Integrating Costs With Primavera Contract
Manager, P6 Scheduler, and P6 Web
September Webinar
Manager, P6 Scheduler, and P6 Web
presented by:
Jonathan McNatty, PSP
DRMcNatty & Associates, Inc.
The Primavera Solution!
•• Primavera allows you to effectively manage time, Primavera allows you to effectively manage time,
costs, resources, contracts and changescosts, resources, contracts and changes in a in a
single integrated solution. single integrated solution.
2
•• Primavera’s IntegratedPrimavera’s Integrated Program Management (IPM) Program Management (IPM)
provides each project participant with anytime, provides each project participant with anytime,
anywhere access to their project informationanywhere access to their project information. .
Primavera’s Integrated Program Management
Interactive Program Dashboard and Reporting
Work Flow - Collaboration - Document Management
Integrated Program Management P6 Web
Web interface
accesses Planner &
CM data, provides
collaboration
platform
Contract and Change Management Job Cost Control Risk MitigationWork Flow - Collaboration - Document ManagementDocumentControlScheduling Resource Management
P6 Planner
Schedules + costs
& resources in the
perspective of
time
Contract
Management
Contracts, Costs,
Changes &
Correspondence
3
Primavera Deployment
Internet
P6 WebP6 WEB USER
Project data from P6 (Schedule) and
Contract Management (Contracts) can be
viewed in P6 Web
LAN, VPN
P6 DatabaseContract Management
Database
Local Area Network
CM USER
Contract
Management Web
ServerP6 USERP6 Web Server
LAN, VPN
RDP, Citrix
Linking Projects
4
Primavera Contract Management
– Project Managers
– Construction Managers
– Contract Administrators
– Field Superintendents
– Contractors
– Subcontractors
Who uses Contract Management
– Cost Engineers
– Job Cost Administrators
– Architects
– Owners
5
Contracts • Change Management • Job Cost • Document Control
P6 – Project Management
Who uses P6 Project Management?
– Program Management Team – Program Master Schedule
– Construction Managers – Project Master Schedule
– Cost Engineers – Project cost & resource loading & reporting
– Contractors – Project execution schedules– Contractors – Project execution schedules
– Subcontractors – Subcontract execution schedules
– Architects – Design milestone schedules
– Owners – regulatory compliance milestones & schedules
Scheduling Resource Management • Costs & Resources in Perspective of Time
6
Project Setup Needs To Be Standardized
• The projects in Contract Management and P6 Project Management need to
match when linking the projects between the two systems.
Contract Management Project Tree P6 Project Structure
The Project Tree in Contract
Management & the EPS-
Enterprise Project Structure in
P6 should mirror each other.
Projects can be
created in matching
nodes.
7
Getting Them Linked
•• Once the project structure is set up the two systems Once the project structure is set up the two systems can be linked to share data. The project structure is can be linked to share data. The project structure is integral to linking the systems.integral to linking the systems.
8
•• An Application Administrator should be responsible for An Application Administrator should be responsible for
setting up the link between the two systems, it setting up the link between the two systems, it
requires some IT knowledgerequires some IT knowledge. .
Getting The Projects Linked – P6 • Access the Admin Preferences in P6 to link to Contract Management & P6 Web.
Click Admin
Access the
Options Tab
Fill in the URL address
for P6 Web
Fill in the URL address for
Contract Management
Check the box for
Contract Management &
Choose version
Choose Admin
Preferences
9
Getting The Projects Linked – P6 • Access the Admin Preferences in P6 to link to Contract Management & P6 Web.
Click Admin
Access the
Options Tab
Fill in the URL address
for P6 Web
Fill in the URL address for
Contract Management
Check the box for
Contract Management &
Choose version
Choose Admin
Preferences
10
Getting The Projects Linked – P6 (cont.)
• Select a project in P6 and click on the Contract Management tab.
Click on a
project
Click on the
Contract
Management tab
Check box to link
to Contract
Management
Select the project from the
Contract Management
database
Click to access the
Contract Management
database
Type in the Contract
Management ID and
Password
Select to access
Contract Management
11
Getting The Projects Linked – Contract Management
• Access the Project Settings from a project to link to a project in P6.
Right Click on a
project
Select Project Settings
to access the Schedule
section
12
Getting The Projects Linked – Contract Management
• Select the Database & Project from P6.
Choose
PrimaveraSelect the database
from the P6
database listdatabase list
Select the
project from P6
13
Managing The Costs & Schedule Together
•• Project Managers need the Costs & Schedule to be integrated between Project Managers need the Costs & Schedule to be integrated between Contract Management & P6 to not duplicate data entry.Contract Management & P6 to not duplicate data entry.
•• Project Managers wantProject Managers want to create all the Committed contracts in to create all the Committed contracts in
Contract Management with costs and import to P6 to create a Contract Management with costs and import to P6 to create a
summary cost loaded baseline schedule with datessummary cost loaded baseline schedule with dates. . summary cost loaded baseline schedule with datessummary cost loaded baseline schedule with dates. .
