19
© Canon Inc. © M. Nishiguchi/SENAUN Ships of the world : Sagres II : Assembly Instructions Assembly Instructions Mountain fold(dotted line) Make a mountain fold. Valley fold(dashed and dotted line) Make a valley fold. Scissors line(solid line) Cut along the line. Cut in line(solid line) Cut along the line. Glue spot(Red dot) Glue parts with the same number together. Glue spot(Green dot) Glue within the same part. Glue spot(Blue dot) Glue to the rear of the other part. Glue The glue spot(colored dot) shows where to apply the glue. Tools and materials Assembly tip Caution Scissors, set square, glue(We recommend stick glue), pencil, used ballpoint pen, toothpicks, tweezers, (useful for handling small parts) Before gluing, crease the paper along mountain fold and valley fold lines and make sure rounded sections are nice and stiff. Glue, scissors and other tools may be dangerous to young children so be sure to keep them out of the reach of young children. View of completed model Assembly Instructions : Six A4 sheets (No. 1 to No. 6) *Hint: Trace along the folds with a ruler and an exhausted pen (no ink) to get a sharper, easier fold. * Build the model by carefully reading the Assembly Instructions , in the parts sheet page order. * This model was designed for Papercraft and may differ from the original in some respects. Bow pointed to the right (A - standard parts) Bow pointed to the left (B - optional parts) Indicates sections that should be glued first, then cut out. Indicates sections that should be folded once, then unfolded. Indicates where sections should be glued together. Indicates where to insert sections. Do not glue the sections together. After folding the part once and gluing the two folds together, cut out from the yellow area. Glue part 2 together in the same way. http://www.canon.com/c-park/en/ Before starting assembly : Writing the number of each section on its back side before cutting out the sections is highly recommended. (* This way, you can be sure which section is which even after cutting out the sections.) The parts used will vary somewhat, depending on whether the completed vessel will be modeled to depict a ship facing wind from the left (with the bow pointed to the right) or from the right (with the bow pointed to the left). First decide where you want to display the completed vessel, then decide whether the bow should point to the left or right.

Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUNShips of the world : Sagres II : Assembly Instructions

Assembly InstructionsMountain fold(dotted line)Make a mountain fold.

Valley fold(dashed and dotted line)Make a valley fold.

Scissors line(solid line)Cut along the line.

Cut in line(solid line)Cut along the line.

Glue spot(Red dot)Glue parts with the same number together.

Glue spot(Green dot)Glue within the same part.

Glue spot(Blue dot)Glue to the rear of the other part.

GlueThe glue spot(colored dot)shows where to apply the glue.

Tools and materials

Assembly tip

Caution

Scissors, set square, glue(We recommend stick glue), pencil, usedballpoint pen, toothpicks, tweezers, (useful for handling small parts)

Before gluing, crease the paper along mountain fold and valley fold lines and make sure rounded sections are nice and stiff.

Glue, scissors and other tools may be dangerous to young children so be sure to keep them out of the reach of young children.

View of completed model

Assembly Instructions : Six A4 sheets (No. 1 to No. 6)

*Hint: Trace along the folds with a ruler and an exhausted pen (no ink) to get a sharper, easier fold.

* Build the model by carefully reading the Assembly Instructions , in the parts sheet page order.

* This model was designed for Papercraft and may differ from the original in some respects.

Bow pointed to the right (A - standard parts)

Bow pointed to the left (B - optional parts)

Indicates sections that should be glued first, then cut out.

Indicates sections that should be folded once, then unfolded.

Indicates where sections should be glued together.

Indicates where to insert sections. Do not glue the sections together.

After folding the part once and gluing the two folds together, cut out from the yellow area. Glue part 2 together in the same way.

http://www.canon.com/c-park/en/

Before starting assembly : Writing the number of each section on its back side before cutting out the sections is highly recommended. (* This way, you can be sure which section is which even after cutting out the sections.) The parts used will vary somewhat, depending on whether the completed vessel will be modeled to depict a ship facing wind from the left (with the bow pointed to the right) or from the right (with the bow pointed to the left). First decide where you want to display the completed vessel, then decide whether the bow should point to the left or right.

Page 2: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUNShips of the world : Sagres II : Assembly Instructions

(bow pointed to the right) or (bow pointed to the left; optional part) After folding this part, unfold and cut out from the cream-colored area.

Parts , ,Glue the rear sides of these parts together.

Insert until the corners meet.

Curl part 18 by wrapping it around a thin stick (such as a toothpick).

Part

Page 3: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUNShips of the world : Sagres II : Assembly Instructions

Glue these parts together.

Cut away the yellow area. Cut away this area for part 46 in the same way.

Glue the rear sides of these parts together.

