the strategic project Adriatic - Danube - Black Sea multimodal platform (acronym: ADB multiplatform), within T.o.r. 3,2 of the 3rd SEE call.

2.4.8.5. Overview of the ERDF PP7’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

64,090.00 85.00 11,310.00 15.00 0.00 0.00 0.00 0.00 75,400.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

27/156

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

28/156

2.4.9 ERDF PP8

2.4.9.1. Legal Identification Data

Official name in English UNIVERSITY POLITEHNICA OF BUCHAREST

Full name in original language

UNIVERSITATEA POLITEHNICA DIN BUCURESTI

Abbreviation UPB Country Romania

NUTS II Region Bucuresti - Ilfov NUTS III Region Bucuresti

Type of institution University, higher education institution, research centre, scientific institution, college

Legal status Governed by public law

National tax number 4183199

Official address Spl. Independentei 313, Bucharest, 060042 Romania

Phone (40)-214029461 Mobile

Fax (40)-214115365 e-mail [email protected]

Homepage www.upb.ro

Legal representative

Name of the legal representative

Prof. dr. ing. Ecaterina Andronescu

Position of legal representative

Rector

Phone (40)-21-318 10 00 Mobile

Fax (40)-21-318 10 01 e-mail [email protected]

Contact Person

Name of contact person in project

Prof.dr.ing. Mihaela Popa

Position of contact person in project

Vice-dean of Transport Faculty

Phone (40)-21-4029 547 Mobile (40)-744-744 481 824

Fax (40)-21-318 10 12 e-mail [email protected]

2.4.9.2. Geographic scope of the ERDF PP8 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

29/156

National

2.4.9.3. Relevance of the proposed ERDF PP8 in this project (thematic competence)

UPB will contribute to all WPs in ACROSSEE project. It's most relevent contributions are related to the WP3 and WP5 through, at least, the following issues: - the impact's evaluation of the TEN-T revision and the consequences of the EU enlargement to the Eastern/South-Eastern part of Europe including WB and Black Sea region; - proposals for the improvement of the TEN-T core-network; - proposals for improving actions in promoting, planning and operation for transport infrastructure; - analysis, monitoring and activity plan proposal for standardization and procedures improvments in case of the custom activities on the Romanian teritorry ; - assesment of the existing surface transport infrastructure capacity in Romania, their interoperatibility, bottlenecks on corridors and analysis of the new market extension beyond Black Sea region; - analysis of the cross-border platforms (for Romania/Serbia and Romania/Ukraine corossing points); - assesment, use of the market potentials, and recomandations for strengthening the modal shift from road to rail, IWW or intermodal freight transports; - proposals for advancement measures of procedure for a better flowing of traffic at Romanian borders.

2.4.9.4. Description of previous participation to other relevant EU funded projects

UPB academic community (about 1500 teachers) carries out many scientific research programs and projects that confer it not only appreciation and professional reputation, but also the quality of its teaching steps and the premise of its participation in realizing an information society within the higher education European space through knowledge creation. Since 2000, UPB research activity was carried out more than 130 international projects. UPB had participated in FP6 and FP7 programs, for almost all programs type, in POS CCE program and also SEE program ( at request, a selection of relevant projects will be provided) . Currently, UPB-CCPCT is partner to the FLAVIA project, funded by the ERDF through the Central Europe program. Prof.dr.ing. Mihaela Popa is responsible person for UPB contribution.

2.4.9.5. Overview of the ERDF PP8’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

102,000.00 85.00 18,000.00 15.00 0.00 0.00 0.00 0.00 120,000.00

Revenues generated by the project

No Amount: 0.00

Activities of the ERDF partner in non-EU countries of the Programme Area

Sponsored EU ASP

Beneficiary partner EU ASP1

Amount 4,000.00 Rate 0.15

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

30/156

Description and location of the activities implemented by applying the % flexibility rule

Travel and ammodation costs to be involved in the project events, above all in the Minsiterial Conference.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

31/156

2.4.10 ERDF PP9

2.4.10.1. Legal Identification Data

Official name in English Public Foundation for the Development of Industry

Full name in original language

Iparfejlesztési Közalapítvány

Abbreviation IFKA Country Hungary

NUTS II Region Közép-Magyarország NUTS III Region Budapest

Type of institution Other

Legal status Governed by public law

National tax number 19655220-2-42

Official address Munkacsy M. u. 16, Budapest, 1063 Hungary

Phone (36)-1-3122213 Mobile (36)-30-4003268

Fax (36)-1-3320787 e-mail [email protected]

Homepage www.ifka.hu

Legal representative

Name of the legal representative

Dr. Krisztina Bardos

Position of legal representative

Managing director

Phone (36)-1-3122213 Mobile (36)-30-203-3177

Fax (36)-1-3320787 e-mail [email protected]

Contact Person

Name of contact person in project

Dr Bárdos Krisztina

Position of contact person in project

executive director

Phone (36)-1-312-2213 Mobile (36)-30-203-3177

Fax (36)-1-332-0787 e-mail [email protected]

2.4.10.2. Geographic scope of the ERDF PP9 activities

Regional

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

32/156

2.4.10.3. Relevance of the proposed ERDF PP9 in this project (thematic competence)

IFKA as a not-for-profit foundation is serving research-development within the most modern industrial technologies and practical application thereof. The main focuses are logistics, quality assurance and environmental protection. IFKA plays bridging role between public administration and the corporate sphere through the analysis of economic needs, promoting national strategies, thus coordinates and links the various actors of business, science and policy making. As a background institution of the Ministry for National Economy IFKA supports the regional realisation of trade specific policies (logistics, SMEs, innovation) with special focus on sustainable development. IFKA conducts logistics research and formulates solutions in light of international tendencies The results are utilised in the economy. IFKA acts as a link between economic actors and public administration while leverages its links with the Hungarian logistics actors to influence regional and local policies. IFKA is direclty linked to the development of inbound and outbound logistic industrial solutions at company level, such as road map design, freight transport optimalization, central storage system desing, cost optimalization. IFKA has direct contacts with trade organisations, chambers, academic actors and other national and regional professional institutions. In the focus of IFKA?s main projects are green supply chain solutions, integrated intermodal approach, environment-friendly logistic design in order to utilize its cross-competences deriving from IFKA?s logistic and environment organisational units.

2.4.10.4. Description of previous participation to other relevant EU funded projects

In the last five years IFKA has been involved in several EU projects (FP7, SEE, LIFE+, Territorial Cooperation HU-SK, etc), as LP or partner, the number of international projects are growing fast. Indicative list: REPROWIS ? Reducing Production Waste by Industrial Symbiosis (HUSK/0901/2.1.2/0193, Hungary-Slovakia Cross-border Cooperation Program) ;ISIM-TCC ? Industrial Symbiosis as an Innovative Method in Tackling Climate Change (LIFE08 ENV/H/000291);ENVIMPACT - Increasing the impact of Central-Eastern European environment research results through more effective dissemination and exploitation (FP7-ENV-2010-5.1.0-2-265275) EVAL-INNO Fostering Evaluation Competencies in Research, Technology and Innovation in the SEE Region.C_Liége - Clean Last mile transport and logistics management for Energy-Efficient local Governments in Europe (CIP-IEE) CDP CEE ? Carbon Disclosure Project in Central and Eastern Europe. Methods-TRANS-Syl: - Cooperation Programme

2.4.10.5. Overview of the ERDF PP9’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

102,000.00 85.00 18,000.00 15.00 0.00 0.00 0.00 0.00 120,000.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

33/156

2.4.11 ERDF PP10

2.4.11.1. Legal Identification Data

Official name in English Region of Epirus / Regional unit of Thesprotia

Full name in original language

Periferia ipirou/ periferiaki enotita thesprotias

Abbreviation RUTH Country Greece

NUTS II Region Ipeiros NUTS III Region Thesprotia

Type of institution Regional public authority

Legal status Public

National tax number 997908822

Official address P. Tsaldari 18 18, Igoumenitsa,, 46100, Greece

Phone (30)-2-6650 99993 Mobile

Fax e-mail [email protected]

Homepage http://www.thesprotia.gr

Legal representative

Name of the legal representative

Mr. Thomas Pitoulis

Position of legal representative

ice Governor of Region of Epirus / Regional unit of Thesprotia

Phone (30)-266-5361101 Mobile

Fax (30)-266-5026067 e-mail [email protected]

Contact Person

Name of contact person in project

Ms. Pepi Thedorou

Position of contact person in project

Consultant

Phone (30)-26823 60285 Mobile (30)-6944 161400

Fax (30)-26823 60217 e-mail [email protected]

2.4.11.2. Geographic scope of the ERDF PP10 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

34/156

Regional

2.4.11.3. Relevance of the proposed ERDF PP10 in this project (thematic competence)

The Regional Unit of Thesprotia has a privately owned three floor building in the city of Igoumenitsa which houses its main offices. Additional buildings are leased within the area of Thesprotia in order to house some of its services. There are about 230 people working for the Regional unit of Thesprotia at the moment, while the ratio servants/personal computers is 4/3. The Regional unit of Thesprotia has a considerable experience in the supervision of projects. During the five last years 51 projects have been accomplished. The total budget of the projects was about 34,000,000 Euros. Moreover, at the moment 145 new projects (budget 26,200,000 Euros) are supervised by the Regional Unit of of Thesprotia. Thanks to its experience in the management of cooperation projects, the Regional Unit of Thesprotia will bring into the consortium its know-how in cooperation projects management and will capitalise the tools and methods already defined within other cooperation projects where appropriate. The issue of mobility in the area of Thesprotia involves many organizations, such as the port organization, the organization of the interurban busses and the municipalities. The Regional Unit of Thesprotia due to its institutional role is in the position and will co-ordinate the relevant bodies in order to materialize actions concerning mobility. The Regional Unit of Thesprotia is determined to promote the use of environment-friendly ways of transport, in order to reduce pollution and solve the traffic problem that the city of Igoumenitsa faces.

2.4.11.4. Description of previous participation to other relevant EU funded projects

Among the projects which were materialized in the frame of INTERREG III are the following. IT-NET: policies for the integration of immigrants. POPULAR: actions and promotion for environmental-friendly ways of disposing waste from olive oil presses. SEALINK: administration of sea-transport. SUL CAMMINO DI ENEA: tourist promotion of areas in Greece and Italy. GIPSY: system counting the passengers at the port of Igoumenitsa. INTRARADAR: system observing ships coming/leaving the port of Igoumenitsa. MEDITRADE: prediction of the number of cars and tracs that will be transported from the port of Igoumenitsa. The Regional unit of Thesprotia is participating also to an INTERREG IVC programme ?MISRAR?.

2.4.11.5. Overview of the ERDF PP10’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

110,500.00 85.00 19,500.00 15.00 0.00 0.00 0.00 0.00 130,000.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

35/156

2.4.12 ERDF PP11

2.4.12.1. Legal Identification Data

Official name in English Venice International University

Full name in original language

Venice International University

Abbreviation V.I.U. Country Italy

NUTS II Region Veneto NUTS III Region Venezia

Type of institution Non-governmental or non profit organisation

Legal status Governed by private law

National tax number 02928970272

Official address Isola di San Servolo 1, Venice, 30135 Italy

Phone (39)-0412719511 Mobile

Fax (39)-.0412719510 e-mail [email protected]

Homepage www.univiu.org

Legal representative

Name of the legal representative

Mr. Umberto Vattani

Position of legal representative

President

Phone (39)-0412719511 Mobile

Fax (39)-0412719510 e-mail [email protected]

Contact Person

Name of contact person in project

Mr. Marco Mazzarino

Position of contact person in project

TLSU Head of Unit

Phone (39)-0412719511 Mobile

Fax (39)-0412719510 e-mail [email protected]

2.4.12.2. Geographic scope of the ERDF PP11 activities

Transnational

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

36/156

2.4.12.3. Relevance of the proposed ERDF PP11 in this project (thematic competence)

In coordination with the other universities involved in the project, VIU will carry out a strategic analysis of the main ports and multimodal infrastructures in the South-East Europe area, with the aim of identifying major bottlenecks of long-haul tranpsortation services from/to South-East Europe ports. In particular, major bottlenecks with reference to the respective national networks, cross-border (EU-non EU) sections and within the Western Balkans area will be specifically addressed.

2.4.12.4. Description of previous participation to other relevant EU funded projects

City of Venice, City of Koper, City of Nova Gorica, City of Trieste, City of Divača, City of Monfalcone, City of Sežana, Airport of Ronchi dei Legionari, Airport of Potorož, Airport of Venice, Airport of Lubiana, Port of Trieste, Turismo FVG, Slovenian Tourism Board, Port of Koper, Ezit, University of Trieste, University Koper/Portorose, City of Gorizia - 2) FUNDING PROGRAM: Interreg Italia Austria, Objective European territorial cooperation 2007 - 2013; PROJECT TITLE: TRIM- Transport Infrastructure Monitoring; PROJECT THEME: Guarantee the accessibility and reach the green goals improving the informatics infrastructure of the traffic for the long term street management planning ; PROJECT DURATION: 2008/2011 Lead partner: Government of Carinthia Partners: Regione Autonoma Friuli Venezia Giulia, Regione del Veneto Unit? Complessa Logistica, Venice International University; 3) FUNDING PROGRAM: FP7; PROJECT TITLE: Euridice: European Inter-Disciplinary Research on Intelligent Cargo for Efficient, Safe and Environment-friendly Logistics; PROJECT THEME: to create the necessary concepts, technological solutions and business models to establish the most advanced information services for freight transportation in Europe. The project is built on the Intelligent Cargo concept; PROJECT DURATION: 2008/2011

2.4.12.5. Overview of the ERDF PP11’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

184,756.00 85.00 32,604.00 15.00 0.00 0.00 0.00 0.00 217,360.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

37/156

2.4.13 ERDF PP12

2.4.13.1. Legal Identification Data

Official name in English Logistics Unit - Veneto Region

Full name in original language

Unit? di Progetto Logistica - Segreteria Regionale per le Infrastrutture, Regione del Veneto

Abbreviation RV Country Italy

NUTS II Region Veneto NUTS III Region Venezia

Type of institution Regional public authority

Legal status Public

National tax number 02392630279

Official address Calle Priuli Cannaregio 99, Venice, 30121 Italy

Phone (39)-041 279 2105 Mobile

Fax (39)-041 279 2022 e-mail [email protected]

Homepage www.regione.veneto.it

Legal representative

Name of the legal representative

Luigi Zanin

Position of legal representative

Head of Logistics Unit

Phone (39)- 041-279 2105 Mobile

Fax (39)-041- 279 2022 e-mail [email protected]

Contact Person

Name of contact person in project

Luigi Zanin

Position of contact person in project

Head of Logistics Unit

Phone (39)- 041-279 2105 Mobile

Fax (39)-041- 279 2022 e-mail [email protected]

2.4.13.2. Geographic scope of the ERDF PP12 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

38/156

Regional

2.4.13.3. Relevance of the proposed ERDF PP12 in this project (thematic competence)

Veneto Region will contribute to the management of this project by providing a large database for analysis of traffic flows "origin - destination" in reference to the exploration of scenarios useful to contextualize the project analysis.

2.4.13.4. Description of previous participation to other relevant EU funded projects

Veneto Region participates to the following projects, that have some synergies with the ACROSSEE proposal: Adria A - Programme Italy-Slovenia 2007-2013 (as Project Partner); SoNorA ? Central Europe Programme (as Lead Partner); Alpcheck 1 and Alpcheck 2 ? Alpine Space Programme (as Lead Partner); Watermode ? South East Europe Programme (as Project Partner)

2.4.13.5. Overview of the ERDF PP12’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

60,350.00 85.00 10,650.00 15.00 0.00 0.00 0.00 0.00 71,000.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

39/156

2.4.14 ERDF PP13

2.4.14.1. Legal Identification Data

Official name in English Institute of Traffic and Transport Ljubljana l.l.c.

Full name in original language

Prometni Institut Ljubljana d.o.o.

Abbreviation PIL Country Slovenia

NUTS II Region Zahodna Slovenija NUTS III Region Osrednjeslovenska

Type of institution Other

Legal status Governed by private law

National tax number SI34722645

Official address Kolodvorska 11, Ljubljana, 1000 Slovenia

Phone (386)-1 29 14 626 Mobile

Fax (386)- 1 23 19 277 e-mail [email protected]

Homepage http://www.prometni-institut.si

Legal representative

Name of the legal representative

Dr. Momčilo Šarenac

Position of legal representative

manager

Phone (386)-1-2914627 Mobile

Fax (386)-1-2319277 e-mail [email protected]

Contact Person

Name of contact person in project

Ms Mateja Matajič

Position of contact person in project

chief researcher

Phone (386)-1 29 14 330 Mobile (386)-31 358 296

Fax (386)-1 23 19 277 e-mail [email protected]

2.4.14.2. Geographic scope of the ERDF PP13 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

40/156

Transnational

2.4.14.3. Relevance of the proposed ERDF PP13 in this project (thematic competence)

Prometni Institut Ljubljana d.o.o. is a research organisation founded by Slovenian Railways. The company has over 40 years of tradition and conducts research and development projects in all traffic modes applied to the domestic and foreign market. The company specialises in research and development of transport technology, infrastructure, transport economics and law, transport related IT&T as well as in elaboration of investment documentation. Within the field of traffic technology and IT&T Prometni Institut Ljubljana d.o.o. is focused on railway and road traffic studies (infrastructure capacity analysis, organization of technological processes etc.), traffic database modelling and its implementation. In the field of transport economics research, company also conducts analysis of transport management systems, transport flows and efficiency of transport processes.

2.4.14.4. Description of previous participation to other relevant EU funded projects

REZIPE: Renewable Energies for Zero Emission Transport in Europe (Central Europe Programme, 2010-2013) Transafe-ALP: connecting Transport regional networks to Security and emergency Advanced Strategy Frameworks of European and Alpine regions decisional platforms (Alpine Space, 2011-2012) Mediterranean Intermodal Transit- "TRANSIT" (MED Programme, 2009-2012) EU Community INTERREG III A Italy-Slovenia 2000-2006: New railway link Trieste - Divača (Transport study, Operation study, Financial-economic study) (INTERREG III A, 2008) REDECON: Regional development along corridors and nodes (INTERREG IIIB CADSES, 2005-2008) Study of regional development of triangle Austria-Slovenia-Hungary (INTERREG IIIA, 2005) IMMONODE: Efficient Integration of Cargo Transport Modes & Nodes in CADSES area (INTERREG IIIB, 2004) ECO4LOG: Development of an East border Corridor 4th party LOGistics service approach along the axis Brandenburg-Saxonia-Austria with accession countries (INTERREG IIIC, 2003)

2.4.14.5. Overview of the ERDF PP13’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

144,712.50 85.00 0.00 0.00 0.00 0.00 25,537.50 15.00 170,250.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

41/156

2.4.15 ERDF PP14

2.4.15.1. Legal Identification Data

Official name in English GEA COLLEGE - FACULTY OF ENTREPRENEURSHIP

Full name in original language

GEA COLLEGE - FAKULTETA ZA PODJETNIŠTVO

Abbreviation GEA COLLEGE - FP Country Slovenia

NUTS II Region Zahodna Slovenija NUTS III Region Osrednjeslovenska

Type of institution University, higher education institution, research centre, scientific institution, college

Legal status Governed by public law

National tax number SI65056435

Official address Kidričevo nabrežje 2, Piran, 6330 Slovenia

Phone (386)-1-5881300 Mobile (386)-5-1600552

Fax (386)-1-5881333 e-mail [email protected]

Homepage http://www.gea-college.si/

Legal representative

Name of the legal representative

Ms. Alenka Temeljotov Salaj

Position of legal representative

Dean

Phone (386)-1-5881300 Mobile (386)-5-1761930

Fax (386)-1-5881333 e-mail [email protected]

Contact Person

Name of contact person in project

Ms. Marina Letonja

Position of contact person in project

Researcher

Phone (386)-1-5881326 Mobile (386)-5-1600552

Fax (386)-1-5881333 e-mail [email protected]

2.4.15.2. Geographic scope of the ERDF PP14 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

42/156

National

2.4.15.3. Relevance of the proposed ERDF PP14 in this project (thematic competence)

Profesional skills in training, education, project analysis and evaluation

2.4.15.4. Description of previous participation to other relevant EU funded projects

Some of the projects, funded by EU: European Social fund (2006-2007) - Entrepreneurship and management of innovation in tourism study program, ESS (2006-2008) - EU Training Excellence for Social Entrepreneurship Sector, TEMPUS (2006-2009) - Albanian, Italian, Slovenian post-graduate program, COST (2010-2014) - Public Private Partnership in Transport: Trends and Theory, LifeLongLeraning Porgram (2011-213) - Training for Fostering Crativity and Innovation

2.4.15.5. Overview of the ERDF PP14’s budget

ERDF Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

72,250.00 85.00 12,750.00 15.00 0.00 0.00 0.00 0.00 85,000.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

43/156

2.4.16 IPA-I PP1

2.4.16.1. Legal Identification Data

Official name in English Ministry of Public Works and Transport of Albania

Full name in original language

Ministria e Puneve Publike dhe Transportit

Abbreviation MPWT Country Albania

NUTS II Region - NUTS III Region -

Type of institution National public authority

Legal status Public

National tax number K 01612007 I

Official address Sheshi Skenderbej 5, Tirana, AL Albania

Phone (355)-4-2380734 Mobile (355)-69-2073421

Fax (355)-4-2227945 e-mail [email protected]

Homepage www.mpptt.gov.al

Legal representative

Name of the legal representative

Rovena MUZHAQI

Position of legal representative

Director

Phone (355)-42-2380734 Mobile (355)-69-2073421

Fax (355)-4-2227945 e-mail [email protected]

Contact Person

Name of contact person in project

Rovena MUZHAQI

Position of contact person in project

Director

Phone (355)-42-2380734 Mobile (355)-69-2073421

Fax (355)-4-2227945 e-mail [email protected]

2.4.16.2. Geographic scope of the IPA-I PP1 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

44/156

National

2.4.16.3. Relevance of the proposed IPA-I PP1 in this project (thematic competence)

The Mission of the Ministry of Public Works and Transport of Albania (MPWT) is: Formulation, application and monitoring of the policies, programs, norms and national standards of road infrastructure, transports, public services, space and housing planning, with ascertainment aim of a sustainable development and promotion for private investments and economic growth, considering used sources available in manner with productivity, effective and direct. The Ministry of Public Works and Transport is the institution in charge of the: - Road transport activity, which deals with drafting the policies of road transport (introduction to the transport market of the transport operators for goods and passengers) and regulatory functions (licenses of urban, interurban and international transport of passengers and transport of goods;- Road Safety and its component elements. Sectorial policies in the field of road safety, aiming at increasing the life and health protection services through the prevention and minimisation of the roads accidents. - The Ministry oversees road safety through the Directorate of Traffic and Road Safety, driver licensing and vehicle registration and inspection through the General Directorate of Road Transport Services, and planning and policy through the General Directorate of Policies and Planning. - Maritime Transport,(transportation of passengers and goods internal/domestic transportation (cabotage), touristic and sports? navigation, monitoring of maritime traffic and hydrograph/surveillance.Albania has ratified and adhered into a number of conventions in cooperation with the International Maritime Organization, (?UNCLOS?, ?SOLAS?, ?STCW 78?, ?SAR?, ?IMO?, ?MARPOL?, etc.). - Railway transport The current structural organisation of the railway transport is based on three main levels: 1- The level of drafting and updating the railway transport policies, as well as the role of the regulatory entity is responsibility of the MPWTT, and is conducted by the Railway Transport Policy Section in this Ministry; 2- The level of operation made up of railway transporters. At present there is only one railway transport operator which is the Albanian Railway A.C. (Hekurudha Shqiptare Inc.) which operates as an integrated railway transporter. In 2008, the infrastructure sector will be separated from the sector of goods transport and passengers transport. One legal person has submitted the request to obtain the license of railway transporters to operate in the network.

2.4.16.4. Description of previous participation to other relevant EU funded projects

The Ministry of Public Works and Transport (MPWT) of the Republic of Albania: - Is currently under the last phase of the implementation of the project South East European Transport Axis Cooperation (SEETAC), financed by IPA 2007 Cross Border Cooperation SEE Programme. - Continued to participate actively in the implementation of the Memorandum of Understanding signed in 2004 for the development of the Core (Comprehensive) Regional Transport Network, and in the South East Europe Transport Observatory (SEETO), - Is in the last phase of the preparation of the STRATEGIC COHERENCE ? FRAMEWORK, 2011-2013 (SCF). Subsequent to discussion with the European Commission in January 2010, the Government of Albania agreed a work plan for the preparation of a Strategic Coherence Framework and the Operational Programme, respectively for IPA Component III.

2.4.16.5. Overview of the IPA-I PP1’s budget

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

45/156

IPA Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

57,800.00 85.00 0.00 0.00 10,200.00 15.00 0.00 0.00 68,000.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

46/156

2.4.17 IPA-I PP2

2.4.17.1. Legal Identification Data

Official name in English Pro-rail alliance

Full name in original language

Savez za željeznicu

Abbreviation Pro-rail alliance Country Croatia

NUTS II Region Sjeverozapadna Hrvatska NUTS III Region Grad Zagreb

Type of institution Non-governmental or non profit organisation

Legal status Governed by public law

National tax number 2390426

Official address Trnjanska 11F, Zagreb, 10000 Croatia

Phone (385)-1-3783038 Mobile (385)-99-735 85 98

Fax (385)-1-3783038 e-mail [email protected]

Homepage http.//www.szz.hr

Legal representative

Name of the legal representative

Mr. Branko Kreš

Position of legal representative

President

Phone (385)-1-3783038 Mobile (385)-99-735 85 98

Fax (385)-1-3783038 e-mail [email protected]

Contact Person

Name of contact person in project

Mr. Ante Klecina

Position of contact person in project

Project Manager

Phone (385)-1-378 30 38 Mobile (385)-99-735 85 98

Fax (385)-1-378 30 38 e-mail [email protected]

2.4.17.2. Geographic scope of the IPA-I PP2 activities

National

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

47/156

2.4.17.3. Relevance of the proposed IPA-I PP2 in this project (thematic competence)

SZZ has 31 profit organization members and 14 non-profit organization members. They were actively and legally involved in several national project such as: Promoting the intermodal freight traffic (financed by the Ministry of transport), Integrated public passenger transport (financed by the Varaždin and Međimurje Counties), Railway crossings saftey (national program with Automobile Club, Ministry and Croatian Railways), etc.

2.4.17.4. Description of previous participation to other relevant EU funded projects

Actively involved as a full partner in the EU project USEmobility. The project is funded from the FP7. The project surveys what actually makes passengers to switch from individual transport to public transportation chains especially concerning so called "soft factors" (cleanliness, friendly staff, eco-awareness, vehicle design, accessibility of the services, etc.). The survey and the project are carried out in six European countries (Germany, Austria, Belgium, Netherlands, Hungary and Croatia).

