14
TOPIC Water Operators Partnership: Bulawayo Water and Sewage Emergency Response (BOWSER) Eng. Simela Dube PrEng Director Engineering Services City of Bulawayo Zimbabwe

Sewage Emergency Response (BOWSER) Director …• Eng. Simela Dube PrEng • Director Engineering Services • City of Bulawayo • Zimbabwe . State of Infrastructure 2009 BLOCKED

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • TOPIC Water Operators Partnership: Bulawayo Water and Sewage Emergency Response (BOWSER)

    • Eng. Simela Dube PrEng

    • Director Engineering Services

    • City of Bulawayo

    • Zimbabwe

  • State of Infrastructure 2009

    BLOCKED SEWERS

    BROKEN SEWER BRIDGES

    WATER BURSTS AGED WATER TREATMENT EQUIPMENT

  • Bulawayo –eThekwini Partnership

    TWINNING AGREEMENT SIGNED 2010

  • BOWSER PROJECT

    • FUNDING AusAID and World Vision Australia

    • OBJECTIVES

    Improve hygienic conditions of communities

    Improved sewage and water supply system

    Capacity Building of City of Bulawayo (ESD)

  • Bulawayo –eThekwini Partnership

    • Technical Exchange – BOWSER PROJECT FACILITATED EXCHANGE

    • MASTER PLANNING

    • GIS TRAINING

    • SEWER MAINTENACE

    • PARTICIPATORY HEALTH EDUCATION AND

    HYGIENE

  • Water and Wastewater Master Plan

    • eThekwini Municipality facilitated the preparation of the Master Plan through Bosch Stemele.

    • Department of International Trade (RSA) provided 60% of funding while City of Bulawayo provided 40%

    • BOWSER provided funding for the exchange visits for the technical teams

  • Water and Wastewater Master Plan

    • Planning horizon 2013 -2033 covering

    technical and institutional issues

    – Immediate action plans (2013)

    – Short term action plans (2014-2016)

    – Long term action plans(2017-2033)

    • BOWSER Project provided funding for the

    exchange visits for the technical teams of

    the two utilities

  • Outcomes (Funding)

  • Outcomes (Revenue)

    $0.00

    $10 000 000.00

    $20 000 000.00

    $30 000 000.00

    $40 000 000.00

    $50 000 000.00

    $60 000 000.00

    $70 000 000.00

    $80 000 000.00

    2 009 2 010 2 011 2 012 2 013 2014 2 015

    COLLECTIONS FROM YR 2009 TO YR 2015

    TOALS

  • Outcomes (GIS)

  • How Well are Ward Paying

  • Call Centre

  • Current Partnership Projects