5
Personnel Details: 4D,15/1-A,Arshad Plaza,Flat No C-7, Nazimabad No 4, kararchi. Cell:0300-2265214 Email: [email protected] Professional reg:- Civil/06 94 04 584 /00 006 18/94 Area of Work:- Civil & Earth Works. Construction of Well Site ,Access Road & Rig Camp, cutting pit/water pit, soak & Garbage pit. Evaporation pond. Plant Extension. Air Strip construction Building Projects, Resort, Bank, office HSE & PTW system. Shaikh Shakir, Civil Engineer 1994 from College of Engineering University of the Philippines EXECUTIVE SUMMARY Over 21 years of International and Domestic experience in oil & gas and petrochemical sector. Seeking a challenging and result oriented position in Pipeline Engineering, Civil Structure, Surveying of Project Layout and Project Engineering Management where I effectively utilize my professional experience and skills. SKILLS AS GAS FACILITIES, PIPELINE & CIVIL ENGINEER Experience of working as a Civil Lead on Industrial Structure & Piping & Pipeline Engineer on domestic and international projects of Uch gas field Dehydration Plant, ICI Raw water Pipe line Gravity & pressure line, United Energy Pakistan with SGS Pakistan Gas Facility, Bosicor Oil Refinery, Huge Industrial civil work and mainly involved in providing engineering and construction supervision services to oil & gas and petrochemical sectors to construct new facilities and upgrading of existing facilities. Core Skills involve developing piping materials specifications, scope of work, general arrangement drawings, pipeline plan & profile drawings, supervision of trenching survey and excavation for large diameter pipeline welding and laying in trench etc. CORE RESPONSIBILITIES Managing and coordinating multidisciplinary engineering activities to ensure projects are executed in a safe, efficient, cost effective and timely manner. Prepare Project quality & execution plans at the start of project. Conduct kickoff meetings & interactive planning session. Front end engineering design validation. Review project key drawings like P&ID’s and overall plot plan. Request technical information from client and ensure its timely flow from client. Manage Interdisciplinary interfaces & information flow for smooth execution of project. Ensure design team is aware of, and complying with client's Basis of Design, standards & codes. Identify long lead items & innovated equipment at early stage of project. Assess procurement process through the project to ensure goods meet specification and are delivered on time and within budget. Identify trends with lead engineers, take action to avoid cost overruns & raise change orders. Supervise work in accordance with the approved schedule using MS Project. Prepare, monitor & control manpower loading plan. Prepare weekly and monthly reports, progress monitoring and updates. Monitor & control document control index as per project scope. Monitor any deviation from the agreed original scope and contract.

Shakir Updated CV 21-3-2016

Embed Size (px)

Citation preview

Page 1: Shakir Updated CV 21-3-2016

Personnel Details:

4D,15/1-A,Arshad Plaza,Flat No C-7, Nazimabad No 4, kararchi.

Cell:0300-2265214

Email:

[email protected]

Professional reg:-

Civil/06 94 04 584 /00

006 18/94

Area of Work:-

Civil & Earth Works.

Construction of Well

Site ,Access Road &

Rig Camp, cutting

pit/water pit, soak &

Garbage pit.

Evaporation pond.

Plant Extension.

Air Strip construction

Building Projects,

Resort, Bank, office

HSE & PTW system.

Shaikh Shakir, Civil Engineer 1994 from College of Engineering University

of the Philippines

EXECUTIVE SUMMARY

Over 21 years of International and Domestic experience in oil & gas and petrochemical sector. Seeking a challenging and result oriented position in Pipeline Engineering, Civil Structure, Surveying of Project Layout and Project Engineering Management where I effectively utilize my professional experience and skills.

SKILLS AS GAS FACILITIES, PIPELINE & CIVIL ENGINEER

Experience of working as a Civil Lead on Industrial Structure & Piping & Pipeline Engineer on domestic and international projects of Uch gas field Dehydration Plant, ICI Raw water Pipe line Gravity & pressure line, United Energy Pakistan with SGS Pakistan Gas Facility, Bosicor Oil Refinery, Huge Industrial civil work and mainly involved in providing engineering and construction supervision services to oil & gas and petrochemical sectors to construct new facilities and upgrading of existing facilities. Core Skills involve developing piping materials specifications, scope of work, general arrangement drawings, pipeline plan & profile drawings, supervision of trenching survey and excavation for large diameter pipeline welding and laying in trench etc.

CORE RESPONSIBILITIES

• Managing and coordinating multidisciplinary engineering activities to ensure projects are executed in a safe, efficient, cost effective and timely manner.

