Page 1 of 29
Shell U.K. Limited
Subsea Tree Specification
SWEEP Project
Document No. SWP-67-SH-0001
This document is the property of Shell U.K. Limited, and the copyright therein is vested in Shell
U.K. Limited. All rights reserved. Neither the whole nor any part of this document may be
disclosed to others or reproduced, stored in a retrieval system, or transmitted in any form by any
means (electronic, mechanical, reprographic recording or otherwise) without prior written
consent of the copyright owner.
REVISION HISTORY
A05 12/12/13 Design &
Manufacture
PTP-O-US
WS PTP-O-US
WR PTW-O-C
CD - - - PTP-O-US
AF
A04 06/01/12 Design & Manufacture
UIE-T-PS
WS UIE-T-PS
WR UIE-T-WS
CD - UIE-T-PS
PA UIE-T-PS
AD UIE-T-P
AF
A03 05/02/10 Design &
Manufacture
EPE-T-PS
WS EPE-T-PS
WR EPE-T-WS
CD NAM-EPE-T-WE
FH EPE-T-PS
PA EPE-T-PS
TC EPE-T-PS
AF
A02 07/12/09 Design &
Manufacture
EPE-T-PS
WS EPE-T-PS
WR EPE-T-WS
CD NAM-EPE-T-WE
FH EPE-T-PS
PA EPE-T-PS
TC EPE-T-PS
AF
A01 07/04/09 Design &
Manufacture
EPE-T-PS
WS EPE-T-PS
WR EPE-T-WS
CD NAM-EPE-T-WE
FH EPE-T-PS
PA EPE-T-PS
DR EPE-T-PS
AF
R01 16/03/09 Issued for
review
EPE-T-PS
WS EPE-T-PS
WR EPE-T-WS
CD NAM-EPE-T-WE
FH - EPE-T-PS
DR EPE-T-PS
AF
Rev Date Description Originator Reviewed
Controls
Reviewed
Well Ser
Reviewed
Well Eng
Reviewed
Proc Eng
Reviewed
Sub Proj
Approval
Sub Proj
REVISION APPROVAL
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 2 of 29
REVISION REVISION HISTORY
R01 Issued for review
A01 Issued for Design and Manufacture
A02 Document SWP-67-SH-0001 to cover UK sector requirements only.
Max CITHP now 345bar. Was 420bar.
Max Flowing Wellhead Temperature now 87 deg C. Was 96 deg C.
CO2 content reduced to 6.2 mol% (max). Was 6.5 mol%.
Formation water pH now 5 max. Was 3.5.
H2S content now 5ppm. Was 0 ppm.
SCSSV max hold open pressure = 10,000psi during fraccing added.
SCSSV max hold open pressure =10,000psi during cementing. Was
11,500psi.
Hotline requirement for Tree and Flowline Connector removed.
Production PPTT’s now directly mounted to tree and flowline mandrel
block. Back side of DBB’s to be capped with blind flange.
Injection Chemical’s changed to MEG + CI.
Chemical Injection supply tubing changed to 316 cold worked stainless
steel. Was 25%Cr Super Duplex.
Tree and Flowline Connector lock/unlock line changes on P&ID to reflect
that they are no longer ganged together.
Choke Cv now 100 max.
Control Fluid confirmed as Transaqua HT2.
AKS SCM part number confirmed as 10096095.
Sand production rates amended.
Shell specification DEP39.01.10.12Gen added to Appendix A.
Shell specification DEP61.40.20.31EPE added to Appendix A.
Shell specification MER-26-SH-003 removed from Appendix A.
Section B7 amended to capture PMI checking of 25% Cr parts prior to
fabrication.
Section B7 and B8 amended to capture new specification for super duplex
pipe welding.
7-1/16” Split Gate Header Isolation Valve now a standard feature on the
tree flowbase to allow for pipeline de-watering as well as daisy-chaining.
Appendix F updated to reflect latest P&ID requirements.
Appendix G to reflect latest controls distribution arrangements.
A03 Nomenclature for 7-1/16” Header valve now ‘FDV’. Was ‘FCV’
8” x 6” Tee in header now to be ‘barred’.
Tubing Hanger bottom connection HOLD point removed
A04 Additional CIV1 added upstream of production choke.
Additional Pressure/Temperature Sensor (FPTT2) added downstream of
production choke.
Additional DBB valve to be fitted to 7-1/16” Header 1st end tie-in flange
Tubing Hanger Box Connection now. 3-1/2” 10.2lb/ft VAM Top Box. Was
3-1/2” 9.2lb/ft VAM Top Box.
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 3 of 29
Additional text added to specify that hydraulic couplers for XOV,
PWV,PMV,SCSSV,THAV-O,THAV-C and AMV require to be vented on
the tree fixed plate.
Material reference to barred ‘T’ removed. Was stated as 25% Cr
Welding of bars now optional.
Additional parking receptacle added to flowbase parking plate for FPTT2.
Corrosion Monitoring Spool no longer required. Reference removed
Project Representative details updated.
Appendix A&B – The following changes to material specifications have
been incorporated:-
DEP31.38.01.31 UIE now replaces ES124
DEP61.40.20.31EPE now DEP61.40.20.31UIE
EEMUA 158 deleted
Appendix E – Latest GA Arrangement drawing of SCM included for
reference
Appendix F - Tree schematic updated to capture additional CIV1 and
temperature transmitter. Jumper for APT and Choke Position Indicator now
shown as spliced jumper. Nomenclature for CIV’s updated to reflect Shell
process P&ID nomenclature.
Appendix G – Controls Layouts updated to show addition CI supply and
splicing of CPI/APT jumper. Reference to corrosion monitoring spool
removed
Abbreviation list added
A05 DNV RP B401 replaced by DEP30.10.73.10GEN and DEP30.10.73.32GEN
for Cathodic Protection
ES313 replaced by DEP30.48.00.32GEN in Section A.4
DEP 30.48.00.33EPE replaced by DEP30.48.00.31GEN in Section A.4
DEP39.01.10.32EPE replaced by DEP39.01.10.32GEN in Section A.4
DEP 30.10.02.35EPE replaced by DEP30.10.02.35GEN in Section A.4
DEP30.10.02.15GEN added to Section A.4
Section B.1 amended to capture latest requirements for process wetted
metals and also to specify 42J min average/32J min single impact energy
requirements for low alloy steels.
Section B.5 amended to capture latest bolting requirements.
Section B10.2 amended to capture lasted external coating requirements.
Fluid Cleanliness amended to SAE4059 Class 6 - Open side and Class 8 -
Close Side.
