Shri. M. Prasada RaoIRSEE
Senior Divisional Electrical Engineer
Secunderabad Division
South Central Railway
Brief introduction
The Passenger Reservation complex located at Secunderabad was built in the year1989, PRS houses important servers where the disaster recovery servers areinstalled for replicating of online information of the entire ticketing system onIndian Railway.
The PRS Application CONCERT (Country-wide Network of Computerized EnhancedReservation and Ticketing) is the world’s largest online reservation application,developed and maintained by CRIS.
PRS provides reservation services to nearly 1.5 to 2.2 million passengers a day onover 2500 trains running throughout the country.
The system currently operates from 5 Data centres located at New Delhi, Kolkata, Mumbai, Chennai & Secunderabad.
The server clusters are connected together by a core network that enables universal terminals across country, through which the travelling public can reserve a berth on any train, between any pair of station for any date and class
Brief introduction
10
12
14
16
18
20
22
Consumption(KWH)
20
.80
18
.8
14
.1
x La
kh
2017-18
2018-19
2019-20
Consumption has reduced by 32.16% from 2017-18 to 2019-20
Energy Scenario
530.6
478.8
359.8
0
100
200
300
400
500
6002580
2498
1943
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
SEC (KWH/KW) EPI(KWH/Sq. Mtrs)
SEC has been reduced by
24.67% from 2017-18 to
2019-20.
SEC (KWH/KW)
SEC has been reduced by
32.16% from 2017-18 to
2019-20
EPI(KWH/Sq. Mtrs)
Energy Parameters of Hyderabad Railway station building
17-18 18-19 19-20 17-18 18-19 19-20
Direct Competitors & National Benchmarking :
1.6
1.5
1.31
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
Ctrl S Data center,Gachibowli
Ctrl S Data center, Mumbai PRS Secunderabad
PUE (Power Usage Effectiveness)
Information on Competitors/National Benchmarking
Road Map to achieve Global Bench Marking
Adoption of smart energy monitoring & control.
Optimum utilization of HVAC system.
Periodical Energy auditing and Management.
Certification of building by prominent institutionsLike Bureau of Energy Efficiency.
Short Term Targets/Major En.Con projects planned FY2020-21
Replacement of 2 x 104 Ton fixed speed chiller plant with energy efficient 2 x 80 Ton VFD driven chiller plants .
Sl
NoProject Description
Savings in
kWh/AnnumInvestment in Rs. Savings in Rs.
Payback
period in years
1 2 x 80 Ton Chiller plant 47000 ₹ 60.00 Lakhs ₹ 3.90 Lakhs 15
Long Term Targets/Action plan
All the Major loads ( HVAC plants, AHU, Pumps, etc.) will be monitoredonline for early identification and rectification for avoiding equipment failures therebypromoting effective utilization of assets.
Installation of suitable On grid solar power plant (On site/off site).
• Reducing the Energy consumption by Focussing on Energy efficient
alternatives, latest advance technology for energy monitoring & optimization
of consumption.
Major En.con projects implemented in 2017-18
Sl
NoProject Description
Savings in
kWh/Annum
Investment in
Rs.
Savings in
Rs./Annum
Payback
period in
years
1 Provision of VFD drive
for AHUs 22294 ₹ 0.65 Lakh ₹ 1.82 Lakh 0.4
2 Provision of energy
efficient LED lighting
inplace of T5 fittings
8577 ₹ 0.88 Lakh ₹ 0.7 Lakh 1.3
3 Provision of VFD drive
for condenser pumps
of Chiller Plant
65350 ₹ 1.95 Lakh ₹ 5.35 Lakh 0.4
Energy Saving Projects implemented in last 3 years
4 Selection of right sizing
capacity of pumps for
cooling tower
13070 ₹ 0.20 Lakh ₹ 1.07 Lakh 0.2
5 Provision of timers &
temperature setting
4928 ₹ 0.22 Lakh ₹ 0.40 Lakh 0.5
6 Controlling of HVAC
temperature & voltage
range
108500 Nil ₹ 8.89 Lakh 0
Major En.con projects implemented in 2018-19
Energy Saving Projects implemented in last 3 years
Sl
NoProject Description
Savings in
kWh/Annum
Investment in
Rs.
Savings in
Rs./Annum
Payback
period in
years
1 Implementing preventive
maintenance schedules
15990 Nil ₹ 1.32 Lakh 0
2 Reset of chilled water &
condenser water
temperature of chiller plant
33800 Nil ₹ 2.80 Lakh 0
3 Reduction of conversion
losses (AC/DC) by
installing 3 sets of modern
energy efficient 2 x 30
KVA UPS in place of
overaged & inefficient
UPS
39600 ₹ 45 lakh ₹ 3.28 Lakh 13.7
4 Provision of APFC panel 47970 ₹ 1.1 Lakh ₹ 3.98 Lakh 0.27
Sl
NoProject Description
Savings in
kWh/Annum
Investment in
Rs.
Savings in
Rs.