2.4.17.5. Overview of the IPA-I PP2’s budget

IPA Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

25,372.50 85.00 0.00 0.00 0.00 0.00 4,477.50 15.00 29,850.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

48/156

2.4.18 IPA-I PP3

2.4.18.1. Legal Identification Data

Official name in English BELGRADE CHAMBER OF COMMERCE

Full name in original language

Privredna komora Beograda

Abbreviation BCC Country Serbia

NUTS II Region NUTS III Region

Type of institution Chamber of commerce, collective business support actor

Legal status Governed by public law

National tax number 100045959

Official address Kneza Milosa 12, Belgrade, 11000 Serbia

Phone (381)-11-2641 355 Mobile

Fax (381)-11-2642 029 e-mail [email protected]

Homepage www.kombeg.org.rs

Legal representative

Name of the legal representative

Ms Ivana Zeljkovic

Position of legal representative

Secretary General

Phone (381)-11-2641.355 Mobile

Fax e-mail [email protected]

Contact Person

Name of contact person in project

Ms Marija Askovic Matic

Position of contact person in project

Deputy Secretary of the Transport and Telecommunications Association

Phone (381)- 11 2643 284 Mobile (381)-64 8760 150

Fax (381)-11 3618 003 e-mail [email protected]

2.4.18.2. Geographic scope of the IPA-I PP3 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

49/156

Regional

2.4.18.3. Relevance of the proposed IPA-I PP3 in this project (thematic competence)

Belgrade Chamber of Commerce is an interesed based, independent, professional, business oriented organization whose members are enterprises, the enterpreneurs and other entities that perform economic activities in Belgrade. One of the main activities of The Belgrade Chamber of Commerce is improvement of business environment in order to enhance activities in the region. Activities of the Transport and Telecommunications Association are based on improving transport activities in the region, as well as accessibility improvement at border crossings in order to enhance flow of goods and passengers.

2.4.18.4. Description of previous participation to other relevant EU funded projects

o CARDS 2003 - PARTNERS The objective was to reinforce the capacity of the national and regional Chambers in Western Balkan countries. o CARDS - GUIDELINES FOR DOING BUSINESS WITH EU Project resulted in brochures related to various economic sectors. The project was intended to give practical information to companies on EU legislature, standards. o CARDS - BUSINESS INFO CENTRE The overall objectives were to promote innovative approach to entrepreneurship, and assist development of SMEs in Serbia and their better positioning on the international scene. o Interreg III A - ADRIANET General objective was the exchange of best practices aiming at the system harmonization between different local management systems. o Interreg III A - CO&CO Chambers Project achieved the constitution of a Help-Desk for the internationalization of SME businesses. o Strengthening Serbia-EU CSD-KAČER HONEY Objectives: to raise the level of awareness among honey producers and consumers in Serbia about benefits of PGI.

2.4.18.5. Overview of the IPA-I PP3’s budget

IPA Contribution State Contribution Other Public Contribution

Own Public Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR

136,414.80 85.00 0.00 0.00 0.00 0.00 24,073.20 15.00 160,488.00

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

50/156

2.4.19 ENPI PP1

2.4.19.1. Legal Identification Data

Official name in English ODESSA NATIONAL MARITIME UNIVERSITY

Full name in original language

ODES'KII NACIONAL'NII MORS'KII UNIVERSITET

Abbreviation ONMU Country Ukraine

NUTS II Region Odessa oblast NUTS III Region Odessa oblast

Type of institution University, higher education institution, research centre, scientific institution, college

Legal status Governed by public law

National tax number 01127777

Official address MECHNIKOV STREET 34, ODESSA, 65029 Ukraine

Phone (380)-48-7321735 Mobile

Fax (380)-48-7321621 e-mail [email protected]

Homepage www.onmu.odessa.ua

Legal representative

Name of the legal representative

Mrs. Iryna Morozova

Position of legal representative

Rector

Phone (380)-48-7321735 Mobile

Fax (380)-48-7321621 e-mail [email protected]

Contact Person

Name of contact person in project

Mr. Sergii Rudenko

Position of contact person in project

Professor

Phone (380)-48-7321735 Mobile

Fax (380)-48-7321621 e-mail [email protected]

2.4.19.2. Geographic scope of the ENPI PP1 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

51/156

National

2.4.19.3. Relevance of the proposed ENPI PP1 in this project (thematic competence)

Realization of the of the Projects main object (elaboration of single model of European transport system) provides including into the subject of the project EU transport system extending to the countries of Western Balkans, Danube and Black Sea regions of South East Europe. Development and further including into this system the Ukrainian transport complexes should become one of the directions of the Project. The PP is important to include extra EU university and research centre, above all because Unkraine represents one of the main traffic generators for the area. Main constituents of his part (Ukrainian transport integration) are - unifications of rules and legislation reglamenting transport processes; - simplifying of procedures and processed of boarder crossing; - cooperation of administration and management; - standardization of technical and technological schemes; Implementation of the above objectives should be bases on integration of Ukrainian transport complex and its adaptation to the European one. Transport complex includes railways, motor roads, river (Danube), Black Sea ways and ports of Odessa region as logistical centers.

2.4.19.4. Description of previous participation to other relevant EU funded projects

The PP has a wide experience of cooperation with the LP, through CEI University Network Joint Programme : - trans-Regional Cooperation in Maritime Transport and Sustainable Development - Maritime Transport and Infrastructure - Maritime Transport of Refrigerating Cargoes

2.4.19.5. Overview of the ENPI PP1’s budget

ENPI Contribution

State Contribution

Other Public Contribution

Own Public Contribution

Own Private Contribution

Total eligible budget

EUR % EUR % EUR % EUR % EUR % EUR

166,345.02 90.0

0 18,482.78

10.00

0.00 0.00 0.00 0.00 0.00 0.00 184,827.80

Revenues generated by the project

No Amount: 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

52/156

2.4.20 EU ASP1

2.4.20.1. Legal Identification Data

Official name in English MINISTRY OF NATIONAL DEVELOPMENT (Republic of Hungary)

Full name in original language

NEMZETI FEJLESZTÉSI MINISZTÉRIUM (Magyar Köztársaság)

Abbreviation NFM Country Hungary

NUTS II Region Közép-Magyarország NUTS III Region Budapest

Type of institution National public authority

Legal status Public

National tax number 15764412-2-41

Official address FŐ U 44-50, Budapest, H-1011 Hungary

Phone (36)- 1 795 6877 Mobile

Fax (36)-1 795 0655 e-mail [email protected]

Homepage www.kormany.hu

Legal representative

Name of the legal representative

Mr Attila Rakos

Position of legal representative

Counsellor

Phone (36)- 1 795 6877 Mobile

Fax (36)-1 795 0655 e-mail [email protected]

Contact Person

Name of contact person in project

Mr Attila Rakos

Position of contact person in project

Counsellor

Phone (36)- 1 795 6877 Mobile

Fax (36)-1 795 0655 e-mail [email protected]

2.4.20.2. Geographic scope of the EU ASP1 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

53/156

National

2.4.20.3. Relevance of the proposed EU ASP1 in this project (thematic competence)

The Ministry of National Development intends to take part in the project as an associated partner. The ministry will have the concrete possibility to put into place the results of the ACROSSEE project since it has the decisional power to define and implement transport strategies in the Hungarian territory. A representative of the Ministry will be also a member of the ACROSSEE Project Steering Committee that will supervise and approve the project implementation (WP Technical Reports, Progress Reports, Final Report) to be submitted to the Managing Authority of SEE Programme. Moreover the ministry will assume the role by participating in the decision making process of the project's steering committee.

2.4.20.4. Description of the added value of its participation

A representative of the Ministry will be invited to take part in the ACROSSEE Project Steering Committee that will supervise and approve the project implementation (WP Technical Reports, Progress Reports, Final Report) to be submitted to the Managing Authority of SEE Programme and will provide valauble input to the technical activities. Its added value depend on its nature to be the most relevant decision making body in the transport field in its country.

2.4.20.5. Description of the involvement of the partner in the project

A representative of the Ministry will be also a member of the ACROSSEE Project Steering Committee that will supervise and approve the project implementation (WP Technical Reports, Progress Reports, Final Report) to be submitted to the Managing Authority of SEE Programme. Moreover the ministry will assume the role by participating in the decision making process of the project's steering committee.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

54/156

2.4.21 EU ASP2

2.4.21.1. Legal Identification Data

Official name in English Ministry of infrastructure and transport of Italy

Full name in original language

Ministero delle infrastrutture e dei trasporti

Abbreviation MIT-IT Country Italy

NUTS II Region Other NUTS III Region Other

Type of institution National public authority

Legal status Public

National tax number 97439910585

Official address via Nomentana 2, Rome, 00161 Italy

Phone (39)-64412 Mobile

Fax e-mail [email protected]

Homepage

Legal representative

Name of the legal representative

Ms. Maria Margherita Migliaccio

Position of legal representative

Director General

Phone (39)-644125200 Mobile

Fax (39)-644267373 e-mail

Contact Person

Name of contact person in project

Mr Roberto Ferrazza

Position of contact person in project

Head of TEN-T Unit

Phone (39)-644126202 Mobile (39)-3346955280

Fax (39)-644125389 e-mail [email protected]

2.4.21.2. Geographic scope of the EU ASP2 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

55/156

National

2.4.21.3. Relevance of the proposed EU ASP2 in this project (thematic competence)

The ministry will have the concrete possibility to put into place the results of the ACROSSEE project since it has the decisional power to define and implement transport strategies in the Italian territory. A representative of the Ministry will be involved in the relevant ACROSSEE events as associated partner.

2.4.21.4. Description of the added value of its participation

A representative of the Ministry will be invited as observer to take part in the ACROSSEE Project Steering Committee that will supervise and approve the project implementation (WP Technical Reports, Progress Reports, Final Report) to be submitted to the Managing Authority of SEE Programme and will provide valauble input to the technical activities. Its added value depend on its nature to be the most relevant decision making body in the transport field in its country.

2.4.21.5. Description of the involvement of the partner in the project

The Italian Ministry of Infrastructure and Transport has been involved in a number of EU projects, such as: -South East Europe Transport Cooperation Axis (SEETAC) under the SEE programme -Accessibility and Development for the Re-launch of the Inner Adriatic Area (ADRIA A) funded under the Cross-border Cooperation Programme Italy ? Slovenia 2007-2013. -PORTUS - (Perspectives On inter-Regional Transport Unitary System) within the ADRIATIC NEW NEIGHBOURHOOD PROGRAMME, funded by the INTERREG funds for Community Countries, CARDS and PHARE for Balkan Countries, with a total budget of Euro 1.200.000; -CROSS-5 - mainly financed by the European Regional Development Fund of the INTERREG IIIA ITALY-SLOVENIA CBC programme. The project includes a strategic study on the main track of the Pan-European Corridor V and a feasibility study for the implementation of the Corridor V railway missing link between Trieste (Italy) and Divača (Slovenia). Project budget amounts to 2.199.500 euro; -Moreover, the General Directorate for Planning has been the Managing Authority and Paying Authority for the PIC INTERREGIIIB CADSES (Central Adriatic Danubian South Eastern Europe Space) Neighbourhood Programme 2000-2006.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

56/156

2.4.22 20% ASP1

2.4.22.1. Legal Identification Data

Official name in English Community of European Railway and Infrastructure Companies (CER)

Full name in original language

Community of European Railway and Infrastructure Companies (CER)

Abbreviation CER Country Belgium

NUTS II Region NUTS III Region

Type of institution International organisation

Legal status Governed by private law

National tax number BE 0459235909

Official address Avenue des Arts 53, Brussels, 1000 Belgium

Phone (32)-2 213 08 70

Mobile

Fax e-mail [email protected]

Homepage

Legal representative

Name of the legal representative

Mr Johannes Ludewig

Position of legal representative

Executive Director

Phone (32)-22130871 Mobile

Fax (32)-25125231 e-mail [email protected]

Contact Person

Name of contact person in project

Mr Matteo Mussini

Position of contact person in project

Seniro Policy Adviser

Phone (32)-22130838 Mobile

Fax (32)-5125231 e-mail matteo [email protected]

2.4.22.2. Geographic scope of the 20% ASP1 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

57/156

Transnational

2.4.22.3. Relevance of the proposed 20% ASP1 in this project (thematic competence)

Around 15,000 lobbyists and 2,500 lobby organisations are based in Brussels. All of them are trying to articulate and represent various interests during the political decision-making process. For 20 years CER has been recognised as the voice of European railways in this competitive environment - delivering practical and reliable information to all European institutions in the debate about the future of (rail) transport. A representative will be invited to take part in the most relevant project events. CER will be invited at the EU Parliament and DG Move workshops.

2.4.22.4. Description of the added value of its participation

The Community of European Railway and Infrastructure Companies (CER) is the leading European railway organisation. It was founded in 1988 with 12 members and now brings together 77 railway undertakings and infrastructure companies ? private and state-owned, large and small. Our members come from the European Union, the candidate countries (Croatia, Macedonia and Turkey) as well as from the Western Balkan countries, Norway, and Switzerland. CER is based in Brussels and represents the interests of its members to the European Parliament, Commission and Council of Ministers as well as to other policymakers and transport actors. CER?s main focus is to promote a strong rail industry that is essential to the creation of a sustainable transport system which is efficient, effective and environmentally sound.

2.4.22.5. Description of the involvement of the partner in the project

CER will have a very important role, in order to disseminate the project's outcomes at the EU level. In fact, CER has a direct channel to rail operators and this will contribute to the project's objective, to inform and direct operators and final users, avoiding bottlenecks at border crossings.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

58/156

2.4.23 20% ASP2

2.4.23.1. Legal Identification Data

Official name in English ITALFERR

Full name in original language

ITALFERR

Abbreviation ITALFERR Country Italy

NUTS II Region Other NUTS III Region Other

Type of institution Other

Legal status Governed by private law

National tax number 6770620588

Official address Via V.G. Galati 71, Rome, 00155 Italy

Phone (39)-6- 49752507 Mobile

Fax e-mail [email protected]

Homepage http://www.italferr.it/italferr.html

Legal representative

Name of the legal representative

Mr. Renato Casale

Position of legal representative

Chief Executive Officer

Phone (39)-6-49752507 Mobile

Fax e-mail [email protected]

Contact Person

Name of contact person in project

Mr Alberto D'Amico

Position of contact person in project

Head of Commercial Department

Phone (39)-6- 49752507 Mobile

Fax e-mail [email protected]

2.4.23.2. Geographic scope of the 20% ASP2 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

59/156

Transnational

2.4.23.3. Relevance of the proposed 20% ASP2 in this project (thematic competence)

Italferr is the consulting engineering company of the Italian State Railways (Ferrovie dello Stato Italiane - FS) founded in Rome in 1984. The company has an average annual turnover of ? 180 million, and currently supervises and controls projects and investments for a total value of ? 45 billion on behalf of FS. Italferr is largely recognized as a world leader in the railway consultancy field and it possesses all the technical and professional requirements to face the challenge of this important and strategic transport planning project. Italferr is active in traditional and high speed main railway lines, metropolitan systems and complementary sectors. The Company is engaged in the planning, design and works supervision of new transport infrastructures, upgrading of existing networks, devolopement of intermodality and application of innovative technological systems. Italferr permanent staff of about 1400 persons includes railway engineers, economists, transport planners and technicians with many years of experience in positions of responsibility with the Italian State Railways. A representative of Italferr will be invited to take part in relevant technical meeting and other project events.

2.4.23.4. Description of the added value of its participation

In the Balkan Region Italferr has successfully performed in the last five years the following important projects in the transport sector: - the General Transport Master Plan in Serbia, including roads, railways, air transport, ports, maritime transport and intermodal facilities, financed by EC ? CARDS Programme and assigned by the EC Delegation of Belgrade. The project included the updating of the transport data-base aimed to the preparation of a multimodal traffic model. The final results was the submission of a coherent package of transport projects for investments up to 2027, with an economic, financial, environmental and social justification. - the Design and Tender Documents preparation of the new Zezelj Bridge over the Danube in Novi Sad, financed by EC ? CARDS Programme and assigned by the EC Delegation of Belgrade; - the Technical and Financial Study for the Rehabilitation of the Bar ? Belgrade Railway line, financed by the Italian Ministry for the Economic Development. - the Feasibility Study for the modernization of the Railway Corridor X in Croatia, financed by EC ? ISPA Programme and assigned by the EC Delegation of Zagreb; - the Main Design of civil and electro-technical intervention on Bar ? Vrbnica railway line, financed by EC ? IPA Programme and assigned by the EC Delegation of Pordgorica; - the Assistance to BiH Railway Authorities for harmonization of the railway sector to EU Directives, financed by EC ? IPA Programme and assigned by the EC Delegation of Sarajevo; - the Technical assistance to Roman Railways for alignment to EU quality systems, financed by World Bank Funds; - the Technical Assistance to Roman Railways for reorganization of railway passenger services, financed by World Bank Funds; - the Technical Assistance for the preparation of Rail Project for the Cohesion Fund Romania, financed by EU-ISPA Fund.

2.4.23.5. Description of the involvement of the partner in the project

Italferr is now engaged in two projects / technical assistances dealing with the railway sector: - the Implementation of a System for Analysis of railway track conditions on Serbian network, financed EC ? IPA Programme and assigned by the EC Delegation of Belgrade;

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

60/156

- the Lender?s Monitoring Advisory aimed to monitor the implementation of track renewal projects both in Macedonia and Serbia, financed by Central European Initiative (CEI) and assigned by EBRD.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

61/156

2.4.24 10% PP1

2.4.24.1. Legal Identification Data

Official name in English Ministry of Transport and Marittime Affairs

Full name in original language

Ministarstvo saobradaja j pomorstva

Abbreviation MMAT-MNE Country Montenegro

NUTS II Region NUTS III Region

Type of institution National public authority

Legal status Public

National tax number 02156369

Official address Rimski trg 46, Podgorica, 81000 Montenegro

Phone (382)-20-234062 Mobile

Fax (382)-20-234331 e-mail [email protected]

Homepage www.minsaob.gov.me

Legal representative

Name of the legal representative

Minister Andrija Lompar

Position of legal representative

Minister

Phone (382)-20-234062 Mobile

Fax (382)-20-234062 e-mail [email protected]

Contact Person

Name of contact person in project

Ms. Angelina Zivkovic

Position of contact person in project

Adviser to the Minister

Phone (382)-20-234062 Mobile

Fax (382)-20-234062 e-mail [email protected]

2.4.24.2. Geographic scope of the 10% PP1 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

62/156

National

2.4.24.3. Relevance of the proposed 10% PP1 in this project (thematic competence)

The Ministry of Maritime Affairs and Transport can can contribute to the ACROSSEE project thanks to their national competence. The Ministry will benefit greatly from the project in the field of transport, economy and transnational cooperation. A representative of the Ministry will invited in the most relevant project Events (Ministerial Meeting and EU Parliament and DG Move workshops).

2.4.24.4. Description of the added value of its participation

Taking into consideration the EC proposal for a regulation on Union Guidelines for the development of the Trans-European Transport Network - COM (2011) 650/2, that defines the long-term strategy for the TEN T policy up, comprising annex III : Indicative maps of the trans-European transport network extended to specific third countries, Volume 06 and 07 Western Balkans Region and Montenegro as a part of it, we consider our participation mutually important.

2.4.24.5. Description of the involvement of the partner in the project

The Ministry will be specifically involved in the institutional activities, WP3, adopting a Memorandum of Understanding with the other institutional partners. The Ministry will particularly be involved in the evaluation of the impact of the TEN T revision. The Ministry will be involved in the field surveys at border crossings.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

63/156

2.4.25 10% PP2

2.4.25.1. Legal Identification Data

Official name in English Croatian Ministry of the Sea, Transport and Infrastructure

Full name in original language

Ministarstvo Mora, Prometa i Infrastrukture

Abbreviation MSTI Country Croatia

NUTS II Region Sjeverozapadna Hrvatska NUTS III Region Grad Zagreb

Type of institution National public authority

Legal status Public

National tax number 3277097

Official address Prisavlje 14, Croatia, 1000 Croatia

Phone (385)-16169111 Mobile

Fax (385)-13793901 e-mail [email protected]

Homepage www.mmpi.hr

Legal representative

Name of the legal representative

Mr Oliver Kumric

Position of legal representative

Assistant Minister

Phone (385)-16169111 Mobile

Fax e-mail [email protected]

Contact Person

Name of contact person in project

Ms. Jasna Kancir

Position of contact person in project

Adviser

Phone (385)-13783938 Mobile

Fax (385)-13784591 e-mail [email protected]

2.4.25.2. Geographic scope of the 10% PP2 activities

National

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

64/156

2.4.25.3. Relevance of the proposed 10% PP2 in this project (thematic competence)

The ministry will have the concrete possibility to put into place the results of the ACROSSEE project since it has the decisional power to define and implement transport strategies in the Croatian territory.

2.4.25.4. Description of the added value of its participation

The Croatian Ministry of the Sea, Transport and Infrastructure is in charge of TEN-T network and transnational corridors policy. The Ministry will have the concrete possibility to put into place the results of the ACROSSEE project since it has the decisional power to define and implement transport strategies in the Croatian territory. Moreover accessibility at border crossing plays an important role for the development of the Croatian Transport network..

2.4.25.5. Description of the involvement of the partner in the project

The Ministry of the Sea, Transport and Infrastructurea had expirience in CARDS Programme in CroatIa 2001-2004, ISPA Programme 2005, IPA Programme 2006 and Phare 2006: Maritime Safety The ISPA programme co-finances a large scale infrastructure on Railway Corridor X. The IPA Programme is ongoing dealing also with Railway Corridor X and Inland Waterways Navigation reconstruction on Corridor VII. Moreover the Minsitry has a deep experience in projects financed byt the programme South East Europe, since it is partner of the project SEETAC, financed in the first call for proposals of the programme.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

65/156

2.4.26 OP1

2.4.26.1. Legal Identification Data

Official name in English European Union Road Federation

Full name in original language

European Union Road Federation

Abbreviation ERF Country Belgium

NUTS II Region NUTS III Region

Type of institution Non-governmental or non profit organisation

Legal status Governed by public law

National tax number 0470591441

Official address Place Stephanie 6/B, Brussels, 1000 Belgium

Phone (32)-2-6445877 Mobile

Fax e-mail [email protected]

Homepage www.erf.be

Legal representative

Name of the legal representative

Mr Christophe Nicodome

Position of legal representative

Director General

Phone (32)-2-6445877 Mobile

Fax e-mail [email protected]

Contact Person

Name of contact person in project

Ms Fusco Irene

Position of contact person in project

Project Manager

Phone (32)-2-6445877 Mobile

Fax e-mail [email protected]

2.4.26.2. Geographic scope of the OP1 activities

Transnational

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

66/156

2.4.26.3. Relevance of the proposed OP1 in this project (thematic competence)

The European Union Road Federation (ERF) is a non-profit association which coordinates the views of Europe's road sector and acts as a platform for dialogue and research on mobility issues. ERF participation as project co-ordinator: - contract n°B2000 ITREN E3 2000 S12.295381- Guidelines to Black Spot Management- identification & Handling (Grant) - contract n° GJU/05/2408/CTR/GIROADS ? GIROADS ?GNNSS introduction in the road sector (Sixth Framework Programme) - Contract EURO-AUDITS - Contract n° MOVE/SUB/2010/D3/300-1/S12.561768-WHITEROADS ERF participation as consortium member in charge of dissemination taks Contract No 247851, SCUTUM (SeCUring the EU GNSS adoption in the dangerous Material transport ? 7th Framework programme) Contract No 227725 GINA (GNSS for Innovative Road Applications) ? 7th Framework programme Contract No TREN-EI-1-08-S-ST-S07.89580-LABEL-NEA, LABEL, Creating a Label for (Secured) Truck Parking Areas along the trans-European Road Network and Defining a Certification Process, including an Online Information Facility Blue Flag Scheme for Rest Areas Contract n° 1003/CTR/FP6/NV ? ADVANTIS ?A centralised guarantted integrity localisation service. A key for the Egnos and Galileo business model (Sixth Framework Programme).

2.4.26.4. Description of the added value of its participation

The ERF is a non profit association which coordinates the views of Europe's road sector and acts as a platform for dialogue and research on mobility issues. ERF's mission is to promote EU transport policies that recognise the socio-economic contribution of roads and elevate road transport to its envisioned function, an affordable and sustainable service connecting citizens and economies. ERF firmly believes in the value of sharing "best in Europe" know-how and offers road authorities in Central & Eastern Europe an opportunity to familiarise themselves with successful road engineering practices through a series of "on demand" training workshops. The guiding principle behind these workshops is to offer comprehensive overview of the safety contribution of better designed built and operated road networks through interactive presentations delivered by some of Europe's foremost road safety professionals.

2.4.26.5. Description of the involvement of the partner in the project

ERF will have a very important role, in order to disseminate the project's outcomes at the EU level. In fact, ERF has a direct channel to road operators and this will contribute to the project's objective, to inform and direct operators and final users, avoiding bottlenecks at border crossings.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

67/156

2.4.27 OP2

2.4.27.1. Legal Identification Data

Official name in English European Intermodal Association

Full name in original language

European Intermodal Association

Abbreviation EIA Country Belgium

NUTS II Region NUTS III Region

Type of institution International organisation

Legal status Governed by private law

National tax number 456220197

Official address Rue d'Arenberg 44, Brussels, 1000 Belgium

Phone (32)-2-5145654 Mobile

Fax (32)-5146760 e-mail [email protected]

Homepage www.eia-ngo.com

Legal representative

Name of the legal representative

Mr. Peter Wolters

Position of legal representative

Secretary General

Phone (32)-2-5145654 Mobile

Fax (32)-2-5146760 e-mail [email protected]

Contact Person

Name of contact person in project

Mr. Andrea Grisilla

Position of contact person in project

Project Manager

Phone (32)-2-5145654 Mobile

Fax (32)-2-5146760 e-mail [email protected]

2.4.27.2. Geographic scope of the OP2 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

68/156

Transnational

2.4.27.3. Relevance of the proposed OP2 in this project (thematic competence)

This neutral organisation with more than 90 members is suitably qualified to discuss controversial subjects and to propose well balanced sustainable solutions in line with and to improve the EU transport policy.

2.4.27.4. Description of the added value of its participation

Partner in the CAESAR coordination action: providing Technical Secretariat support to EIRAC, dissemination activities, management and organization of plenaries; partner in "Intermodal Quality", "Imprend (Improvement of Pre- and End haulage at terminals)", EURIFT (EU Reference Centre for Intermodal freight Transport), REALISE (Regional Action for Logistical Integration of Shipping across Europe), SAIL (Semitrailers in Advanced Intermodal Logistics), Protrans/Sulogtra, eWIT. Partner in ISIC (Integrated Services in the Intermodal Chain): forming recommendations to EU Commission regarding harmonization of technical liability and documentation issues; promotion, certification and training for intermodalism. Partner in EIRAC II (European Intermodal research Advisory Council), SMART-CM Container Chain Management (Streamlining worldwide customs & container management processes), TelliBox (Intelligent MegaSwapBoxes for Advanced Intermodal Freight Transport), EWITA (European Web Platforms and Training Concepts for Intermodal Inland Waterway transport), SCUTUM (Securing the EU GNSS adopTion in the dangeroUs Material transport), SPECTRUM (Solutions and Processes to Enhance the Competitiveness of freight Transport by Rail in Unexploited Markets).