Section C.4 updated to include the coating warranty from the paint supplier
per Section 2.3 of DEP 30.48.00.31GEN
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 4 of 29
Signatures: WS - Willie Stevenson
WR - Willie Reid
FH - Fred Huismann
CD - Calum Dinnes
AF - Andy Fitton
DR - Dave Ridgway
PA - Paul Atkinson
TC - Timothy Clark
AD - Andrew Dickson
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 5 of 29
List of Abbreviations :
ABBREVIATION DESCRIPTION
AMV Annulus Master Valve
APT Annulus Pressure Transmitter
ASV Annulus Swab Valve
BUTA Bullnose Umbilical Termination Assembly
CITHP Closed-In Tubing Head Pressure
CIV Chemical Injection Valve
CPI Choke Position Indicator
CRA Corrosion Resistant Alloy
DBB Double Block and Bleed
DPI Dye Penetrant Inspection
FAT Factory Acceptance Test
FCL Flowline Connector Lock
FCU Flowline Connector Unlock
FDV Flowline Daisy Chain Valve
FIV Flowline Isolation Valve
FPTT Flowline Pressure and Temperature Transmitter
HP High Pressure
ID Internal Diameter
LP Low Pressure
MEG Mono Ethylene Glycol
MIV MEG Injection Valve
MPI Magnetic Particle Inspection
MWP Maximum Working Pressure
NPT National Pipe Thread
PCV Production Choke Valve
PMI Positive Material Identification
PMV Production Master Valve
PWV Production Wing Valve
PPTT Production Pressure and Temperature Transmitter
ROV Remotely Operated Vehicle
SCM Subsea Control Module
SCSSV Surface Controlled Subsurface Safety Valve
SIT Site Integration Test
TCL Tree Connector Lock
TCTV Tree Cavity Test Valve
TCTVS Tree Cavity Test Valve Supply
TCU Tree Connector Unlcock
THAV Tubing Hanger Annulus Valve
TRT Tree Running Tool
UT Ultrasonic Test
WPS Weld Procedure Specification
WPQR Welding Procedure Qualification Record
WHFT Wellhead Flowing Temperature
XOV Crossover Valve
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 6 of 29
Subsea Production Equipment Specification
This Specification encompasses the requirements for a Tree on Mudline System to fulfill Shell’s requirements for
applications within the UK and Dutch Sector of the Southern North Sea.
GENERAL FIELD Additional Comments Field/Block 48-19,48-20,49-9,49-14,49-19,49-
20,49-24,49-25,49-26,49-30 A number of prospects may be
developed within these blocks
Well Name Generic
Well Category (Producer/ Producer with gas
lift/ Water injector / Gas Disposal)
Gas Producer
Max WHFT (wellhead flowing temperature) +87deg C (+189 deg.F) Tree System max temperature
rating is +121deg C (+250
deg.F)
Minimum flowing temp upstream and down
stream of choke
Upstream: + 4 deg C
Downstream: -70 deg C
Tree materials upstream of
production choke and on
annulus side are certified for
–29deg C.
Max CITHP (closed in tubing head pressure) 5,000 psi (345 barg)
Rating of chemical injection
system is 448 bar.
Tree System Design Pressure:-
6,500 psi (448 bar).
Sand Production (no/ yes – Quantify) 8kg/MMSm3 (Peak Rate)
4kg/MMSm3 (Average Rate)
Anticipated sand production rate
over first 5years:
Year 1 & Year 5 : 8kg/MMSm3
Years 2-4 : 4 kg/MMSm3
Sand Properties:
Size: 250microns
Density 2560kg/m3
Note: Predicted combined sand
& proppant rates specified on
SWP-67-SH-0002.
Production Chemistry – H2S , CO2, Hg 5 ppm (Max) H2S predicted
6.2 mol% CO2 (max)
Hg = 2.3µg/m3 (max)
Formation Water pH=5 max
Equipment should be rated for
sour service in accordance with
ISO 15156, DEP30.10.02.15
Gen and DEP39.01.10.12 Gen.
Water Depth 45 m (max)
Metocean Data Refer to Appendix D for wave and
current data
Additional Information Design Life for equipment is 15
years
APPLICABLE CODES AND STANDARDS
Refer to Appendix A for a list of all
applicable codes, standards and
references for the supply of goods in
relation to this specification.
MATERIAL REQUIREMENTS
Refer to Appendix B for a list of
specific material requirements for the
supply of goods in relation to this
specification.
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 7 of 29
DOCUMENTATION
Refer to Appendix C for a list of all
documentation requirements for the
supply of goods in relation to this
specification.
COMPLETION DESIGN
The SWEEP portfolio of wells shall
adopt a slim well cemented
completion design.
Full details of the drilling fluids used
during cementing operations are
contained within specification SWP-
67-SH-0002.
The tree system shall be designed for
running in specified drilling fluids.
WELL STIMULATION
A number of SWEEP prospects have
been identified as potential prospects
for well fracturing.
The flow-wetted components of the
tree system shall be compatible with
the fracturing fluid and the tree system
designed that operational integrity of
the tree system is maintained
following proppant injection.
Full details of the fracturing fluid and
proppant are contained within
specification SWP-67-SH-0002.
TREE SYTEM DESIGN
Tree System General Overview The 13-5/8” Tree on Mudline system
shall be furnished with the
functionality as detailed in the system
schematic, Fig.1 contained within
Appendix F of this specification.
All equipment shall be PR2 tested in
accordance with ISO10423 Annex F
to cover the design temperature rating
of the equipment.
Each tree system shall be subject to
gas testing in line with PSL 3G
requirements.
In order to facilitate the daisy chaining
of wells and allow for de-
watering/pigging of the flowline the
tree system flowbase shall be
furnished with an 8” header complete
with a 7-1/16” 10k split gate valve.
The flowbase shall utilize a 6”
flowline spool tee’d into the 8” header.
Note: The 7-1/16” 10k daisy
chain split gate valve, FDV
complete with DBB facility
shall be free issue equipment
to the tree vendor. Unless
otherwise stated all other
items of equipment, shall be
supplied by the Tree Vendor.
The 8” branch ‘T’ shall have
7-1/16” BX-156 10k rated
flanges with one single 5-1/8”
BX-169 10k rated flange for
connection onto the 6”
flowbase spool. The ‘T’ shall
be of ‘barred’ design in
accordance with
DEP31.40.21.30-Gen, Fig G.
The bars shall be of same
internal CRA material as body
of ‘T’. If bars are welded the
Tree Vendor to ensure that
WPS/WPQR’s to cover full
penetration welds at –70 degC
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 8 of 29
The header shall also incorporate a
Double block and Bleed sandwich
valve to permit isolation
checks/venting prior to performing a
2nd end tie-in or installation of the pig
launcher.
Both ends of the 8” header shall be
furnished with pressure retaining blind
flanges.
All thermal loads resulting from well
start-up, steady state production and
shutdown shall be considered during
the design process.
Accidental loads resulting from
fishing interaction shall not be
transmitted into the header
pipework/valve arrangement.
The header pipework/valve
arrangement shall be supported from
the flowbase structure with due
consideration given to compliance
within the mounting arrangement.
Installation of the tree system shall
take place from a conventional/non-
conventional J.U.D.R. (Jack-Up Drill
Rig).
design temperature are in
place and submit to the
COMPANY for approval.
The DBB sandwich valve
shall be 7-1/16” BX-169 10k
rated.
Tree Control System Architecture Figures 2 and 3 contained within
Appendix G of this specification
outline the controls distribution
requirements for both a single well
cluster and daisy chain well option.
Electrical and Hydraulic services to
the tree are provided by means of an
umbilical terminating with a bullnose
head (BUTA). All hydraulic and
electrical supplies to the control
module from the BUTA shall be
achieved via single hydraulic/electrical
lines with diver mateable connector
either end.
The daisy chain well shall
accommodate an additional BUTA for
ongoing electrical/hydraulic services
to the second well.
The primary BUTA supplying
electrical/hydraulic services from the
host platform shall be mounted on the
control module side of the flowbase
structure. The secondary BUTA
supplying electrical/hydraulic services
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 9 of 29
to the outer well shall be mounted on
the side of the flowbase structure
opposite the 8” header.
A modular design approach shall be
adopted for the BUTA mounting
design to allow for tree system
adaptability between single well and
daisy chain options.
Hydraulic distribution from the control
module to the tree shall be achieved
using a single 12 way flexible hose
bundle. At the control module end
each hose bundle shall terminate onto
a common stabplate. At the opposing
end, the hose bundles shall be broken
out into single pigtails for connection
onto a fixed bulkhead plate using diver
mateable couplers. On the reverse side
of the bulkhead hydraulic tubing shall
be used to mechanically complete the
hydraulic lines to the respective tree
function.
