Upload
trannga
View
219
Download
0
Embed Size (px)
Citation preview
10/29/2009
1
Theme: Public Sector Capacity Development : Towards Improved Service Delivery
15th ASEAN Conference on Civil Service Matters
Lim Ann SengDepartment of Water Services, Brunei
2
1. The Vision and need for Institutional change
(As-Is state)
2. Roadmap and framework of change
(Will-be state)
3. Initiatives of Change
(secret ingredient)
4. Improvements (Current state)
5. Moving forward towards sustainability
10/29/2009
2
MINISTRY OF DEVELOPMENT throughWATER SERVICES DEPARTMENT, PWD
Mission : `To provide clean, safe, affordable and continuous
water supply to the people of Negara Brunei Darussalam’
To plan, develop and manage water resources in the country
• 100% of overall population of about 385,000 served with
safe potable piped system
• 100% of water connections metered
• 2% of population in rural community are served with slow sand filtration
protopak system
• Water Quality that meets WHO International Guidelines
• Public water supply relies solely on surface water resources under 4 main
water supply systems
• Water tariff among the lowest in the region ie $0.11/m3 for the first 55m3
and $0.44/m3 after 55m3 (domestic rate).
WATER SUPPLY
10/29/2009
3
77% is for domestic and commercial use, 18% for oil and gas industry
and 5% for irrigation
3 existing impounding reservoirs with a total storage capacity of 55
MCM for water storage and augmenting river flow during drought
period against intrusion of saline water.
3 new reservoirs are to be developed ie Kargu Dam (10MCM-ongoing),
Ulu Tutong (100MCM-to be constructed) and Ulu Belait Dam (100MCM-
planning) will secure water supply till 2035 and beyond.
Consumption per capita is about 450 lcp and % NRW is 33%
WATER SUPPLY
1)External Client’s Charter
a) Customer survey :
Priority of isues
Intermitten water supply
Delayed water bills
b) Organizational Performance
Only 60% of Client’s Charter is met every month for 10 parameters
Low revenue collection
`Firefighting’ culture
Slow response
Service delivery of water bills
Very Satisfactory
Satisfactory
Average
Unsatisfactory
Service delivery of water supply
Very Satisfactory
Satisfactory
Average
Unsatisfactory
2005
10/29/2009
4
7
SYSTEM PROCESS PEOPLE/
STRUCTURERISK
Obsolete IT system
especially in Billing
(low revenue
late bills)
No documentation
Outdated legislative
acts
Lack of IT support
(manually done) for
operational
monitoring &
management.
• Lack of transparency
and assessibility
• Long winding
procedures thus
longer feedback
response
Unclear roles
Management by `top
down’ approach
Lack of technical &
professional staffs
Passive culture
leading to late
response/incorrect
bills
Inconducive
environment
Increase in public
complaints &
frustrations
Internal conflicts
Low performance
Losing public’s trust
Private sector’s
opportunity to take
over
First we had to identify the Need for Change (As-Is state)
and vision forward…
1. The Vision and need for Institutional change (As-Is state)
8
WILLINGNESS FROM THE TOP FOR CHANGE INITIATED
EFFORTS TO :-
Introduce Institutional Strengthening using the concept of Change
Management
Improving the level of customer service that meets the customers
expectation and satisfaction in terms of fast and efficient.
Alignment of strategic plans and plan of actions
1. The Vision and need for Institutional change (As-Is state)
10/29/2009
5
Strategic Alignment
`Restructuring’
Strategies & plan of Actions
`Benchmarking’
Certification of ISO’s
Refining systems /internal
process
Improvements in
management systems/ IT
People/HRD/Environment
Positive culture mindset
& customer orientated
Regulator
New entity
Analyze current Status
(Where are we?)
Incremental/Transactional Change
Transitional Change
Transformational Change
•Doing what we currently do but faster, simpler, better
As-Is
Future
Will-beYr 2005
2. Roadmap and framework of change (Will-be state)
Capacity Building
Short term Medium term
Long term
10
Success was based on balancing the four key components of
implementing new change into an organisation
CU
LTU
RE
ICT
Conducive Environment
Performance basedTransparency
New mindset &
sense of belonging
3. Initiatives of Change (secret ingredient)
10/29/2009
6
11
TACTIC : In terms of `Holistic’ and `Parallel’ using concepts of
Change Management
1010
Where are we ?Where are we ?