2.4.27.5. Description of the involvement of the partner in the project

EIA will have a very important role, in order to disseminate the project's outcomes at the EU level. In fact, EIA has a direct channel to intermodal operators and this will contribute to the project's objective, to inform and direct operators and final users, avoiding bottlenecks at border crossings.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

69/156

2.4.28 OP3

2.4.28.1. Legal Identification Data

Official name in English European Road Haulers Association

Full name in original language

Unione européenne des transporteurs routiers

Abbreviation UETR Country Belgium

NUTS II Region NUTS III Region

Type of institution Non-governmental or non profit organisation

Legal status Governed by public law

National tax number /

Official address Rue Jospeh II 36-38, Brussels, 1000 Belgium

Phone (32)-2-22307414 /440 Mobile

Fax (32)-2-2307219 e-mail [email protected]

Homepage www.uetr.eu

Legal representative

Name of the legal representative

Mr Francesco Del Boca

Position of legal representative

President

Phone (39)-6-70374330 Mobile

Fax (39)-6-77079910 e-mail [email protected]

Contact Person

Name of contact person in project

Mr. Marco Digioia

Position of contact person in project

Secretary General

Phone (39)-6-70374218 Mobile (39)-331-6682633

Fax (32)-2-2307219 e-mail [email protected]

2.4.28.2. Geographic scope of the OP3 activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

70/156

Transnational

2.4.28.3. Relevance of the proposed OP3 in this project (thematic competence)

UETR represents 200.000 road transport undertakings in Europe (Micro, Small and Medium Enterprises) with a total capacity of 430.000 commercial vehicles from EU Western and Eastern EU member states. In particular, its Eastern Europe members (Hungary, Bulgaria, Slovenia) can contribute positevely to the project.

2.4.28.4. Description of the added value of its participation

Undertakings users and private operators are in the project target groups. Through UETR they can be directly involved in the project (useful for surveys and data collection).

2.4.28.5. Description of the involvement of the partner in the project

UETR will have a very important role, in order to disseminate the project's outcomes at the EU level. In fact, UETR has a direct channel to private operators and this will contribute to the project's objective, to inform and direct operators and final users, avoiding bottlenecks at border crossings.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

71/156

3. Project description

3.1. Project background

Despite projections for rapid growth in Europe over the next 15 years, doubts still surround railfreight's capability to reap these potentially productive rewards following the expected economic turnaround. Since the early 1990s, the European Union (EU) has stepped up efforts to promote greater interoperability on its inland railfreight network because of growing competition from other economic regions. However, these measures - ranging from the adoption of technical operability standards, market liberalisation through the first and second railway packages and the Trans European Transport Network (TEN-T) Decisions- have been criticised for not going far enough. Moreover, full integration of Western Balkans in the network is still lagging behind, as in comparison with the 2004 De Palacio?s report (HLG). Still in the recent Commission?s proposal the Western Balkans network is included, but only in the comprehensive ( secondary and not financed level) part of EU new TEN-T network leaving the Balkans network still undefined and outside of the EU core TEN-T network. Regardless the Commission?s efforts, with the stagnate co-operation for easing the problems on cross border issues and despite huge growth in overall freight volumes in some relevant SEE ports, the modal split between road and rail, still appears not to be in line with the EU policies and with the single market?s efficiency. Relevant studies, including the SEE programme co-financed SEETAC project argue that the policies adopted by the EC since 2001, including the 30 TEN-T priority projects, as well as the low level of investments by member states, are only freezing the rate at which the transport is shifting from rail to road. At the heart of the recommendations for the WB ?s inclusion is the rapid adoption of the Transport community Treaty with the Western Balkans (WB). However, after years of exhausting negotiations it hasn?t been signed yet. The firm adoption of the recommendations included in the White Paper ?Roadmap to a Single European Transport Area ? Towards a competitive and resource efficient transport system? COM(2011)144 can be considered as coherent policy guidelines for all the continental transport policy. Specifically, it is worth saying that the only Regulation concerning the European Rail Network for Competitive Freight which includes the continuation of the EU network to the WB is represented by the Regulation EC 913/2010. In the latter the EU transport infrastructure is described as still fragmented - both geographically and between/within transport modes- marked by the permanence of missing links, in particular the cross-border sections, which represent a major obstacle for the free movement of goods along the freight corridors routs and their links with the Western Balkans. With the document ?The EU and its neighbouring regions: A renewed approach to transport cooperation?- (COM 2011) 415. the Commission underlined the importance to strengthen transport links with the neighbouring regions to the East and South of the EU. The plan calls for concrete measures, in the short and longer term, to make transport connections smoother, safer and more reliable. The EC has recently published the Proposal for a Regulation on Union guidelines for the development of the

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

72/156

trans - European transport network -COM (2011) 650/2, that defines the long term strategy for the Ten-T policy up to 2030/2050 and proposes Corridors relevant for the SEE area. The presence of the regional perspective is considered vital for the development of the Danube Region. The European Commission proposed on 8th December 2010 the EU Strategy for the Danube Region (Commission Communication), endorsed by the Member States at the General Affairs Council on 13th April 2011 that, inter alia, focuses on the key priority area :?to improve mobility and inter-modality?

3.2. Problem or challenge to be addressed

The extension of the EU rail network to the new member, candidate and accession countries is crating a significant opportunity for rail freight, however this potential remained not fully exploited, due to several reasons, including lack of co-ordination of investments ,unbalanced openness to the market and unexploited potential of the intermodal connectivity. Slow improvements in the completion of the Tent-t network in the SEE area, economic pressure from international trade and rising consumption patterns represents the current challenges. Freight transport is currently dominated by road transport despite the growing market for international rail freight transport, in particular among the main international corridors which is by far marked by high rail transit time are due to the long processing times at rail border-crossing points in the SEE. Furthermore the role of co-operation in developing efficient rail cross-border services is still explored on the road modality side: the issue of certificates and cabotage, language and stay permits are elements that affect the potential use of the rail services and the development of co-modality. In the South East Europe Area, there are a great number of border crossing stations that are characterized by long waiting times, unpredictable customs services, burdensome administrative procedures - all leading to additional transport and trade costs for manufacturers and importers/exporters, in particular in the rail freight transport. The identification of the cost of these burden within the total cost of the logistic chain is still unexplored as well as the identification and the assessment of best practice in cross border procedure in the light to promote to similar stakeholders. In this context a broad, comprehensive and reliable consumer demand analysis for better standard of the road and rail service in SEE is still missing. EU 913/2010 regulation concerning international rail freight, calls for enhanced cross-border coordination, in order to improve rail freight performance and increase its attractiveness to potential freight customers. On the basis of the EU methodology, the project will address the issues related to arguments for rationalising the network in SEE trough balancing the capacity with cost-effectiveness. The Western Balkan members of SEETO are signatories to an Addendum to a Memorandum of Understanding aimed at enhancing the South East European Railway Transport Area. Successful reform also required the adoption of secondary legislation, the establishment of required institutional, organizational, and financial arrangements, the issuance of operational decisions, and the staffing of new institutions. Specific challenges addressed by the project: ? Trans tool is still not considered properly suitable as planning instrument for Western Balkans. Urgent necessity to extend it to the western Balkans in an homogeneous way ? Local traffic flows are still not sufficiently considered in transport study at EU level thus not allowing a properly financial investment plan for the area Section geo-referenced (GIS system) ? Lack of updated information and properly analysis of reliable traffic impediments to the transport flows in cross border sections

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

73/156

? Lack of knowledge regarding the type of freight transport which enable a better planning and a proper organisation of the logistic chain ? Lack of co-operation between of rail operators, infrastructure managers, logistic and intermodal operators, relevant ministries is still lagging behind in the cross-border sections ? Necessity for optimizing the TEN-T extension on the western Balkans in order to fully include the main transport corridors (Core network) ? Missing definition of the main nodes primarily and secondary in the long distance strategy to enhanced the functioning of the European market in synergy with SEE ? Lack of shared solution for administrative and rail service cross border issues. ? Lack of WB MuU

3.3. Main objectives of the project

The general aim of the proposed project is to improve cross-border accessibility in the SEE area and to improve the coordination among SEE national administrations, in the light of EU legislation with a three-fold general objective: 1) contribute to the extension of the Tent-T network and optimising the existing SEE network implement action to foster intermodality and co-modality on transnational corridors to reach the White Paper targets by linking different regional strategies of SEE, including the WE and the traffic generators from Russia/Ukraine, Turkey and Suez. 2) Adopt a common transport model for the entire South East Area, integrated with the rest of Europe and compatible with the current EU system, adequate to be exploited also by public administrations and transport operators 3)Improve the cross-border accessibility of the freight flows. Adopt concrete measures in order to cut the running time in the cross-border points and to ease up the existing bottlenecks in the SEE area. Increase transparency of the operations The main aim of the project will be achieved through several specific objectives: -To analyse the status and needs of the exiting cross borders sections -Optimisation of the Ten-T planning in relation to the current and future traffic flows -Contribution to the optimisation of international borders management, that includes reducing cross-border transit time, increase regional and international trade by improving border crossings, ensuring that national trade facilitation procedures are compatible with markets and administrative procedures -To facilitate the movement of goods and mobility across borders by improving infrastructures facilities and institutional capacities -Promotion of an Integrated Border Management Strategy -To reduce non-tariff costs on trade and transport by strengthen and modernise the customs administrations and other border agencies -Integrates the efforts of the participating national authorities, European Commission in the context of Ten-T extension to the Western Balkans to collectively align procedures to EU standards -To contribute with pilot actions and recommendation to the new EU Financial Framework 2013-2020 -Creation of the first geo-referential model for the South East Europe and for the Western Balkans -Promoting economic cooperation among the countries in the region by focusing on efficient transit services -Involvement of various actors responsible for the organisation of transport, through networking and exchange of information activities; -Conceptualizing integration and coordination between organising authorities, cities and rural communities and operators at all levels: strategic, planning and technical; -Developing multi-modal transport action plans aimed at relieving missing links along cross-border

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

74/156

transport -Identifying investment needs into cross-border transport infrastructure and services. -Identifying existing financial instruments that can support the necessary infrastructure upgrading -support the recent proposals of the European Parliament- Transport and Tourism Committee that would see legislation surrounding rail liberalisation strengthened

3.4. Contribution of the project objectives to the objectives of the Priority and AoI (relevant ToR if

strategic call)

The project contributes to Priority Axis 3: improvement of the accessibility as it will foster the development of the accessibility network and will support multi-modal platforms. The project will foster the 3 operational objective ?Improve framework conditions for multi-modal platform, by promoting multimodal measures to increase border-crossings accessibility. Multimodal paths like corridors and section will be analysed thanks to an updated and realistic appraisal of the main international trade flows in the SEE, integrated for the first time, by external traffic generators like (Russia/Ukraine and Turkey/Suez) which are currently affect the Eu transport flows: A common transport model for the entire South East Area, integrated with the rest of Europe and compatible with the current EU system (trans-tool) will be created, this instrument represent an important technical device available by public administrations , project partners and transport operators. It will Improve the cross-border accessibility of the rail freight flows easing the planning of concrete measures for upgrading or designing infrastructure, spotting current and future bottlenecks in a dynamic way offering the public decision makers the first integrated planning tool for the entire SEE area. Their related impact on the existing and future infrastructure network will represent a indisputable elements of planning decision for public and private investments. Multimodal platforms and paths will be also identified in strict coherence with the macro regional strategy deployment (Danube strategy, Adriatic Ionic strategy, Black Sea synergy) thus gathering a comprehensive view of the entire SEE in relation to the common transport strategy and its geographic deployment perspectives in terms of accessibility especially for land locks regions In particular by tracking the administrative and legal issue the project will primarily foster the efficiency of the existing infrastructure promoting new guidelines and or amendments of existing legislation to allow the full development of an integrated European market, the removal of restrictions and contributing to the formation of undistorted prices. The project will contribute to the development of multimodal strategies for border crossing and will foster agreements for the promotion of multi-modality and develop informatics tools for multimodal platforms in order to ease up and standardize the customs procedures acceleration and Traffic freight flows monitoring The Identification of the main border cross stakeholders groups and their selected involvement within all the project?s steps preparation (the association of transport operators, infrastructure managers, infrastructure planners, industries, forwarders, carriers, shippers, logistic operators) will assure the solutions and actions taken by the project consortium can represent a tangible improvement for the accessibility in relation to 1) the capacity of the terminals and capacity assignment the selected section in the rail network 2) the advancement of interoperability measures 3) the easing of the administrative procedures 4) the adoption of guidelines or memorandum for the removal of major admin bottlenecks in the shot term.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

75/156

Thanks to the present of 5 transport ministries (3 ERDF and 2 IPA), and the most important European transport Association, the project will serve as a wake up call to the transport ministries and relevant authorities in order to step up the implementation at EU and national level for urgent reforms in order to bring national legislation in line with the EU freight acquis. Moreover, the project will implement transnational actions in order to develop synergies and propose coherent arguments for the implementation and the extension of the Tent-T network to the Western Balkan. The long term sustainability of the results is ensured by the direct involvement of Ministeries, Regions and transport associations and EU ass.

3.5. Methodological approach

Optimisation and Evaluation of the impact of the Ten-T revision/core and comprehensive network ? based on results of WP4 the action will proceed by assessing of the impact of WBs? EU accession on the Ten-t. Moreover, the evaluation of the core and comprehensive network will be take into consideration the extension to the western Balkans. The optimisation of the network and its extension to the WB will consider: Additional of ?missing links? to close gaps or upgrading/additional cross border links , Removal of dead ends or isolated links, multimodal inclusion of Ports. The optimisation will follow EU criteria and monitored by interim meetings with DG MOVE in particular will: a) reflect the main long-distance/international traffic flows(existing / potential); b) correspond to the long-term needs of the Community and remain stable over a reasonably long period; c) include and propose to extend the ?Motorways of the Sea?; d) include supplementary infrastructure measures ;e) allow investment needs and projects to be derived top-down taking into account the commission proposal on TEN-T Guidelines. The central information system of the DG TREN was GETIS (Geographic Energy and Transport Information System) established in 2003, utilising the Eurogeographics and GISCO tools. This system is evolving with the TEN-tec system. The TRANS-TOOLS model was developed in the period 2004-2006 based on the existing system ETIS-BASE, while its second version was done in the framework of TEN-CONNECT in 2009, since the first version referred to the EU-25 and not EU-27. The TEN-tec information system consists today the monitoring platform for the TEN-T policy implementation. It is a Geographic Information System with reference to a network (links and nodes), but not adjusted for simulation purposes like those developed by ETIS, TRANSTOOLS and WORLDNET. Therefore, in the future, the synergy of these tools are to be examined. At time being, the TEN-tec is being updated and the third version of TRANSTOOLS is being developed, with foreseen completion the year 2014. In ACROSSEE project nodes and sections will be both goe-referenced for all SEE area. This is an attempt of creating a unified transport model for a region consisting of EU and non-EU countries, as for time being the TRANS-TOOLS model of the European Commission?s DG Mobility and Transport is limited to cover only the EU-27 network. In such a way the project will adopt a common transport model for the entire South East Area, in interlinked with already EU project SoNoRa, and fully compatible with Trans tool model.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

76/156

The modelling area will be divided in two macro areas: the study area where the zoning level will be COMPATIBLE TO TRANSTOOL LEVEL and the accessing points to the area connected with the neighbouring countries. A comprehensive approach regarding the analysis of traffic flows will be used. three elements will be investigated: a) the main international routes of goods circulation and the type of goods ( rail and road surveys) b) how the existing freight transport supply meets the transport demand, c) where and how substantial transport improvements can be obtained through better services before relevant infrastructure investments d) Those three points need to be summed up by investigating how goods transport demand is evolving in SEE according to the international goods exchange and freight transport flows Rail and road Crossing points methodology: Taking into account the updated relevant literature, three type of analysis have been envisaged: a) capacity and infrastructure b) Administrative and legal 4) consumer demand and market requirements. In particular Direct field-surveys on the main cross border rail and road will be used in order to define a precise and realistic map of rail border crossingtraffic flows , capacity resrictions admin burden including real time transit. Investigation questionnaire pursued a com. meth. will be carried out at all rel. stakeholders

3.6. Transnational approach

Since the South East Europe is a mostly a transit region. the project will focus on core/comprehensive network with the aim of remove bottlenecks, facilitating the upgrading infrastructure and streamlining cross border transport operations for passengers and businesses along all the transport corridor crossing the entire SEE area. This will improve transnational connections between different modes of transport and contribute to the EU's climate change objectives for the whole area. The transnational approach of the project is inherent in the character of international flows and of the logistic chain of freight transport, comprised the related issues regarding the border crossing points. In order to reach the above mentioned objectives it is necessary that all the key stakeholders of the eligible area cooperate, in particular Ministries and transport operators. The project will take action from the TEN T primary and secondary network which in SEE identified four main corridors ? nr. I/V/VIII/X ?where the improvement efforts on the multimodal network and on intermodal services among ports, metropolitan areas and borders should be focused. The action will identify the cross-border section along these corridors, for the non EU countries the SEETO cross border map will be used- AS SEE may be seen as a sub European platform where external trade flows ? from Russia-Ukraine, Black Sea and Western Europe - and inner trade flows - due to the growth of local economies - overlap so that external transits are summed up to the local ones, through a limited infrastructure network supply. This is the reason why in the SEE area transport demand grows quicker than transport supply.: this affects negatively the economic system (congestion costs) and the environment system (pollution and decline). Numerous borders that penalise the SEE transport rail flows development which horizontal measures encompassing technical, normative and organisational improvements, as part of a single and coherent SEE mobility policy.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

77/156

The mobility demand related to the interchange/transit of the main freight categories in the SEE area will be evaluate at the current supply stage and with possible evolutions. The aim of the Border Crossing action is to focus all necessary interventions on Border Cross Points (BCP) of the TEN T Corridors and SEETO maps. These improvements has a large transnational effect as they deal with regional economic development of the WB and deadlocks region. Moreover The implementation of these strategic transport links depends on the development of each single border crossing and bottlenecks in general as one single relevant impediment can undermine the smooth operation of a transport operator and change the traffic flows undermining the efficiency of whole transnational Corridor/network. The introduction of the concept and the methodology for the establishment of One Stop Shops for rail cross border points will be formulated for the entire SEE area focusing in the relation between EU-Countries and Western Balkans and understanding the reason for the current status quo. The project will also identify 6 innovative transnational measure including a recommendation with a list of negative practices that should be avoided by the public authorities all the project partners will adopt these recommendations On the basis of agreements of Infrastructure Interconnection in order to expedite border-crossings where a good example is the one proposed by SEETO approved by the SEETO Commission representing the transport ministries of the Western Balkan countries a set of pilot scheme ( road map) for setting up an OSS will be made. This road map scheme will take into consideration patical solutions of common problem encountered: Finally the partnership represent include a large area coverage of the whole SEE area including Ukraine ( ENPI) and the mix of the nature of the partners assure that all horizontal issued will

3.7. Expected outputs and results

Taking into account the aforementioned issues, the project will implement the following priority actions: 1) Establishment of an institutional multilevel platform and promotion of administrative co-operation in order to complete and extend the implementation of the Ten-T (EU Ten-T guidelines, Ten- T extension to the Western Balkans, liberalisation and economic trend, impact of economic crisis) and to enhance cooperation among relevant stakeholders with the aim to improve national and regional strategic plan. Draft a pipeline of projects to be implemented within the Danube, Adriatic and Black Sea strategy. Promote partner agreement on border-crossing issue on the basis of the Single window principle for freight customs. Such as All customs services should be carried out by the customs authorities of both countries at one location 2) Elaboration of a Integrated Transport Model completed with the inclusion of local and international flows (extension trans-tool to WB, geo-referenced model for nodes and sections, included in the model). Definition of common transport model for all the regions and countries which allows to plan efficiently the possible investments

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

78/156

3) Plan for action for Cross border points and bottlenecks in SEE area. Institutional platform with operators and stakeholders. Joint proposal for administrative standardisation and concrete plan for cutting transit time on EU corridors and WB comprehensive network. Survey on the field and adoption of concrete proposals coming from economic and logistic actors. Creation of a full accessible web information platform. 3a) Field survey on 23 selected rail border crossing points in the whole SEE and field survey on 23 road selected crossing sections: selected interviews and questionnaires on more the 400 stakeholders of the transport community in SEE area including SEE ports, interports and area nodes. 4) compliance with open access standards that are required by EU directives in force; cooperation between border authorities?in particular, the possibility for the border authority of one country to be active in a neighbouring country; reduce border-crossing times; achieve higher commercial speed for trains; and streamline border procedures. However 5) A memorandum of understanding signed during a ministerial conference organized by Croatian Transport Ministry in September 2013 and adoption of and guidelines on One Stop Shop for the use of rail infrastructure in the Joint Border Zone. A One Stop Shop in this context means a body that designs an international train path. The applicant receives all information, including the timetable, fees and technical parameters that enable one to use the path. Any licensed rail undertaking can purchase rail infrastructure border services?such as path, shunting, and communication?from one of the two infrastructure managers. The rules and regulations of the One Stop Shop are specified in a joint network statement, which can be an annex to the network statement demanded by Directive 2001/14/EC. 6) A promotion actions for the Agreements of Infrastructure Interconnection (AIIs) in order to expedite border-crossings procedures 7) One seminar with DG MOVE on pilot routes for improving intermodal chin of transport according to TEN T revision and 2 seminars organized at the EU Parliament for including the relevant authorise and Eu networks. 8) Action plan for the synergy of macro regional strategy ( EUSDR- Adriatic ?Ionian strategy and Black sea synergy) including the preparation of a series of tangible actions/project proposal to be submitted to the EU relevant priority coordinators for this regional initiatives 9) Methodology for the extension of trans-tool to the Western Balkans 10) Web-based platform for the information exchange on cross border and bottlenecks sections 11) improvement of cross-border policies and adoption of soft measures including upgrading of small infrastructure in selec

3.8. Plans for sustainability and transferability of projects results

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

79/156

The sustainability of the project will be ensured through its core outputs and results. 1)Institutional sustainability: will be ensured thanks to the institutional partners. The CEI will set up at the end of the project a Project focal point that will be able to provide information even after the end of the project. 2) Financial sustainability: will represent the natural consequence of the measures adopted and the studies delivered (the recommendation on EU financial perspectives 2013-2020, Ten-T impact assessment, report on impact of proposed ten t revision, report on the consequences of the EU enlargement to WB, Cross ) as these outputs will help in the prioritisation of future investment in the project area and beyond . 3) Political sustainability - the project will have an impact on political choices leading to improved legislation, policies and procedures. In particular, through the Multilevel Memorandum of Understanding for advancement of cooperation on border-crossing sections, based on compliance with open access standards that are required by EU directives in force, the institutional PPs will ensure the sustainability of relevant project outputs and results. Transfer of the project results and main findings will be secured mainly by carrying out the activities in the WP2. For this purpose a Communication Manager will be appointed in order to ensure coherence and will act as the project?s Spokesperson : - traditional dissemination tool: newsletters, website, press releases - dedicated events: ministerial conferences, meetings in Brussels and any transport related event of relevance for the SEE area and the project - the CEI will set up a Contact Point that will operate also after the end of the project All PPs will contribute to the long term results? sustainability as they will benefit from project outputs. Moreover, they will adopt measures and best practices and implement polices conceived during the project implementation. In particular Ministries and Regional authorities will have the opportunity to transfer to other relevant stakeholders the project results through the incorporation of policies and adoption of measures shaped within the ACROSSEE project. It goes without saying the through the projects the single countries will also highlight their own priorities in the field of the project. Taking into account their positions will most surely ensure the promotion and dissemination of the outputs in the partners countries as these will represent also their priorities and benefits at the local, regional and national level. The non partner SEE countries, will be also targeted by following the communication strategy and by relying on the CEI, the CER, the ERF and EIA networks. Furthermore, relevant external stakeholders will be invited during dedicated meetings or workshops in order to create synergies with other similar initiatives.

3.9. Target groups/ stakeholders involvement

Project direct stakeholders are PPs that are at the same time the main SEE decision makers in the field of transport. Their involvement in the day by day activities, events, project and steering committee meetings will be guaranteed and therefore constant. They will implement and incorporate the project results thus provide long term sustainability. It is crucial for the effective dissemination of the project results to involve the relevant transport policy authorities and other stakeholders through an active stakeholders engagement. In this regard, a chapter of the Communication Strategy will be dedicated to the stakeholders engagement. The project will target three relevant stakeholders groups:

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

80/156

1)Institutional-target groups will be represented by Transport Ministries, Regional, National/Regional Agencies that will be the key players during the project implementation and after the end of the project by ensuring the project results long term sustainability . The decision-making actors are full-fledged partners and will be further involved through the Communication and dissemination activities. The organisation of a Transport Ministerial meeting will represent a crucial political event that will give outstanding visibility at ministerial level to the ACROSSEE project. Moreover, also the main EU policy-makers will be involved, first during the seminar at the European Parliament and the workshop at the EU Commission and second by exploiting the EU transport networks/lobbies that are involved in ACROSSEE. 2)Transport target group: transport associations, t. authorities, t.lobbies and networks (CER, ERF, EIA, UNIFE, etc), national railways highways agencies / companies, border authorities, Universities, Think-Thanks 3)Private sector/ Businesses ? Target Group: private companies, transport operators, chamber of Commerce, business agencies, development agency . These last could benefit from the clear identification of the mains fields of intervention and investment opportunities. Communication Plan will also address these TGs, through transparent spread of information, promotion of events concerning progress and the definition of future opportunities.

3.10. Capitalisation of results

Firstly, the project will rely on similar projects/initiatives already implemented both in the previous programming period and in the current. It will benefit from the existing data on transports in the SEE, capitalising the efforts done by the National Statistic Agencies and by EUROSTAT. The organization of a SEETAC database is one of the expected results, that is going to work in strict cooperation with the above mentioned agencies, utilizing the experience of PPs and of SEETO in the elaboration of data and in the promotion of the transport core network development in the SEE. The PPs also participated directly in the most relevant transport projects implemented in the previous programming period. Only few projects are not well known to PPs, but the establishment of a permanent and electronic database will facilitate this knowledge, avoiding the dispersion of information and the duplication of projects. For this reason, despite the fact that SEETAC doesn't refer directly to any previous project, it plans to capitalize the efforts done until now by the transnational and cross-border cooperation. The project will incorporate the SEETAC and SONORA and it will be carried out in synergy with RAIL4SEE for passengers and ADB project for the identification of pilot corridors in the WB: moreover ministerial and regional policy actions, investment strategies will also be incorporated. IPA countries will be involved and their experience in transport related projects will also be highly taken into consideration. SEETAC and ADRIA A, BATCO, SETA, SONORA Speaking about the Transport model, until today, a series of studies and researches have been dedicated to the monitoring of the Trans-European Transport Networks implementation progress and the forecast of

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

81/156

traffic flows (TEN-STAC, SASI, ASTRA, SCENES, WORLDNET, ETIS, iTREN, with most recent the ???-CONNECT), as well as for the assessment of the wider impacts of transport infrastructure projects (EUNET-SASI, IASON). TEN-STAC (NEA, 2004) analyzed 25 trans-European transport corridors concerning their bottlenecks, traffic and their impacts on the environment, in view of the revision of the TEN-T in 2004. In line with these examples, the ???-CONNECT (Tetraplan, 2009) is serving the on-going TENT-T revision. The central information system of the DG TREN was GETIS (Geographic Energy and Transport Information System) established in 2003, utilising the Eurogeographics and GISCO tools. This system is evolving with the TEN-tec system. The TRANS-TOOLS model was developed in the period 2004-2006 based on the existing system ETIS-BASE, while its second version was created in the framework of the TEN-CONNECT in 2009, since the first version referred to the EU-25 and not EU-27.