Note: Welded connections shall be
used wherever possible on all
hydraulic and chemical injection lines.
The tree vendors shall ensure
that all hoses/bundles and
hydraulic tubing are
adequately clamped/tied to
prevent damage resulting from
vibration due to high seabed
currents.
The controls vendor shall
supply the fixed bulkhead
plate fully populated with
couplers complete with
300mm long stubs to allow
interfacing with the tree
tubing.
Main Tree Valves All main tree valves shall be
hydraulically actuated failsafe closed
with ROV override and shall have
visual indication of stem travel.
Valves shall have bi-directional
sealing with metal-to-metal seals on
the downstream gate/seat/body
interface.
Note: Vented couplers for the
following tree functions shall
be utilised on the tree fixed
stabplate to ensure the valve
control lines remain free of
trapped pressure and valves
can failclose once outboard
production stabplate or
workover plate is removed:-
XOV,PWV,PMV,AMV,
SCSSV, THAV-O, THAV-C
Crown Plugs (if applicable) All crown plugs shall have metal-to-
metal sealing
Choke requirements (Production/ Injection/
Gas lift)
Production Choke Only
Hydraulic/Chemical Instrumentation Tubing All chemical injection and controls
tubing shall be designed, fabricated
and tested in accordance with ASME
B31.3. All lines shall be hard piped
and adequately secured. Welded
fittings shall be used wherever
possible, if welded fittings are not
practical, vibration resistant fittings
shall be utilized.
Note: Compression/NPT fittings are
not permissible on process
wetted/chemical injection lines.
All chemical and hydraulic shall be
flushed in accordance with SAE
AS4059 Class 6.
Specific tubing requirements
are stated on the key diagram
within Appendix F.
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 10 of 29
Chemical Injection ( one, two or three
penetrations )
3 penetrations are required for
Hydrate prevention and Corrosion
Inhibition.
MIV
1 penetration required upstream of
production choke and wing valve for
Mono-Ethylene Glycol (MEG)/CI
injection during start-up. Start-up
injection rates are expected to be
approx 2.0m3/hr.
CIV-1
1 penetration required upstream of
production choke between wing valve
and choke for CI injection. Injection
rates are expected to be approx
2.0m3/hr.
CIV-2
1 penetration required downstream of
production choke for MEG/CI
injection during start-up and normal
production. Injection rates are also
expected to be approx 2.0m3/hr.
Controls vendor to provide bulkhead
mounting plate complete with diver
mateable couplings on tree frame
adjacent to control module to allow
hook-up of chemical injection supply
lines from umbilical.
Earthing strap also to be provided.
Fixings to be provided by Tree
Vendor.
Size and material selection of couplers
to be confirmed via interface
management process.
MIV Line:
316 Cold Worked Stainless
Steel M/P Tubing 3/4” OD x
0.438” ID. All wetted fittings
to be 316 Cold Worked SS ¾”
M/P. 316ss 3/4” M/P anti-
vibration collet and gland
assemblies to be used for tube
termination.
MIV bore ID = 0.5” ID
CIV-1 Line:
316 Cold Worked Stainless
Steel M/P Tubing 3/4” OD x
0.438” ID. All wetted fittings
to be 316 Cold Worked SS ¾”
M/P. 316ss 3/4” M/P anti-
vibration collet and gland
assemblies to be used for tube
termination.
CIV-1 bore ID = 0.5” ID
CIV-2 Line:
316 Cold Worked Stainless
Steel M/P Tubing 3/4” OD x
0.438” ID. All wetted fittings
to be 316 Cold Worked SS ¾”
M/P. 316ss 3/4” M/P anti-
vibration collet and gland
assemblies to be used for tube
termination.
CIV-2 bore ID = 0.5” ID
Additional QA checks to be
put in place to ensure correct
material grade of tubing is
used. Inspection by PMI
(Positive Material
Identification) unit to be
utilized.
Downhole Chemical injection- (type and
pressure )
Not required
DHPT / D/H metering
Not required
Down Hole Fibre Optics
Not Required
SCRAMS / DTM Not Required
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 11 of 29
SCSSV pressure rating (Production / Annulus) Production SCSSV required
Recommended hold open pressure –
CITHP+1900+500 psi. (during
production)
Maximum Hold Open Pressure –
10,000psi (during cementing)
Maximum Hold Open Pressure –
10,000psi (during fraccing)
The SCSSV line to be rated to
10,000psi MWP.
Note:
During completion operations
the maximum hold open
pressure of 10,000psi shall be
maintained in W/O mode.
During normal production
operations the recommended
hold open pressure shall be
maintained via the SCM.
Fraccing operations shall be
performed with the tree in-situ
via the W/O riser.
Flowmeter ( gas lift ) – state required DP range Not Required
Pressure and Temperature Transducers
(PPTT – Production Inboard)
(FPTT1 – Production Outboard)
(FPTT2 – Production Outboard)
(APT – Annulus Inboard)
Tree mounted combined pressure and
temperature sensors to be fitted to the
production side inboard and outboard
of the choke valve. Transmitters shall
be mounted direct to the tree to allow
for accurate measurement of
temperature.
Additional combined pressure and
temperature sensor to be fitted to DBB
valve downstream of choke. (Refer to
Fig.1 Appendix F)
Pressure Transmitter required on
Annulus side only. (See note below
regarding mounting).
Production Inboard
Transmitter to be 0 – 150
deg.C. 4-20mA, 0-700bar
flange mounted.
Production Outboard
Transmitters to be -70 /+120
deg.C, 4-20mA, 0-700bar
flange mounted
Annulus Transmitter to be 4-
20mA, 0-700bar flange
mounted.
Diver Operable DBB’s
Diver operable Double Block and
Bleed valves to be provided to allow
for barrier isolation verification prior
to intervention by divers. DBB’s to be
located between the following valves
1) PMV and PWV
2) PWV and FIV
3) AMV and ASV1
Note: It shall be permissible to mount
the annulus pressure transmitter
directly onto the DBB valve to allow
for future diver replacement. DBB
Valves shall be fully accessible during
diving operations. [Production Side
DBB’s to be accessible without
removing canopy].
Choke Position Monitoring Choke position monitoring also
required via SCM for Production
Choke
SCM – ( 5th Generation control module, c/w
mounting base - standard )
Aker Solutions (AKS) SCM
Part No. 10096095
See Appendix E for
dimensional details.
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 12 of 29
HP Operating Pressure: 517 bar
LP Operating Pressure: 207 bar
LP Supply accumulation supplied by
AKS.
The SCM shall be furnished with
lifting appendage to aid in diver
removal.
Max design HP operating
pressure: 690 bar
Further information shall be
provided at contract award via
the formal interface process.
Control Module HydraulicFunctionality SCM Hydraulic Functionality:
HP Services:
SCSSV (PSSV)
LP Services:
PMV
PWV
AMV
XOV
THAV-Open
THAV – Close
PCV (open/close)
MIV
CIV-1
CIV-2
Note: The HP supply is
obtained using a HP intensifier
mounted external to the
control module.
Workover Controls The following tree valves and
functions shall be capable of being
operated in workover control mode:-
SCSSV
PMV
PWV
AMV
ASV1
ASV2
XOV
THAV-Open
THAV - Close
TCTV
TCTVS
FCL
FCU
TCL
TCU
Note: It is assumed that
methanol delivery during
installation and workover shall
be provided via the TRT (Tree
Running Tool) Interface.
Note: In workover mode it
shall not be possible to
function the main
tree/flowline connectors from
the HPU/workover panel.
Control Fluid Water Based Control Fluid Castrol Transaqua HT2
Fluid cleanliness to SAE
Class6 (Open Side)/Class 8
(Close Side) of Actuators
Additional Accumulation (return / supply ) Tree vendor to supply return side
accumulation for all hydraulically
actuated tree valves in production
mode.