• Prepare Project quality & execution plans at the start of project. Conduct kickoff meetings & interactive planning session. Front end engineering design validation.

• Review project key drawings like P&ID’s and overall plot plan. Request technical information from client and ensure its timely flow from client.

• Manage Interdisciplinary interfaces & information flow for smooth execution of project.

• Ensure design team is aware of, and complying with client's Basis of Design, standards & codes.

• Identify long lead items & innovated equipment at early stage of project. Assess procurement process through the project to ensure goods meet specification and are delivered on time and within budget.

• Identify trends with lead engineers, take action to avoid cost overruns & raise change orders.

• Supervise work in accordance with the approved schedule using MS Project.

• Prepare, monitor & control manpower loading plan.

• Prepare weekly and monthly reports, progress monitoring and updates.

• Monitor & control document control index as per project scope.

• Monitor any deviation from the agreed original scope and contract.

Page 2: Shakir Updated CV 21-3-2016

Professional Skills:-

Equipment Management

Bar Bending Schedule

& BOQs.

Material & Manpower

Management.

Quality Assurance/

Quality Control

Site Supervision

Procurement.

Daily Progress

Reporting.

Personnel Skills:-

Ability to understand

& present others points

of view.

Good communication

skills.

A team player with

enthusiastic attitude.

A Hard working &

devoted person.

Can handle stress.

Always Proactive

Safety conscious.

Doer & Conformist

Computer Tools:-

AutoCAD

MS Office & Project

• Effectively manage assigned budgets within project total scope.

• Monitor cost aspects of the project within direct control and forecasts final costs.

• Ensure timely delivery of project documents to client per agreed milestones.

• Monitor closure of all identified risks & opportunities.

• Prepare lesson learnt, clients satisfaction survey and project closeout reports.

• Maintain HSE focus within the team to ensure its requirements are included in the design & procurement.

PROFESSIONAL EXPERIENCE

Period: Dec 2015 – till date

Position: Lead Civil Engineer

Client:: UNITED ENERGY PAISTAN

Construction of 30mmcfd Gas Processing Plant at Buhari Facility UEPL

• Verifying execution of works as per IFC Drawings & Spartan specifications.

• Making Inspection & Test Plan for the activities involved in construction of plant.

• Ensuring implementation of Checklist/protocols by the contractors for all the major activities carried out at site.

• Verifying Contractor’s Invoices/Project Bills.

• Issuing Revised IFC Drawings to contractors.

• Verifying Release Notes of work Sites from various contractors.

• Coordination with Design house for Resolve any deficiency in civil dwg

• Specifying Taking Over of the completed civil jobs to Mechanical Contractors.

• Keeping a follow-up of Project deadlines & schedule for civil works.

• Ensuring Health & Safety protocols to be implemented at site.

• Daily progress reporting of the works carried out at site.

Period: sept 2014 – Nov 2016

Position: Senior Civil Engineer

Client:: UNITED ENERGY PAISTAN

Construction of 160mmcfd Gas Processing Plant at UEPL

• Verifying execution of works as per IFC Drawings & C.P.E specifications.

• Making Inspection & Test Plan for the activities involved in construction of plant.

• Ensuring implementation of Checklist/protocols by the contractors for all the major activities carried out at site.

Page 3: Shakir Updated CV 21-3-2016

Outlook & Emails • Verifying Contractor’s Invoices/Project Bills.

• Issuing Revised IFC Drawings to contractors.

• Verifying Release Notes of work Sites from various contractors.

• Specifying Taking Over of the completed civil jobs to Mechanical Contractors.

• Keeping a follow-up of Project deadlines & schedule for civil works.

• Ensuring Health & Safety protocols to be implemented at site.

• Daily progress reporting of the works carried out at site.

Period: 2007 – Dec 2013

Position: Operation Manager

Company & Location: Survcon Construction , Pakistan

Responsibilities:

• This position, Operation Manager, Pakistan and is responsible for providing all Projects Engineering support, Planning and development.

• Dp world at port qasim, Crain Rail track Maintenance surveying and design for birth level fluctuations Containers stacking and oil terminal Piping maintenance

• Fauji Akbar Portia Terminal at port qasim, silo foundation and erection of silo and conveyer belt from silo to birth under main contractor china harbor , weigh bridge complete work , diesel tank installation piping and pumping station, pre engineered rice ware house complete work etc

• Byco oil Refinery Hub Balochistan, Sand Blasting and coating for new Plant, storage tank fabrication foundation and sand blasting and epoxy coating

• Pak hy oil Korangi Karachi, existing Pre engineered building maintenance and new pre engineered building construction, construction of Bitumen debarrelling plant foundation, Fabrication and installation.