3.11. Possible internal or external constraints during and after project implementation and solutions

foreseen

The project does not present at the initial stage major internal or extern constraints that could endanger the successful implementation of the project. However, the LP being aware of the fact that issues may arise in the future will develop with all the PPs a contingency plan in order to overcome the common problems that EU projects have to face and to create a decision making procedure in order to react effectively and smoothly. In particular in case of: - project delays in activities: the LP in cooperation with the PPs will act swiftly in order to catch up with relevant delays. It may, for example, redefine or take up some responsibilities and tasks when necessary with the approval of the Steering Committee. Moreover, it can assist partners in order to obtain results on time and will provide support and information whenever requested to avoid further delay and interruption of connected activities. - Under-spending and FLC issues. Public bodies, in particular have to cope with cumbersome administrative and financial procedure that may lead to substantial under-spending in EU funded projects. In order to avoid this situation or to adjust it rapidly the LP project management team will carefully plan and monitor all PPs spending and react pre-emptively. In order to respect the expenditure forecast, it is essential that the technical and content activities are delivered on time and started immediately in order to avoid the phenomenon of low spending in the initial phase of the project. In case of administrative problems with the FLC and validation of expenditures, the LP will cooperate with the JTS and national contact points in order to find the best solution in the shortest time possible. Dedicated forms for financial monitoring will be sent out to PPs. In case of delays the LP will organize meetings with partners in financial delay to solve problems and find the best solution for the successful implementation of the project. Budget shits may also be envisaged in order to overcome consistent underpinning problems. A dedicates session of the kick off meeting for all partners regarding Financial reporting and issues will be organized. -back out of a partner for changes in political priorities. The LP in this case will redefine the tasks and responsibilities to all PPs and will liaise with the JTS in order to adopt the optimal solution.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

82/156

- quality control of the outputs. The LP will cooperate with the external experts and technical partners responsible for specific project actions and WPs to deliver quality outputs for the benefit of the whole partnership. The constant monitoring of activities and laisoning with partners will guarantee smooth path towards concrete and desired results.

3.12. Contribution to the Community Cohesion Policy and the Programme's overall objective/strategy

The 5th Cohesion Report addresses explicitly the strengthening of the multilevel governance system in view of introducing the third dimension:territorial cohesion (in addition to social and economic dimension).This is in line with the Treaty of Lisbon (the Treaty was signed on December 13th, 2007, and came into force by December 1st, 2009), that recognizes territorial cohesion as the third dimension of Cohesion Policy. The project falls within the scope of the overall objective of the SEE Programme (SEEP), since it guarantees the integration of the SEE territory, aiming at developing infrastructure, traffics and economy in an environmental friendly way. Accessibility is a fundamental aspect of the territorial cohesion and it is perceived as a vital need by the SEE countries and citizens. The lack of mobility is an obstacle for the economic and social development of the area and ACROSSEE intends to remove the barriers generated by the national disparities, increasing the integration of the of SEE.the project faces the major challenges of SEE concerning accessibility, priority Axis 3, aiming at improving framework conditions for multimodal platforms and at completion of the transportation networks (AoI 3.3), this by working to resolve the phisical and sdministrative barriers at border crossings.

3.13. Consistency of the project with EU horizontal policy on environmental sustainability

Environmental sustainability Positive

The EU horizontal policy on environmental sustainability represents one of the main pillars of the ACROSSEE project. The development of a sustainable transport system represents the blueprint along which the ACROSSEE project will be implemented and in this sense it will have a positive impact to the environment and will work in line with the environment objectives at the EU and national level. The project will contribute to the EU2020 Strategy pursuing a comprising, smart, sustainable and inclusive economy delivering high levels of employment, productivity and social cohesion. In particular, the project will promote sustainable modes for freight transportation thus contributing to achieving the EU2020 goal for a Resource Efficient Europe. The ACROSSEE approach has been inspired by the main principles included in the Lisbon Strategy, the 2009 Review of the EU Sustainable Development Strategy (EU SDS), the European Commission's Roadmap for a resource-efficient Europe, SEE Programme Manual and SEE Background Study, where transport, in particular, represents one of the sectors responsible for most environmental impacts and significant efforts are needed to decrease the current unsustainable level of high energy consumption. By taking into account the aforementioned documents, the project will develop actions and strategies to improve the cross-border accessibility of freight flows; will adopt concrete measures in order to cut the running time in the cross-border points and to ease up the existing bottlenecks in the SEE area, thus promoting measures, where reasonable, for the shifting of the freight transport from road to rail with safe and sustainable low-carbon impact.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

83/156

3.14. . Consistency of the project with EU horizontal policy on opportunities and non-discrimination

Equal opportunities Positive

The project activities are intended to reach out directly or indirectly all the citizens living in the South East Europe, independently from their nationality, sex, ethnic background or religious beliefs, by improving the accessibility along the border crossing points in the SEE region. The project will fully respect the Article 16 of the General Regulation and Article 6 of the Treaty, concerning equal opportunities for men and women as well as combating discrimination based on sex, racial or ethnic origin, religion or belief, disability, age or sexual orientation. In fact, within the project partnership experts, national and local officials, chambers? of commerce and lobbies? representatives with different background, coming from countries with different religions, ethnic groups, minorities and cultures will work and collaborate for the success of the project and to meet the same end. This multicultural and multilingual environment will represents an important added value for the successful implementation of the project. The LP will uphold a conducive environment for group interaction, cooperation, mutual understanding, and tolerance in all project activities and will contribute positively to the creation of an inclusive culture, which reduces discrimination and provides genuine opportunity equality. When necessary, the LP will undertake actions in order to remove barriers that may prevent Project Partners from participating in and achieving project goals. The CEI is particularly fit for this role, since its staff has international background and its day-to-day activities imply strong sensibility in dealing with people coming from different countries. The project will ensure an adequate gender balance with no discrimination towards minorities, by assuring a equal opportunities to men and women in the project planning, decision-making as well as in the project target groups.

3.15. Level of joint cooperation

The potential beneficiaries will cooperate in at least two of the following ways:

Joint development of the project’s idea

Yes

The rationale of the project was developed during different SEETAC project meetings (some partners of the SEETAC project are involved in the current proposal) and after the exchange of views with different EU institutions and Western Balkans partners. Then all the ideas where merged during a coordination meeting that was held in Vienna at the Transport Ministry with Austria-Tech and with the CEI transport expert who set the conceptual pillars of the project. The ACROSSEE partner consortium was rapidly indentified through the CEI institutional links and also thanks to the Partner Search tool of the SEE programme. The project was jointly developed and agreed on by all partners through multilateral and bilateral communication (mails, phone calls, video conference and bilateral face-to face meetings) during the preparation and drafting of the full application. This fruitful interaction resulted in the current definition of the project structure and rationale.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

84/156

The common intertwined challenges faced by all partners are the necessity to develop the cross border accessibility, the full implementation and the extension to the Western Balkans of the Ten-T network. In this respect each partner, Ministries, Regional Agencies Universities, Transport Operators etc, will bring their peculiarities and their specific best practices, thus leading to joint results and solutions. In the South East Europe Area, there are a great number of border crossing stations that are characterized by long waiting times, unpredictable customs services, burdensome administrative procedures - all leading to additional transport and trade costs for manufacturers and importers/exporters.

Joint implementation of the activities

Yes

All Project partners have been involved in the definition of the activities with a bottom-up approach. All partners will be involved, with a different degree of responsibility in the implementation of the Work-Packages, according to a joint transnational methodological approach. In order to obtain an effective transnational impact through the exchange of best practices and experiences all partners will be involved in the decision-making and monitoring and evaluating procedures of the project. Every partner will play an active role in the project implementation under the coordination of the Lead Partner that will assure horizontal (among WPs) and vertical (among WPs? activities) coherence and consistency. The activities and results have a joint transnational scope and in order to guarantee an effective transnational impact and ownership all partners will take up a relevant role in the implementation of the project activities. The joint implementation is reflected in the technical project structure and in the core products tackled by the WPs, in particular: WP2,WP3, WP4, WP5.

Joint staffing Yes

All Project Partner will be involved in project management, financial and technical activities through the Project Management Committee. In this sense, the project staff works jointly and coherently. Every PP has a different and clear role in the project and there is no overlapping of roles and functions. The Lead Partner and each partner will appoint a Project Manager, Project Financial Manager and Communication Manager that will work in tied cooperation. Each partner will, through the Project Manager, provide their local, regional and national experience at disposal of all the PPs. Each PP will contribute to the transnational outputs through exchange of experiences, best practices and by adopting joint solutions. All partners will take part in joint transnational working groups which

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

85/156

concern both the project management and coordination bodies (e.g. Steering Committee and Project Managers Committee).

Joint financing Yes

The Budget has been developed through accurate negotiations with a balanced approach. Coherent share of the budget in each Work Package for all PPs has been allocated. All the PPs will contribute financially according to their tasks and responsibilities, thus committing to the joint success of the project.

3.16. Innovative character

1) Establishment of an institutional platform and promotion of administrative co-operation in order to complete and extend the implementation of the Ten-T (EU Ten-T guidelines, Ten- T extension to the Western Balkans, liberalisation and economic trend, impact of economic crisis) and to enhance cooperation among relevant stakeholders with the aim to improve national and regional strategic plan. Will allow the draft a pipeline of projects to be implemented within the Danube, Adriatic and Black Sea strategy. Currently these macro regional strategies are focusing their action on possible issued to be addressed in the short run. 2) On the basis of the EU methodology , the project will address the issues related to arguments for rationalising the network in SEE trough balancing the capacity with cost-effectiveness. In particular an investigation on what are the financing option left will be required in consideration of the need of securing existing project particularly those at the stage of final design. starting form the consideration that the full integration of the Western Balkans in the network is still lagging behind, as in comparison with the De Palacio?s report of 2004 (HLG) only in the recent commission?s proposal the western Balkans network is included in the EU proposal of a comprehensive (secondary and not financed level) part of EU the project will evaluate scenarios, aquire relevant information and create transport arguments and consequesces for including the W.Balkans network in the the EU core TEN-T network 3) Promote partner agreement on bo The project will primarily address the issue of network optimisation in the whole SEE and the extension of the Tent-T network by identifying scenarios of for the extension of the core network to the WB ink the Western Balkan region and implications for the extension of the comprehensive network. 4) Today in the SEE area it exists a large and growing market segment for rail transport, particularly along international freight corridors, the extension of the EU Transport network can actually create important opportunities in the long-run rail freight, given the extra capacity on the SEE axes and the high growth rate of trade between Old and New Europe, huge potential for modal shift particularly for freight , using the rail corridors connection the SEE area, should be exploited. 5) The project will address the question how does the rail capacity need to grow to achieve the transport 2020 and 2050 targets and what are the short term targets needed to progress towards an ambitious long tem vision set by the EU commission. 6) The creation of a Transport model on one side and the evaluation of the total amount of goods mobility and the type of freight on the other will be decisive asset for SEE as it will be interfaced primarily on the existing infrastructure, upgrading sections and bottlenecks and later to they will be turn into potential goods mobility demand able to indentify sustainable intermodal freight corridors.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

86/156

7) In this context for the first time in the SEE analysis a broad, comprehensive and reliable consumer demand analysis for better standard of the road and rail will be carried out 8) A Memorandum of Understanding will be signed in the context of the Croatian enlargement (July 2013) to promote and OSS. 9) Currently a transport model with reference to the region of the South East Europe is being developed in the framework of the SEETAC project. Nevertheless only nodes are geo-referenced. In ACROSSEE project nodes and sections will be both goe-referenced for all SEE area. This is an attempt of creating a unified transport model for a region consisting of EU and non-EU countries, as for time being the TRANS-TOOLS model of the European Commission?s DG Mobility and Transport is limited to cover only the EU-27 network. 10) Elaboration of a Integrated Transport Model will allow the extension trans-tool m

3.17. Synergies with other policies, programmes and projects

There are several EU relevant documents and strategies that the ACROSSEE project will highly consider in its contents and final aims - the EU 2020 with the aim of achieving a Resource Efficient Europe through the transport sector decarbonisation and measures? promotion to ease up cross border bottlenecks. - the EU enlargement strategy 2011-2012. The project will asses the enlargement strategy impact by focusing on the transport sector. -The White Paper ?Roadmap to a Single European Transport Area ? Towards a competitive and resource efficient transport system? COM(2011)144 and the Regulation concerning a European Rail Network for Competitive Freight (Regulation EC 913/2010), point out that the EU transport infrastructure is still fragmented - both geographically and between/within transport modes- and that there are missing links. In particular cross-border sections are the major obstacle for the free movement of goods along the freight corridors routes and their links with the Western Balkans. The ACROSEE project will tackle all the aforementioned issues. -With the document ?The EU and its neighbouring regions: A renewed approach to transport cooperation?- (COM 2011) 415. the Commission underlined the importance of strengthening transport links with neighbouring regions to the East and South of the EU. The ACROSEE project will adopt concrete measures, in the short and longer term, to make transport connections smoother, safer and more reliable. - In order to boost the development of the Danube Region, the European Commission proposed on 8th December 2010 the EU Strategy for the Danube Region (Commission Communication), endorsed by the Member States at the General Affairs Council on 13th April 2011 (Council Conclusions) that, inter alia, focuses on the key priority area :?to improve mobility and inter-modality? - the EU Sustainable Development Strategy, 2005, Report for the Council and the European Parliament, COM (2005) 658 final; (2005). The RAIL4SEE focuses exactly on creating alternatives to road transport and more attractive options for passengers, including the Trans European Networks? development. This issue is explored by options? simulation & definition for desirable changes in the feeder rail & non-rail services. - most of the WB countries are on the right track for the EU accession, even though some problems still have to be properly addressed according to the EC enlargement strategy 2011-2012.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

87/156

- Moreover, the project will work in synergy with the recent recommendation of the Committee of the Regions for drawing up a strategy for the Adriatic-Ionian macro-region and with the main priorities of the Black Sea Synergy. The ACROSSEE will also capitalize on: - 1) the SEETAC project in terms of demand modelling on the present demand and methods for the TEN-T extension to the West Balkans via LP; - 2) Accessibility and Development for the Re-launch of the Inner Adriatic Area (ADRIA A) by taking into account the measures developed to increase the accessibility and transport reorganisation in the entire cross-border area with the aim to form a unique integrated Italian ? Slovene metropolitan transport area. Besides these two EU funded project, also BATCO, SETA, SONORA and ADB projects will be taken into consideration and their results will be closely followed and capitalised.

3.18. Consistency with the local, regional and national policies of the involved partners

The ACROSSEE project will contribute to the SEE Operational Programme objectives by developing the attractiveness of regions and cities, and promoting sustainable development. The improvement of the cross-border accessibility in the SEE area by improving the coordination among the SEE national administrations, in the light of the EU legislation, will have a benign impact on the national and transnational policies. What is more, should any project partner be embedded in nationally relevant networks and associations, the project partnership will examine how synergies can be exploited. Full integration of the Western Balkans in the EU network is still lagging behind, as witnessed by the recent Commission?s proposal, where the Western Balkans network is only included the comprehensive ( secondary and not financed level) part of EU new TEN-T network leaving the Balkans network still undefined and outside of the EU core TEN-T network. Linking Western Balkan region to the whole SEE area is intended to be obtained by creating synergies and proposing coherent arguments for the implementation and the extension of the Tent-T network. Therefore the involvement of the PPs coming form the W. Balkan countries will ease these processes and provide all necessary requisites for reaching this common goal. In the South East Europe Area, there is a great number of border crossing stations that are characterized by long waiting times, unpredictable customs services, burdensome administrative procedures - all leading to additional transport and trade costs for manufacturers and importers/exporters, in particular in the rail freight transport. All these problems inevitably reflect negatively on all participating partners, providing consistent and unavoidable problems that can only be solved through the cooperation of all involved actors. ) In this sense the adoption of a common transport model for the entire South East Area, integrated with the rest of Europe and compatible with the current EU system, adequate to be exploited also by public administrations and transport operators will be essential and can only be obtained through the active involvement of high level policy makers in the transport field. It goes without saying that also in this field the role of the Transport ministries, together with all technical experts will be fundamental. )The improvement of the cross-border accessibility of the freight flows is one of the absolute project necessities. For this reason concrete measures must be adopted to cut the running time in the cross-border points and to ease up the existing bottlenecks in the SEE area. High level institutional partners will be in the position to promote and consequently adopt the defined measures in their own country providing coherence and continuity along the axis.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

88/156

The non partner SEE countries, will be also targeted by following the communication strategy and by relying on the CEI, the CER, the ERF and EIA networks. Moreover relevant external stakeholders will be invited during dedicated meetings or workshops in order to create synergies with other similar initiatives

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

89/156

4. Work packages and activities

4.0. wp0 – Preparation activities

4.0.1.Work Package Main Data

Title Preparation activities

Responsible Partner LP - CEI

WP Total 2,413.50 EUR WP Total ERDF partners 2,413.50 EUR

WP Total IPA-I partners 0.00 EUR

4.0.2. Description

The rationale of the project was developed during different SEETAC project meetings and after exchange of views with different EU institutions. Then all the ideas where merged during a coordination meeting that was held in Vienna at the Transport Ministry with Austria-Tech and CEI transport expert that set the conceptual pillars of the project. The project was developed with a bottom up approach by directly involving all the partners by the LP. The project activities and budget were jointly developed and agreed on by all the partners through multilateral and bilateral communication (mails, phone calls, video conference and bilateral face-to face meeting) during the preparation and drafting of the full application.

4.0.3. Activities of ERDF & IPA-I partners

act 0.1

Title Project Proposal Preparation

Timeframe 01/04/2009 - 25/11/2011

Amount 1,813.50 EUR

Description of the activity Selection of the partners according to their relevance to the project rationale, through the CEI previous contacts and SEE portal. Application Form drafting and project content writing; work packages and activities development, set up of the main work packages leaders, distribution of roles and responsibilities and detailed budget; collection and checking of all required administrative documents; project preparation meetings between LP and Italian Ministry of Infrastructure, Veneto Region, Friuli Venezia Giulia Region and other relevant PPS; constant dialogue with each partner and with the JTS in Budapest.

Role of each partner The LP coordinated the activities, each PP contributed with comments and suggestions to the project contents and structure.

Geographical location SEE area

act 0.2

Title Preparatory meeting

Timeframe 05/09/2011 - 07/09/2011

Amount 600.00 EUR

Description of the activity Preparatory meeting in Vienna. Meeting at the Federal Ministry in order to prepare the technical activities of the project. LP, Ministry of Transport of

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

90/156

Austria and Austria Tech .

Role of each partner LP, Ministry of Transport of Austria and Austria Tech .

Geographical location Vienna

4.0.4. Qualitative and quantitative description of the outputs and results

Type Description Partner Contributing

Partner Measure-ment unit

Base value

Target value

Period of delivery

output Application Form LP - CEI all PPs 1

0.00

1.00 period01

output Minutes of the meeting

LP - CEI 1

0.00

1.00 period01

output Partnership Agreement

LP - CEI all PPs 1

0.00

1.00 period01

4.1. wp1 – Transnational project and financial management

4.1.1.Work Package Main Data

Title Transnational project and financial management

Responsible Partner LP - CEI

WP Total including ENPI partners

494,561.00 EUR WP Total ERDF partners 398,451.00 EUR

WP Total IPA-I partners 56,110.00 EUR

4.1.2. Description

THE WP ACTIVITIES ENTAIL THE FULFILMENT OF THE PROJECT START UP REQUIREMENTS, THE DEVELOPMENT OF A CLEAR MANAGEMENT, COORDINATION AND MONITORING MECHANISM FOR THE SMOOTH IMPLEMENTATION OF THE ACROSSEE PROJECT. THE LP WILL ASSURE DURING THE WHOLE PROJECT DURATION THE OVERALL MANAGEMENT AND COORDINATION OF THE ACROSSEE PROJECT FROM AN ADMINISTRATIVE, CONTENT, COMMUNICATION, TECHNICAL, QUALITY MONITORING AND FINANCIAL POINTS OF VIEW. FOR THIS PURPOSE THE LP WILL APPOINT 5 STAFF MEMBERS, WORKING ON THE ACROSSEE PROJECT AND WILL ALSO RELY ON THE ADMINISTRATIVE BACK UP OF THE WHOLE CEI ORGANISATION. THE LP ACROSEE TEAM WILL CONSIST OF A PROJECT MANAGER, FINANCIAL MANAGER AND COMMUNICATION MANAGER PLUS 1 JUNIOR PROJECT OFFICER AND 1 ASSISTANT THAT WILL SUPPORT THE LP ACTIVITIES. WORK PACKAGES LEADERS WILL BE IN CHARGE OF THE COORDINATION OF THEIR RESPECTIVE WP ACTIVITIES THE STEERING COMMITTEE WILL REPRESENT THE PROJECT?S DECISION MAKING BODY AND WILL BE RESPONSIBLE FOR ALL THE STRATEGIC DECISIONS, AMENDMENTS AND MONITORING OF THE PROJECT. EACH PARTNER WILL APPOINT A SC MEMBER. THE PROJECT OUTPUTS AND RESULTS WILL BE MONITORED AND STEERED IN 3 STEPS : WP LEADERS, LP AND STEERING COMMITTEE , AND TECHNICAL MONITORING FORMS WILL BE DEVELOPED FOR EACH PARTNER TO MONITOR THEIR PERFORMANCE. THE WP1 INCLUDES THE TECHNICAL AND FINANCIAL MANAGEMENT AS DUE IN THE SUBSIDY CONTRACT. A RESTRICTED AREA WILL BE DEDICATED IN THE ACROSSEE PROJECT WEBSITE IN ORDER TO FACILITATE THE FLOW OF INFORMATION AMONG PARTNERS AND TO HAVE A COMMON DOCUMENTS MANAGEMENT

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

91/156

SYSTEM. MOREOVER A THE LP WILL PRODUCE A METHODOLOGICAL WORK PLAN AND A DETAILED IMPLEMENTATION PLAN, WITH PERIODIC UPDATES, WHERE ALL THE PROJECT ACTIVITIES, TIME FRAME, APPROACH/METHODOLOGIES AND THE PPS' CONTRIBUTIONS RESPONSIBILITIES WILL BE INSERTED.

4.1.3. Activities of ERDF & IPA-I partners

act 1.1

Title Start up activities

Timeframe 01/10/2012 - 31/12/2012

Amount 79,060.00 EUR

Description of the activity Project start-up activities start with the elaboration and signature of the Subsidy Contract and the distribution to all PPs of the original Partnership Agreements. A comprehensive Implementation plan is produced in order to define in details the project activities and responsibilities, according to the approved AF. Each PP will contribute to the Implementation Plan, according to the requests of the LP. Moreover the LP will prepare a Project Handbook, including administrative and financial guidelines, in order to set up the internal procedures and the communication flow among partners. The Project Handbook will be based on the Programme Implementation Manual, including details on the programme reporting procedure, validation of the expenditures, National useful contacts (National contact points and other central authorities), monitoring activities, internal communication flows, risk assessment and project cycle management. The internal rules of the project Steering committee will be defined and approved by PPs. The Project Handbook will be later integrated with the Project Communication Plan (see WP2). The Project Management Board (PMB) will be set up : each Partner will appoint a Project Manger, Financial Manger and a Communication Manager ( in some cases could be the same person). Each PP organise itself in order to guarantee a transparent financial flow (opening a project dedicated bank account, when needed, or defining a procedure to keep track of the project financial flows), select the First level Controller (when needed) and set up the project archive. Each PP will also nominate its representative for the Steering Committee.

Role of each partner The LP will sign the Subsidy Contract with the JTS, elaborate the Implementation Plan and the Project Handbook. All the PPs will contribute to the preparation of the Implementation Plan and Project Handbook, by approving them via written procedure (within 10 working days from the circulation of the documents drafted by the LP). All the PPs will appoint their member of the management board (PJ manager, Financial Manager, Communication Manager, SC member).

Geographical location The whole project area.

act 1.2

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

92/156

Title Project Management-communication flows

Timeframe 01/10/2012 - 30/09/2014

Amount 59,100.00 EUR

Description of the activity The day-to- day project management and the project internal communication flow is ensured by the Management Board through the LP. The LP will regularly update all the PPs on the progress of the action and will cooperate with WP Leaders to guarantee the timely development of activities. The Project Management Board (PMB) will be set up in occasion of the Kick off Meeting, that will be organised by the LP in Trieste during the first month of activities. The PMB will meet regularly in order to catch up with deadlines and in order to monitor the implementation of administrative and financial activities and progress. Conference calls among WP leaders and PPs will take place regularly to review the project technical status, as well as bilateral meetings and contacts between the LP and other PPs, in order to face specific problems and exceptional situations. The LP will regularly get in contact with the JTS of the programme in order to keep them posted on possible problems, developments and progress of the project.

Role of each partner The LP coordinate the activity, will keep PPs regularly updated on the project activities, progress, problems and will support all the PPs in case of any specific problem or constraint. The LP will ask for the support of the JTS in case of a partner?s problem. Each WP Leader will coordinate its activities with the LP and other WP leaders. All the PPs will respond promptly to the LP and WP leaders? requests. All the PPs will inform the LP on any problem or constraint that may arise during the project implementation.

Geographical location The whole project area

act 1.3

Title Project Management - SC and Project Meetings

Timeframe 01/10/2012 - 30/09/2014

Amount 196,081.00 EUR

Description of the activity The Steering Committee monitors that the project implementation is in line with the AF. Each partner will appoint a SC member, who exercises the decisional power in the SC meetings and in the SC written consultations and procedures. The rules of procedure of the SC will be agreed and adopted in the first meeting of the SC, when it will be officially set up. These rules will be included in the Project Handbook. The quality check is devolved to WP leaders and the LP, but the SC approves the final deliverables and takes all the relevant project decisions. The SC will be convened in occasion of the project meetings, that are foreseen as follows :

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

93/156

- Kick off meeting, in Trieste - 1st meeting in Vienna, - 2nd meeting in Tirana, - 3rd meeting in Igumenitsa, - Final meeting and conference in Vienna.

Role of each partner All the PPs will appoint a SC member and participate in SC decisions. The LP will organise the Kick off meeting, ERDF PP2 will organise the 1st meeting, IPA PP1 will organise the 2nd meeting, ERDF PP10 will organise the 3rd meeting, ERDF PP5 will organise the final meeting/event

Geographical location Trieste, Vienna, Tirana and Igumenitsa.

act 1.4

Title Financial Flows and Activities

Timeframe 01/10/2012 - 30/09/2014

Amount 120,320.00 EUR

Description of the activity On a 6 monthly basis, the LP is requested to present a progress report on the project financial and technical progress. All PPs contribute to the progress report, by sending to the LP their Partner reports, including a description of project technical implementation and a picture of the financial progress of the expenditure. In order to be included in the progress report and application for reimbursement, the expenses have to be validated by the First Level Controllers. Each Partner present its Partner report to the FLC (which might be internal, external or centralised, depending on the National system) and, when it gets the validation back, each PP sends it to the LP to be annexed to the progress report. Project reports have to be submitted on the official forms prepared by the programme, according to the deadlines defined in the Subsidy Contract (each PP will receive a copy of the Subsidy to be archived). In case of administrative or financial problems, the LP will support the PPs, through its Financial Manager.

Role of each partner The LP coordinates the activities, collects and checks the Partner reports, supports PPs in case of financial or administrative problems, prepares the Progress report, monitors the financial progress of the project and intervenes with corrective actions. All PPs prepare a 6 monthly Partner report, activate the FLC and contribute to the elaboration of the Progress report.

Geographical location The whole project area.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

94/156

4. 1.4. ENPI partners activities in the Work package

Description of ENPI partners activities in the Work package

The WP activities entail the fulfilment of the project start up requirements, the development of a clear management, coordination and monitoring mechanism for the smooth implementation of the ACROSSEE project. The day-to- day project management and the project internal communication. ENPI PP1 will assure smooth and on time management. ENPI PP will comply with EUROPE aID and ENPI regulation. ENPI PP will respond promptly to the LP and WP leaders? requests and will inform the LP on any problem or constraint that may arise during the project implementation.