Transfer barrier accumulation to be
supplied by Tree vendor for
workover/installation mode
Design capacity to be verified.
Refer to P&ID’s in Appendix
F and standard set-up for
5”x2” dual bore frame
agreement tree.
Tree Electrical/Hydraulic Jumper Parking The following hydraulic functions
shall require parking on the xmas tree
in close vicinity to the control
Refer to Appendix G for
hydraulic distribution
arrangement.
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 13 of 29
module:-
SCSSV
THAV-C
THAV-O
PMV
AMV
XOV
PWV
MIV
CIV-1
CIV-2
PCV-Open
PCV-Closed
Return Line
The following electrical functions
shall require parking on the tree:-
CPI /APT – choke position
indicator/annulus pressure sensor
spliced jumper
PPTT – Production
pressure/temperature sensor jumper
The controls vendor shall supply all
necessary parking plates complete
with dummy couplers to facilitate
parking of the above function lines in
the event of SCM changeout. The
parking plate shall be cited adjacent to
the control module for diver access
and shall be furnished complete with
earthing strap. Fixings to be provided
by Tree Vendor.
ESP – (coupler type and no ) Not required
Thermal Insulation ( Specify ) None
Tree and Flowline Connector Main tree and flowline connectors
shall have provision for hydraulic and
mechanical contingency release of the
connectors.
A facility to allow function testing of
the tree and flowline connector on the
rig / shop floor shall be provided
ROV Valve Interfaces All ROV interfaces, unless otherwise
stated shall be in accordance with
ISO13628-8 and shall be read in
conjunction with the details contained
within EP200601205487 Appendix H.
All hydraulically operated tree and
choke valves shall be furnished with
ROV overrides in accordance within
EP200601205487 Appendix H.
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 14 of 29
TUBING HANGER
Tubing Hanger Details Concentric Hanger Design
Bottom Connection Size: 3-1/2” 10.2
lbs/ft VAM TOP Box
Suspension plug profile: 2.885" AVA
Pup joint supplied and fitted
by Shell approved sub-vendor
Additional Information
FLOWBASE
Type – (Remote Satellite or Daisy Chain) Both options to be provided
All flowbase pipework shall be
designed to be free draining.
Refer to P&ID in Appendix F
and Appendix G for daisy
chain configuration.
Design of process piping must
take into account deflection of
WPS due to snag loading and
any thermal expansion
associated with the flowline.
Daisy chain header size – (6”/ 8”/ 10”) 8”
Header rating – pipeline design pressure 6,500 psig
Tie-in – (diver or ROV) Diver tie-in
UTA tie-in – (cradle or hang off / diver /ROV) Diver tie-in
Additional chemical valve- (manual /
hydraulic)
None
Thermal Insulation ( Specify ) None
Sand detector. Yes Acoustic clamp on non-
intrusive device. Supplied by
controls vendor.
Diver Operable DBB’s As described in the tree system
general overview section the 8” header
shall incorporate a Double block and
Bleed sandwich valve to permit
isolation checks/venting prior to
performing a 2nd
end tie-in or
installation of the pig launcher.
In addition a DBB valve shall be
provided at the 1st End Header Tie-in
flange to allow pressure testing prior
to blind flange removal and tie-in.
Refer to P&ID in Appendix F.
Protection structure – (none / cocoon /
independent)
Protection structure required.
The well protection structure shall be
designed to withstand the fishing
interaction loads as defined in Section
2.5, Table2-2 and Section 2.6, Table2-
3 of Boreas Report No.
5075215/001/BR09002 Rev A.
The well protection structure shall also
be designed to resist accidental loads
from dropped objects in accordance
with Section 2.7, Table2-4 of Boreas
Report No. 5075215/001/BR09002
Rev A.
The protection structure shall
be designed to prevent
beam/otter board entry such
that any risk of damage to the
UTA’s and the daisy chain
valve arrangement housed
under the protection structure
is avoided.
If the protection structure is
designed to be snag free
overtrawl load and impact
loads need only be considered.
Note: The control module and
choke insert shall be capable
of being retrieved via a hinged
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 15 of 29
aperture in the protection
structure without the removal
of the canopy. The protection
structure shall also be tolerant
to seabed scour of up to
2metres.
Tie in flange type – (fixed / swivel / GSR
multibore/ GSR mono bore etc)
7-1/16” BX-156 10k ISO10423 weld
neck flange.
Umbilical Termination Assembly (UTA) The UTA for each well shall be
positively clamped to the well
protection structure frame and shall be
adequately protected to safeguard
against beam/otter board impacts
The well protection structure shall
provide an additional facility for the
mounting of a second UTA when the
daisy chain option is required
Padeyes shall be provided to
aid in the installation of the
UTA with the protection
frame. Padeyes shall be rated
for an 8.5 Tonne S.W.L.
Flowbase Electrical/Hydraulic Jumper Parking The following hydraulic functions
shall require parking on the flowbase
structure in close vicinity to the
control module for Xmas tree
recovery:-
LP Supply Line
MI Supply
CI Supply 1
CI Supply 2
Return Line
The following electrical functions
shall require parking on the flowbase:-
Power/Comms Jumper
Sand Detector Jumper
FPTT1 – Flowline
pressure/temperature sensor jumper
FPTT2 – Flowline
pressure/temperature sensor jumper
The controls vendor shall supply the
necessary parking plate fully
populated with receptacles to allow
parking of the above functions,
including earthing strap. The xmas
tree vendor shall supply all necessary
fixings.
Final design and position of
parking plate to be agreed at
design freeze, but shall permit
Diver access.
Corrosion Monitoring Not Required
ROV Valve Interfaces The following flowbase valves shall
have a Class IV rotary torque interface
in accordance with ISO13628-8 Fig
18.
FIV
FDV (free issue supply)
Additional Information All system components including and
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 16 of 29
downstream of production choke to
tie-in point to be rated to –70deg C
GAS LIFT CHOKE – 10000 psi MWP
Trim Not Required
CV
Characteristics
PRODUCTION CHOKE – 10000 psi MWP
Trim 4” HF – LCV
–70 deg.C. rating.
CV 100
Characteristics Equal %
Subsea Tree Systems Eng: Willie Stevenson Tel: 01224 884182
Controls System Eng: Willie Reid Tel: 01224 882112
Project representative: Andrew Dickson
Tel: 01224 883464
Well Eng: Calum Dinnes
Graeme Henderson
Tel: 01224 887254
Tel: 01224 881456
Project Delivery: Refer to Specific Purchase Order
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 17 of 29
Appendix A: Codes and Standards
The Vendor shall apply the latest edition (and any superseding documents) of the following
Normative References (Legislation, Codes, Standards, Specifications, and HSE Approved
Codes of Practice (ACOPs) and Guidance Notes) when using this Specification.
The Vendor shall not deviate from their requirements without the COMPANY’S prior
agreement. Where any ambiguity in, or conflict of, requirements occur, the Vendor shall refer
to the COMPANY for advice in interpreting and establishing the requirements.
It is Vendor’s responsibility to ensure that current standards are being used, including the
implementation by sub-contractors.
A.1 Health and Safety
Refer to Section 3.3 of Shell specification EP200601205487.
A.2 Verification
Refer to Section 3.4 of Shell specification EP200601205487.
A.3 Principle Codes for Design, Construction and Operation
Document No. Title
DNV RP F112 Design guideline for duplex stainless steel used for
subsea equipment exposed to cathodic protection.