Page 4: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUNShips of the world : Sagres II : Assembly Instructions

Curl part 33 by wrapping it around a thin stick (such as a toothpick).

Page 5: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUNShips of the world : Sagres II : Assembly Instructions

Parts

PartsAs shown in the illustration, use A parts (standard parts) for parts 42 - 44 when the bow will face to the right and B parts (optional parts) when the bow will face to the left.

Fold once and glue the folds together, then give the sails a bulging appearance. If you plan to have the bow face to the right, curl the sails so that surface A will bulge out. If the bow will face to the left, curl the sails so that surface B will bulge out.

For parts 69 - 71, choose A parts (standard parts) or B parts (optional parts) depending on the direction in which the bow will point.

Attach parts 59 - 63 (the yards) to the vessel masts. If the bow will point to the right, attach the yards so that surface A is on top.

If the bow will face to the left, attach so that surface B is on top. Glue the yards in place at an angle, as shown in the illustration,

so that the model will resemble a ship sailing in the wind.

Surface A on top (bow pointed to the right)

Surface B on top (bow pointed to the left)

Page 6: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUNShips of the world : Sagres II : Assembly Instructions

Parts

After folding parts 64 - 68 (the square sails) in two and gluing them, cut out the yellow guides. After curling these from top to bottom as shown in the illustration, make them curl from the center to the outside, to make it appear as if they are catching the wind.

Glue the rear sides of these parts together.

Finished!

Portuguese vesselSagres II

Portuguese vessel

Sagres II

Portuguese vesselSagres II

Page 7: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

View of completed model

Ships of the world : Sagres II

Parts list (pattern) : Thirteen A4 sheets (No. 1 to No. 13)

No. of Parts : 111 (Including seven optional parts)* Build the model by carefully reading the Assembly Instructions , in the parts sheet page order.

Built in 1937 by Blohm & Voss in Hamburg, Germany, the Sagres II began life as a German Navy training vessel known as the Albert Leo Schlageter. Damaged in World War II, she was subsequently confiscated by the United States and given to Brazil, where she served through 1961 as a training vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the training vessel Sagres II, a role that continues through today. Her name comes from the Sagres Cape, the site of the world's first marine school, established by Prince Henry the Navigator in the 15th century. Its sails feature the Cross of Malta, which was emblazoned on sails of Portuguese vessels during the Age of Discovery.

Sagres II : built in 1937; 1725 tons; three masts; bark; 89.5 m total length; Portugal

* This model was designed for Papercraft and may differ from the original in some respects.

© Canon Inc. © M. Nishiguchi/SENAUN

http://www.canon.com/c-park/en/

Ships of the world : Sagres II : Pattern

Page 8: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Cut out after first folding and gluing in place.

Page 9: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Cut out after first folding and gluing in place.

A -

Stan

dard

par

t (bo

w p

oint

ed to

the

right

)

Fold

, the

n cu

t out

. (

Fol

d on

ce, t

hen

unfo

ld w

ithou

t glu

ing

the

two

fold

s to

geth

er.)

Page 10: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Fold

, the

n cu

t out

. (

Fol

d on

ce, t

hen

unfo

ld w

ithou

t glu

ing

the

two

fold

s to

geth

er.)

Page 11: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Fold

, the

n cu

t out

. (

Fol

d on

ce, t

hen

unfo

ld w

ithou

t glu

ing

the

two

fold

s to

geth

er.)

A - Standard part (bow pointed to the right)

Page 12: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Page 13: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Cut out after first folding and gluing in place.

Page 14: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

If p

oint

ing

the

bow

to th

e rig

ht, c

url t

his

pie

ce so

that

surfa

ce A

face

s out.

If po

intin

g th

e bo

w to

the

left,

curl

this

piec

e so

that

surfa

ce B

face

s out.

If p

oint

ing

the

bow

to th

e rig

ht, c

url t

his

pie

ce so

that

surfa

ce A

face

s out.

If po

intin

g th

e bo

w to

the

left,

curl

this

piec

e so

that

surfa

ce B

face

s out.

If p

oint

ing

the

bow

to th

e rig

ht, c

url t

his

pie

ce so

that

surfa

ce A

face

s out.

If po

intin

g th

e bo

w to

the

left,

curl

this

piec

e so

that

surfa

ce B

face

s out.

If po

intin

g th

e bo

w to

the

right

, cur

l thi

s pi

ece

so th

at su

rface

A fa

ces o

ut.If

poin

ting

the

bow

to th

e lef

t, cu

rl th

is pi

ece

so th

at su

rface

B fa

ces o

ut.

Cut

out

afte

r firs

t fol

ding

an

d gl

uing

in p

lace

.

Cut

out

afte

r firs

t fol

ding

an

d gl

uing

in p

lace

.