Role of each ENPI partner The LP submit the ENPI application form and the LP will sign the subsidy contract with the JTS on behalf of the MA and will act as direct contact between the project and joint management bodies of the programme only with regard to ERDF and IPA Funds. ENPI PP1 Grant Contracts will be concluded between the ENPI partners and JTS/ MA, therefore ENPI PP is responsible for the ENPI contribution awarded. Relation between the ERDF LP and the ENPI partners should be established by partnership agreement

Amount 40,000.00 EUR

4.1.5. Additional information

Will the activities related to transnational management and coordination be sub-contracted?

No

Will the activities related to transnational financial mangament be sub-contracted?

No

Description of project management The rationale of the project was developed during different SEETAC project meetings and after exchange of views with different EU institutions. Then all the ideas where merged during a coordination meeting that was held in Vienna at the Transport Ministry with Austria-Tech and CEI transport expert that set the conceptual pillars of the project. The project was developed with a bottom up approach by directly involving all the partners by the LP. The project activities and budget were jointly developed and agreed on by all the partners through multilateral and bilateral communication (mails, phone calls, video conference and bilateral face-to face meeting) during the preparation and drafting of the full application. - coordination meeting of transport institutions representative ? Ministry of Infrastructure of Ukraine, University, transport joints/logistical centres in Danube and Black Sea regions of Ukraine in the framework of this Project presentation

4.1.6. Qualitative and quantitative description of the outputs and results

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

95/156

Type Description Partner Contributing

Partner Measure-ment unit

Base value

Target value

Period of delivery

output 1.1.1. Subsidy contract

LP - CEI contract

0.00

1.00 period01

output 1.1.2. Implementation Plan

LP - CEI WP Leaders plan

0.00

1.00 period01

output 1.1.3. Project Handbook

LP - CEI WP Leaders handbook

0.00

1.00 period01

output 1.2.1. Project Management Board set up

LP - CEI All PPs PMB

0.00

1.00 period01

output 1.2.2. E-Mails LP - CEI all PPs emails

0.00

2,400.00 period05

output 1.3.1. kick off meeting

LP - CEI All PPS meeting

0.00

1.00 period01

output 1.3.2.Project/SC meetings

LP - CEI all PPs meetings

0.00

5.00 period05

output 1.3.3.Final meeting/event

LP - CEI all PPs meeting

0.00

1.00 period05

output 1.3.4. Minutes of the meeting

LP - CEI all PPs MoM

0.00

5.00 period05

output 1.4.1. Progress reports

LP - CEI all PPs progress reports

0.00

5.00

period05

output 1.4.2. Partner reports per partner

LP - CEI all PPs partner reports

0.00

5.00

period05

output 1.4.3. Audit certificates per partner

LP - CEI all PPs

declaration on

validation of the

expenditure

0.00

5.00

period05

result

ACROSSEE project and financial management systems operational

LP - CEI all PPs project

management

0.00

1.00

period05

4.2. wp2 – Communication activities

4.2.1.Work Package Main Data

Title Communication activities

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

96/156

Responsible Partner ERDF PP6 - UCV

WP Total including ENPI partners

171,361.23 EUR WP Total ERDF partners 143,681.23 EUR

WP Total IPA-I partners 7,680.00 EUR

4.2.2. Description

Communication activities play a crucial role in the achievement of project results, since they make the project outcomes available to a wider public. The Communication Plan (CP) and project identity/brand image will be finalised within the first 3 months from the beginning of the activities. A set of communication tools (newsletter, press releases, brochure, etc.) will be also implemented and a dedicated website will be realised. All the project partners will involve their communication channels in order to disseminate the project?s results. In addition to this, European Transport Associations, Regional Networks, Local, Regional, National and European media will be involved. As a result, not only National, Regional and Local authorities will benefit from the project outcomes, but a wider public will be aware of ACROSSEE, including private users and operators, that are the final beneficiaries of the solution of bottlenecks at border crossings. The media represents an important tool to disseminate information about the ACROSSEE project to a wide range of stakeholders, from the expert target group, strategic/political target to the wider public. Therefore communication via the press should focus on specific and well chosen media opportunities, and focus on the specific target groups. At key moments of the project (i.e Kick-off, ministerial meeting, EU meetings and final conference) press releases will be drafted and disseminated to a selected list of journalist varying from the transport specific press to daily newspapers.

4.2.3. Activities of ERDF & IPA-I partners

act 2.1

Title Non media dissemination

Timeframe 01/10/2012 - 30/09/2014

Amount 74,272.97 EUR

Description of the activity Non media dissemination is a communication method that, because of its efficiency, is essential, since it increases the results of the traditional media communication methods. Non media communication involves a set of activities that allow the project to reach its target groups by promoting materials that are very easy in use. The most important marketing material is the project identity, through a project logo, that should be immediately recognisable by the wider public. The project brand will be included in all the dissemination instruments, project brochure, project gadgets, newsletter and project website. The website will be immediately published and it will be regularly updated, with the contribution of all the PPs. It will be the primary tool of communication for those involved in the project and all information to be shared amongst the project consortium and also to the general public will be placed on this website, with various degrees of protection. PPs will be involved in the elaboration of the brochure and the newsletters, that will be published on a yearly basis (2 annual newsletters). Partners will disseminate the project outcomes through their institutional websites, distribute the results and experience to local organisations, industries

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

97/156

and authorities through their networks and presenting the project activities in other external events. During the kick-of meeting and the final conferences all ?observing" stakeholders will be invited.

Role of each partner The WP leader, ERDF PP6, will elaborate the project brand, the dissemination materials and the project website. Moreover it will prepare and update the Project Communication Plan. The LP will contribute to the definition of the project identity and will support the WP leader in all its activities. All PPs will contribute to the non media dissemination, by agreeing upon the brand image and the materials, by updating their own websites and by contributing to the project website. CER, ERF and EIA (EU network of transport associations and stakeholders) will contribute to the dissemination at EU level.

Geographical location The whole project area, the programme area, the whole EU territory.

act 2.2

Title Media dissemination

Timeframe 01/10/2012 - 30/09/2014

Amount 77,088.26 EUR

Description of the activity In the project Communication Plan, a list local, regional, national and international media will be defined. These media will be involved in the project activities at all the stages of the project. Media will be addressed by PPs, that will publish on their national-regional-local press at least 2 articles concerning the project activities and results (at least one at the beginning and one at the end of the project lifetime). The press will be also involved with the occasion of the dissemination events, through dedicated press conferences, one after the Kick off meeting, one after the Ministerial conference and one after the Final conference. In occasion of these events, also press releases will be distributed

Role of each partner The WP Leader, ERDF PP6 will coordinate the action, in cooperation with the LP. All PPs will publish at least 2 articles during the project lifetime. The LP, ERDF PP2, IPA PP1, ERDF PP10 and ERDF PP5 will distribute a press release in occasion of the meetings they will host. The LP, ERDF PP7 and ERDF PP5 will organise a press conference.

Geographical location The whole Project area, the programme area and EU.

4. 2.4. ENPI partners activities in the Work package

Description of ENPI partners activities in the Work package

ENPI PP will involve their communication channels in order to disseminate the project?s results, in particular the University will rely on its established contacts among institution of higher education in Ukraine and Moldova to create synergies and to promote not only the ACROSSEE rationale but also the SEE

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

98/156

Programme as a whole

Role of each ENPI partner Dissemination activities. Distribution of promotion materials, mails campaign, participation in local events, Dissemination to the media. ENPI PP 1 will contribute to the non media dissemination, by agreeing upon the brand image and the materials, by updating their own websites and by contributing to the project website. Publications of at least 2 articles. -including into the Projects publications the materials/articles of Ukrainian scientists in the sphere of transport and specialists in the transport field.

Amount 20,000.00 EUR

4.2.5. Additional information

Will the activities related to project's transnational communication and dissemmination be sub-contracted?

Yes

4.2.6. Qualitative and quantitative description of the outputs and results

Type Description Partner Contributing

Partner Measure-ment unit

Base value

Target value

Period of delivery

output Project Logo ERDF PP6 - UCV

all PPs logo

0.00

1.00 period01

output branding image ERDF PP6 - UCV

all PPs image

0.00

1.00 period02

output Project brochures ERDF PP6 - UCV

all PPs brochure

0.00

2,000.00 period05

output Project gadgets ERDF PP6 - UCV

all pps gadget

0.00

2,000.00 period05

output Project website ERDF PP6 - UCV

all PPs website

0.00

1.00 period02

output presentation to external events

LP - CEI all PPs event

0.00

5.00

output cross-fertilization events with at least 3 projects

LP - CEI all PPs event

0.00

3.00

result Project final publication

ERDF PP6 - UCV

all PPs publication

0.00

1.00 period05

result Stakeholders ERDF all PPs persons period05

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

99/156

reached by the project disseminationa activites

PP6 - UCV

0.00 10,000.00

output Project Communication Plan

ERDF PP6 - UCV

LP plan

0.00

1.00 period01

output

Articles published in National, Regional or Local Press

ERDF PP6 - UCV

all PPs article

0.00

40.00 period05

output Press realease ERDF PP6 - UCV

all PPs press

release

0.00

5.00 period05

output Press Conferences ERDF PP6 - UCV

LP, PP5, IPA 4

conference

0.00

3.00 period05

result

Communication Strategy and dissemination campaign

ERDF PP6 - UCV

all PPs strategy

0.00

1.00 period05

4.3. wp3 – Content

4.3.1.Work Package Main Data

Title Institutional platform and administrative co-operation

Responsible Partner ERDF PP5 - Mot AUT

WP Total including ENPI partners

477,720.48 EUR WP Total ERDF partners 425,932.48 EUR

WP Total IPA-I partners 31,788.00 EUR

4.3.2. Description

WP3 promotes Institutional and stakeholders cooperation in order to provide concrete actions to the macro-regional strategy; Danube strategy, WB integration and SEE. Creation of Institutional forum and promoting effective multilevel governance to complete the implementation of Ten-T network crossing the SEE area trough the activation of action to foster the administrative cooperation for the standardization for procedures. In general in the WB legal framework is similar to those in force in the EU member states but the implementation measures are lacking and local procedures often differ. Specifically the extension of the core network to the Western Balkans according to the results of wp 4 the network optimisation actions will be carried out taking into consideration the following already established Eu criteria: a) Links shall connect main nodes in the most efficient way:2) Stringing maximum of intermediate nodes (acc. to size or importance and corresponding detour; c) Using infrastructure existing or being implemented; d) short term investment e) Avoiding detours which traffic flows would not follow f)Taking into account possible capacity constraints?) Splitting e.g. to separate rail passenger ? freight (different speeds and alignment parameters!) for Intermediate nodes: a) inclusion of smaller cities (optimization: importance vs. detour), b) inclusion of major ports, airports, freight

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

100/156

terminals, industrial clusters. This structured dialogue platform assists the national directorates for transport to develop engaging connections with the SEE railways and cluster representatives. Worthless to say that the project institutional structure cannot be effective without the involvement and coordination with the higher decision making and programming body in this field, the European Commission.The European Commission, DG MOVE, will be constantly kept informed on the progress of the ACROSSEE activities and invited to meetings.

4.3.3. Activities of ERDF & IPA-I partners

act 3.1

Title Fostering co-operation for a single SEE transport network

Timeframe 01/10/2012 - 30/09/2014

Amount 311,327.05 EUR

Description of the activity - Establishment of the Transport ministerial co-operation forum: co-ordinated approach on macro regional strategies focusing on cross border, bottlenecks and Ten-t extension to the Western Balkans through an active dialogue with International organisations, governments, regions, transport operators, association in the SEE and border countries which affect the area. - Evaluation of the impact of the Ten-T revision / core and comprehensive network ? based on results of the WP4, the action will proceed by assessing the impact of Croatia?s EU accession on the Ten-t, the beginning of negotiations with the republic of Serbia, the implementation of the national plan of Montenegro and Albania, the role of the external EU countries (Russia, Ukraine, Turkey, middle east and far east) on the EU corridors; Review and appraisal of the former legislation and its implementation on the EU and SEE countries like the EU freight reg., EU relevant documents, past projects and finally the preparation of recommendation for the new financial perspectives 2013, definition of working paper for national administration in order to evaluate the guidelines impact and transfer to national planning strategy - Optimisation of the proposed TEN-T comprehensive and core-network Based on the current EU regulation and in synergy with the transport flows on the area and the evolution of the enlargement of the EU to WB contribute to the optimisation of the relevant international institution effort in the extension of the European rail and road network in order to integrate efficiently the entire area of the SEE. - Action plan on synergy with macro regional strategy: Danube strategy and EUSDR action plan: elaboration of a set of possible project related to the upgrading of existing lines, better connection of peripheral regions, cross-border missing infrastructure and last mile investments on land and maritime terminal and inland waterways to be implemented within the regional strategy - Road map: Improve coordination in promoting, planning and operation for primary and secondary infrastructure (physical accessibility ? provisions tools and space for coordinated promoting, planning and operation for primary and secondary transportation networks) - All activities will be implemented in coordination with the EC DG MOVE : regular meetings and consultations will be performed. The LP will constantly report the project development and upgradings to the EC.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

101/156

Role of each partner The Work Package leader is the Ministry of Transport of Austria that will supervise and coordinate all activities. The LP with ERDF PP7 will organise the ministerial meeting in Trieste with the contribution of all PPs back-to-back with another EU project event. All PPs will participate The PP7 will organise the seminar with DG Move in Brussels. All PPs will participate. The LP will organise 2 workshops at the European Parliament before the Transport and Tourism Committee. The CER and ERF and EIPA will be invited. All PPs will participate The PP5, as WP Leader, will supervise and coordinate and draft the report on impact of proposed Ten T revision, the report on the consequences of the EU enlargement to WB, the recommendation on EU financial perspective 2013-2020 the report on the optimisation of the proposed TEN T comprehensive and core-network and the ministerial and stakeholders recommendation. LP, ERDF PP13, Ministries and the Universities and associated will contribute. The action plan will be developed by the PP12 with the support of the PP7, PP8, PP10 and PP3 The LP will be in contact and coordination with the EC DG MOVE.

Geographical location the whole project area. Trieste for the Ministerial Conference Brussels for the workshops and seminars with EU commission

act 3.2

Title Multilevel Memorandum of Understanding for a short term advancement of cooperation on border-crossing sections (M.MoU.S.T.A.CO.BO.)

Timeframe 01/10/2012 - 30/09/2014

Amount 146,393.43 EUR

Description of the activity - analysis and monitoring activities of the customs procedure in the SEE/WB in order to improve the freight and passenger transit - Improvement of procedure activities plan for standardisation and formulation of procedures including clearance procedure, working methods waiting times as well as preparation of new procedures according to the EU standards. -Adoption of a Multilevel Memorandum of Understanding for a short term advancement of cooperation on border-crossing sections (M.MoU.S.T.A.CO.BO.) based on compliance with open access standards that are required by EU directives in force and which create an web information exchange on the cross border procedure of SEE countries.

Role of each partner PP6 will be in charge of the Analysis and monitoring of the customs procedures with the support of PP11, PP8, PP9, PP10, PP14 and all IPA PPs All Ministries will draft the implementation plan ( assisted by the Universities) and will adopt the Multi-level memorandum of understanding under the coordination of the PP5, during the ministerial conference. The LP will inform the EC DG MOVE on the development and outcomes of the activity.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

102/156

Geographical location Brussels, SEE area, Project area,

4. 3.4. ENPI partners activities in the Work package

Description of ENPI partners activities in the Work package

The ENPI PP will be involved in the institutional and stakeholders cooperation in order to provide concrete actions to the macro-regional strategy; Danube strategy, WB integration and SEE. Creation of Institutional forum and ? promoting effective multilevel governance to complete the implementation of Ten-T network crossing the SEE area trough the activation of action to foster the administrative cooperation for the standardization for procedures.

Role of each ENPI partner The ENPI partners will be involved in the WP activities by providing relevant inputs to all the WPs activities -including the Ukrainian part into SEE synergy plan of regional transport strategy. -participation of Ukrainian transport administrations in organization forum of the Project. -review and appraisal of the existing legislation for adaptation it to the EU one and the unification of crossing boarder/customs and other procedures on this basis, as well as processes of freight/cargo and passengers transportation, handling the cargoes in Ukrainian ports and terminals. -Preparation of the suggestion for transport development national programme as for implementation in Ukrainian regulations on transport corridors including passing through SEE to Ukrainian, Danube and Black Sea regions. -preparation of the suggestions for investment projects of development river and sea ports, coastal terminal of the South of Ukrainian within the frames of SEE regional strategy. -Participation in monitoring of transport/ border/custom and other procedures concerning cargo flows within Ukrainian borders and elaboration of such procedures unifications with EU. -Suggestions on associated participation of UKraine in M.MoU.S.T.A.CO.BO in order to simplify transport procedures.

Amount 20,000.00 EUR

4.3.5. Additional information

4.3.6. Qualitative and quantitative description of the outputs and results

Type Description Partner Contributing

Partner Measure-ment unit

Base value

Target value

Period of delivery

output Ministerial Conference

LP - CEI ERDF PP7 conference

0.00

1.00 period04

output Seminar DG Move

ERDF PP7 - FVG

all PPs seminar

0.00

1.00 period03

output Workshop at the EP

LP - CEI 20% ASP 1

CER workshop

0.00

2.00

period05

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

103/156

output Report on Impact of proposed Tent T revision

ERDF PP5 -

Mot AUT

PP 13,PP1,PP8, PP11, PP13

all IPA, Associated

report

0.00

1.00 period02

output

Report on the consequences of the EU enlargement to WB

ERDF PP5 -

Mot AUT

LP, PP11, PP8,PP1,

PP13 all IPA PPs

report

0.00

1.00 period03

output

Recommendation on EU financial perspective 2013-2020

ERDF PP5 -

Mot AUT

PP8, P11, IPA PP3

report

0.00

1.00 period03

output

Working paper for the Optimisation of the proposed Ten T comprehensive and core-network

ERDF PP5 -

Mot AUT

LP, PP11, PP8, PP13

report

0.00

1.00 period04

output Ministerial and stakeholders recommendation

ERDF PP5 -

Mot AUT LP, PP11; PP8 report

0.00

1.00

period03

output

Action plan on synergy with macro regional stratregy

ERDF PP5 -

Mot AUT

LP, PP12, PP 13, IPA PP3

action plan

0.00

1.00 period04

output

Road map improving coordination for primary and secondary infastructure

ERDF PP1 -

A.U.TH. PP11, PP8 road map

0.00

1.00

period04

output Report Analysis of the customs procedures

ERDF PP6 - UCV

PP11, PP8, IPA1, PP3,

PP10, PP13, IPAs

report

0.00

1.00 period03

output

Implementation plan for improvement of procedures and standardisation

ERDF PP5 -

Mot AUT

PP13, all IPAs, PP11,

PP8

implementation plan

0.00

1.00

period04

output

Adoption of multi-level memorandum of understanding

ERDF PP5 -

Mot AUT all PPs MoM

0.00

1.00

period05

output Coordination with LP - CEI meetings period05

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

104/156

the EC DG MOVE 0.00 4.00

output Reporting to DG MOVE on a regular basis

LP - CEI emails

0.00

10.00 period05

4.4. wp4 – Content

4.4.1.Work Package Main Data

Title Transport model

Responsible Partner LP - CEI

WP Total including ENPI partners

1,037,472.69 EUR WP Total ERDF partners 942,032.69 EUR

WP Total IPA-I partners 45,440.00 EUR

4.4.2. Description

Due to the difficuties of transtool model for the WB and the current limitations to international flows with reference to the region of the South East Europe is being developed in the framework of the SEETAC project. This is an attempt of creating a unified transport model for a region consisting of EU and non-EU countries, as for time being the TRANS-TOOLS model of the European Commission?s DG Mobility and Transport is also limited to cover the EU-27 network. WP4 contains activities of collection of necessary, adequate and updated data associated to the demand analysis and traffic forecasting Then, a GIS model will be established, as a visualisation and analysis tool,able to depict the collected data in a comprehensive manner to support the other activities of the project, the decision making process, as well as the web toolbox available to all interested parties (public administrations, transport operators) and the wider public. A transport model, dedicated to the needs of simulation of the existing situation and the examination of future development scenarios will be developed. The development of the model, in its planning process, will take into account all the parameters that are considered necessary in order to ensure the compatibility with the TRANS-TOOLS, in order to integrate the model in the third (under development up to 2014) version of the system of DG MOVE, enriching it with extension to the Western Balkan countries transport networks. This activity include for example the appropriate codification of traffic zones, the links and the nodes of the network, the completion of the necessary attributes (physical and operational characteristics) to the elements of the network, the use of appropriate geographic reference system (georeferencing), etc. The simulation success shall be tested through the model calibration.Then,various scenarios of alteration of parameters related to transport supply and demand will be formulated in order to be exam

4.4.3. Activities of ERDF & IPA-I partners

act 4.1

Title Demand analysis: methodology and data collection, Data loading road railway and waterways

Timeframe 01/10/2012 - Amount 595,049.43 EUR

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

105/156

30/09/2013

Description of the activity The first activity will concern the most appropriate zoning level according to the modelling requirements and to the availability of more or less detailed information. The modelling area will be divided in two macro areas: the study area where the zoning level will be at least NUTS3 and will diminish for significant agglomerations or for territories with high population density and with numerous transport infrastructure as well and the accessing points to the area connected with the neighbouring countries. Whenever possible, the existing data basis will be used for the reconstruction of the current transport demand. Project partners? contribution will be essential for both, the data provision should they not be retrievable through official data basis and for the validation of final data. In order to complete the transport demand data base, it will be essential to collect information on transit data for both, road network (for light and heavy vehicles) and rail services in terms of number of passenger and freight trains, number of passengers and tonnes of freight carried. This information will be acquired by collecting all available data from official sources, deriving from flow monitoring systems, previous surveys or from previous European projects. Should the information turn out to be lacking or not sufficiently updated, a direct survey will be provided to retrieve the missing information. Road date will be inserted with an already consolidated methodology in other European projects. All partners will be involved in the collection of updated data, should the usual data sources turn out to be unreliable. In extreme cases, direct surveys will be organised. Road data will concern number of lanes, single arch capacity, de-flow curve, speed for empty trains and tolls presence. Railway data will be inserted per line and not per single route, which will enable to route the trains along certain paths and to evaluate immediately the feasibility of a single link. This will also make it possible to understand which trains are linked to possible criticalities that could appear in the network. This procedure that allows the inclusion per line and not per route represents an essential element for a proper evaluation of train routing that will trigger an evaluation of the intermodal potential of identified hubs, first of all in the Balkan ports. Similar methodology will be applied to inland waterways.

Role of each partner LP as the work package leader will provide general co-ordination, action on the field. All Universities will contribution to draft of format, support LP in establishing criteria and target and methodology , support in validation of results - LP with the support of the universities +associated will draft the methodology for the demand analysis and for the transport model development. -The relevant PPs will carry out surveys on selected ports coordinated by PP11 ( PP11-Venezia, PP7-Trietse, PP14-15 Koper, IPA PP2 and IPA PP4 Rjeka, Split, IPA PP1- Durres, PP10 PP1 PP4-Igoumenitza, Tessaloniki, PP3Varna, Burgas, PP8 Costanza ) - The LP with the support of the Universities will survey the SEE traffic flows (road, rail, waterways) international +local flows - survey on inter-ports : PP6, IPA PP3, PP3, PP7, PP10, PP12, PP13, PP14

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

106/156

- PP2 in cooperation with the LP will guarantee harmonisation of available data and analysis of exiting transport model ? The LP will assure the general co-ordination of surveys on transport and data format and coherence flows. Data will be provided upon the request of LP. Other data may be asked to relevant PPs. other data to be given by regions, chambers of commerce, operators, universities

Geographical location Location all SEE area Project area and beyond

act 4.2

Title Transport Model

Timeframe 01/10/2013 - 31/01/2014

Amount 197,230.00 EUR

Description of the activity This action will be focused to the maximum result capitalisation of other European transport projects in the Balkan area. It will start from the SEETAC basic network, that will be further detailed to the data updating. More details will concern the entire ordinary railway network, inland waterways and all roads of national and regional importance as well as those provincial ones in case of low density on other roads. The graph will be extended to the accessing points of the Balkan area and linked to the European model graphs. In particular, it will be linked with SoNorA graph and made compatible with the Transtool. Of course, the graph will be produced with reference to the main and secondary infrastructures of all transport modes under study (road, rail and waterways). - Geo-referencing: The graph obtained in the above described way will be entirely geo-referenced, both for nodes and arches, up to the conjunction points with the neighbouring countries, in order to guarantee an absolute continuity in the network representation and in the flow interpretation for the whole area between the Baltic, Adriatic and Black sea. First of all, an infrastructural network graph will be designed for the road and rail transport. To this end, GIS data basis deriving from systems like OpenStreetMap will be used. GIS basic support will be appropriately updated, verified and integrated both from the geographical/topological and from the database point of view, in order to implement the infrastructural network graph in the modelling environment. Each element of the road network graph will be coupled with a set of features concerning: Segment length (km); Arch type;Speed at 0 flow (km/h);Capacity (equivalent vehicles(h); Possible presence of tolls (0,1); Presence of traffic flow values (equivalent vehicles/h); Direction (one way traffic; two way traffic); Zoning code at more levels. In the same way, in the case of the railway infrastructures, each graph element will be coupled with the following features: Segment length (km); Arch type; Capacity (train/day per direction);Zoning code at more levels; Track number;Traction system;Route name.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

107/156

-Transport Model calibration: The Assignment model will be a preparatory activity for the transport model calibration, indeed it will be produced beforehand. This activity aims at estimating/updating OD transfer matrixes, starting from an existing matrix, so that a final network flow reproduction is as realistic as possible. In other words, the reproduction will be as close as possible to the data related to the road flows of passengers and freight transported by road and freights transported through inland waterways, provided by the project partners according to the activities defined initially in the Application form and through surveys on flows among regions included in the SEE, by using the institutional network of the related Chambers of Commerce. This activity will be carried out by using Matrix Estimation technique, based on an algorithm that minimises an objective function, which is the result of a statistic procedure known as maximum likelihood method. The use of this method guarantees that the estimated data (in this case the estimated matrix) is the best probability for the input data function. More specifically, the requested data for the model development concern:Prior Matrix; preliminary OD matrix and the starting point for the estimation and related matrix with the reliability level for each relation; traffic counts for passenger and freight vehicles, with the reliability level per each section; Possible travel routes, provided in a binary format. The reliability check on the estimations will be carried out with the validation procedure, in which the estimated traffic flows of the model are compared with those measured in both, the ex-ante situation, where the assignment model is run with a Prior matrix and in the ex-post situation, where an updated matrix is used.