• Meezan Bank Head office building in Karachi gulbai (survey and managing project)

• Supervision and technical support in SQUAIRE ONE Saima builder project in gulistane jouhar near milinium mall.

• NRL National Refinery Limited Korangi, Pre engineered shed for tanker loading and pre engineered residence for workers.

• Earthquake Rehabilitation Project Abbotabad NWFP, worked on primary and secondary school building in galyat and thandyani.

• Small Reservoir Dam Upper and lower kohistan Sindh Pakistan

Period: 2005 – 2007

Position: Manager Engineering

Company & Location: GH Construction, Pakistan.

Responsibilities:

• Bosicor oil Refinery, Oil storage Tank foundation and fabrication sand blasting and epoxy coating Pre engineered shed pip rack construction

Page 4: Shakir Updated CV 21-3-2016

and piping

• Oil storage tank 6 no complete in kemari oil terminal.

• Pre engineered building in engro zarkhez and mahpak edible oil port qasim

• Oil storage tank mahpak oil and engro vopak port qasim.

• Panjgoor to gawadar road aprx 180km

• Period: 2003 – 2004

• Position: DRE Deputy Resident Engineer

• Company & Location: Petrosin Pakistan., UCH GAS FIELD, Dera Bugti, Balochistan.

Responsibilities:

• Dehydration Plant, complete civil work surveying to completion foundation of pipe vessel administration building roads etc.

• H2S Plant, complete civil work surveying to completion.

• Managed all engineering activities from Planning to Implementation, development, plus field engineering support in Project.

• Responsible for all administrative management and engineering functions as well as P&I for department.

• Responsible for all civil foundation for pipe rack vessels, administration Building, Internal Road etc and engineering functions as well as P&I for department.

• Responsible for all Plant Erection Fabrication Installations pipe vessel, administration Building, Internal Road etc and engineering functions as well as P&I for department.

Responsibilities:

• Period: 2000– 2002

• Position: Construction Manager

• Company & Location: Echo West International. ICI Pta plant for raw Water pipe line.

• Managed all engineering activities from Planning, Implementation, development plus field engineering support in Project. Under consultancy of Foster Wheeler.

• Responsible for Profile Survey, Designee of Gravity & pressure line Break pressure Tank.

• Responsible for all civil work, Thrust Block, Trust bore for Road Crossing, Pumping Station Etc.

• Responsible for all welding work using DOLIMIX welding procedure , laying pipe line by side boom, sand Blasting Coating and all engineering functions as well as P&L for department.

• Period: 1995– 2000

• Position: Pipeline Engineer

Page 5: Shakir Updated CV 21-3-2016

• Company & Location: ARAMCO Saudi Arabia

Responsibilities:

• Supervise as client Yanbu Export Refinery–Offsite Pipelines Project, Client Saudi Aramco

• Pipeline engineer detail design, survey profile design supervise trenching laying and testing of Khafji NGL Pipeline Project; Client: Saudi Aramco

• Pipeline Detail design SHY-1 Pipeline Capacity Expansion Project, Phase II, Client: Saudi Aramco;

• Detail design package of Water Injection Header Extension for Well ABQQ-221 and hook-up connections points for wells, ABQQ-246/222/247. Client: Saudi Aramco;

• Detail design package of Water Injection Header Extension for Well ABQQ-291 and hook-up / connection points for wells ABQQ-152/297/345, Client: Saudi Aramco;

• Pipeline engineer Detail design package of Upgrade Crude Facility phase-I of Safaniya Client: Saudi Aramco;

• Detail design package of Upgrade Substation #50 at Juaymah Tank Farm, Client: Saudi Aramco;

• RESPONSIBILITIES:

• Managed all engineering activities from Planning, Implementation, development plus field engineering support in Project.

• Responsible for Profile Survey,

• Responsible for all civil work, Thrust Block, Trust bore for Road Crossing, Pumping Station Etc.

• Responsible for all welding procedure using DOLIMIX, laying pipe line by side boom, sand Blasting Coating and all engineering functions as well as P&L for department.

HSE Certifications:-

• HITRA TEAM LEADER

Certification No : HTL-0128-00418-14-06

• 8- Golden Safety Rules & Control of Work Standard

Certification No : URS/UEP/COW/0128-00417-14-002428