September 2010 Construction Photos Balfour Beatty Subcontractor Meyer's tracked excavator working on clearing & grubbing in the area of the future fish screen. West Bay Subcontractor Meyer excavating in the canal structure to concrete sub grade elevation.

September 2010 Construction Photos

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: September 2010 Construction Photos

September 2010 Construction Photos

Balfour Beatty Subcontractor Meyer's tracked excavator working on clearing & grubbing in the area of

the future fish screen.

West Bay Subcontractor Meyer excavating in the canal structure to concrete sub grade elevation.

Page 2: September 2010 Construction Photos

September 2010 Construction Photos

West Bay Subcontractor Sierra Geosynthetic Service installing the geomembrane to stockpile landfill

excavation material.

Balfour Beatty employees driving sheet piles for upstream end of fish screen cofferdam, sheet pile

guides.

Page 3: September 2010 Construction Photos

September 2010 Construction Photos

West Bay Builders Subcontractor Hughes Construction pre drilling before installing sheet piles.

Coffer Dam for the Settling Basin Structure.

Page 4: September 2010 Construction Photos

September 2010 Construction Photos

Balfour Beatty working on Red Bluff Pumping Plant & Fish Screen Cofferdam Sheet Pile Driving.