Role of each partner The LP will develop the transport model in cooperation with PP2. For this action the CEI will externalize the development of the transport model In particular the following activities will be implemented by the LP in : -data loading road-rail and waterways (PP2 will be involved) -transport model development -Geo-referencing -calibration

Geographical location Project area and beyond SEE

act 4.3

Title Extension of the Transtool model to the Western Balkans

Timeframe 01/01/2013 - 30/09/2013

Amount 14,165.00 EUR

Description of the activity Extension of Trans-Tools to Western Balkan At the moment the data used in Trans-Tools for the Western Balkan is limited and not fully comparable to that available for other European countries. Enormous efforts will be necessary in on order to establish a data base with can fulfill the requirements of Trans-Tools. Data bases from different states must be brought to a comparable level and validated to ensure consistency and quality. Once the data is available the model must be calibrated which again is large task but a necessary step to ensure successful integration into Trans-Tools.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

108/156

From this follows that the steps for extended Trans-Tools to the Western Balkan the following steps must be carried out for each state: - Establish minimum data requirements for extension of Trans-Tools - Evaluate existing data bases - Highlight any deficits - Define priorities for data collection - Provided roadmaps for filling any data gaps - Perform quality assurance and (if necessary) data correction - Integrate data into Trans-Tools - Calibrate Model with new data sets - Ensure continuous collection of data as necessary - Establish quality control and documentation - Regular contacts to other countries to share experience and ensure compatibility It will establish procedures which will guide the work in the future. Especially when it comes to data collection it will not be possible to satisfy all data requirements during the lifetime of the project. In other cases, such as establishing minimum data requirements, evaluating existing data bases, highlighting deficits, etc In the long run all this work help improve Trans-Tools for the SEE-region and thus the overall validity of the Trans-Tools output. Improving the modeling basis for that area will help address important transport questions which go far beyond South-East Europe. As transport becomes more and more interconnected and dependent on the full functioning of each part it is not possible to leave large regions out or only include them with low quality data when carrying out modeling exercises.

Role of each partner PP2 will be in charge of the action. Austriatech supervised by PP5 and LP posses an outstanding experience in this domain and will deliver an innovative transport tool

Geographical location Western Balkan area and SEE area

act 4.4

Title Evaluation of different scenario

Timeframe 01/01/2014 - Amount 49,728.26 EUR

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

109/156

30/09/2014

Description of the activity Some time horizons will be defined to evaluate the demand and supply scenarios, among which a particular importance will be assigned to those linked to the travel time reduction at border crossings due to simplification measures or infrastructural interventions. In particular, the crossborder data will be analysed in the current and future management situation with reference to different freight types carried by the transport means. It will therefore be crucial to collaborate with the Chambers of Commerce, Transport Associations and Industrial organisations. More specifically, some significant trade exchange flows among old and new Member states and Candidate countries in the SEE will be identified, that will allow the experts to evaluate the limits and the bottlenecks of the current transport supply in the crossborder area. Through a joint use of the model (where the cross-border arches will be identified separately) and of the analysed trade flows, a network of main intermodal nodes will be created. On this basis an hypothesis for the improvement of the transport supply will be elaborated, with the twofold aim to select some limited, but efficient organisational and infrastructural priority improvements.

Role of each partner Following up on the results of the transport model, LP in cooperation with PP2 will asses the different transport scenarios , including those related to the transit times improvements at the borders, due to the introduction of simplification measures.

Geographical location Trieste, the whole project area, Brussels for consultation with the EC

act 4.5

Title Data Manager Centre and Creation of an Information Cross-border interactive tool

Timeframe 01/10/2012 - 30/09/2014

Amount 131,300.00 EUR

Description of the activity A data management centre, with a specially designed web-based information toolbox will be established in order to host the transport model and data required to run this model. This centralized solution has the advantage that is can be a single access point for those involved in data modelling, ensuring that they have access to the most up-to date data as well as historical data sets at a defined quality. The main advantage for all the PP and stakeholders is that they can be sure that full access to the most up-to-date and historical data in a well-defined format will always be assured Besides running the national transport model already implemented in respective countries, information on other models are kept and regularly update and links established to the relevant institution and authorities on a national and international level. As the models evolve over time this will help ensure that they will be further harmonised in the future, helping to make best use of the strengths of each model while at the same time making certain that the results are compatible and complementary. The goal of this centre is thus to:

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

110/156

- Coordinate continuous development of national transport model - Carry out traffic modelling activities for the Ministries an public authorities they may require - Coordinate partners involved in developing and using the transport model - Reach a consensual agreement on which conditions model data may be distributed to third parties according to the Eu legislation. - Continuous consolidation of data needed for modelling in the required quality and level of detail - Ensure conformity with existing standards and contribute to the creation of new ones - Establish expertise on different existing models (e.g. TransTools, ?) - Host these models - Ensure easy access to data and, if necessary, models to all parties with access privileges - Continues communication with similar institutions in other countries - Support harmonisation of models and data with neighbouring countries and beyond

Role of each partner PP2 will develop the web-site platform with information on border crossing, principal inland terminals, border agencies procedures in SEE region with the aim of integration, to provide the first step for a common customs information systems: all the partner will provide relevant data and information and participate to the demonstration meeting during the project?s meeting in Vienna

Geographical location SEE area

4. 4.4. ENPI partners activities in the Work package

Description of ENPI partners activities in the Work package

The ENPI partner will be consulted and will provide data regarding border crossings Ukraine_EU WP4 contains activities of collection of necessary, adequate and updated data associated to the demand analysis and traffic forecasting. Then, a GIS model will be established, as a visualisation and analysis tool,able to depict the collected data in a comprehensive manner to support the other activities of the project, the decision making process, as well as the web toolbox available to all interested parties (public administrations, transport operators) and the wider

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

111/156

public. A transport model, dedicated to the needs of simulation of the existing situation and the examination of future development scenarios will be developed. The development of the model, in its planning process, will take into account all the parameters that are considered necessary in order to ensure the compatibility with the TRANS-TOOLS, in order to integrate the model in the third (under development up to 2014) version of the system of DG MOVE, enriching it with extension to the Western Balkan countries transport networks. This activity include for example the appropriate codification of traffic zones, the links and the nodes of the network, the completion of the necessary attributes (physical and operational characteristics) to the elements of the network, the use of appropriate geographic reference system (geo-referencing), etc. .The simulation success shall be tested through the model calibration. Then, various scenarios of alteration of parameters related to transport supply and demand will be formulated in order to be examined with several model runs, and their results of the scenarios will be evaluated appropriately, in order to feed the activities foreseen in WPs 3 (e.g. the organisation of the trans-European Transport Networks, the composition of a Road Map for improvement of coordination in promoting, planning and operation of the primary and the secondary transport networks) and 5 (e.g

Role of each ENPI partner Data providing, contribution when asked by the LP. - Participation of Ukrainian port and railway operators in cargo flows monitoring and elaboration of scientific suggestions concerning single transport model on its basis. -analysis of maritime, rail and road traffic flows regarding Ukrainian territory including Eu-Russia interchange. -Scientific research of SEE connection with Ukrainian Danube and Black Sea regions considering economical geography.

Amount 50,000.00 EUR

4.4.5. Additional information

4.4.6. Qualitative and quantitative description of the outputs and results

Type Description Partner Contributing

Partner Measure-ment unit

Base value

Target value

Period of delivery

output Methodology LP - CEI All PPs /

0.00

1.00 period02

output Survey on Selected Ports

LP - CEI ERDF PP11 /

0.00

1.00 period03

output

Survey SEE traffic flows (road, rail, waterways) international and

LP - CEI All Pps /

0.00

1.00 period03

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

112/156

local

output Survey on interports

LP - CEI ERDF PP6 /

0.00

1.00 period03

output Demand analysis and data collection

LP - CEI All PPs /

0.00

1.00 period03

result Planning investments

LP - CEI all PPs /

0.00

1.00 period05

result Transport Transnational policies improved

LP - CEI All Ministries /

0.00

4.00 period05

output Model LP - CEI all PPs /

0.00

1.00 period03

output Report on the evaluation of Scenarios

LP - CEI all PPs /

0.00

1.00 period04

output Data Management Centre

LP - CEI ERDF Pp2 /

0.00

1.00 period05

4.5. wp5 – Content

4.5.1.Work Package Main Data

Title CROSS BORDER ANALYSIS

Responsible Partner ERDF PP1 - A.U.TH.

WP Total including ENPI partners

841,717.74 EUR WP Total ERDF partners 669,569.94 EUR

WP Total IPA-I partners 117,320.00 EUR

4.5.2. Description

The final action and output of the project will be an Action Plan for tackling the border crossings bottlenecks and facilitating the trans-national flows. This would be the subject of the WP5 of the project, incorporating and concluding the outcomes of the previous WPs. The findings from seetac project show that up to the integration of the Western Balkans in the EU there is significant margin of improvement of the transport operations which can be achieved utilising the existing infrastructures by improving them through large investments, but also with ?soft measures?, such as those related to the rationalisation and standardisation/ harmonisation of procedures. The cross-border will be analyzed in terms of their current and possible future management, with reference to the various types of freight. Therefore will be essential the collaboration with the Chambers of Commerce, associations of transporters and industrial organizations. In particular, significant trade flows will be identified between old and new member countries and / or candidate countries, SEE countries, in order to evaluate the limitations and bottlenecks of the current supply through the cross-border points. Through a joint use of the model, where the links related to cross-border are separately from the others and trade flows are analyzed, the network of major intermodal nodes upon which develop hypotheses of improving the supply of transport

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

113/156

will be identified, with the dual purpose of selecting limited and effective organizational improvements and infrastructures. This WP will mobilise national and local authorities to solve the issues of local cross-border transport by removing the obstacle to allow the establishment of a One Stop Shop and to prepare recommendations on necessary coordination and integration of competent authorities and transport services providers on either side of borders. Multiple data base will be used as, Eurostat, WTO, OECD, FMI, World Bank literature on Bord

4.5.3. Activities of ERDF & IPA-I partners

act 5.1

Title Assessment of Available Infrastructure Capacity

Timeframe 01/10/2012 - 31/01/2014

Amount 201,154.31 EUR

Description of the activity In this context border crossings can be major bottleneck in a continental transportation system, especially with regards to traffic between EU- non EU member States. TEN-T network policy has confirmed four main corridors: N 1, N 5, N 8, N 10, and SEETO network on which to concentrate the multimodal network and the intermodal service improvements connecting ports, metropolitan areas and border cross points As Rail-road-inland waterway infrastructure supply represent the network for goods circulation; its efficiency depends from the physical capacity of the single infrastructure layout and their intermodal connecting platforms: the representation of the complete layout for the whole SEE area is the premise for investigating its global efficiency as a system. A comprehensive approach is needed to design the SEE integration in the EU trade and transport standards . Based in this, three elements need to be focused: a) the main international routes of goods circulation, b) how existing freight transport supply meets demand, c) where and how substantial transport improvements can be obtained through better services before relevant infrastructure investments, that?s to say acting through short term policies. The BCP represent the map of the main discontinuities and bottlenecks in the SEE goods mobility. The selected BCP will be submitted to a multiple analytical approach: - The physical layout of each selected road and rail BC area will be evaluated for its capacity and spatial organization according to official efficiency standards; - those data will be integrated with the interviews coming from stakeholders; The rail-road infrastructure network will be represented through a GPS graph where links and nodes will be identified with specific attention to the relationship between infrastructure capacity and transport flows and to the Ports and Border Cross Points (BCP)as potential bottlenecks according to the EU capacity standards and Ten T transport policies.

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

114/156

the partnership will undertake the assessment of the capacity of existing infrastructures, comprising a review and comparison of the characteristics of the infrastructures with the respective EU standards (for infrastructures and their interoperability), with exploitation of the GIS model developed in the framework of WP4. Furthermore, selected cross border points (posts) of inland transport modes will be analysed concerning their infrastructural and operational capacities, in order to define the inefficiencies, the reasons of their appearance and their impact on cross border transport facilitation, i.e. the delays and costs mainly on international itineraries. The followed procedures (Action 5.02,5.03.5.04) and required times will be represented on time-distance diagrammes with the usage of the GIS model developed by WP4.depicting the running times and the various delays that could potentially be minimised including extension of the major trans-European transport routes. 1. Review of existing standards, capitalisation of former similar projects and identification of potential border crossing projects. 2 Status capacity analyses together with railway undertakings (RU) Assessment of Available Infrastructure Capacity: Assessment of the existing infrastructure capacity (cross border section, section by section) in due consideration of the actually possible running speeds ; redaction of an updated capacity map focused don cross border and internal bottlenecks; Assessment of the actual number of trains (in cross border section) 3 Graphical presentation of bottlenecks on corridors and their possible extension in the WB analysis of new market trends in relation with the TEN T corridor (core and comprehensive network, thier extension, and traffic flows generated by external area ( Ukraine/Russia- Turckey- Suez chanel- North mediterranean area)

Role of each partner The PP1 will be the Work package Leader. It will carry out the assessment of the of available infrastructure capacity (rail and road with focused on bottlenecks) and will review: first, the existing infrastructure and interoperability standards in relation to EU directives, second, the Status capacity analysis of selected cross border points (rail and road) graphical presentation of bottlenecks on corridors and their possible extension in the WB analysis of new market trends in relation with the TEN T corridor (core and comprehensive network, their extension, and traffic flows generated by external area ( Ukraine/Russia- Turkey- Suez channel- North Mediterranean area) with the support of the LP + all Ministries, PP11, PP7, PP10, PP12d PP6, PP9, IPA PP3 and PP2 and PP4.

Geographical location the programme area

act 5.2

Title Potential Competitive Elements and Cutting Running Times Objective: to plan

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

115/156

shorter running times for already existing and new trains; Make the infrastructure performance transparent; Providing an input for infrastructure investments

Timeframe 01/10/2012 - 31/01/2014

Amount 276,448.23 EUR

Description of the activity An analysis of the market potentials and trends should be performed, in relation with the Trans-European Transport Networks revised policy and the overall European Neighbourhood Policy, namely the priority (core and comprehensive) networks, their extensions, and the trade flows having origin and destination from/to the neighbouring countries and regions (Ukraine/Russia - New Independent States/ Caucasus ? Turkey ? Middle East ? Suez Channel ? North Africa and the Mediterranean Basin). These trends will be analysed in WP3 through the evaluation of the impact of trans-European Transport network revision and the optimisation of the TEN-T networks and in WP4 by the simulation of future scenarios for examining the potential growth of trade (and not only). This analysis shall refer to the performance of these border crossings points, in order to define the required interventions/measures. Therefore, a common methodology should be further developed and established among the partnership, in order to implement it at the various RAIL border crossing points by the project partners responsible for this task in each country. But the added value of this action is represented by the direct survey on the main rail crossing points along corridor nr. I/V/VIII/X and Seeto network. Direct field-surveys on RAIL cross border station will be used in order to define a precise and realistic map of rail border crossing time transit. Investigation questionnaire pursued a common methodology will be carried out at railways? agency, rail operators, rail safety regulators, safety and security agencies, freight forwarders and phitosanitary offices. In particular it will be also assessed: a) compliance with open access standards that are required by EU directives in force; b) cooperation between border authorities?in particular, the possibility for the border authority of one country to be active in a neighbouring country; c) possibility of reducion border-crossing times and achieve higher commercial speed for trains; d) drafting operators and stakeholder opinions on streamlining border procedures. In addition, a survey on typologies of transported goods will be carried out in order to identify the optimum intermodal solutions along corridor nr. I/V/VIII/X and Seeto network And business potential according to the EU freight mobility standards and market requirements (imput coming form economic stakeholders) will be clearly identified and interlinked. Attached the annex with the list of border crossing points (rail and road).

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

116/156

Role of each partner PP1 will carry out the analysis of the following competitive elements, with the support of LP and with the support PP3, PP4, PP6, IPA PP2, IPA PP3, PP9 and all the partners will contribute. -shared methodology for common standards analysis on CBP (PP1 with support of Ministries, LP, Universities, Regional agencies and transport operators) - will report on the elimination of level crossings on existing lines - will report on renewal of existing ITC devices and proposal to increase CBP competitiveness - survey for rail border crossings ( 4 in Slovenia, 3 in Austria, 4 in Romania 4 Croatia, 4 Serbia, 2 in Greece, 3 Bulgaria, 2 Italy, 3 in Albania) for the identification of rail flows, origin and destination, a performance level in service and competitive/non competitive elements of the crossing sections. necessary involvement of Transport of logistic operators Field surveys: 1. for Italy: PP6 2. for Austria: available data from the Ministry of transport and PP2 3. for Hungary: PP9 with the support of the LP 4. for Albania: the Albanian ministry of transport 5. for Greece; PP10 and PP4 (Albania/Greece and Greece/Bulgaria) and the university of Thessaloniki 6. for Romania: PP8 (Romania/Serbia and Romania/Ukraine) 7. for Bulgaria: PP3( Romania /Hungary and Romania/Bulgaria) 8. for Serbia: the chamber of commerce of Belgrade IPA PP3 9. for Slovenia: PP13 and PP14( Italy-Slovenia) 10. for Croatia: IPA PP2 with the support of LP

Geographical location SEE and project area

act 5.3

Title Assessment and Use of Market Potentials

Timeframe 01/10/2012 - 30/09/2014

Amount 209,631.20 EUR

Description of the activity Furthermore, an Origin-Destination Matrix (database) for the road freight transport shall be formulated together with a field survey focused on problems encountered for border crossings for international traffic (certificates, transit permit, safety rules, language) will be implemented taking into accounte relevant legal documents and the TIR convention and the Community Customs Code. Within this activity a survey on the various types of transported commodities will be performed and a routes? analysis will be tested using the GIS model in accordance with wp4 on the basis of existing and future scenario

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

117/156

where the potential of shifting from road to rail and the combined used of this modality will be tested . The identification of a representative panel of international stakeholders selected among those playing an remarkable active role in the SEE is a key element of the bottom up approach to the transport service demand/supply coming from the SEE mobility market present in this action. Forwarders, shippers, carriers and logistic operators, together with rail companies represent the interlocutors to be selected and to which to address a questionnaire for profiling an updated description/interpretation of the freight mobility in SEE, with all its efficiencies and deficiencies and potential improvements. The questionnaire elaboration made by Chambers of Commerce will be a mile stone of this action whose deployment will include a number of planned seminars involving stakeholders where the questionnaires outcomes will be discussed and improved. A survey will be set up and addressed to lorry drivers at BCP for being compared with the outcomes of the Port transit analysis and contributing to draw up the extension of long distance road routes in SEE; the questionnaire will include info such the O-D, transit frequency, average distance covered, travel times, speed average, etc.; the outcomes of interviews will provide inputs for detailing the transport model (action 4); The outcomes of BCP analysis will complement the ?stakeholders involvement? through its systematic recognition of existing infrastructure and administrative bottlenecks limiting the goods circulation in the SEE. Also in this case, like the rail modality, the survey on the type of goods will be confronted with the existing routes in the logistic chain and its potential future efficiency; the efficiency links and nodes of the infrastructure network will be compared and integrated with the outcomes of the transport model elaborations (WP4) focusing on infrastructure capacity and bottlenecks, transit times, existing and potential intermodal supply, etc. The outcomes of this empiric approach will be interfaced with the other transport analysis evidence for overlapping/integrating the Project elaborations as inputs to gather the final assessment of transport organization will be made. It will be furthermore important to consider the effect of border stops, road congestion and transportation bottlenecks on logistics and equipment usage. In particular cases will be mapped where exactly the road? bottlenecks congestion plays as a ?pricing? mechanism to encourage the use of alternative modes. In this context a ?carnet list? with a total of 6 transnational innovative measures focusing on new possible intermodal services and upgrading infrastructures shall be drafted in order to show the concrete possibility and the financial viability and sustainability for bringing additional traffic on freight rail corridors in combination in with the road modality and waterways transport.

Role of each partner PP6 in cooperation with PP14 and PP15, IPA PP3 Union camere veneto + Slovenian PP+PUBLIC FUNDATION FOR THE

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

118/156

DEVELOPMENT OF INDUSTRY+Belgrade chamber of commerce+Pro rail+Trainose+Prorail +VIU+University of Bucharest+University of Thessaloniki+associated partners Assessment and use of market potentials: - database on road freight O/D - field enquires focused on trucks problems on cross-border points (road). PP6 in cooperation with PP9, IPA PP2 and IPA PP3, and universities -Survey on type of transported commodities (road) PP6, PP9, IPA PP2 and IPA PP3, and universities -routes analysis based on selected filed enquires on trucks for potential shifting to rail and waterways. PP6 in cooperation with PP9, IPA PP2 and IPA PP3, and universities -report of 6 measure (serivce+infrastrucutre) for attraction of additional traffic on freight rail Corridor. PP6 in cooperation with PP9, IPA PP2 and IPA PP3, and universities

Geographical location SEE and project area

act 5.4

Title Cutting stops at border crossings

Timeframe 01/01/2013 - 30/09/2014

Amount 99,656.20 EUR

Description of the activity Within the SEE and in relation with the border areas Border Cross Points (BCP) are considered to be the relevant nodes of the existing infrastructure network where the transport flows are confronted with multiple national border cross procedures affecting the efficiency of goods circulation in a fragmented market A proposal for the introduction of the concept and the establishment of One Stop Shops for rail cross border points will be formulated, including a recommendation with a list of negative practices that should be avoided by the public authorities and should stop in the short term (next 2 years). As in the case of the other deliverables, all the project partners should adopt these recommendations, to ensure their rapid implementation through the commitment of the participating countries. This activity is interlinked with the activity of WP3 for the reporting on the development of procedure activities plan for standardisation and formulation of participants, leading to the WP3 ultimate goal of adoption of a Memorandum of Understanding (MoU). An implementation plan of measures that would mean shortest possible stops at border crossing rail stations and a road map with proposed measures to be promoted for the facilitation of traffic flows at border crossings will be the final deliverables of the WP5. On the basis of cross boderssection identifies in wp 5.02 and taking the resutles from WP3 and WP4 and action 5.02 the Joint Border Zone such as the area

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

119/156

delimitation object of the One Stop Shop will be identified. A One Stop Shop in this context will be conceived not only as body that designs an international train path but also asan Office whereThe applicant can receive all information, including the timetable, fees and technical parameters that enable one to use the path. Any licensed rail undertaking should be entitled to purchase rail infrastructure border services?such as path, shunting, and communication?from one of the two infrastructure managers. The rules and regulations of the One Stop Shop will be implemented taking into consideration the already established a joint network statement, which can be supportive to the network statement demanded by Directive 2001/14/EC. On the basis of agreements of Infrastructure Interconnection (AIIs) in order to expedite border-crossings where a good example is the one proposed by SEETO approved by the SEETO Commission representing the transport ministries of the Western Balkan countries a set of pilot scheme ( road map) for setting up an OSS will be made. This road map scheme will take into consideration patical solutions of common problem encountered by a) rail undertakings and infrastructure managers; b) between neighbouring infrastructure managers, and c) shippers/forwarders and rail undertakings for the effective establishment of an OSS. This would allow pre-approval messages for the economic and transport community and the EC . In this context , taking this into account, as well as the running of a demonstration train from Ljubljana (Slovenia) to Halkali (Turkey) ?Bosporus Express? in March 2009 that proved that there is big potential for reduction of travel times (the train ran this route in 35 hours instead of 60 hours), under the special conditions provided during the test run this action will develop special attention/treatment and identify strong cooperation methods between infrastructure managers, rail operators, and the authorities responsible for border crossing procedures, who participated in the project, provision of priority to the train along the entire route, provision of multi-system and diesel locomotives, performance of customs and commercial inspections at the departure station, and finally promote the use of required information and documentation. an implementation plan along transnational selected intermodal corridor for all the see area will be made on shortest possible stops in border crossing rail stations

Role of each partner Cutting stops at border crossings: -proposal for the establishment of One stop shop for rail cross-border points. LP with all ERDF and IPA PPs and associated - Adoption by Project partners of a recommendation formed by a list of negative measures to be avoided by public authorities in the next 2 years. LP with all ERDF and IPA PPs and associated - implementation plan on shortest possible stops in border crossing rail stations 1 road map for of the advancement measures of procedure for easing the border stops traffic flows. LP with all ERDF and IPA PPs and associated

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

120/156

Geographical location SEE and project area

4. 5.4. ENPI partners activities in the Work package

Description of ENPI partners activities in the Work package

The ENPI partner will be involved in the the cross-border will be analyzed in terms of their current and possible future management, with reference to the various types of freight. Therefore will be essential the collaboration with the Chambers of Commerce, associations of transporters and industrial organizations. In particular, significant trade flows will be identified between old and new member countries and / or candidate countries, SEE countries, in order to evaluate the limitations and bottlenecks of the current supply through the cross-border points. Through a joint use of the model, where the links related to cross border are separately from the others and trade flows are analyzed, the network of major intermodal nodes upon which develop hypotheses of improving the supply of transport will be identified, with the dual purpose of selecting limited and effective organizational improvements and infrastructures. The general aim of this Work Package is to mobilise national and local authorities to solve the issues of local cross-border transport and to prepare recommendations on necessary coordination and integration of competent authorities and transport services providers on either side of borders and prepare recommendations on needed investments in cross-border transport infrastructure.

Role of each ENPI partner ENPI will provide surveys as required by the WP leader. -Suggestion on cooperation for international and regional transport establishments. -analysis of maritime, rail and road traffic flows regarding Ukrainian cross border sections. Survey on the filed at cross border road and rail station point.

Amount 54,827.80 EUR

4.5.5. Additional information

4.5.6. Qualitative and quantitative description of the outputs and results

Type Description Partner Contributing

Partner Measure-ment unit

Base value

Target value

Period of delivery

output

Report on the assessment of available infrastructure capacity (rail and road with focused on bottlenecks)and geographical presentation of bottlenecks

ERDF PP1 -

A.U.TH.

All Ministries,

LP, Universities, Chambers of Commerce, Associations

and Operators

/

0.00

1.00 period04

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

121/156

output

shared methodology for common standards analyis on CBP

ERDF PP1 -

A.U.TH.

Universities and LP

/

0.00

1.00 period03

result Easying up bottlenecks at border crossings

ERDF PP1 -

A.U.TH. All Partners /

0.00

1.00

period05

result

Improvement of administrative procedures at border crossings

ERDF PP6 - UCV

All Partners /

0.00

1.00 period05

result

Transport Operators : enhanced cooperation

ERDF PP1 -

A.U.TH.

Chambers of Commerce

and Operators

/

0.00

1.00 period05

output Surveys at border crossings

ERDF PP1 -

A.U.TH.