Organization
(Internal TPOR)
Customers
(External TPOR)
Asean Pacific
(KPI’s)
DWSW.A.T.E.RW.A.T.E.R FORFOR ALLALL
(DWS Business Plan)
•Alignment
Structural approach of Structural approach of realisingrealising our visionour vision
NATION VISIONNATION VISION1st
2 nd
3 rd
4 th
5 th
6 th
7 th
8 th
MOD VISIONMOD VISION
JKR VISIONJKR VISION
DWS VISIONDWS VISION
MISSIONMISSION
GOALS & OBJECTIVESGOALS & OBJECTIVES
STRATEGIESSTRATEGIES
ACTION TAKENACTION TAKEN
Built Environment
of Distinction
Quality Living, Sustainable Development,
Prosperous Nation
W.A.T.E.R FOR ALL
Memperolehi ketenteraman dan keselamatan, kebajikan serta kebahagiaan bagi rakyat Negara Brunei Darussalam. ‘(Petikan Titah pada 1hb Januari 1984
•ISO Certification
•Capacity Building & IT
•Environment
•Strategic Management (Balance scorecard/Business
Plan/Action Plan/Benchmarking/Auditing)
•Public Private Participation
•E-BIS (new Billing system)
•Customer Website
•Environment & Information
•Spot Billing
•System GIS Mapping &MAXIMO
(Complaint Management)
•Telemetry system
(Surveillance of water supply)
•Emergency Task Force Team
•KPI’s
•`Common platform’ with
established Water Utilities
•Networking
Solutions Tailored
3. Initiatives of Change (secret ingredient)
12
1) IT SUPPORT SYSTEM
Greater efficiency in the management of Customer Complaints
especially during crisis
Improved bills and increase in revenue collection (doubled)
A standardised approach to Maintenance and Work Order
Management
More efficient tracking of Inventory in the Stores
An improved Customer & Asset Information base
Better access to Maps and Asset Information
More secure IT Infrastructure
4. Improvements (Current state)
10/29/2009
7
13
•Increase in payment counters and
payment modes
•One stop agency for water
payment modes including
application fees
•Increase in payment opening
hours including public holiday
•More conducive environment for
staffs and customers
4. Improvements (Current state)
14
• Improvement in staffs image
• Customer orientated work culture
(Sense of belonging and believe to
change)
• Increase in technical competency
through HRD Development
• Collaboration with other established
utilities through MOU
• Knowledge transfer for new system
and multidisciplinary skills (especially
during crisis)
• BE THE CHANGE !
4. Improvements (Current state)
10/29/2009
8
15
`Assurance’ for better performance
Certification of ISO 17025 - General Requirements for the
Competence of Testing and Calibration Laboratories
Certification of ISO 9001:2000 (now revised to ISO
9001:2008) for provision of water supply
ISO tailored to culture and package in one vision and one
direction
Development of internal & external benchmarks
(KPI’s,Clients Charter,Balancescorecard)
Simplified process with shorter time resulting in improved
customer survey
New revised Water Act focussing on water security
4. Improvements (Current state)
16
PWD
7 Depts
DWS
Emergency
Task Force Team
NDMC
CCC
140 Hotline
OCCMAXIMO, GIS,
Telemetry system
TASK
-Receives calls (Public/NDMC)
-Attends tanker request
-Alerts Emergencies
-Call back
-24 hrs (3-8 lines)
TASK
-Coordinates & manage crisis (TPOR &
Complaints)
-Alerts Emergency Taskforce Team & PWD
team
-Expedite response
-Issues Work order (Computerised)
MISSION
To achieve an efficient and coordinated respond to complaints from CCC (Through 140)
OBJECTIVES To respond to public complaints in the shortest possible time
To coordinate and manage planned and unplanned operational strategies and emergencies
ESTABLISHMENT OF PWD OPERATION CONTROL CENTRE
4. Improvements (Current state)
10/29/2009
9
17
TheChange Doesn’t Stop Here !
18
1) Maintaining sustainability with new changes
• Benchmarking from three aspects (Establishing targets for each
unit, KPI’s). Monitor every month – Analyze results – Act on
Improvements – monitor internal and external TPOR performance.
• Utilizing the concept of Plan,Do,Check,Act + `Wedge of Adaptability’
towards Sustainability
Ie Any new system/IT/`tailored solution’ has to go through an
Analyzing process of Auditing (capacity & capability) and
improve/upgrade to suit any current changes influenced by
changing factors/ environment/ customer expectation. This is what
we call the mechanism `Wedge of Adaptability’
2) Committing to implementation in accordance to planned
5. Moving forward towards sustainability
10/29/2009
10
19
CURRENT AND FUTURE
PLANNING/IMPLEMENTATION
•Source improvement works including dams
• Construction of new treatment works
and upgrading of existing plant
• Construction of new transmission pipelines
•Construction of additional terminal and service
reservoirs
•Replacement programme for
distribution pipelines
•Enhancement of water quality
monitoring system
•Study on development of
alternative source of water
supply
20 20
Bill Issuance
Very Satisfactory
Satisfactory
Average
Unsatisfactory
Bill Issuance
Very Satisfactory
Satisfactory
Average
Unsatisfactory
BEFORE (2005) AFTER (2009)
Continuos Water Supply
Very Satisfactory
Satisfactory
Average
Unsatisfactory
Continuos Water Supply
Very Satisfactory
Satisfactory
Average
Unsatisfactory
10/29/2009
11
21
1) Monitoring process and analyzing continuously (Benchmarking)
2) Continuous Auditing (ie ISO and Internal/External TPOR)
3) Transparency and communication in all aspects
4) Leadership that is more caring and innovative and established a strong HRD
5) Thinking and implementing `out of the box’
6) Plan,Do,Check,Act + `Wedge of Adaptability’
(TOWARDS SUSTAINABILITY)
SECRET INGREDIENT TO CHANGE
MANAGEMENT: BELIEVE !
Ie Any new system/IT/`tailored solution’ has to go through an Analyzing
process of Auditing (capacity & capability) and improve/upgrade to
suit any current changes influenced by changing factors/
environment/ customer expectation. This is what we call the
mechanism `Wedge of Adaptability’
22
TODAY MATTERS !
THANK YOU !
JUST DID IT !!!