1
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA No. URAIAN KODE SEWA ALAT/JAM (di luar PPN) 1 CONCRETE MIXER 0.3-0.6 M3 E06 46,014 2 DUMP TRUCK 6 TON E08 333,179 3 MOTOR GRADER E13 558,622 4 EXCAVATOR E15 408,899 5 VIBRATORY ROLLER 5-8 T. E19 321,692 6 CONCRETE VIBRATOR E20 35,287 7 WATER TANKER 3000-4500 L. E23 203,446

sewa alat

Embed Size (px)

DESCRIPTION

okr

Citation preview

  • DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

    No. URAIAN KODE

    SEWA

    ALAT/JAM (di

    luar PPN)

    1 CONCRETE MIXER 0.3-0.6 M3 E06 46,014

    2 DUMP TRUCK 6 TON E08 333,179

    3 MOTOR GRADER E13 558,622

    4 EXCAVATOR E15 408,899

    5 VIBRATORY ROLLER 5-8 T. E19 321,692

    6 CONCRETE VIBRATOR E20 35,287

    7 WATER TANKER 3000-4500 L. E23 203,446