ERDF PP3, PP4, PP6, IPA PP2, IPA PP3,

ERDF PP9

/

0.00

29.00 period03

output

Report on elimination of level crossings and on renewal of exsisting ICT devices

ERDF PP1 -

A.U.TH. Operators /

0.00

1.00

period04

output Survey on type of transport commodities

ERDF PP6 - UCV

ERDF PP6-9, IPA PP2-3

AND UNIVERSITIE

S

/

0.00

1.00 period03

output

Report on measures for attraction of additional traffic

ERDF PP6 - UCV

all PPs /

0.00

1.00 period04

output

Implementation Plan on shortest possible stops in border crossing rail stations

LP - CEI all PPs /

0.00

1.00 period05

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 122/156

5. Project Budget

5.1. Source of co-financing per partners

Partner role and abbreviation

ERDF Contribution

IPA

Contribution

ENPI Contribution

State Contribution

Other Public Contribution

Own Public

Contribution

Total PP Budget

EUR % EUR % EUR % EUR % EUR % EUR % EUR

LP - CEI 401,245.48 85.00 0.00 0.00 0.00 0.00 70,808.03 15.00 0.00 0.00 0.00 0.00 472,053.50

ERDF PP1 - A.U.TH. 255,000.00 85.00 0.00 0.00 0.00 0.00 45,000.00 15.00 0.00 0.00 0.00 0.00 300,000.00

ERDF PP10 - RUTH 110,500.00 85.00 0.00 0.00 0.00 0.00 19,500.00 15.00 0.00 0.00 0.00 0.00 130,000.00

ERDF PP11 - V.I.U. 184,756.00 85.00 0.00 0.00 0.00 0.00 32,604.00 15.00 0.00 0.00 0.00 0.00 217,360.00

ERDF PP2 - ATE 159,800.00 85.00 0.00 0.00 0.00 0.00 28,200.00 15.00 0.00 0.00 0.00 0.00 188,000.00

ERDF PP3 - RA - Smolyan 102,000.00 85.00 0.00 0.00 0.00 0.00 18,000.00 15.00 0.00 0.00 0.00 0.00 120,000.00

ERDF PP4 - TRAINOSE 155,176.00 85.00 0.00 0.00 0.00 0.00 27,384.00 15.00 0.00 0.00 0.00 0.00 182,560.00

ERDF PP5 - Mot AUT 110,500.00 85.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,500.00 15.00 130,000.00

ERDF PP6 - UCV 170,388.74 85.00 0.00 0.00 0.00 0.00 30,068.60 15.00 0.00 0.00 0.00 0.00 200,457.34

ERDF PP7 - FVG 64,090.00 85.00 0.00 0.00 0.00 0.00 11,310.00 15.00 0.00 0.00 0.00 0.00 75,400.00

ERDF PP8 - UPB 102,000.00 85.00 0.00 0.00 0.00 0.00 18,000.00 15.00 0.00 0.00 0.00 0.00 120,000.00

ERDF PP9 - IFKA 102,000.00 85.00 0.00 0.00 0.00 0.00 18,000.00 15.00 0.00 0.00 0.00 0.00 120,000.00

ERDF PP12 - RV 60,350.00 85.00 0.00 0.00 0.00 0.00 10,650.00 15.00 0.00 0.00 0.00 0.00 71,000.00

ERDF PP13 - PIL 144,712.50 85.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25,537.50 15.00 170,250.00

ERDF PP14 - GEA COLLEGE - FP

72,250.00 85.00 0.00 0.00 0.00 0.00 12,750.00 15.00 0.00 0.00 0.00 0.00 85,000.00

IPA-I PP1 - MPWT 0.00 0.00 57,800.00 85.00 0.00 0.00 0.00 0.00 10,200.00 15.00 0.00 0.00 68,000.00

IPA-I PP2 - Pro-rail alliance

0.00 0.00 25,372.50 85.00 0.00 0.00 0.00 0.00 0.00 0.00 4,477.50 15.00 29,850.00

IPA-I PP3 - BCC 0.00 0.00 136,414.80 85.00 0.00 0.00 0.00 0.00 0.00 0.00 24,073.20 15.00 160,488.00

ENPI PP1 - ONMU 0.00 0.00 0.00 0.00 166,345.02 90.00 18,482.78 10.00 0.00 0.00 0.00 0.00 184,827.80

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 123/156

Total 2,194,768.71 72.55 219,587.30 7.26 166,345.02 5.50 360,757.41 11.92 10,200.00 0.00 73,588.20 2.43 3,025,246.64

5.2. Total project budget per Project Partners and Work Packages

Partner role and abbreviation

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

LP - CEI 2,413.50 97,000.00 26,760.00 37,200.00 255,480.00 53,200.00 0.00 0.00 0.00 472,053.50 18.28

ERDF PP1 - A.U.TH. 0.00 29,150.00 20,900.00 46,200.00 90,200.00 113,550.00 0.00 0.00 0.00 300,000.00 11.62

ERDF PP2 - ATE 0.00 20,580.00 5,680.00 0.00 152,140.00 9,600.00 0.00 0.00 0.00 188,000.00 7.28

ERDF PP3 - RA - Smolyan 0.00 13,491.00 2,000.00 20,060.00 30,604.00 53,845.00 0.00 0.00 0.00 120,000.00 4.65

ERDF PP4 - TRAINOSE 0.00 26,640.00 5,160.00 60,800.00 37,320.00 52,640.00 0.00 0.00 0.00 182,560.00 7.07

ERDF PP5 - Mot AUT 0.00 14,000.00 4,000.00 22,000.00 83,000.00 7,000.00 0.00 0.00 0.00 130,000.00 5.03

ERDF PP6 - UCV 0.00 32,800.00 39,381.23 10,752.48 12,108.69 105,414.94 0.00 0.00 0.00 200,457.34 7.76

ERDF PP7 - FVG 0.00 15,500.00 3,000.00 21,000.00 17,400.00 18,500.00 0.00 0.00 0.00 75,400.00 2.92

ERDF PP8 - UPB 0.00 14,800.00 7,560.00 22,440.00 10,800.00 64,400.00 0.00 0.00 0.00 120,000.00 4.65

ERDF PP9 - IFKA 0.00 18,000.00 8,500.00 40,000.00 26,000.00 27,500.00 0.00 0.00 0.00 120,000.00 4.65

ERDF PP10 - RUTH 0.00 29,000.00 3,000.00 35,000.00 18,000.00 45,000.00 0.00 0.00 0.00 130,000.00 5.03

ERDF PP11 - V.I.U. 0.00 21,200.00 9,640.00 23,120.00 143,700.00 19,700.00 0.00 0.00 0.00 217,360.00 8.42

ERDF PP12 - RV 0.00 18,000.00 0.00 32,000.00 21,000.00 0.00 0.00 0.00 0.00 71,000.00 2.75

ERDF PP13 - PIL 0.00 29,250.00 4,860.00 33,000.00 37,800.00 65,340.00 0.00 0.00 0.00 170,250.00 6.59

ERDF PP14 - GEA COLLEGE - FP

0.00 19,040.00 3,240.00 22,360.00 6,480.00 33,880.00 0.00 0.00 0.00 85,000.00 3.29

WP Totals of ERDF partners 2,413.50 398,451.00 143,681.23 425,932.48 942,032.69 669,569.94 0.00 0.00 0.00 2,582,080.84 100.00

IPA-I PP1 - MPWT 0.00 17,000.00 0.00 14,000.00 6,000.00 31,000.00 0.00 0.00 0.00 68,000.00 26.32

IPA-I PP2 - Pro-rail alliance 0.00 7,170.00 3,360.00 3,240.00 1,680.00 14,400.00 0.00 0.00 0.00 29,850.00 11.55

IPA-I PP3 - BCC 0.00 31,940.00 4,320.00 14,548.00 37,760.00 71,920.00 0.00 0.00 0.00 160,488.00 62.12

WP Totals of IPA partners 0.00 56,110.00 7,680.00 31,788.00 45,440.00 117,320.00 0.00 0.00 0.00 258,338.00 100.00

WP Totals of ENPI partners 0.00 40,000.00 20,000.00 20,000.00 50,000.00 54,827.80 0.00 0.00 0.00 184,827.80 6.11

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 124/156

TOTAL 2,413.50 494,561.00 171,361.23 477,720.48 1,037,472.69 841,717.74 0.00 0.00 0.00 3,025,246.64

0.08 16.35 5.66 15.79 34.29 27.82 0.00 0.00 0.00

5.3. Total budget overview per budget lines and per WP

5.3.a Total budget overview for ERDF and IPA-I partners per budget lines and WP

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 204,920.00 95,001.88 224,787.11 458,341.01 384,750.87 0.00 0.00 0.00 1,367,800.87 48.15

2. Overheads 0.00 20,050.00 8,859.35 17,413.37 50,731.68 32,851.80 0.00 0.00 0.00 129,906.20 4.57

3. Travel and accommodation costs

600.00 131,391.00 9,000.00 88,720.00 35,700.00 58,387.27 0.00 0.00 0.00 323,798.27 11.40

4. External expertise and services

1,813.50 89,700.00 38,500.00 126,800.00 407,200.00 310,900.00 0.00 0.00 0.00 974,913.50 34.32

5. Equipment 0.00 1,000.00 0.00 0.00 35,500.00 0.00 0.00 0.00 0.00 36,500.00 1.29

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7. Financial charges and guarantee costs

0.00 7,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,500.00 0.26

TOTAL 2,413.50 454,561.00 151,361.23 457,720.48 987,472.69 786,889.94 0.00 0.00 0.00 2,840,418.84

0.08 16.00 5.33 16.11 34.77 27.70 0.00 0.00 0.00

5.3.b Total budget overview for ERDF partners per budget lines and WP

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 176,900.00 87,641.88 210,467.11 430,661.01 344,350.87 0.00 0.00 0.00 1,250,020.87 48.41

2. Overheads 0.00 18,610.00 8,539.35 16,965.37 48,971.68 30,931.80 0.00 0.00 0.00 124,018.20 4.80

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 125/156

3. Travel and accommodation costs

600.00 115,141.00 9,000.00 71,700.00 33,700.00 51,387.27 0.00 0.00 0.00 281,528.27 10.90

4. External expertise and services

1,813.50 80,300.00 38,500.00 126,800.00 393,200.00 242,900.00 0.00 0.00 0.00 883,513.50 34.22

5. Equipment 0.00 0.00 0.00 0.00 35,500.00 0.00 0.00 0.00 0.00 35,500.00 1.37

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7. Financial charges and guarantee costs

0.00 7,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,500.00 0.29

TOTAL 2,413.50 398,451.00 143,681.23 425,932.48 942,032.69 669,569.94 0.00 0.00 0.00 2,582,080.84

0.09 15.43 5.56 16.50 36.48 25.93 0.00 0.00 0.00

5.3.c Total budget overview for IPA-I partners per budget lines and WP

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 28,020.00 7,360.00 14,320.00 27,680.00 40,400.00 0.00 0.00 0.00 117,780.00 45.59

2. Overheads 0.00 1,440.00 320.00 448.00 1,760.00 1,920.00 0.00 0.00 0.00 5,888.00 2.28

3. Travel and accommodation costs

0.00 16,250.00 0.00 17,020.00 2,000.00 7,000.00 0.00 0.00 0.00 42,270.00 16.36

4. External expertise and services

0.00 9,400.00 0.00 0.00 14,000.00 68,000.00 0.00 0.00 0.00 91,400.00 35.38

5. Equipment 0.00 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,000.00 0.39

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 56,110.00 7,680.00 31,788.00 45,440.00 117,320.00 0.00 0.00 0.00 258,338.00

0.00 21.72 2.97 12.30 17.59 45.41 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 126/156

5.4. Total spending forecast PER WP and period

5.4.a Total spending forecast for ERDF partners per WP and period

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 2,413.50 93,332.50 29,860.00 104,782.48 241,503.69 134,525.00 0.00 0.00 0.00 606,417.17 23.49 %

period02 0.00 51,395.00 24,420.00 51,895.00 105,054.00 94,614.94 0.00 0.00 0.00 327,378.94 12.68 %

period03 0.00 102,505.00 31,750.00 106,030.00 190,400.00 166,900.00 0.00 0.00 0.00 597,585.00 23.14 %

period04 0.00 102,505.00 36,250.00 106,030.00 263,400.00 166,900.00 0.00 0.00 0.00 675,085.00 26.14 %

period05 0.00 48,713.50 21,401.23 57,195.00 141,675.00 106,630.00 0.00 0.00 0.00 375,614.73 14.55 %

TOTAL 2,413.50 398,451.00 143,681.23 425,932.48 942,032.69 669,569.94 0.00 0.00 0.00 2,582,080.84

0.09 15.43 5.56 16.50 36.48 25.93 0.00 0.00 0.00

5.4.b Total spending forecast for IPA-I partners per WP and period

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 4,500.00 0.00 2,000.00 2,000.00 4,000.00 0.00 0.00 0.00 12,500.00 4.84 %

period02 0.00 10,500.00 1,900.00 7,310.00 9,500.00 27,600.00 0.00 0.00 0.00 56,810.00 21.99 %

period03 0.00 16,500.00 1,900.00 9,310.00 12,500.00 32,600.00 0.00 0.00 0.00 72,810.00 28.18 %

period04 0.00 16,500.00 1,900.00 9,310.00 12,400.00 32,600.00 0.00 0.00 0.00 72,710.00 28.15 %

period05 0.00 8,110.00 1,980.00 3,858.00 9,040.00 20,520.00 0.00 0.00 0.00 43,508.00 16.84 %

TOTAL 0.00 56,110.00 7,680.00 31,788.00 45,440.00 117,320.00 0.00 0.00 0.00 258,338.00

0.00 21.72 2.97 12.30 17.59 45.41 0.00 0.00 0.00

5.5. ERDF and IPA-I partners’ budgets per budget lines and per WP

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 127/156

LP - CEI WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 40,000.00 22,000.00 15,000.00 56,000.00 40,000.00 0.00 0.00 0.00 173,000.00 36.65 %

2. Overheads 0.00 3,200.00 1,760.00 1,200.00 4,480.00 3,200.00 0.00 0.00 0.00 13,840.00 2.93 %

3. Travel and accommodation costs

600.00 40,000.00 0.00 10,000.00 10,000.00 10,000.00 0.00 0.00 0.00 70,600.00 14.96 %

4. External expertise and services

1,813.50 7,800.00 3,000.00 11,000.00 185,000.00 0.00 0.00 0.00 0.00 208,613.50 44.19 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 6,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,000.00 1.27 %

TOTAL 2,413.50 97,000.00 26,760.00 37,200.00 255,480.00 53,200.00 0.00 0.00 0.00 472,053.50

0.51 20.55 5.67 7.88 54.12 11.27 0.00 0.00 0.00

ERDF PP1 - A.U.TH. WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 10,000.00 12,000.00 35,000.00 75,000.00 84,000.00 0.00 0.00 0.00 216,000.00 72.00 %

2. Overheads 0.00 2,650.00 1,900.00 4,200.00 8,200.00 10,322.73 0.00 0.00 0.00 27,272.73 9.09 %

3. Travel and accommodation costs

0.00 7,500.00 7,000.00 7,000.00 7,000.00 19,227.27 0.00 0.00 0.00 47,727.27 15.91 %

4. External expertise and services

0.00 9,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,000.00 3.00 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 29,150.00 20,900.00 46,200.00 90,200.00 113,550.00 0.00 0.00 0.00 300,000.00

0.00 9.72 6.97 15.40 30.07 37.85 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 128/156

ERDF PP2 - ATE WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 8,400.00 3,900.00 0.00 79,700.00 8,000.00 0.00 0.00 0.00 100,000.00 53.19 %

2. Overheads 0.00 1,680.00 780.00 0.00 15,940.00 1,600.00 0.00 0.00 0.00 20,000.00 10.64 %

3. Travel and accommodation costs

0.00 3,000.00 0.00 0.00 4,000.00 0.00 0.00 0.00 0.00 7,000.00 3.72 %

4. External expertise and services

0.00 7,500.00 1,000.00 0.00 30,000.00 0.00 0.00 0.00 0.00 38,500.00 20.48 %

5. Equipment 0.00 0.00 0.00 0.00 22,500.00 0.00 0.00 0.00 0.00 22,500.00 11.97 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 20,580.00 5,680.00 0.00 152,140.00 9,600.00 0.00 0.00 0.00 188,000.00

0.00 10.95 3.02 0.00 80.93 5.11 0.00 0.00 0.00

ERDF PP3 - RA - Smolyan

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 4,000.00 2,000.00 10,400.00 12,090.00 6,300.00 0.00 0.00 0.00 34,790.00 28.99 %

2. Overheads 0.00 0.00 0.00 2,160.00 2,114.00 945.00 0.00 0.00 0.00 5,219.00 4.35 %

3. Travel and accommodation costs

0.00 5,491.00 0.00 5,200.00 3,200.00 3,200.00 0.00 0.00 0.00 17,091.00 14.24 %

4. External expertise and services

0.00 4,000.00 0.00 2,300.00 8,200.00 43,400.00 0.00 0.00 0.00 57,900.00 48.25 %

5. Equipment 0.00 0.00 0.00 0.00 5,000.00 0.00 0.00 0.00 0.00 5,000.00 4.17 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 13,491.00 2,000.00 20,060.00 30,604.00 53,845.00 0.00 0.00 0.00 120,000.00

0.00 11.24 1.67 16.72 25.50 44.87 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 129/156

ERDF PP4 - TRAINOSE

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 8,000.00 2,000.00 10,000.00 4,000.00 8,000.00 0.00 0.00 0.00 32,000.00 17.53 %

2. Overheads 0.00 640.00 160.00 800.00 320.00 640.00 0.00 0.00 0.00 2,560.00 1.40 %

3. Travel and accommodation costs

0.00 10,000.00 0.00 12,000.00 3,000.00 5,000.00 0.00 0.00 0.00 30,000.00 16.43 %

4. External expertise and services

0.00 8,000.00 3,000.00 38,000.00 30,000.00 39,000.00 0.00 0.00 0.00 118,000.00 64.64 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 26,640.00 5,160.00 60,800.00 37,320.00 52,640.00 0.00 0.00 0.00 182,560.00

0.00 14.59 2.83 33.30 20.44 28.83 0.00 0.00 0.00

ERDF PP5 - Mot AUT WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 5,500.00 2,000.00 20,000.00 4,000.00 7,000.00 0.00 0.00 0.00 38,500.00 29.62 %

2. Overheads 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

3. Travel and accommodation costs

0.00 2,000.00 2,000.00 2,000.00 1,000.00 0.00 0.00 0.00 0.00 7,000.00 5.38 %

4. External expertise and services

0.00 6,500.00 0.00 0.00 70,000.00 0.00 0.00 0.00 0.00 76,500.00 58.85 %

5. Equipment 0.00 0.00 0.00 0.00 8,000.00 0.00 0.00 0.00 0.00 8,000.00 6.15 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 14,000.00 4,000.00 22,000.00 83,000.00 7,000.00 0.00 0.00 0.00 130,000.00

0.00 10.77 3.08 16.92 63.85 5.38 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 130/156

ERDF PP6 - UCV WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 10,000.00 14,241.88 8,567.11 7,971.01 17,050.87 0.00 0.00 0.00 57,830.87 28.85 %

2. Overheads 0.00 800.00 1,139.35 685.37 637.68 1,364.07 0.00 0.00 0.00 4,626.47 2.31 %

3. Travel and accommodation costs

0.00 7,500.00 0.00 1,500.00 1,500.00 3,000.00 0.00 0.00 0.00 13,500.00 6.73 %

4. External expertise and services

0.00 13,000.00 24,000.00 0.00 2,000.00 84,000.00 0.00 0.00 0.00 123,000.00 61.36 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 1,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,500.00 0.75 %

TOTAL 0.00 32,800.00 39,381.23 10,752.48 12,108.69 105,414.94 0.00 0.00 0.00 200,457.34

0.00 16.36 19.65 5.36 6.04 52.59 0.00 0.00 0.00

ERDF PP7 - FVG WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 5,000.00 3,000.00 5,500.00 7,900.00 6,000.00 0.00 0.00 0.00 27,400.00 36.34 %

2. Overheads 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

3. Travel and accommodation costs

0.00 4,000.00 0.00 4,000.00 2,500.00 2,000.00 0.00 0.00 0.00 12,500.00 16.58 %

4. External expertise and services

0.00 6,500.00 0.00 11,500.00 7,000.00 10,500.00 0.00 0.00 0.00 35,500.00 47.08 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 15,500.00 3,000.00 21,000.00 17,400.00 18,500.00 0.00 0.00 0.00 75,400.00

0.00 20.56 3.98 27.85 23.08 24.54 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 131/156

ERDF PP8 - UPB WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 10,000.00 7,000.00 18,000.00 10,000.00 38,500.00 0.00 0.00 0.00 83,500.00 69.58 %

2. Overheads 0.00 800.00 560.00 1,440.00 800.00 3,080.00 0.00 0.00 0.00 6,680.00 5.57 %

3. Travel and accommodation costs

0.00 4,000.00 0.00 3,000.00 0.00 2,820.00 0.00 0.00 0.00 9,820.00 8.18 %

4. External expertise and services

0.00 0.00 0.00 0.00 0.00 20,000.00 0.00 0.00 0.00 20,000.00 16.67 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 14,800.00 7,560.00 22,440.00 10,800.00 64,400.00 0.00 0.00 0.00 120,000.00

0.00 12.33 6.30 18.70 9.00 53.67 0.00 0.00 0.00

ERDF PP9 - IFKA WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 10,000.00 4,000.00 12,000.00 18,000.00 16,000.00 0.00 0.00 0.00 60,000.00 50.00 %

2. Overheads 0.00 2,000.00 1,000.00 2,000.00 4,000.00 1,500.00 0.00 0.00 0.00 10,500.00 8.75 %

3. Travel and accommodation costs

0.00 6,000.00 0.00 6,000.00 0.00 2,000.00 0.00 0.00 0.00 14,000.00 11.67 %

4. External expertise and services

0.00 0.00 3,500.00 20,000.00 4,000.00 8,000.00 0.00 0.00 0.00 35,500.00 29.58 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 18,000.00 8,500.00 40,000.00 26,000.00 27,500.00 0.00 0.00 0.00 120,000.00

0.00 15.00 7.08 33.33 21.67 22.92 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 132/156

ERDF PP10 - RUTH WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 8,000.00 0.00 10,000.00 0.00 10,000.00 0.00 0.00 0.00 28,000.00 21.54 %

2. Overheads 0.00 3,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,000.00 2.31 %

3. Travel and accommodation costs

0.00 5,000.00 0.00 3,000.00 0.00 0.00 0.00 0.00 0.00 8,000.00 6.15 %

4. External expertise and services

0.00 13,000.00 3,000.00 22,000.00 18,000.00 35,000.00 0.00 0.00 0.00 91,000.00 70.00 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 29,000.00 3,000.00 35,000.00 18,000.00 45,000.00 0.00 0.00 0.00 130,000.00

0.00 22.31 2.31 26.92 13.85 34.62 0.00 0.00 0.00

ERDF PP11 - V.I.U. WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 15,000.00 8,000.00 14,000.00 115,000.00 15,000.00 0.00 0.00 0.00 167,000.00 76.83 %

2. Overheads 0.00 1,200.00 640.00 1,120.00 9,200.00 1,200.00 0.00 0.00 0.00 13,360.00 6.15 %

3. Travel and accommodation costs

0.00 5,000.00 0.00 6,000.00 500.00 500.00 0.00 0.00 0.00 12,000.00 5.52 %

4. External expertise and services

0.00 0.00 1,000.00 2,000.00 19,000.00 3,000.00 0.00 0.00 0.00 25,000.00 11.50 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 21,200.00 9,640.00 23,120.00 143,700.00 19,700.00 0.00 0.00 0.00 217,360.00

0.00 9.75 4.44 10.64 66.11 9.06 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 133/156

ERDF PP12 - RV WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 10,000.00 0.00 10,000.00 0.00 0.00 0.00 0.00 0.00 20,000.00 28.17 %

2. Overheads 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

3. Travel and accommodation costs

0.00 3,000.00 0.00 2,000.00 1,000.00 0.00 0.00 0.00 0.00 6,000.00 8.45 %

4. External expertise and services

0.00 5,000.00 0.00 20,000.00 20,000.00 0.00 0.00 0.00 0.00 45,000.00 63.38 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 18,000.00 0.00 32,000.00 21,000.00 0.00 0.00 0.00 0.00 71,000.00

0.00 25.35 0.00 45.07 29.58 0.00 0.00 0.00 0.00

ERDF PP13 - PIL WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 20,000.00 4,500.00 25,000.00 35,000.00 60,500.00 0.00 0.00 0.00 145,000.00 85.17 %

2. Overheads 0.00 1,600.00 360.00 2,000.00 2,800.00 4,840.00 0.00 0.00 0.00 11,600.00 6.81 %

3. Travel and accommodation costs

0.00 7,650.00 0.00 6,000.00 0.00 0.00 0.00 0.00 0.00 13,650.00 8.02 %

4. External expertise and services

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 29,250.00 4,860.00 33,000.00 37,800.00 65,340.00 0.00 0.00 0.00 170,250.00

0.00 17.18 2.85 19.38 22.20 38.38 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 134/156

ERDF PP14 - GEA COLLEGE - FP

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 13,000.00 3,000.00 17,000.00 6,000.00 28,000.00 0.00 0.00 0.00 67,000.00 78.82 %

2. Overheads 0.00 1,040.00 240.00 1,360.00 480.00 2,240.00 0.00 0.00 0.00 5,360.00 6.31 %

3. Travel and accommodation costs

0.00 5,000.00 0.00 4,000.00 0.00 3,640.00 0.00 0.00 0.00 12,640.00 14.87 %

4. External expertise and services

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 19,040.00 3,240.00 22,360.00 6,480.00 33,880.00 0.00 0.00 0.00 85,000.00

0.00 22.40 3.81 26.31 7.62 39.86 0.00 0.00 0.00

IPA-I PP1 - MPWT WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 7,000.00 0.00 8,000.00 4,000.00 8,000.00 0.00 0.00 0.00 27,000.00 39.71 %

2. Overheads 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

3. Travel and accommodation costs

0.00 4,000.00 0.00 6,000.00 2,000.00 3,000.00 0.00 0.00 0.00 15,000.00 22.06 %

4. External expertise and services

0.00 5,000.00 0.00 0.00 0.00 20,000.00 0.00 0.00 0.00 25,000.00 36.76 %

5. Equipment 0.00 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,000.00 1.47 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 17,000.00 0.00 14,000.00 6,000.00 31,000.00 0.00 0.00 0.00 68,000.00

0.00 25.00 0.00 20.59 8.82 45.59 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 135/156

IPA-I PP2 - Pro-rail alliance

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 3,020.00 3,360.00 720.00 1,680.00 8,400.00 0.00 0.00 0.00 17,180.00 57.55 %

2. Overheads 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

3. Travel and accommodation costs

0.00 3,750.00 0.00 2,520.00 0.00 0.00 0.00 0.00 0.00 6,270.00 21.01 %

4. External expertise and services

0.00 400.00 0.00 0.00 0.00 6,000.00 0.00 0.00 0.00 6,400.00 21.44 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 7,170.00 3,360.00 3,240.00 1,680.00 14,400.00 0.00 0.00 0.00 29,850.00

0.00 24.02 11.26 10.85 5.63 48.24 0.00 0.00 0.00

IPA-I PP3 - BCC WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

1. Staff 0.00 18,000.00 4,000.00 5,600.00 22,000.00 24,000.00 0.00 0.00 0.00 73,600.00 45.86 %

2. Overheads 0.00 1,440.00 320.00 448.00 1,760.00 1,920.00 0.00 0.00 0.00 5,888.00 3.67 %

3. Travel and accommodation costs

0.00 8,500.00 0.00 8,500.00 0.00 4,000.00 0.00 0.00 0.00 21,000.00 13.09 %

4. External expertise and services

0.00 4,000.00 0.00 0.00 14,000.00 42,000.00 0.00 0.00 0.00 60,000.00 37.39 %

5. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

6. Small scale investment

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

7. Financial charges and guarantee costs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 %

TOTAL 0.00 31,940.00 4,320.00 14,548.00 37,760.00 71,920.00 0.00 0.00 0.00 160,488.00

0.00 19.90 2.69 9.06 23.53 44.81 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 136/156

5.6. ERDF and IPA-I Partners’ spending forecast per WP and per period

LP - CEI WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 2,413.50 25,000.00 5,000.00 9,000.00 90,000.00 13,000.00 0.00 0.00 0.00 144,413.50 30.59 %

period02 0.00 11,000.00 2,880.00 4,450.00 17,480.00 6,500.00 0.00 0.00 0.00 42,310.00 8.96 %

period03 0.00 25,000.00 7,000.00 9,000.00 18,000.00 13,000.00 0.00 0.00 0.00 72,000.00 15.25 %

period04 0.00 25,000.00 7,000.00 9,000.00 90,000.00 13,000.00 0.00 0.00 0.00 144,000.00 30.51 %

period05 0.00 11,000.00 4,880.00 5,750.00 40,000.00 7,700.00 0.00 0.00 0.00 69,330.00 14.69 %