ISO 13628- 1 Petroleum and Natural Gas Industries – Design and
Recommendations
ISO 13628 – 2 Flexible Pipe Systems for Subsea and Marine Application
ISO 13628 – 4 Subsea Wellhead and Tree Equipment
ISO 13628 – 5 Subsea Control Umbilicals
ISO 13628 – 7 Completion Workover Riser Systems
ISO 13628 – 8 Remotely Operated Vehicle (ROV) Interfaces
ISO 13628 – 9 Remotely Operated Tool (ROT) intervention systems
ISO 10423 Specification for Valves and Wellhead Equipment. As
referred in ISO 13628-4
ISO 15156 Materials for use in H2S containing environments in oil
and gas production. Supersedes NACE MR-01-75.
ASTM B165 Nickel Copper Alloy (UNS N04400) Seamless Pipe and
Tube.
ASTM A182 Specification for Forged or Rolled Alloyed Steel, Pipe
Flanges, Forged Fittings and Valves and Parts for High
Temperature Service
EEMUA 194 Guidelines for Material Selection and Corrosion Control
for Subsea Oil and Gas Production Equipment
ISO 10204 Metallic Products – Types of Inspection Documents
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 18 of 29
Document No. Title
SAE AS4059 Aerospace Fluid Power –Cleanliness Classification for
Hydraulic Fluids
A.4 Company Standards
Document No. Title
DEP30.48.00.32GEN Coating of Fasteners
DEP31.38.01.31UIE Welding and Inspection of Process and Utility
Pipework, Vessels and Equipment at Land and
Offshore Facilities
DEP 30.10.02.35GEN Technical requirements for the supply of components
in 6% Mo, 22% Cr Duplex and 25% Cr Super Duplex
Stainless Steel
DEP31.40.20.34GEN Welded and Seamless Duplex and Super Duplex
Stainless Steel Line Pipe (Amendments/Supplements
to API Spec 5LC)
DEP31.40.21.34GEN Carbon and Low Alloy Steel Pipeline Flanges for use
in Oil and Gas Operations (Amendments/Supplements
to ISO15590-3)
DEP 31.40.20.33GEN Linepipe Induction Bends (Amendments/Supplements
to ISO 15590-1)
DEP31.40.21.30GEN Pipeline Fittings (Amendments/Supplements to ISO
15590-2)
DEP31.40.20.37GEN
Linepipe for Critical Service
(Amendments/Supplements to ISO 3183-3)
DEP 30.48.00.31GEN Protective Coatings for On-and offshore Facilities
DEP39.01.10.32GEN Specification of Nickel Base Alloy 718 (UNS
N07718) for Oil and Gas Drilling and Production
Equipment (Amendments/Supplements to API6A 718)
DEP39.01.10.11GEN Selection of Materials for Life Cycle Performance
(EP) – Materials Selection Process
DEP39.01.10.12GEN Selection of Materials for Life Cycle Performance
(EP) – Upstream Equipment
DEP30.10.02.15GEN Materials for use in H2S containing environments in
Oil &Gas Production (Amendments/Supplements to
ISO15156:2009)
DODEP02.01B.03.02 Functional and material requirements for non-metallic
seal materials
DEP38.80.00.11EPE
EPE Wells Barrier Requirements (TS02)
DEP61.40.20.31UIE Welding of Super Duplex Pipelines.
Amendments/Supplements to BS4515 Part2. DEP30.10.73.10 GEN Cathodic Protection
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 19 of 29
Document No. Title
DEP30.10.73.32 GEN Cathodic Protection Systems for Subsea Pipeline and
Hardware (Amendments/Supplements to ANSI/NACE
SP0607-2007/ISO15589-2)
EP200601205487 Specification for Subsea Well Flow Control Assembly
4610015672 EPE Subsea Xmas Trees and Wellheads Contract
SWP-F-10-SH-0001 SWEEP Project Basis for Design
SWP-67-SH-0002 Well Stimulation and Completion Fluid Requirements
for SWEEP wells.
Boreas Report Number
5075215/001/BR09002
Updated Fishing Loads - Subsea Structure Design
Shell UK Ltd
A.5 Dutch Standards
Document No. Title
- Mining Regulations of the Netherlands (2003).
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 20 of 29
Appendix B: Material Requirements
B1 General
All materials shall comply with the material inspection and test requirements of ISO 10423
Section 5 to PSL 3, DEP39.01.10.11Gen and DEP39.01.10.12Gen, supplemented by the
following requirements of this section.
Low alloy steel forgings shall be impact tested to the minimum design temperature in both
longitudinal and transverse directions and meet the specified acceptance criteria of 42J
minimum average value and 32J minimum single value.
All materials in contact with process fluid shall conform to the requirements of ISO 15156
DEP30.10.02.15GEN and DEP39.01.10.12Gen.
All elastomeric components must be compatible with the exposure fluids over the temperature
and pressure range of the equipment, and where appropriate be materials proven to be
explosive decompression resistant.
B2 Material Class
The production bore of the tree system shall be in accordance with ISO10423 Material Class
H-H.
The annulus bore of the tree system shall be in accordance with ISO10423 Material Class
E-E.
All seal surfaces, ring grooves and valve cavities shall be inlayed with Alloy 625.
B3 Weld Inlay/Overlay
The minimum thickness of inlay/overlay applied shall be no less than 3mm and shall be
applied in two phases. The maximum iron content shall be 10% at the finished surface.
B4 Gaskets
All production gaskets shall be furnished in Alloy 825 (HB 160 max).
B5 Bolting
All pressure containing and structural steel bolting shall in accordance with
DEP39.01.10.12GEN Section3.2.12 and ISO13628-4 Section 5.3.1.5. A 10% MPI inspection
shall be undertaken on each batch. Bolts and nuts shall also be batch hardness tested to
BS6001 and shall be coated in accordance with DEP30.48.00.32GEN.
B6 Certification Level
All 22% and 25% Cr materials shall be certified in accordance with EN10204 Type 3.2. (Note
– This requirement shall take precedence over DEP30.10.02.35GEN Section 4.3)
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 21 of 29
All other materials shall be certified to EN10204 Type 3.1.
B7 Additional Requirements for 25% Cr Stainless Steel
All subsea equipment fabricated from 25%Cr SS subject to cathodic protection (CP), shall be
designed to avoid hydrogen induced stress cracking (HISC). The required design criteria are
detailed in the specification ‘Design guideline for duplex stainless steel used for subsea
equipment exposed to cathodic protection’- DNV RP F-112 and EEMUA 194 Appendix III.
All welding and inspection shall be carried out in accordance with DEP61.40.20.31UIE.
Prior to welding of 25% Cr SS components all parent material and filler wire shall be subject
to 100% PMI (positive material identification).
The design criteria detailed in this document shall apply in addition to fulfilling requirements
of the applicable company, national or international standards governing the design.
B8 Welding
All welding undertaken during the manufacture of the equipment shall be performed, where
production methods allow, with procedures in accordance with ISO 10423 Section 6 to PSL
3. Company specifications DEP31.38.01.31UIE and DEP61.40.20.31UIE shall also apply,
where applicable.
The Vendor shall supply a weld map for all welding activities associated with pressure
containing/controlling parts.
Weld repairs to forgings are prohibited by the COMPANY.
All welding procedures shall be APPROVED by the COMPANY.
B9 Padeyes
All Padeye base plate material shall be subjected to through thickness mechanical test checks
and NDE lamination checks prior to the commencement of any welding activities. The NDE
inspection records shall form part of the final documentation submitted to the COMPANY.
B10 Corrosion Control
B10.1 Internal Corrosion Allowances
No corrosion allowance need be applied to Duplex SS pipe or fittings if selected. An
erosion allowance however shall be accounted for in the design.
