20
Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM TDM and the Transit and the Transit Strike Strike Surviving 53 days of Surviving 53 days of Gridlock Gridlock

Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

Embed Size (px)

Citation preview

Page 1: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

Session 10B – Integrating TDM into Municipal Operations

Canadian TDM SummitToronto

18 Nov 2009

TDM TDM and the Transit and the Transit

StrikeStrike

Surviving 53 days of Surviving 53 days of GridlockGridlock

TDM TDM and the Transit and the Transit

StrikeStrike

Surviving 53 days of Surviving 53 days of GridlockGridlock

Page 2: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

2

CITY OF OTTAWA SCENARIOCITY OF OTTAWA SCENARIO Population - 870,000

40,000 in downtown Ottawa 15,000 in downtown Gatineau

There are approximately 185,000 people that work in the downtown core of the National Capital Region (includes Ottawa and Gatineau)

Area: 2,796 km2 , 90 km east to west Ottawa's area is almost 80 per cent rural Ottawa winter temperatures average around -10°C

but can be up to -40°C in winter

Page 3: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

3

The Transitway – Rapid Transit Network

Gatineau

Page 4: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

4

TRANSIT SHARE BY PERSON TRIPSTRANSIT SHARE BY PERSON TRIPS 13% to 18% of the total trips

displaced by transit strike

An estimated 122,000 passengers used transit in the morning daily before the strike

Page 5: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

5

TRANSIT SHARE OF MOTORIZED TRAVEL

TRANSIT SHARE OF MOTORIZED TRAVEL

Page 6: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

6

Page 7: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

7

OC TRANSPO SRIKE TIMELINES

OC TRANSPO SRIKE TIMELINES

No transit: Dec 10, 2008 to Jan 31, 2009 – a total of 53 days.

No transit for 5 additional days after Jan 31, 2009

Page 8: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

8

PROVIDING ALTERNATIVESPROVIDING ALTERNATIVES

Page 9: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

9

Page 10: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

10

DRIVINGDRIVING Improved signal timing Bus lanes opened Additional parking lots opened downtown (3000 spaces) Suburban transit park and rides & additional lots

opened to carpoolers (approx. 600/day) On-street parking permitted all day in unmetered areas Reduced on street parking rates Reduced parking permit rates (-50%) New no-stopping zones City continued to enforced driving and parking

regulations

Page 11: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

11

DRIVING IMPACTSDRIVING IMPACTS

Page 12: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

12

CARPOOLINGCARPOOLING

Increased promotion of www.OttawaRideMatch.com

Increased carpool parking lots (Transitway parking opened for carpoolers)

Carpool parking signage downtown (designated pick-up/drop-off areas) and in suburban carpool parking lots

Shuttle service for universities permitted on TransitWay

Page 13: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

13

WWW.OTTAWARIDEMATCH.COM IMPACTSWWW.OTTAWARIDEMATCH.COM IMPACTS

Pre‐strike Nov 30/08 - 2221 ORM registrants (average < 5 new/day)

Day 1 – 5000 new registrants. By Day 53 over 20,000 new registrants Ridematching system enhancements

RideShark increased from 4 to 72 processors to handle anticipated peak loading

Dedicated 12 CPUs to web farm for ORM exclusively Automated recognition of key destination addresses

(e.g. Federal Government buildings) Launched bike and walking buddy matching Inclusion of new carpool park and ride locations on

map

Page 14: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

14

ACTIVE TRANSPORTATIONACTIVE TRANSPORTATION

Enhanced winter maintenance of key cycling and pedestrian routes

Page 15: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

15

TELEWORKTELEWORK

Anecdotal evidence of many private sector companies aggressively promoting and supporting telework.

Conversely public sector did not.

Page 16: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

16

COMMUNITY IMPACT & MEASURESCOMMUNITY IMPACT & MEASURES

$700,000 funding to community agencies to meet the needs of low-income residents

Additional emergency fund established for low-income residents

Expanded Para-Transpo service – extra vehicles and drivers

Page 17: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

17

POST STRIKE TRANSIT FARE INCENTIVES

POST STRIKE TRANSIT FARE INCENTIVES

Free rides for everyone for week one (until Feb. 15/09) Half price for all cash and ticket fares until the end of February. Free weekends the entire month of February for all transit riders. People who had purchased a December transit pass could return it for

full reimbursement or ride for free with it in February, and then cash it in for a 60% discount on a March pass.

Riders who  purchased a February pass received a 65% discount. April and May express passes were also sold at regular prices to

December express pass holders. Federal EcoPass riders that purchased express Ecopasses were given

3.5 monthly deductions off and regular Ecopass holders 2.5 monthly deductions off. While non-Federal government EcoPass express pass holders were given 10 bi-weekly deductions off and regular EcoPass holders were given 5 bi-weekly deductions off. The reason for the the extended discount period for express EcoPass holders was that early in the start-up of service it was contemplated that full express service could not be guaranteed until April 1.

Page 18: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

18

POST STRIKE TRANSIT RIDERSHIPPOST STRIKE TRANSIT RIDERSHIP

 6.1 % ridership decline comparing July 2009 July 2008.

 Real test of strike recovering in ridership will come in September when budget and actual ridership levels are expected to be virtually the same. 

Ridership decline also due to employed labour force reduction of 5%  in comparison to last year by 3 %. 

Page 19: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

19

SUMMARYSUMMARY

Lessons learned Be ready! TDM Showcase – Opportunity in crisis

City of Ottawa minimized transit strike impacts through: Proactive planning and communication by City

government, partners and stakeholders Clear transparency in available options Media communications of alternatives Transparency on strike status Engagement and positive participation of citizens

Page 20: Session 10B – Integrating TDM into Municipal Operations Canadian TDM Summit Toronto 18 Nov 2009 TDM and the Transit Strike Surviving 53 days of Gridlock

20

THE RESULTThe City kept MOVING...THE RESULTThe City kept MOVING...