Cut

out

afte

r firs

t fol

ding

an

d gl

uing

in p

lace

.

Cut

out

afte

r firs

t fol

ding

an

d gl

uing

in p

lace

.

If pointing the bow to the right, curl this piece so that surface A faces out.If pointing the bow to the left, curl this piece so that surface B faces out.

Cut out after first folding and gluing in place.

Page 15: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

If

poi

nting

the

bow

to th

e rig

ht,

cu

rl thi

s piec

e so

that

surfa

ce A

fa

ces o

ut. If

poi

nting

the

bow

to th

e lef

t, cu

rl thi

s piec

e so

that

surfa

ce B

face

s out.

I

f poi

nting

the

bow

to th

e rig

ht, cu

rl thi

s

piec

e so

that

surfa

ce A

face

s out.

If

point

ing th

e bo

w to

the

left,

curl

this p

iece

so th

at su

rface

B fa

ces o

ut.

If po

inting

the

bow

to th

e rig

ht, cu

rl thi

s pi

ece

so th

at su

rface

A fa

ces o

ut.

If po

inting

the

bow

to th

e lef

t, cu

rl thi

s piec

e so

that

surfa

ce B

face

s out.

If po

inting

the

bow

to th

e rig

ht, cu

rl thi

s piec

e so

that

surfa

ce A

face

s out.

If

point

ing th

e bo

w to

the

left,

curl

this p

iece

so th

at su

rface

B fa

ces o

ut.

Cut

out

afte

r firs

t fol

ding

an

d gl

uing

in p

lace

.

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Cut

out

afte

r firs

t fol

ding

a

nd g

luin

g in

pla

ce.

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

If pointing the bow to the right, curl this piece so that surface A faces out. If pointing the bow to the left, curl this piece so that surface B faces out.

Cut out after first folding and gluing in place.

Cut out after first foldingand gluing in place.

A - Standard part(bow pointed to the right)

Page 16: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Cut out after first foldingand gluing in place.

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

A - Standard part(bow pointed to the right)

B (B

on

top:

bow

poi

nted

to th

e lef

t)

A (A on top: bow pointed to the right)

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

B (B

on

top:

bow

poi

nted

to th

e lef

t)B

(B o

n to

p: b

ow p

ointe

d to

the

left)

A (A on top: bow pointed to the right)

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

B (B

on

top:

bow

poi

nted

to th

e lef

t)

A (A on top: bow pointed to the right)

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

B (B

on

top:

bow

poi

nted

to th

e lef

t)

A (A on top: bow pointed to the right)

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

B (B

on

top:

bow

poi

nted

to th

e lef

t)

A (A on top: bow pointed to the right)

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

B (B

on

top:

bow

poi

nted

to th

e lef

t)

A (A on top: bow pointed to the right)

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

A (A on top: bow pointed to the right)

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

B (B

on

top:

bow

poi

nted

to th

e lef

t)

A (A on top: bow pointed to the right)

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

B (B

on

top:

bow

poi

nted

to th

e lef

t)

A (A on top: bow pointed to the right)

Fold

, the

n cu

t out.

(Unf

old

with

out g

luing

the

two

fold

s tog

ethe

r.)

B (B

on

top:

bow

poi

nted

to th

e lef

t)

A (A on top: bow pointed to the right)

Page 17: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Cut out after first folding and gluing in place.

Cut out after first folding and gluing in place.

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Cut

out

afte

r firs

t fol

ding

and

glu

ing

in p

lace

.

Page 18: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Cut out after first folding and gluing in place.

A - Standard part (bow pointed to the right)

© M

. Nishiguchi/S

EN

AU

N

Do not hit other people w

ith the pointed edges.D

oing so could result in injury.A

dults should make sure that children observe this caution.

CA

UT

ION

http://w

ww

.canon.com/c-p

ark/en/

Portu

gues

e ve

ssel

Sagr

esII

Page 19: Ships of the world : Sagres II : Assembly Instructions M ... bouwplaat zeilschip.pdftraining vessel under the name Guanabara. Following a sale to the Portuguese Navy, she became the

© Canon Inc. © M. Nishiguchi/SENAUN

Ships of the world : Sagres II : Pattern

Cut out after first folding and gluing in place.

Cut out after first folding and gluing in place.

Cut out after first folding and gluing in place.

B - optional part (bow pointed to the left)

B - optional part (bow pointed to the left)

B - optional part (bow pointed to the left)

Fold

, the

n cu

t out

. (

Fol

d on

ce, t

hen

unfo

ld w

ithou

t glu

ing

the

two

fold

s to

geth

er.)

B - optional part (bow pointed to the left)

B - o

ptio

nal p

art (

bow

poi

nted

to th

e le

ft)