B10.2 External Corrosion Protection
External corrosion protection for the subsea equipment shall be provided by a
combination of anti-corrosion coating and sacrificial anodes.
The cathodic protection system shall protect all pipe-work, valves and structural
steelwork for the defined design life. The cathodic protection system shall be
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 22 of 29
designed to supplement the coating system and shall be in accordance with
DEP30.10.73.10GEN and DEP30.10.73.32GEN
The anti-corrosion coating system shall be in accordance with DEP.30.48.00.31GEN
as applicable to the design temperature.
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 23 of 29
Appendix C: Documentation Requirements
C1. Formats
All text documents shall be supplied A4 size in .pdf format.
All drawings shall be supplied A3 size in .pdf format.
C2. Units of Measure
The Imperial system of units shall be used throughout. Any system stack-up drawings shall
be supplied in dual units (Imperial units with SI units in parentheses).
C3. Documents for Review
The Vendor shall not begin fabrication work until such times that all design documentation
submitted for review has been acknowledged by Shell and possible comments have been
incorporated.
The Vendor shall also issue a Master Document List (MDL) for review and approval
identifying all the documents being supplied by the Vendor and highlighting those required
for review by the company. The MDL shall be approved by the company prior to the onset of
procurement activities and fabrication work.
It is the preference of the COMPANY that the Vendor uses LiveLink for Document review,
distribution and storage. This is a web based system which allows for efficient transfer and
storage of large document files.
Documents submitted for review will be returned within 15 working days.
Any document returned to the vendor for revision shall be re-submitted within 10 working
days complete with revisions clearly flagged for ease of identification.
C4. Final Documents
On completion of the provision of the GOODS, or when requested by the COMPANY, the
Vendor shall provide the data books complete with contents as listed below.
Under cover of a transmittal the vendor shall supply one bound copy plus two electronic
copies on CD.
The Vendor data books shall be bound in A-4 heavy duty binders with transparent pockets on
the cover and spine and 4 hole ring binder mechanisms. Each section shall be separated by
using numbered dividers with each book clearly indexed.
C4.1 Data Book 1 – Mechanical Completion Dossier
Certificate of Compliance
Certificate of Ownership
Velosi Inspection Release Certificate
DNV Inspection Release Certificate
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 24 of 29
DNV Design Review Certificate
DNV Product Certificate Lifting Certification
Suppliers Punch List
Concessions complete with Index
Interface Register complete with Index
Suppliers Master Document List
C4.2 Data Book 2 – Design Reports and Test Documentation
As Built Drawings complete with Bill of Materials
Design Premise
Performance Standards
Design/Analysis Reports
FAT Procedures
SIT Procedures
C4.3 Data Book 3 – Manufacturing Records
The following manufacturing data shall be provided for all pressure containing, pressure
controlling (including valve gates and seats) and main load bearing components forming the
subsea tree system. This data book shall be sub-catagorised such that all relevant records for
the main assemblies and sub-assemblies are retained together. For example tree connector
assembly, choke assembly, production valve block assembly, flowline connector assembly
may all form sub-sections within the data book.
Material Certificates
Sub-supplier Certificate of Conformance
Hardness Test Report
Impact Test Report
Heat Treatment Report
NDE Report (DPI, MPI, UT and Radiographic) including calibration records
Micro Structure Report (if applicable)
Pitting Corrosion Report (if applicable)
Dimension Inspection Report
Weld Overlay Thickness Report (if applicable)
Coating Report and Coating Warranty from Supplier
WPQR
Weld Record/Weld Map
PMI (Positive Material Identification) Report/Record
Weight Record
Hydrostatic Test Report
Gas Test Report (if applicable)
FAT Record
SIT Record
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 25 of 29
C4.4 Data Book 4 – Installation Operating and Maintenance Manual
This data book shall provide a detailed description of the following:-
Preservation, Storage and Transport of the equipment
Installation and commissioning of the equipment
Operation and Maintenance of the Equipment
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 26 of 29
Appendix D: Metocean Data
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 27 of 29
Appendix E: Subsea Control Module
03
03
03
03
03
Proprietary informationThis document contains Aker Subsea legal entity proprietary and confidential information that is legally privileged and is intended only for the person or entity to which it is addressed and any unauthorised use is strictly prohibited.
It is provided for limited purpose and shall not be reproduced, stored electronically, transferred to other documents, disseminated or disclosed to any third parties without the prior written consent of the relevant Aker Subsea legal entity. Any attachments are subject to the specific restrictions and confidentiality regulations stated therein and shall be treated accordingly.
The document is to be returned upon request and in all events upon completion of use for which it was provided.
UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN MILLIMETRESALL STANDARDS REFERRED TO SHALL BE THE CURRENT ISSUE
TM
part of Aker
AkerSolutions
A1
Initiated IFC
03
25.05.2010
10000878428
COUTTS, GRAEME
10096095
SEE BOM FOR MATERIALS
COUTTS, GRAEME
Title
Modified by
Checked by
Approved by
Originator
Material no. (part)
Material spec.
Document no.
Release date
Doc. ver.
Reason for issue
ECO no.
Size Sheet no.
SUBSEA CONTROL MODULEGA/IFACE
Plant
121Est. weight
820
1103
1602 (
MIN
)
60°
402 (
ES
TIM
AT
ED
C O
F G
)
A
E E
LIFTING PADEYES TO SUIT 7/8" PIN4.75 TONNE SWL SHACKLE TO
US FEDERAL SPECIFICATIONRR-C-271D TYPE IVA CLASS 3
4 POSNS
N2 PRECHARGE120 BARG
N2 PRECHARGE400 BARG
10-20mmHIGH
CHARACTERS
200
MAX SLING ANGLEBETWEEN DIAGONALLYOPPOSITE LEGS
SEM