TOTAL 2,413.50 97,000.00 26,760.00 37,200.00 255,480.00 53,200.00 0.00 0.00 0.00 472,053.50

0.51 20.55 5.67 7.88 54.12 11.27 0.00 0.00 0.00

ERDF PP1 - A.U.TH. WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 7,500.00 5,500.00 11,550.00 11,000.00 30,000.00 0.00 0.00 0.00 65,550.00 21.85 %

period02 0.00 3,325.00 2,200.00 5,775.00 11,500.00 8,550.00 0.00 0.00 0.00 31,350.00 10.45 %

period03 0.00 7,500.00 5,500.00 11,550.00 22,500.00 30,000.00 0.00 0.00 0.00 77,050.00 25.68 %

period04 0.00 7,500.00 5,500.00 11,550.00 22,500.00 30,000.00 0.00 0.00 0.00 77,050.00 25.68 %

period05 0.00 3,325.00 2,200.00 5,775.00 22,700.00 15,000.00 0.00 0.00 0.00 49,000.00 16.33 %

TOTAL 0.00 29,150.00 20,900.00 46,200.00 90,200.00 113,550.00 0.00 0.00 0.00 300,000.00

0.00 9.72 6.97 15.40 30.07 37.85 0.00 0.00 0.00

ERDF PP2 - ATE WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 2,572.50 1,500.00 0.00 40,000.00 1,200.00 0.00 0.00 0.00 45,272.50 24.08 %

period02 0.00 5,145.00 590.00 0.00 16,070.00 2,400.00 0.00 0.00 0.00 24,205.00 12.88 %

period03 0.00 5,145.00 1,500.00 0.00 40,000.00 2,400.00 0.00 0.00 0.00 49,045.00 26.09 %

period04 0.00 5,145.00 1,500.00 0.00 40,000.00 2,400.00 0.00 0.00 0.00 49,045.00 26.09 %

period05 0.00 2,572.50 590.00 0.00 16,070.00 1,200.00 0.00 0.00 0.00 20,432.50 10.87 %

TOTAL 0.00 20,580.00 5,680.00 0.00 152,140.00 9,600.00 0.00 0.00 0.00 188,000.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 137/156

0.00 10.95 3.02 0.00 80.93 5.11 0.00 0.00 0.00

ERDF PP3 - RA - Smolyan

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 4,000.00 0.00 4,500.00 7,650.00 5,000.00 0.00 0.00 0.00 21,150.00 17.63 %

period02 0.00 745.00 500.00 3,030.00 2,654.00 13,500.00 0.00 0.00 0.00 20,429.00 17.02 %

period03 0.00 4,000.00 500.00 5,000.00 7,650.00 13,500.00 0.00 0.00 0.00 30,650.00 25.54 %

period04 0.00 4,000.00 500.00 5,000.00 7,650.00 13,500.00 0.00 0.00 0.00 30,650.00 25.54 %

period05 0.00 746.00 500.00 2,530.00 5,000.00 8,345.00 0.00 0.00 0.00 17,121.00 14.27 %

TOTAL 0.00 13,491.00 2,000.00 20,060.00 30,604.00 53,845.00 0.00 0.00 0.00 120,000.00

0.00 11.24 1.67 16.72 25.50 44.87 0.00 0.00 0.00

ERDF PP4 - TRAINOSE

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 6,660.00 0.00 15,200.00 7,320.00 13,000.00 0.00 0.00 0.00 42,180.00 23.10 %

period02 0.00 3,330.00 1,290.00 5,200.00 5,000.00 5,000.00 0.00 0.00 0.00 19,820.00 10.86 %

period03 0.00 6,660.00 1,290.00 15,200.00 10,000.00 13,000.00 0.00 0.00 0.00 46,150.00 25.28 %

period04 0.00 6,660.00 1,290.00 15,200.00 10,000.00 13,000.00 0.00 0.00 0.00 46,150.00 25.28 %

period05 0.00 3,330.00 1,290.00 10,000.00 5,000.00 8,640.00 0.00 0.00 0.00 28,260.00 15.48 %

TOTAL 0.00 26,640.00 5,160.00 60,800.00 37,320.00 52,640.00 0.00 0.00 0.00 182,560.00

0.00 14.59 2.83 33.30 20.44 28.83 0.00 0.00 0.00

ERDF PP5 - Mot AUT WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 1,750.00 0.00 6,000.00 20,500.00 0.00 0.00 0.00 0.00 28,250.00 21.73 %

period02 0.00 3,500.00 1,000.00 2,000.00 10,750.00 2,000.00 0.00 0.00 0.00 19,250.00 14.81 %

period03 0.00 3,500.00 1,000.00 6,000.00 20,500.00 2,000.00 0.00 0.00 0.00 33,000.00 25.38 %

period04 0.00 3,500.00 1,000.00 6,000.00 20,500.00 2,000.00 0.00 0.00 0.00 33,000.00 25.38 %

period05 0.00 1,750.00 1,000.00 2,000.00 10,750.00 1,000.00 0.00 0.00 0.00 16,500.00 12.69 %

TOTAL 0.00 14,000.00 4,000.00 22,000.00 83,000.00 7,000.00 0.00 0.00 0.00 130,000.00

0.00 10.77 3.08 16.92 63.85 5.38 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 138/156

ERDF PP6 - UCV WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 8,200.00 15,000.00 1,252.48 1,108.69 22,000.00 0.00 0.00 0.00 47,561.17 23.73 %

period02 0.00 4,100.00 6,000.00 2,500.00 3,000.00 14,414.94 0.00 0.00 0.00 30,014.94 14.97 %

period03 0.00 8,200.00 5,000.00 2,500.00 3,000.00 27,000.00 0.00 0.00 0.00 45,700.00 22.80 %

period04 0.00 8,200.00 10,000.00 2,500.00 3,000.00 27,000.00 0.00 0.00 0.00 50,700.00 25.29 %

period05 0.00 4,100.00 3,381.23 2,000.00 2,000.00 15,000.00 0.00 0.00 0.00 26,481.23 13.21 %

TOTAL 0.00 32,800.00 39,381.23 10,752.48 12,108.69 105,414.94 0.00 0.00 0.00 200,457.34

0.00 16.36 19.65 5.36 6.04 52.59 0.00 0.00 0.00

ERDF PP7 - FVG WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 4,000.00 0.00 5,000.00 4,500.00 4,000.00 0.00 0.00 0.00 17,500.00 23.21 %

period02 0.00 500.00 1,000.00 3,000.00 1,400.00 1,500.00 0.00 0.00 0.00 7,400.00 9.81 %

period03 0.00 4,000.00 1,000.00 5,000.00 4,500.00 4,500.00 0.00 0.00 0.00 19,000.00 25.20 %

period04 0.00 4,000.00 500.00 5,000.00 4,500.00 4,500.00 0.00 0.00 0.00 18,500.00 24.54 %

period05 0.00 3,000.00 500.00 3,000.00 2,500.00 4,000.00 0.00 0.00 0.00 13,000.00 17.24 %

TOTAL 0.00 15,500.00 3,000.00 21,000.00 17,400.00 18,500.00 0.00 0.00 0.00 75,400.00

0.00 20.56 3.98 27.85 23.08 24.54 0.00 0.00 0.00

ERDF PP8 - UPB WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 1,850.00 560.00 6,000.00 800.00 3,575.00 0.00 0.00 0.00 12,785.00 10.65 %

period02 0.00 3,700.00 2,000.00 1,940.00 3,000.00 15,750.00 0.00 0.00 0.00 26,390.00 21.99 %

period03 0.00 3,700.00 2,000.00 6,000.00 3,000.00 15,750.00 0.00 0.00 0.00 30,450.00 25.38 %

period04 0.00 3,700.00 2,000.00 6,000.00 3,000.00 15,750.00 0.00 0.00 0.00 30,450.00 25.38 %

period05 0.00 1,850.00 1,000.00 2,500.00 1,000.00 13,575.00 0.00 0.00 0.00 19,925.00 16.60 %

TOTAL 0.00 14,800.00 7,560.00 22,440.00 10,800.00 64,400.00 0.00 0.00 0.00 120,000.00

0.00 12.33 6.30 18.70 9.00 53.67 0.00 0.00 0.00

ERDF PP9 - IFKA WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 4,500.00 1,000.00 10,000.00 6,500.00 6,000.00 0.00 0.00 0.00 28,000.00 23.33 %

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 139/156

period02 0.00 1,500.00 2,000.00 5,000.00 3,250.00 6,000.00 0.00 0.00 0.00 17,750.00 14.79 %

period03 0.00 4,500.00 2,000.00 10,000.00 6,500.00 6,000.00 0.00 0.00 0.00 29,000.00 24.17 %

period04 0.00 4,500.00 2,000.00 10,000.00 6,500.00 6,000.00 0.00 0.00 0.00 29,000.00 24.17 %

period05 0.00 3,000.00 1,500.00 5,000.00 3,250.00 3,500.00 0.00 0.00 0.00 16,250.00 13.54 %

TOTAL 0.00 18,000.00 8,500.00 40,000.00 26,000.00 27,500.00 0.00 0.00 0.00 120,000.00

0.00 15.00 7.08 33.33 21.67 22.92 0.00 0.00 0.00

ERDF PP10 - RUTH WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 5,000.00 0.00 8,500.00 4,500.00 11,250.00 0.00 0.00 0.00 29,250.00 22.50 %

period02 0.00 5,000.00 750.00 8,000.00 2,000.00 5,000.00 0.00 0.00 0.00 20,750.00 15.96 %

period03 0.00 8,000.00 750.00 8,000.00 4,500.00 11,250.00 0.00 0.00 0.00 32,500.00 25.00 %

period04 0.00 8,000.00 750.00 8,000.00 4,500.00 11,250.00 0.00 0.00 0.00 32,500.00 25.00 %

period05 0.00 3,000.00 750.00 2,500.00 2,500.00 6,250.00 0.00 0.00 0.00 15,000.00 11.54 %

TOTAL 0.00 29,000.00 3,000.00 35,000.00 18,000.00 45,000.00 0.00 0.00 0.00 130,000.00

0.00 22.31 2.31 26.92 13.85 34.62 0.00 0.00 0.00

ERDF PP11 - V.I.U. WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 5,300.00 440.00 5,780.00 35,000.00 2,000.00 0.00 0.00 0.00 48,520.00 22.32 %

period02 0.00 2,300.00 2,400.00 3,000.00 18,700.00 5,000.00 0.00 0.00 0.00 31,400.00 14.45 %

period03 0.00 5,300.00 2,400.00 5,780.00 35,000.00 5,000.00 0.00 0.00 0.00 53,480.00 24.60 %

period04 0.00 5,300.00 2,400.00 5,780.00 35,000.00 5,000.00 0.00 0.00 0.00 53,480.00 24.60 %

period05 0.00 3,000.00 2,000.00 2,780.00 20,000.00 2,700.00 0.00 0.00 0.00 30,480.00 14.02 %

TOTAL 0.00 21,200.00 9,640.00 23,120.00 143,700.00 19,700.00 0.00 0.00 0.00 217,360.00

0.00 9.75 4.44 10.64 66.11 9.06 0.00 0.00 0.00

ERDF PP12 - RV WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 4,500.00 0.00 8,000.00 2,625.00 0.00 0.00 0.00 0.00 15,125.00 21.30 %

period02 0.00 2,250.00 0.00 3,000.00 5,250.00 0.00 0.00 0.00 0.00 10,500.00 14.79 %

period03 0.00 4,500.00 0.00 8,000.00 5,250.00 0.00 0.00 0.00 0.00 17,750.00 25.00 %

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 140/156

period04 0.00 4,500.00 0.00 8,000.00 5,250.00 0.00 0.00 0.00 0.00 17,750.00 25.00 %

period05 0.00 2,250.00 0.00 5,000.00 2,625.00 0.00 0.00 0.00 0.00 9,875.00 13.91 %

TOTAL 0.00 18,000.00 0.00 32,000.00 21,000.00 0.00 0.00 0.00 0.00 71,000.00

0.00 25.35 0.00 45.07 29.58 0.00 0.00 0.00 0.00

ERDF PP13 - PIL WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 7,500.00 860.00 8,000.00 9,000.00 15,000.00 0.00 0.00 0.00 40,360.00 23.71 %

period02 0.00 3,000.00 1,000.00 3,000.00 4,000.00 5,000.00 0.00 0.00 0.00 16,000.00 9.40 %

period03 0.00 7,500.00 1,000.00 8,000.00 9,000.00 15,000.00 0.00 0.00 0.00 40,500.00 23.79 %

period04 0.00 7,500.00 1,000.00 8,000.00 9,000.00 15,000.00 0.00 0.00 0.00 40,500.00 23.79 %

period05 0.00 3,750.00 1,000.00 6,000.00 6,800.00 15,340.00 0.00 0.00 0.00 32,890.00 19.32 %

TOTAL 0.00 29,250.00 4,860.00 33,000.00 37,800.00 65,340.00 0.00 0.00 0.00 170,250.00

0.00 17.18 2.85 19.38 22.20 38.38 0.00 0.00 0.00

ERDF PP14 - GEA COLLEGE - FP

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 5,000.00 0.00 6,000.00 1,000.00 8,500.00 0.00 0.00 0.00 20,500.00 24.12 %

period02 0.00 2,000.00 810.00 2,000.00 1,000.00 4,000.00 0.00 0.00 0.00 9,810.00 11.54 %

period03 0.00 5,000.00 810.00 6,000.00 1,000.00 8,500.00 0.00 0.00 0.00 21,310.00 25.07 %

period04 0.00 5,000.00 810.00 6,000.00 2,000.00 8,500.00 0.00 0.00 0.00 22,310.00 26.25 %

period05 0.00 2,040.00 810.00 2,360.00 1,480.00 4,380.00 0.00 0.00 0.00 11,070.00 13.02 %

TOTAL 0.00 19,040.00 3,240.00 22,360.00 6,480.00 33,880.00 0.00 0.00 0.00 85,000.00

0.00 22.40 3.81 26.31 7.62 39.86 0.00 0.00 0.00

IPA-I PP1 - MPWT WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 1,000.00 0.00 1,000.00 0.00 2,000.00 0.00 0.00 0.00 4,000.00 5.88 %

period02 0.00 3,000.00 0.00 3,000.00 1,000.00 6,000.00 0.00 0.00 0.00 13,000.00 19.12 %

period03 0.00 5,500.00 0.00 4,000.00 2,000.00 9,000.00 0.00 0.00 0.00 20,500.00 30.15 %

period04 0.00 5,500.00 0.00 4,000.00 2,000.00 9,000.00 0.00 0.00 0.00 20,500.00 30.15 %

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 141/156

period05 0.00 2,000.00 0.00 2,000.00 1,000.00 5,000.00 0.00 0.00 0.00 10,000.00 14.71 %

TOTAL 0.00 17,000.00 0.00 14,000.00 6,000.00 31,000.00 0.00 0.00 0.00 68,000.00

0.00 25.00 0.00 20.59 8.82 45.59 0.00 0.00 0.00

IPA-I PP2 - Pro-rail alliance

WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 1.68 %

period02 0.00 1,500.00 900.00 810.00 500.00 3,600.00 0.00 0.00 0.00 7,310.00 24.49 %

period03 0.00 2,000.00 900.00 810.00 500.00 3,600.00 0.00 0.00 0.00 7,810.00 26.16 %

period04 0.00 2,000.00 900.00 810.00 400.00 3,600.00 0.00 0.00 0.00 7,710.00 25.83 %

period05 0.00 1,170.00 660.00 810.00 280.00 3,600.00 0.00 0.00 0.00 6,520.00 21.84 %

TOTAL 0.00 7,170.00 3,360.00 3,240.00 1,680.00 14,400.00 0.00 0.00 0.00 29,850.00

0.00 24.02 11.26 10.85 5.63 48.24 0.00 0.00 0.00

IPA-I PP3 - BCC WP0 WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 TOTAL

period01 0.00 3,000.00 0.00 1,000.00 2,000.00 2,000.00 0.00 0.00 0.00 8,000.00 4.98 %

period02 0.00 6,000.00 1,000.00 3,500.00 8,000.00 18,000.00 0.00 0.00 0.00 36,500.00 22.74 %

period03 0.00 9,000.00 1,000.00 4,500.00 10,000.00 20,000.00 0.00 0.00 0.00 44,500.00 27.73 %

period04 0.00 9,000.00 1,000.00 4,500.00 10,000.00 20,000.00 0.00 0.00 0.00 44,500.00 27.73 %

period05 0.00 4,940.00 1,320.00 1,048.00 7,760.00 11,920.00 0.00 0.00 0.00 26,988.00 16.82 %

TOTAL 0.00 31,940.00 4,320.00 14,548.00 37,760.00 71,920.00 0.00 0.00 0.00 160,488.00

0.00 19.90 2.69 9.06 23.53 44.81 0.00 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 142/156

5.7. Equipments

WP Description of the equipment Responsible partner Quantity Unit rate Amount

EUR

wp1 Laptop - mobile IPA-I PP1 - MPWT 1 1,000.00 1,000.00

WP total 1,000.00

WP Description of the equipment Responsible partner Quantity Unit rate Amount

EUR

wp4 Purchasing of Information System for the Border Checkpoint

ERDF PP3 - RA - Smolyan 1 5,000.00 5,000.00

wp4 Computer and devices for surveys ERDF PP5 - Mot AUT 1 8,000.00 8,000.00

wp4 Computer devices for the creation of the data management centre

ERDF PP2 - ATE 1 22,500.00 22,500.00

WP total 35,500.00

Total equipments 36,500.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 143/156

5.8. Small scale investments

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM 144/156

5.9. Project Budget of ENPI partners

ENPI PP1 Year 1 Year 2 Year 3 All Years

1. Human Resources 43,400.00 43,400.00 0.00 86,800.00 46.96

2. Travel 13,600.00 13,600.00 0.00 27,200.00 14.72

3. Equipment and supplies 5,000.00 0.00 0.00 5,000.00 2.71

4. Local office 4,320.00 4,320.00 0.00 8,640.00 4.67

5. Other costs, services 29,500.00 22,200.00 0.00 51,700.00 27.97

6. Other 0.00 0.00 0.00 0.00 0.00

8. Provision for contingency reserve

0.00 0.00 0.00 0.00 0.00

10. Administrative costs 2,932.00 2,555.80 0.00 5,487.80 2.97

TOTAL 98,752.00 86,075.80 0.00 184,827.80

53.43 46.57 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

145/156

6. Timeplan

Activites 2009 2010 2011

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gust

Sep

tem

be

r

Oct

ob

er

No

vem

ber

De

cem

ber

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gust

Sep

tem

be

r

Oct

ob

er

No

vem

ber

De

cem

ber

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gust

Sep

tem

be

r

Oct

ob

er

No

vem

ber

De

cem

ber

act 0.1 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

act 0.2 X

act 1.1

act 1.2

act 1.3

act 1.4

act 2.1

act 2.2

act 3.1

act 3.2

act 4.1

act 4.2

act 4.3

act 4.4

act 4.5

act 5.1

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

146/156

act 5.2

act 5.3

act 5.4

Activites 2012 2013 2014

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gust

Sep

tem

be

r

Oct

ob

er

No

vem

ber

De

cem

ber

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gust

Sep

tem

be

r

Oct

ob

er

No

vem

ber

De

cem

ber

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gust

Sep

tem

be

r

Oct

ob

er

No

vem

ber

De

cem

ber

act 0.1

act 0.2

act 1.1 X X X X

act 1.2 X X X X X X X X X X X X X X X X X X X X X X X X X

act 1.3 X X X X X X X X X X X X X X X X X X X X X X X X X

act 1.4 X X X X X X X X X X X X X X X X X X X X X X X X X

act 2.1 X X X X X X X X X X X X X X X X X X X X X X X X X

act 2.2 X X X X X X X X X X X X X X X X X X X X X X X X X

act 3.1 X X X X X X X X X X X X X X X X X X X X X X X X X

act 3.2 X X X X X X X X X X X X X X X X X X X X X X X X X

act 4.1 X X X X X X X X X X X X X

act 4.2 X X X X X

act 4.3 X X X X X X X X X

act 4.4 X X X X X X X X X

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

147/156

act 4.5 X X X X X X X X X X X X X X X X X X X X X X X X X

act 5.1 X X X X X X X X X X X X X X X X X

act 5.2 X X X X X X X X X X X X X X X X X

act 5.3 X X X X X X X X X X X X X X X X X X X X X X X X X

act 5.4 X X X X X X X X X X X X X X X X X X X X X

Activites 2015 2016 2017

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gust

Sep

tem

be

r

Oct

ob

er

No

vem

ber

De

cem

ber

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gust

Sep

tem

be

r

Oct

ob

er

No

vem

ber

De

cem

ber

Jan

uar

y

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gust

Sep

tem

be

r

Oct

ob

er

No

vem

ber

De

cem

ber

act 0.1

act 0.2

act 1.1

act 1.2

act 1.3

act 1.4

act 2.1

act 2.2

act 3.1

act 3.2

act 4.1

act 4.2

act 4.3

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

148/156

act 4.4

act 4.5

act 5.1

act 5.2

act 5.3

act 5.4

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

149/156

7. Indicators

7.1. Output

Description Type Mandatory Measurement

unit Base value Target value

Indicators

01. No of articles/appearances published in the press and in other media (including online media, TV, radio)

output No no. 0.00 40.00

02. No of press conferences output No no. 0.00 3.00

03. Average of hits per month on the project?s website

output No no. 0.00 4.00

04. No of publications produced (editions, specify: e.g. folder, newsletter, brochure, report, guideline, handbook), No of copies disseminated

output No no. 0.00 1.00

05. No of transnational events implemented, no of participants involved

output No no. 0.00 11.00

06. No of national events implemented, no of participants involved

output No no. 0.00 0.00

07. No of regional events implemented, no of participants involved

output No no. 0.00 0.00

08. No of study visits organised, no of participants involved

output No no. 0.00 0.00

09. No of studies produced output No no. 0.00 9.00

10. No of guidelines produced

output No no. 0.00 0.00

11. No of management plans developed

output No no. 0.00 2.00

12. No of joint action plans produced

output No no. 0.00 3.00

13. No of databases created or improved

output No no. 0.00 1.00

14. No of training events, output No no. 0.00 2.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

150/156

Description Type Mandatory Measurement

unit Base value Target value

seminars organised

15. No of participants involved in trainings and seminars

output No no. 0.00 200.00

16. No of individuals that participated in exchange schemes

output No no. 0.00 80.00

17. No of promotion concepts

output No no. 0.00 1.00

18. No of promotion actions output No no. 0.00 14.00

19. No of services developed output No no. 0.00 0.00

20. No of small scale infrastructure projects

output No no. 0.00 0.00

21. No of person in charge for administration of projects

output No no. 0.00 40.00

22. No of project meetings held

output No no. 0.00 5.00

Project specific indicators

Ministerial COnference output No no. 0.00 1.00

Press releases output No no. 0.00 3.00

Surveys output No no. 0.00 5.00

Transport Model output No no. 0.00 1.00

7.2. Result

Description Type Mandatory Measurement

unit Base value Target value

Indicators

01. No of permanent information sources / channels in project (e.g. websites, regular publications)

result No no. 0.00 1.00

02. No of individuals reached directly through dissemination outputs in the co-operation area

result No no. 0.00 10,000.00

03. No of administrative actors reached directly

result No no. 0.00 40.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

151/156

Description Type Mandatory Measurement

unit Base value Target value

through dissemination outputs in the co-operation area

04. No of private sector actors reached directly through dissemination outputs in the co-operation area

result No no. 0.00 100.00

05. No of SME reached directly through dissemination outputs in the co-operation area

result No no. 0.00 50.00

06. No of advanced tools and methodologies adopted to increase the projects visibility among experts and wider communities, the public (additionally description necessary)

result No no. 0.00 1.00

07. No of common positions / agreements formulated

result No no. 0.00 3.00

08. No of common methodologies adopted

result No no. 0.00 2.00

09. No of strategies adopted at governmental level

result No no. 0.00 3.00

10. No of innovative products developed

result No no. 0.00 1.00

11. No of regional/local policies and instruments improved or developed

result No no. 0.00 7.00

12. No of common standards established (e.g. through new guidelines)

result No no. 0.00 0.00

13. No of new tools / instruments developed

result No no. 0.00 0.00

14. No of impact studies on environmental issues carried out (e.g. in pre-investment projects)

result No no. 0.00 0.00

15. No of pilot actions prepared (first application)

result No no. 0.00 0.00

16. No of pilot actions implemented (first

result No no. 0.00 0.00

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

152/156

Description Type Mandatory Measurement

unit Base value Target value

application)

17. No permanent exchange programmes established

result No no. 0.00 1.00

18. No of staff members with increased capacity (awareness / knowledge / skills)

result No no. 0.00 40.00

19. No of advanced tools and methodologies adopted to improve knowledge management within the partnership (additionally description necessary)

result No no. 0.00 1.00

20. No of regions proactively promoted

result No no. 0.00 4.00

21. No of common management structures / systems established

result No no. 0.00 1.00

22. No of individuals benefiting directly from new / improved services

result No no. 0.00 10,000.00

23. No of investment proposals developed (if possible specify volume of investment)

result No no. 0.00 0.00

24. No of private market reactions achieved (e.g. private activities mobilized)

result No no. 0.00 100.00

25. No of investment projects implemented (specify volume of investment)

result No no. 0.00 0.00

26. No of infrastructures of common interest improved

result No no. 0.00 0.00

Project specific indicators

Communication strategy result No no. 0.00 1.00

Transnational Policies improved

result No no. 0.00 4.00

8. Other Data

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

153/156

8.1. Codes for the Priority Theme Dimension

27 - Multimodal transport (TEN-T)

28 - Transport

8.2. Keywords

Accessibility

Connectivity

Governance

Interoperability / intermodality

Logistics / freight transport

Modal shift

Territorial development

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

154/156

9. Checklist

Check Fulfilled (YES/NO)

The application form and all its annexes are in the working language of the Programme (English) and all required parts are duly filled in.

YES

All annexes of the application form are submitted by all relevant partners. They are printed on headed paper, signed, dated and stamped and included in the application pack in original version.

YES

No "ERROR" messages are displayed. YES

The applicant has verified the compliance of the application with the eligibility criteria of the SEE Transnational Programme described in the programme documents.

YES

The application form is dated, stamped and signed by a duly authorised representative of the Lead partner and submitted within the fixed deadline.

YES

SEE Programme Document reg. no.: INTRA-5187985

This document has been generated automatically based on the data recorded until 20/09/2012 3:32 PM

155/156

10. Annexes

Code Name Mandatory Channel Attached/Sent Piece

1 Annex 1: Partnership agreement

YES Paper and electronic

YES 1

2 Annex 2: Declaration of pre-financing and co-financing statement

YES Paper and electronic

YES 1

3 Annex 3: State Aid declaration

YES Paper and electronic

YES 1

4 Annex 4: Data sheet on the Member state responsible body

NO Paper and electronic

NO 0

5 Annex 5: ASP and Observer Declaration

NO Paper and electronic

YES 1

6 Annex 6: ENPI Application Form (including annex B budget and annex C logical framework)

NO Paper and electronic

YES 1

7 Annex 6: ENPI Legal entity sheet (and its supporting documents)

NO Paper and electronic

YES 1

8 Annex 6: ENPI Financial identification form

NO Paper and electronic

YES 1

9 Annex 6: ENPI supporting documents (Statutes

NO Paper and electroni

YES 1