•• ManagementManagement wants to see the status of the project without knowing wants to see the status of the project without knowing
how to use Contract Management or P6how to use Contract Management or P6. .
•• SubcontractorSubcontractor schedules can then be imported under the Summary schedules can then be imported under the Summary
activitiesactivities. .
14
Importing Contracts From
Contract Management To P6
•• Use the Contracts module Committed or Budgeted. Use the Contracts module Committed or Budgeted.
•• Importing a Contract creates an activity in P6 with a unique Importing a Contract creates an activity in P6 with a unique
Activity IDActivity ID. .
•• Costs from Contract Management are allocated to the Expense tab onCosts from Contract Management are allocated to the Expense tab on
the activity in P6the activity in P6. . the activity in P6the activity in P6. .
•• Cost Codes from Contract Management update the Cost Accounts list Cost Codes from Contract Management update the Cost Accounts list
in P6in P6. .
•• OtherOther useful data is transferred from Contract Management such as useful data is transferred from Contract Management such as
Codes and Document linksCodes and Document links. .
15
Create Cost Codes In Contract Management• Enter Cost Codes in the Cost Worksheet module.
Use the Add Cost Use the Add Cost
Code button to add
Cost Codes
• Import capability exists with Microsoft Excel.
16
Create Contracts In Contract Management• Create a Contract and provide Cost and Contract name.
Enter Cost data. SOV-
Schedule of Values for
Contract. Imports to
Expense Tab in P6
Provide name of
Contract. Imports as
Activity Name in P6
17
• Enter cost data for contract and allocate to Cost Codes.
Enter $ value for the
total contract value
Create Contracts In Contract Management (cont.)
Add Cost Codes and
allocate $ value for
each line item
18
• Enter the Schedule data in the Schedule Section of the Contract.
Create Contracts In Contract Management (cont.)
Enter the Activity ID #. The
# imports into P6 as the
“Activity ID”
Enter the dates for the
Contract. They import as
the Start & Finish dates for
the Activity in P6
19
• Create all the Contracts to be imported into P6 as activities.
Create Contracts In Contract Management (cont.)
Activity ID
Activity Name “Contract”
Activity Code
“Responsibility”
Activity Code
Start Date/
End Date
Budgeted
Total Cost
20
Import Contracts Into P6 as Activities• Schedule before the import of contracts from Contract Management - LOE
21
Importing Contracts & Other Documents Into P6• Select “Import from Contract Manager” from the File menu in P6 for a specific project.
Select File from the
Menu bar in P6
Choose Import from Contract
Manager to bring up the
selection menu screen
22
Importing Contracts & Other Documents Into P6 (cont.)
• Select the types of documents to import from Contract Management to P6.
Select Import when
finished make selections
23
The Contract Manager
Import Report will display
all changes
Importing Contracts & Other Documents Into P6 (cont.)
After review select the
Commit Changes button
24
• Schedule after the import of contracts from Contract Management.
Import Contracts Into P6 As Activities
25
• Schedule after the import of contracts from Contract Management
Import Contracts Into P6 As Activities (cont.)
26
Imported Activities In P6
• Costs are distributed to the Expenses tab in P6 from Contract Management
Each Line Item from the
Contract is added to the
Expense tab
27
Summary Level Schedule With Costs
• Group by Contract and total the costs.
Subcontractor schedules can be
imported for each contract or
trade performing work
28
Record Actual Cost With Payment Requisitions• Generate a Payment Requisition from an existing contract.
Record actual costs in
the Schedule of Values
section
29
Record Actual Cost With Payment Requisitions (cont.)• Enter the billing amount and select the activity from the P6 schedule.
Enter the billing amount
for this period
Select the Activity ID
from the P6 Schedule
Must be a 1 to 1
relationship with activity in
P6 to update costs
30
Record Actual Cost With Payment Requisitions (cont.)
• Certify the Requisition to record Actual to Date costs.
Requisition must be Requisition must be
certified to update costs
in P6 Schedule
Contract is updated with
Actual to Date Costs
31
Record Actual Cost With Payment Requisitions (cont.)
• Import the Schedule of Values into P6 from Contract Management to update costs.
32
Record Actual Cost With Payment Requisitions (cont.)
• Actual Costs are recorded on the activities assigned to the Payment Requisition.
33
• Actual Costs can be viewed on the Expenses tab.
Record Actual Cost With Payment Requisitions (cont.)
34
P6 R8.2 Web Dashboard
35
Access Contract, Cost & Schedule Data In P6 Web
• Add projects to the Personal Workspace to view Projects.
Click on a project to
access more detail
36
Access Contract, Cost & Schedule Data In P6 Web (cont.)
• Access the P6 schedule with the ability to modify activities in P6 Web.
37
Access Contract, Cost & Schedule Data In P6 Web (cont.)
• Access the Cost Worksheet from Contract Management in P6 Web.
Click to open Contract
Management from P6Web
38
P6 R8.2 Web Product Demonstration
39
Questions?