LP SUPPLYACCUMULATOR
HP SUPPLYACCUMULATOR
810-20mm HIGHCHARACTERS
8
10-20mm HIGHCHARACTERS
SHEET 2
26
2443 17
6924
69 24
8
8
SHEET 3
370
680
1195
B
03
03
03
03
03
03
03
DETAIL F
3127EARTH POINTM12 - 19 A/F
1
2
3
456
7
8
910
1112
1
2
6057 28
20
2422
25
21
28
S1 S3 S7
23
26
xxxkg FRONT
10
23
40-60 WIDE
8
4 POSNS
2
S6
RET
LP
8
81
82
2
2 4
814
815
9
SHEET 3
56 572
28
2 POSNS
3
32
3
3
8
47
SCSSV
8
81
CIV-2
RATIO2.5:1
8
MAxxx 10
47
822
570 (ESTIMATED C OF G)
334 (
ES
TIM
AT
ED
C O
F G
)
03
0303
03
03
VENT
152 POSN
41 42 432 4
26
26
8
29
542
23
2323
23
DETAIL F
3336
RELIEF/DRAIN
37
2
2
TORQUE TABLEM6 A4/70 OR A4/80 7NmM8 A4/70 OR A4/80 17Nm
M10 A4/70 OR A4/80 33NmM12 A4/70 OR A4/80 57NmM16 A4/70 OR A4/80 140NmM20 A4/70 OR A4/80 270Nm
C
B
A
D
E
1 6 742 3 5 8 9 10 11 12 13 14 15 16
F
G
H
I
J
K
L
2 1065 127 91 143 13 16154 118
I
F
D
L
B
C
H
G
J
E
K
A
1 of 3
NOTES
1 TIGHTENING TORQUES FOR ALL THREADED FASTENERS TO BE AS FOLLOWS UNLESS OTHERWISE STATED
2 ESTIMATED WEIGHT IN AIR (OIL FILLED) 1180KgESTIMATED WEIGHT IN WATER (OIL FILLED) 850Kg
3 APPLY GASKET COMPOUND ITEM 103 TO MATING FLANGE FACESIN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.DO NOT ALLOW COMPOUND TO CONTACT 'O' RING SEAL
4 NPT FITTINGS TO BE ASSEMBLED USING HYDRAULIC SEALANTITEM 104 APPLIED TO MALE THREADS ONLY
5 FOR RELEVANT WELD, INSPECTION AND NDT SPECIFICATIONSREFER TO DOCUMENT ON BOM HEADER
6 WELD SYMBOLS TO BS EN 22553
7 PAINT WELD & DAMAGED AREAS IN ACCORDANCE WITH PAINTSPECIFICATION SHOWN ON BOM HEADER
8 BLACK PAINT STENCIL CHARACTERS 20/30mm HIGH UNLESSOTHERWISE STATED AS SHOWN USING ITEMS 107 & 108 INACCORDANCE WITH SPEC ON BOM HEADER
9 WEIGH COMPLETED ASSEMBLY AFTER OIL FILL & BLACK PAINTSTENCIL WEIGHT IN 30/50mm HIGH CHARACTERS AS SHOWNUSING ITEMS (107 & 108) IN ACCORDANCE WITH SPEC ON BOMHEADER
10 BLACK PAINT 'FRONT' & 'BACK' WHERE SHOWN & MODULE ADDRESS IN INDICATED AREA IN 30/50mm HIGH CHARACTERS USING ITEMS (107 & 108) IN ACCORDANCE WITH SPEC ON BOM HEADER
11 FOR QSP. SEE PROJECT QUALITY PLAN ON TOP ASSEMBLY BOM
12 SPARINGLY COAT 'O' RINGS WITH GREASE ITEM 102
13 APPLY GREASE (ITEM 102) TO CONTACTING SURFACE AND STEMBARREL SEAL OF BLADDER
14 DIMENSIONS ARE NOMINAL UNLESS OTHERWISE STATED & MUSTNOT BE CHANGED WITHOUT CLIENT AGREEMENT
15 MARK NAME AND LOAD PLATE WITH RELEVANT INFORMATION(METAL STAMP 4mm HIGH CHARACTERS)
16 ALL THREADED FASTENERS TO BE ASSEMBLED USING LOCKINGCOMPOUND ITEM 105
17 ENSURE SOUND ELECTRICAL CONTACT BETWEEN SEM (ITEM 2) AND HYDRAULIC SUB-ASSEMBLY (ITEM 1) (<0.1 OHM)
18 SCM WIRING TO BE MADE IN ACCORDANCE WITH ELECTRICALSCHEMATIC USING ITEMS IDENTIFIED ON SCM WIRINGCONSUMABLES ITEM 100
19 AFTER PAINTING ENSURE A SOUND (<0.1 OHM) ELECTRICAL CONTACT EXISTS BETWEEN EXTERNALLY FASTENED COMPONENTS. CONTINUITY MUST BE ASSURED WHEN ASSEMBLED TO MOUNTING BASE (0.5 OHM MAX)
20 PROTECTIVE CAPS & COVERS TO BE FITTED AT ALL TIMES
21 CATHODIC PROTECTION TO BE PROVIDED BY OTHERS
22 SURFACE AREAS :CARBON STEEL - PAINTED -5.3mST. STEEL - UNPAINTED 2.4m
23 BLACK PAINT AREA INDICATED USING ITEMS 107 & 108 IN ACCORDANCE WITH SPEC ON BOM HEADER
24 ENSURE SIGNED ACCUMULATOR PRE-CHARGE WARNING LABEL(ITEM 69) IS FITTED (USING APPROPRIATE CABLE TIES)
25 OIL FILL USING ITEM 106 IN ACCORDANCE WITH PROCEDURESHOWN ON BOM HEADER
26 DENOTES ESTIMATED CENTRE OF GRAVITY
27 LIBERALLY COAT THREADS OF EARTH SCREW WITH COPPERPASTE ITEM 114
2
03
03
Proprietary informationThis document contains Aker Subsea legal entity proprietary and confidential information that is legally privileged and is intended only for the person or entity to which it is addressed and any unauthorised use is strictly prohibited.
It is provided for limited purpose and shall not be reproduced, stored electronically, transferred to other documents, disseminated or disclosed to any third parties without the prior written consent of the relevant Aker Subsea legal entity. Any attachments are subject to the specific restrictions and confidentiality regulations stated therein and shall be treated accordingly.
The document is to be returned upon request and in all events upon completion of use for which it was provided.
TM
part of Aker
AkerSolutions
A1
Initiated IFC
03
25.05.2010
10000878428
COUTTS, GRAEME
10096095
SEE BOM FOR MATERIALS
COUTTS, GRAEME
Title
Modified by
Checked by
Approved by
Originator
Material no. (part)
Material spec.
Document no.
Release date
Doc. ver.
Reason for issue
ECO no.
Size Sheet no.
SUBSEA CONTROL MODULEGA/IFACE
Plant
121Est. weight
03
C
C
DETAIL G
48 3
54 746
TORQUETO 15Nm
3 4343
1314878889
13
4
3
11
72
78 79 84
30
3
BACK
10
5 7 29
VIEW ON ARROW ASHEET 1
955 952 948 940 z5
03
03
03
03
D
D
FILL RELIEF/DRAIN
EARTHPOINT
8
10-20mm HIGHCHARACTERS2 POSNS
28 56572
S2 S4 S5
8
XMTRET
8
8 10-20mm HIGH
81 24 204 3
47
47
47
SECTION D-D
40913
TORQUETO 1Nm
272
34
PART SECTION C-C
58
DETAIL G
33 35
FILL
3 POSNS
3 POSNS
3 POSNS
HYDRAULIC COUPLING DETAILS
COUPLING DESIGNATION
KEY ANGLE
FUNCTION
1-10 STABPLATEREFER TO HFD ON BOM HEADER FOR DETAILS
11 54 CIV-2
12 36 HP FUNCTION (SCSSV)
RET 72 RETURN LINE
XMT-RET 72 RETURN LINE
LP 54 LP SUPPLY
ELECTRICAL CONNECTOR DETAILS
S1 POWER & SIGNAL INPUT
S2 PPT
S3 FPTT
S4 APT
S5 CPI
S6 SAND
S7 FSM
C
B
A
D
E
1 6 742 3 5 8 9 10 11 12 13 14 15 16
F
G
H
I
J
K
L
2 1065 127 91 143 13 16154 118
I
F
D
L
B
C
H
G
J
E
K
A
2 of 3
NOTES:CONTINUED FROM SHEET 1
28 DRILL HOLES 2.15 x 10 DEEP MAX AS REQUIRED & FASTENLABELS WHERE SHOWN APPLY EPOXY ADHESIVE (ITEM 59) TOREAR FACE OF LABELS AND TO DRIVE SCREWS (ITEM 57)
29 ENSURE VENT PORT IS POSITIONED AS SHOWN ON PLAN VIEWBEFORE WELDING
30 REDUCE LENGTH OF BLADDER STEM IF NECESSARY
31 DIVER ACCESS AREA
32 APPLY SEALING COMPOUND (ITEM 101) BETWEEN CONNECTOR ISOLATING WASHER AND SCM WELDMENT
2
03
Proprietary informationThis document contains Aker Subsea legal entity proprietary and confidential information that is legally privileged and is intended only for the person or entity to which it is addressed and any unauthorised use is strictly prohibited.
It is provided for limited purpose and shall not be reproduced, stored electronically, transferred to other documents, disseminated or disclosed to any third parties without the prior written consent of the relevant Aker Subsea legal entity. Any attachments are subject to the specific restrictions and confidentiality regulations stated therein and shall be treated accordingly.
