SESAME Straits – Update on the Straits Traffic Management system
John Erik Hagen, Regional Director
Norwegian Coastal AdministrationIndonesia 26 September 2016
SESAME Straits - objectives
26.09. Page 3
The primary objective is to develop and validate shared situational
awareness and cooperative decision making between ship's bridge team and
shore based Vessel Traffic Service (VTS) personnel.
Secondary objectives are:
• Just In Time arrival within a Regional Maritime Service Portfolio
• Use existing systems/equipment as far as possible
SESAME Straits - Secure, Efficient and SAfe maritime traffic ManagEment in the Straits of Malacca and Singapore
SESAME Straits - partners
• Project members:
– MPA, NCA, RCN, Vestfold University,
Navtor, Marintek, SimPlus,
KONGSBERG
• Country Agreement:
– Singapore/Norway R&D MoU
• Funding - MAROFF programme:
– Budget approx. NOK 25 mill
• Project Owner:
– Kongsberg Norcontrol IT
SESAME Straits - CONOPS
Hot spot detection Route & Speed
optimization
Ship reports its
position,
destination,
ETA
S-AIS Ship report
C-Scope VTS Centre
Ship alters
speed and/or
changes route
• Shared situational awareness
• Cooperative decision support
• Regional Maritime Service
Portfolio (MSP) Route Advice-JIT:
o Efficient traffic flow
o Reduced navigation risk
o Reduced ship bunkers
o Reduced toxic gas emissions
o Better utilization of port facilties
resources
Ship Traffic Simulator
prediction
Route Advice
evaluated for
onboard decision
making
Route Advice
service: new
route and/or
speed
VHF
Voice/
AIS
SESAME Straits – Work Packages
WP No Description Responsible
1 Monitoring and control strategy, metrics Norwegian Coastal
Administration
2 Analysis of decision making - HCD Vestfold University
3 System design – S100/200 Kongsberg Norcontrol IT
4 Data collection and preparation Marintek
5 Simulation collaboration - SimPlus Kongsberg Norcontrol IT
6 Cooperative Decision Support Tools Kongsberg Norcontrol IT
7 Ship-shore data communication Kongsberg Maritime
8 Upgraded Planning station Kongsberg Maritime/NAVTOR
9 Demonstration and dissemination Kongsberg Norcontrol IT
10 Management Kongsberg Norcontrol IT
– Vi tar ansvar for sjøvegen
The current status of the SESAME
Straits Project • Work Package 1 – Monitoring and Control Strategy
This work package is concluded.
• Work Package 2 – Analysis of Decision-Making Process
Focus on the simulator testing that will be conducted in Q4 2016 and Q1 2017. This simulator testing will focus on how the availability of an optimized route affects decision making, as well as safety of navigation.
• Work Package 3 – System Design
System Design is concluded.
• Work Package 4 – Data Collection and Preparation
This work package is concluded.
– Vi tar ansvar for sjøvegen
Status….
• Work Package 5 – Simulator Development
KNC, Marintek, and SimPlus continue bi-weekly teleconferences to finalize integration testing.
Currently, the ECDIS, Straits Traffic Management System (STM), and Ship Traffic Simulator (STS) can share information with each other.
The STM system can receive a route from the ECDIS and send the route to the STS. Once the STS has performed its calculations and optimized the route, the result can be displayed on the STM system, which can then forward the optimized route to the ECDIS.
Integration testing is in progress
– Vi tar ansvar for sjøvegen
Status…..
• Work Package 6 – Cooperative Decision Support
Work is ongoing to not only visualize hot spots but also provide suggested actions to reduce risk to navigation, ie. reduce speed to x knots.
• Work Package 7 – Ship Shore Communication
The first prototype VDES transponder is scheduled to be ready by October.
• Work Package 8 – Upgraded Planning Station
Work is ongoing with finalizing communications.
• Work Package 9 – Demonstration and Dissemination
The SESAME Straits project presented two papers at the 2016 e-Navigation Underway International conference, as well as the Innovation e-nav.no conference.
WP 1 - Metrics
20172016
SESAME Straits - Schedule
2014 2015
WP 2 - Analysis of decision making-HCD
WP 3 – System design
WP 4 - Data collection , preparation, analysis
WP 5 - Simulation
WP 6 - Cooperative decision support tools
WP 7 - Ship-shore data communication
WP 8 - Upgraded Planning station
WP 9 - Demo
WP 10 - Management
1. The Project is in progress according to the time schedule
2. The Project will be finalized in April 2017 (SMW)
3. A possible SESAME 2 Project is about to be discussed,
with focus on e-Navigation
solution 2: Standardized and
automatic ship reporting
Summary
e-Navigation is
“three sides of a
coin” and money
makes the
shipping industry
spin!