Payback
period in
years
1 Provision of Occupancy
sensors
37230 ₹ 0.8 Lakh ₹ 3.98 Lakh 0.2
2 Provision of Precision AC 300000 ₹ 40 Lakh ₹ 25.2 Lakh 1.6
3 Energy savers for AC
units
23652 ₹ 2.72 Lakh ₹ 1.98 Lakh 1.4
4 Energy efficient star rated
AC units
39420 ₹ 7.2 Lakh ₹ 3.31 Lakh 2.2
5 Energy efficient LED
lighting
65700 ₹ 3.50 Lakh ₹ 5.51 Lakh 0.7
Major En.con projects implemented in 2019-20
Energy Saving Projects implemented in last 3 years
To Conserve Energy
To increase the use of Renewable energy
To reduce the energy losses.
Energy Objectives
Precision Air Conditioners
4 Nos of 10 tonPrecision AC unitsprovided instead ofSwitching ON of 104 TonChiller plant. Energy Conserved:
3.0 Lakh kWH/Annum
Energy efficient AC units
All the 18 NosAC units at areenergy efficientInverter type .
Energy Conserved:0.4LakhkWH/Annum
APFC Panels
75 KVAR APFCpanel provided formaintaining of 0.99PF. Energy Conserved0.48 lakh/Annum
Reduction of conversion
losses (AC/DC):
Modern energy efficient 2 x 30 KVA UPS in place of overaged & inefficient UPS.
Energy Conserved 0.4 lakh/Annum
Benefits achieved by implementing of
100% LED Lighting
This station hasbeen providedwith 100% LEDluminaries.
EnergyConserved:0.73LakhkWH/Annum
Provision of VFD drive for AHU
Variable frequency drive provided for AHUs to reduce the motor load as per demand requirements Energy
Conserved:0.22LakhkWH/Annum
Provision of Occupancy
sensors
Occupancy sensors provided in officers chambers for switching of lighting load & AC units as per occupancy.
Selection of right sizing capacity of
pumps for cooling tower
Replacement ofold cooling tower5 HP pump with 3HP pump.. Energy
Conserved:0.13LakhkWH/Annum
Benefits achieved by implementing of
Innovation Project - 1
Provision of Precision AC unit
Commissioning of Precision Air-Conditioners instead off switching on of 104 Ton
Comfort Air-Conditioner( water Based) during Night Time( Except Summer) .
Description of parameter Unit Value
Average consumption of 104 ton chiller plant per day kWh 1213
Average consumption of 2 x 10 Ton precision AC per day kWh 384
Average Difference consumption per day kWh 829
Percentage of savings % 68
Average monetary savings per annumRs in
Lakhs25.2
Innovative Projects Implemented
Innovation Project - 2
Reduction of conversion losses (AC/DC):
By providing 1 sets of modern energy efficient 2 x 30 KVA UPS in place of over aged & inefficient UPS. Resulting in saving of 25% of conversion losses
Description of parameter Unit Value
Average Conversion Losses of existing UPS per day kWh 192
Average Conversion Losses of modern energy efficient UPS
per daykWh 79.2
Average Difference consumption per day kWh 112.8
Percentage of savings % 58
Average monetary savings per annumRs in
Lakhs3.28
Innovative Projects Implemented
Energy Policy & Salient features
• Promoting and increasing use of Renewable energyPromoting
• Conducting energy audits and implementing allimprovement measures
Conducting
• Monitoring and review of energy performances Monitoring
• Sharing our experiences on energy conservationwith other Divisions & Zones over Indian Railways
Sharing
• Creating awareness on energy conservationamongst all employees
Awareness
Energy Policy & Salient features
GHG emissions reduced by over 30% in a period of 4 years.
GHG Mitigation
1867
1686
1267
0
200
400
600
800
1000
1200
1400
1600
1800
2000
GHG Emmisions
GHG Mitigation Trend during (2017-2020)
2017-18 2018-19 2019-20
Green Supply Chain
Use of Renewable Energy Sources
Use of Energy efficient luminaries
Use of Super Energy efficient fans
Use of Solar power for Hot Water
Use of Energy efficient Pumps
Use of sun light pipes
Performance Review Meeting regarding Energy Conservation, Posters on energy conservation
Pledge taken by employees on Energy conservation amongst staff
Team Work & Employee Involvement
We believe in adaption of Green Concepts in consultation with IGBC /CII in our
premises to significantly contribute for environmental sustainability & enhancement
of passengers experience.
Long term vision on Energy Efficiency
We are custodians of
earth by reducing carbon
emissions by implementing
Utilization of Solar Power
more and more.
Energy Efficient
appliances
By implementi
ng eco smart systems
Educating and
sensitizing the people
Awards
Passenger Reservation System complex is the only
building that bagged first prize in office building
category in National Energy conservation Awards in
two alternative years 2016 & 2018 by Ministry of
Power, Govt. of India
Awards & Achievements
Receiving first prize for the year 2018 by Hon’ble Lok sabha speaker Smt. Sumithra Mahajan
Receiving First prize fro the year 2016 by Hon’ble Minister of State, Ministry of Power, Gov. of India
Passenger Reservation Complex/ Secunderabad of SC division
has been selected for Telangana State Energy Conservation
Awards 2018 – GOLD AWARD (1st prize) presented by Hon’ble
Governor of Telangana on 20.12.2018.
Awards
Receiving First Prize(Gold) in office building category for the year 2018 from Telangana State