The document is to be returned upon request and in all events upon completion of use for which it was provided.
TM
part of Aker
AkerSolutions
A1
Initiated IFC
03
25.05.2010
10000878428
COUTTS, GRAEME
10096095
SEE BOM FOR MATERIALS
COUTTS, GRAEME
Title
Modified by
Checked by
Approved by
Originator
Material no. (part)
Material spec.
Document no.
Release date
Doc. ver.
Reason for issue
ECO no.
Size Sheet no.
SUBSEA CONTROL MODULEGA/IFACE
Plant
121Est. weight
340
330
154.1NOMINAL I.D. 03
VIEW ON ARROW BSHEET 1
SHOWING MOUNTING PLATE GUIDE POSITION
PART SECTION E-E
TEST
VENT EA
RT
H
202 203
201
SHEET 1
312
32
1420
600
600
2310
600
206WITHDRAWAL
DISTANCE
31
31VIEW SHOWING
DIVER ACCESS AREA
TORQUE DATA
A/F SIZE (mm)INSTALLATION TORQUE (Nm)
MAXTORQUE (Nm)
STAB PLATE 35 500 750
DIVER MATE COUPLINGS 41 120 120
TRONIC DIVERMATE COUPLERS N/A 20 20
SCM MOUNTING PLATE 36 400 400
C
B
A
D
E
1 6 742 3 5 8 9 10 11 12 13 14 15 16
F
G
H
I
J
K
L
2 1065 127 91 143 13 16154 118
I
F
D
L
B
C
H
G
J
E
K
A
3 of 32
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 28 of 29
Appendix F: Xmas Tree Schematic
FIG 1 -TREE SCHEMATIC
AMV
THAV (SHUTTLE)
ASV 1
ASV 2
XOV
THAV-C
THAV-O SCSSV
PMV
TCL
PWV
TCU
TCTV
FIV
PCV
FPTT 1
APT PPTT
UC
P
LC
P
MIV
CIV2
SA
ND
DE
TE
CT
OR
8” FLOWLINE
TC
L
T
CU
TH
AV
-C
TH
AV
-O
P
MV
AM
V
A
SV
-1
A
SV
-2
X
OV
TC
TV
TC
TV
S
P
WV
S
CS
SV
BRIDGING PLATE
SCSSV
THAV-C
THAV-O
PMV
AMV
XOV
PWV
R
R
R
MEG/CI
MEG+CI
BULKHEAD PLATE
SCM
LP
AC
CIM
UL
AT
OR
HP INTENSIFIER
CIV 1 PWR/COMMS
LP SUPPLY
RETURN
R
5-1/8” 10K BX169
7-1/16” 10K BX156
6” FLOWSPOOL
RE
T
RE
TU
RN
AC
C
AMV
XOV
PMV
ASV-1
ASV-2
PWV
MIV
CIV
TCTV
Retu
rn S
ide o
f A
ctuate
d T
ree
Valv
es m
anifold
ed t
o
A
ccum
ula
tor
Bottle
RE
T
R
R
R
R
FC
L
F
CU
FCL
FCU
CIV1
CI
CIV 3
7-1/16” 10K BX156 BEL SPLIT GATE VALVE
7-1/16” 10K BX156 OLIVER DBB SANDWICH VALVE
FDV
R
7-1/16” 10K BX156
BLIND FLANGE
X 2-OFF
1st END TIE-IN
2nd
END
TIE-IN
FPTT 2
4-PIN ELECTRICAL JUMPER (CONTROLS VENDOR SCOPE OF SUPPLY)
DOUBLE BLOCK AND BLEED VALVE
0.5” NB CHEMICAL INJECTION VALVE, FAILSAFE CLOSE C/W NON-RETURN VALVE, 3/4" MP SERIES FEMALE TUBING PREP, MANUAL OVERRIDE INCLUDED
TUBING DETAILS :-
3/8” OD x 0.065” WT STAINLESS STEEL, 316 L COLD WORKED (REQUIRED MWP = 3,000 PSI)
Tree Vendor to specify tubing size and material, (Material to be in accordance with ISO15156) (REQUIRED MWP = 11,500 PSI)
3/4” OD x 0.438” ID STAINLESS STEEL, 316 COLD WORKED, MEDIUM PRESSURE SERIES (REQUIRED MWP = 6,500 PSI)
0.5” OD POLYAMIDE 11 – ATOCHEM P40 TLO (NYLON) (CONTROLS VENDOR SCOPE OF SUPPLY)
Tree Vendor to specify tubing size and material, (Material to be in accordance with ISO15156) (REQUIRED MWP=6,500 PSI)
KEY DIAGRAM
ELECTRICAL JUMPER DETAILS:-
VALVE DETAILS DETAILS:-
0.5” NB GATE VALVE, FAILSAFE CLOSE C/W MANUAL OVERRIDE
2-1/16” NB GATE VALVE, FAILSAFE CLOSE C/W LINEAR OVERRIDE
5-1/8” NB GATE VALVE, FAILSAFE CLOSE C/W LINEAR OVERRIDE
R ROV OPERATED NEEDLE VALVE
R
5-1/8” ROV OPERATED GATE VALVE
R
7-1/16” 10K ROV OPERATED SPLIT WEDGE GATE VALVE
MANUALLY OPERATED NEEDLE VALVE
PRESSURE CONTAINING BLIND FLANGE
SWEEP Tree System Specification: SWP-67-SH-0001 Revision A05: 12/12/2013
Page 29 of 29
Appendix G: Hydraulic/Electrical Distribution Diagrams
PCV
6” FLOWSPOOL HYDRAULIC
BRIDGING PLATE
FIG 2 – SINGLE WELL CONTROLS DISTRIBUTION
To R
etu
rn S
ide o
f
Actu
ate
d T
ree
Valv
es
OLIVER DBB VALVE
8” F
LO
WL
INE
CHEMICAL INJ. BULKEHEAD
12 CORE HYDRAULIC JUMPER
CHEMICAL INJ. SUPPLY HOSE – 3 OFF
ELECTRICAL DISTRIBUTION FOR TREE SENSORS
UMBILICAL
BUTA
CONTROL MODULE
CP
I / A
PT
P
PT
T
FP
TT
1
RE
TU
RN
F
PT
T 2
MA
ST
ER
V
AL
VE
A
SS
Y
SAND DETECTOR
ELECTRICAL JUMPER POWER/COMMS
HYDRAULIC JUMPERS
2-OFF (LP SUPPLY,
RETURN)
BLIND FLANGE
7-1/16” SPLIT GATE VALVE
PCV UM
BIL
ICA
L
6” FLOWSPOOL
HYDRAULIC BRIDGING PLATE
BU
TA
FIG 3 – DAISY CHAIN WELL CONTROLS DISTRIBUTION
To R
etu
rn S
ide o
f
Actu
ate
d T
ree
Valv
es
OLIVER DBB VALVE
8” F
LO
WL
INE
CHEMICAL INJ. BULKEHEAD
12 CORE HYDRAULIC JUMPER
CHEMICAL INJ. SUPPLY HOSE – 3 OFF
ELECTRICAL DISTRIBUTION FOR TREE SENSORS
UMBILICAL
BUTA
CONTROL MODULE
CP
I / A
PT
P
PT
T
FP
TT
1
RE
TU
RN
F
PT
T 2
MA
ST
ER
V
AL
VE
A
SS
Y
SAND DETECTOR
8” F
LO
WL
INE
ELECTRICAL JUMPER POWER/COMMS
HYDRAULIC JUMPERS
2-OFF (LP SUPPLY,
RETURN)
7-1/16” SPLIT GATE VALVE